VSL India Pvt Ltd.
DOCUMENT LIST - SITE SUBMISSION
PROJECT NAME : GANGA SCB BETWEEN SULTANGANJ & AGUWANI GHAT
LOCATION : BIHAR
Latest Issue Date
October 8, 2018
Segment ID Document No. Latest Revision Site submission
S.No. Document Title
VSL 0/A 1/B 2/C 3/D 4/E 5/F Rev Dated
General
Foundation Drawings - Extradosed 25.5 m
1.0 _ VSL-SGCSB-CC-ED-201 Casting Cell Foundation Drawing 23-Jan-18 C 15 - 02 - 2018
2.0 _ VSL-SGCSB-CC-ED-202 Casting Cell Foundation Drawing 23-Jan-18 E 15 - 02 - 2018
3.0 _ VSL-SGCSB-CC-ED-203 Casting Cell Foundation Drawing 20-Nov-17 D 15 - 02 - 2018
4.0 _ VSL-SGCSB-CC-ED-204 Casting Cell Foundation Drawing 23-Jan-18 C 15 - 02 - 2018
5.0 _ VSL-SGCSB-CC-ED-205 Casting Cell Foundation Drawing 23-Jan-18 A 15 - 02 - 2018
6.0 _ VSL-SGCSB-CC-ED-206 Casting Cell Foundation Drawing 23-Jan-18 D 15 - 02 - 2018
7.0 _ VSL-SGCSB-CC-ED-211 Casting Cell Foundation Drawing 23-Jan-18 B 15 - 02 - 2018
8.0 _ VSL-SGCSB-CC-ED-212 Casting Cell Foundation Drawing 23-Jan-18 B 15 - 02 - 2018
9.0 _ VSL-SGCSB-CC-ED-213 Casting Cell Foundation Drawing 20-Nov-17 A 15 - 02 - 2018
10.0 _ VSL-SGCSB-CC-ED-214 Casting Cell Foundation Drawing 20-Nov-17 A 15 - 02 - 2018
11.0 _ VSL-SGCSB-CC-ED-215 Casting Cell Foundation Drawing 23-Jan-18 B 15 - 02 - 2018
12.0 _ VSL-SGCSB-CC-ED-215-1 Casting Cell Foundation Drawing 23-Jan-18 A 15 - 02 - 2018
13.0 _ VSL-SGCSB-CC-ED-216 Casting Cell Foundation Drawing 23-Jan-18 B 15 - 02 - 2018
14.0 _ VSL-SGCSB-CC-ED-601 OuterFrom General Arrangement 02-Mar-18 D 02 - 03 - 2018
15.0 _ VSL-SGCSB-CC-ED-601-1 OuterFrom General Arrangement 02-Mar-18 B 02 - 03 - 2018
16.0 _ VSL-SGCSB-CC-ED-602 OuterFrom General Arrangement 02-Mar-18 D 02 - 03 - 2018
17.0 _ VSL-SGCSB-CC-ED-605 