0% found this document useful (0 votes)
100 views2 pages

SGCSB - Site - Stay - DWG (Extradosed & Cable Stayed) - 11 - 08102018

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
100 views2 pages

SGCSB - Site - Stay - DWG (Extradosed & Cable Stayed) - 11 - 08102018

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

VSL India Pvt Ltd.

DOCUMENT LIST - SITE SUBMISSION

PROJECT NAME : GANGA SCB BETWEEN SULTANGANJ & AGUWANI GHAT


LOCATION : BIHAR

Latest Issue Date


October 8, 2018
Segment ID Document No. Latest Revision Site submission
S.No. Document Title
VSL 0/A 1/B 2/C 3/D 4/E 5/F Rev Dated
General

Foundation Drawings - Extradosed 25.5 m

1.0 _ VSL-SGCSB-CC-ED-201 Casting Cell Foundation Drawing 23-Jan-18 C 15 - 02 - 2018

2.0 _ VSL-SGCSB-CC-ED-202 Casting Cell Foundation Drawing 23-Jan-18 E 15 - 02 - 2018

3.0 _ VSL-SGCSB-CC-ED-203 Casting Cell Foundation Drawing 20-Nov-17 D 15 - 02 - 2018

4.0 _ VSL-SGCSB-CC-ED-204 Casting Cell Foundation Drawing 23-Jan-18 C 15 - 02 - 2018

5.0 _ VSL-SGCSB-CC-ED-205 Casting Cell Foundation Drawing 23-Jan-18 A 15 - 02 - 2018

6.0 _ VSL-SGCSB-CC-ED-206 Casting Cell Foundation Drawing 23-Jan-18 D 15 - 02 - 2018

7.0 _ VSL-SGCSB-CC-ED-211 Casting Cell Foundation Drawing 23-Jan-18 B 15 - 02 - 2018

8.0 _ VSL-SGCSB-CC-ED-212 Casting Cell Foundation Drawing 23-Jan-18 B 15 - 02 - 2018

9.0 _ VSL-SGCSB-CC-ED-213 Casting Cell Foundation Drawing 20-Nov-17 A 15 - 02 - 2018

10.0 _ VSL-SGCSB-CC-ED-214 Casting Cell Foundation Drawing 20-Nov-17 A 15 - 02 - 2018

11.0 _ VSL-SGCSB-CC-ED-215 Casting Cell Foundation Drawing 23-Jan-18 B 15 - 02 - 2018

12.0 _ VSL-SGCSB-CC-ED-215-1 Casting Cell Foundation Drawing 23-Jan-18 A 15 - 02 - 2018

13.0 _ VSL-SGCSB-CC-ED-216 Casting Cell Foundation Drawing 23-Jan-18 B 15 - 02 - 2018

14.0 _ VSL-SGCSB-CC-ED-601 OuterFrom General Arrangement 02-Mar-18 D 02 - 03 - 2018

15.0 _ VSL-SGCSB-CC-ED-601-1 OuterFrom General Arrangement 02-Mar-18 B 02 - 03 - 2018

16.0 _ VSL-SGCSB-CC-ED-602 OuterFrom General Arrangement 02-Mar-18 D 02 - 03 - 2018

17.0 _ VSL-SGCSB-CC-ED-605 OuterFrom General Arrangement 02-Mar-18 B 02 - 03 - 2018

18.0 _ VSL-SGCSB-CC-ED-670 OuterFrom - FORM TIE SUPPORT BEAM DETAILS 02-Mar-18 B 02 - 03 - 2018

19.0 _ VSL-SGCSB-CC-ED-673 OuterFrom - LADDER TYPE 1 DETAILS 02-Mar-18 B 02 - 03 - 2018

20.0 _ VSL-SGCSB-CC-ED-739 Inner Form - Tie Bar Details 28-Mar-18 B 28 - 03 - 2018

21.0 _ VSL-SGCSB-CC-ED-1011 Bulkhead Top slab wing form panel 15-May-18 A 15 - 05 - 2018

Assembly Checklist - Extradosed 25.5 m

1.0 _ VSL-SGCSB-CC-CL-001 Extradosed 25.5 Casting Cell Foundation Check list - VSL-SGCSB-CC-CL-001 Rev A 15-Feb-18 A 15 - 02 - 2018

2.0 _ VSL-SGCSB-CC-CL-002 Extradosed 25.5 Casting Cell -BSF Check list - VSL-SGCSB-CC-CL-002 Rev A 15-Feb-18 A 15 - 02 - 2018

3.0 _ VSL-SGCSB-CC-CL-003 Extradosed 25.5 Casting Cell - BHP 01 Check list - VSL-SGCSB-CC-CL-003 Rev A 19-Feb-18 A 19 - 02 - 2018

4.0 _ VSL-SGCSB-CC-CL-003a Extradosed 25.5 Casting Cell - BHP 01 Check list - VSL-SGCSB-CC-CL-003a Rev A 19-Feb-18 A 19 - 02 - 2018

5.0 _ VSL-SGCSB-CC-CL-004 Extradosed 25.5 Casting Cell - BHP 02 Check list - VSL-SGCSB-CC-CL-004 Rev A 19-Feb-18 A 19 - 02 - 2018

6.0 _ VSL-SGCSB-CC-CL-004a Extradosed 25.5 Casting Cell - BHP 02 Check list - VSL-SGCSB-CC-CL-004a Rev A 19-Feb-18 A 19 - 02 - 2018

7.0 VSL-SGCSB-CC-CL-005 Extradosed 25.5 Casting Cell - OF Check list - VSL-SGCSB-CC-CL-005 Rev A 22-Feb-18 A 22 - 02 - 2018

8.0 _ VSL-SGCSB-CC-CL-006 Extradosed 25.5 Casting Cell - IFT Check list - VSL-SGCSB-CC-CL-006 Rev A 19-Feb-18 A 19 - 02 - 2018

9.0 _ VSL-SGCSB-CC-CL-007 Extradosed 25.5 Casting Cell - IFP Check list - VSL-SGCSB-CC-CL-007 Rev A 15-Feb-18 A 15 - 02 - 2018

10.0 VSL-SGCSB-CC-CL-008 Extradosed 25.5 Casting Cell - TC Check list - VSL-SGCSB-CC-CL-008 Rev A 22-Feb-18 A 22 - 02 - 2018

11.0 _ VSL-SGCSB-CC-CL-009 Extradosed 25.5 Casting Cell - SF Check list - VSL-SGCSB-CC-CL-009 Rev A 15-Feb-18 A 15 - 02 - 2018

12.0 VSL-SGCSB-CC-CL-010 Extradosed 25.5 Casting Cell - IF Check list - VSL-SGCSB-CC-CL-010 Rev A 12-Apr-18

Assembly Checklist - Cable Stay

1.0 _ VSL-SGCSB-CC-CL-011 Cable Stay Casting Cell Foundation Check list - VSL-SGCSB-CC-CL-011 Rev A 12-Apr-18 A 12 - 04 - 2018

2.0 _ VSL-SGCSB-CC-CL-012 Cable Stay Casting Cell -BSF Check list - VSL-SGCSB-CC-CL-012 Rev A 12-Apr-18 A 12 - 04 - 2018

3.0 _ VSL-SGCSB-CC-CL-013 Cable Stay Casting Cell - BHP 01 Check list - VSL-SGCSB-CC-CL-013 Rev A 12-Apr-18 A 12 - 04 - 2018

5.0 _ VSL-SGCSB-CC-CL-014 Cable Stay Casting Cell - BHP 02 Check list - VSL-SGCSB-CC-CL-014 Rev A 12-Apr-18 A 12 - 04 - 2018

7.0 _ VSL-SGCSB-CC-CL-015 Cable Stay Casting Cell - OF Check list - VSL-SGCSB-CC-CL-015 Rev A 12-Apr-18 A 12 - 04 - 2018

8.0 _ VSL-SGCSB-CC-CL-016 Cable Stay Casting Cell - IFT Check list - VSL-SGCSB-CC-CL-016 Rev A 12-Apr-18 A 12 - 04 - 2018

9.0 _ VSL-SGCSB-CC-CL-017 Cable Stay Casting Cell - IFP Check list - VSL-SGCSB-CC-CL-017 Rev A 12-Apr-18 A 12 - 04 - 2018

10.0 _ VSL-SGCSB-CC-CL-018 Cable Stay Casting Cell - TC Check list - VSL-SGCSB-CC-CL-018 Rev A 12-Apr-18 A 12 - 04 - 2018

11.0 _ VSL-SGCSB-CC-CL-019 Cable Stay Casting Cell - SF Check list - VSL-SGCSB-CC-CL-019 Rev A 12-Apr-18 A 12 - 04 - 2018

12.0 _ VSL-SGCSB-CC-CL-020 Cable Stay Casting Cell - IF Check list - VSL-SGCSB-CC-CL-020 Rev A 12-Apr-18 A 12 - 04 - 2018

Form No.: 400-SFD-206 rev.1


PROJECT NAME : GANGA SCB BETWEEN SULTANGANJ & AGUWANI GHAT
LOCATION : BIHAR

Latest Issue Date


October 8, 2018
Segment ID Document No. Latest Revision Site submission
S.No. Document Title
VSL 0/A 1/B 2/C 3/D 4/E 5/F Rev Dated
Assembly Checklist - Etradosed Wide 33.5

1.0 VSL-SGCSB-CC-CL-021 Extradosed 33.5 Casting Cell Foundation Check list - VSL-SGCSB-CC-CL-001 Rev A 25-May-18 A 25 - 05 - 2018

2.0 VSL-SGCSB-CC-CL-022 Extradosed 33.5 Casting Cell -BSF Check list - VSL-SGCSB-CC-CL-002 Rev A 25-May-18 A 25 - 05 - 2018

3.0 VSL-SGCSB-CC-CL-023 Extradosed 33.5 Casting Cell - BHP 01 Check list - VSL-SGCSB-CC-CL-003 Rev A 25-May-18 A 25 - 05 - 2018

4.0 VSL-SGCSB-CC-CL-023a Extradosed 33.5 Casting Cell - BHP 01 Check list - VSL-SGCSB-CC-CL-003a Rev A 25-May-18 A 25 - 05 - 2018

5.0 VSL-SGCSB-CC-CL-025 Extradosed 33.5 Casting Cell - OF Check list - VSL-SGCSB-CC-CL-005 Rev A 25-May-18 A 25 - 05 - 2018

6.0 VSL-SGCSB-CC-CL-026 Extradosed 33.5 Casting Cell - IFT Check list - VSL-SGCSB-CC-CL-006 Rev A 25-May-18 A 25 - 05 - 2018

7.0 VSL-SGCSB-CC-CL-027 Extradosed 33.5 Casting Cell - IFP Check list - VSL-SGCSB-CC-CL-007 Rev A 25-May-18 A 25 - 05 - 2018

8.0 VSL-SGCSB-CC-CL-028 Extradosed 33.5 Casting Cell - TC Check list - VSL-SGCSB-CC-CL-008 Rev A 25-May-18 A 25 - 05 - 2018

9.0 VSL-SGCSB-CC-CL-029 Extradosed 33.5 Casting Cell - SF Check list - VSL-SGCSB-CC-CL-009 Rev A 25-May-18 A 25 - 05 - 2018

10.0 VSL-SGCSB-CC-CL-030 Extradosed 33.5 Casting Cell - IF Check list - VSL-SGCSB-CC-CL-010 Rev A 25-May-18 A 25 - 05 - 2018

Document

1.0 - VSL-SGCSB-CC-MST-006 Casting Cell - Cable Stay Bridge (Typical Srgment) Operation Manual 11-Apr-18 A 11 - 04 - 2018

2.0 - VSL-SGCSB-CC-MST-007 Casting Cell - Extradosed Bridge ( Wide Segment) Operation Manual 24-May-18 A 24 - 05 - 2018

Stay Cable Drawings - Extradosed Bridge

1.0 _ 17-057-ADW-002 Extradosed Bridge Assembly Drawing General Cable Arrangement 29-Jan-18 3 08 - 10 - 2018

2.0 _ 17-057-ADW-047 Extradosed Bridge Assembly Drawing Pylon 3 - Saddle Recess Detail 03-May-18 2 08 - 10 - 2018

3.0 _ 17-057-SDW-082 Extradosed Bridge Shop Drawing Stay Pipe & Expansion Sleeve 28-Feb-18 1 08 - 10 - 2018

4.0 _ 17-057-SDW-083 Extradosed Bridge Shop Drawing Expansion Sleeve 28-Feb-18 1 08 - 10 - 2018

5.0 _ 17-057-ADW-084 Extradosed Bridge Typical Assembly Drawing Deck - All Units 11-Jun-18 2 08 - 10 - 2018

6.0 _ 17-057-SDW-085 Extradosed Bridge Typical Assembly Drawing Pylon - All Units 09-Mar-18 1 08 - 10 - 2018

7.0 _ 17-057-SDW-086 Extradosed Bridge Shop Drawing Bearing Plate & Guide Pipe At Deck 11-Jun-18 3 08 - 10 - 2018

8.0 _ 17-057-SDW-087 Extradosed Bridge Shop Drawing Anti Vandalism Pipe 11-Jun-18 3 08 - 10 - 2018

9.0 _ 17-057-SDW-088 Extradosed Bridge Anti Bursting Reinforcement At Guide Pipe 11-Jun-18 3 08 - 10 - 2018

10.0 _ 17-057-SDW-089 Extradosed Bridge Shop Drawing Steel Disk For Pylon Connection 28-Feb-18 0 08 - 10 - 2018

11.0 _ 17-057-ADW-106 Extradosed Bridge Saddle Geometry 10-Apr-18 1 08 - 10 - 2018

12.0 _ 17-057-ADW-159 Extradosed Bridge General Arrangment Strands Pattern 09-May-18 1 08 - 10 - 2018

13.0 _ 17-057-ADW-161 Extradosed Bridge Deck Anchorage (Stressing End) Guide Deviator 11-Jun-18 2 08 - 10 - 2018

14.0 _ 17-057-ADW-162 Extradosed Bridge Pylon (Saddle) Tension Ring 08-May-18 1 08 - 10 - 2018

15.0 _ 17-057-ADW-163 Extradosed Bridge Deck Anchorage (At Stressing End) Anchorage assembly 08-May-18 1 08 - 10 - 2018

16.0 _ 17-057-SDW-167 Extradosed Bridge Shop Drawing Deck Anchorage (Stressing End) - AVP Seal 10-Sep-18 1 08 - 10 - 2018

17.0 _ 17-057-SDW-168 Extradosed Bridge Shop Drawing Pylon (Saddle) Steel Disk (Expansion Sleeve) Seal 10-Sep-18 1 08 - 10 - 2018

Stay Cable Drawings - Cable Stayed Bridge

1.0 _ 17-057-ADW-003 Cable Stayed Bridge Assembly Drawing General Cable Arrangement 10-Apr-18 2 08 - 10 - 2018

2.0 _ 17-057-SDW-090 Cable Stayed Bridge Shop Drawing Stay Pipe & Expansion Sleeve 12-Mar-18 1 08 - 10 - 2018

3.0 _ 17-057-SDW-091 Cable Stayed Bridge Shop Drawing Expansion Sleeve 12-Mar-18 1 08 - 10 - 2018

4.0 _ 17-057-SDW-092 Cable Stayed Bridge Shop Drawing Bearing Plate & Guide Pipe At Deck & Pylon Anchorage 12-Jun-18 5 08 - 10 - 2018

5.0 _ 17-057-SDW-093 Cable Stayed Bridge Shop Drawing Anti Vandalism Pipe 12-Jun-18 2 08 - 10 - 2018

6.0 _ 17-057-SDW-094 Cable Stayed Bridge Anti Bursting Reinforcement At Deck & Pylon Guide Pipe 12-Jun-18 2 08 - 10 - 2018

7.0 _ 17-057-SDW-095 Cable Stayed Bridge Shop Drawing Steel Disk For Pylon Connection 12-Apr-18 1 08 - 10 - 2018

8.0 _ 17-057-ADW-096 Cable Stayed Bridge Typical Assembly Drawing Deck - All Units 12-Jun-18 3 08 - 10 - 2018

9.0 _ 17-057-ADW-097 Cable Stayed Bridge Typical Assembly Drawing Pylon - All Units 12-Jun-18 3 08 - 10 - 2018

10.0 _ 17-057-ADW-160 Cable Stayed Bridge General Arrangment Strands Pattern 27-Apr-18 0 08 - 10 - 2018

11.0 _ 17-057-ADW-164 Cable Stayed Bridge Deck & Pylon Anchorage (Stressing End & Dead End) Guide Deviator 12-Jun-18 2 08 - 10 - 2018

12.0 _ 17-057-ADW-165 Cable Stayed Bridge Deck Anchorage (At Stressing End) Anchorage assembly 08-May-18 1 08 - 10 - 2018

13.0 _ 17-057-ADW-166 Cable Stayed Bridge Pylon Anchorage (At Dead End) Anchorage assembly 08-May-18 1 08 - 10 - 2018

14.0 _ 17-057-SDW-169 Cable Stayed Bridge Shop Drawing Deck Anchorage (Stressing End) - AVP Seal 10-Sep-18 1 08 - 10 - 2018

15.0 _ 17-057-SDW-170 Cable Stayed Bridge Shop Drawing Pylon Anchorage - Steel Disk (Guide Pipe) Seal 10-Sep-18 1 08 - 10 - 2018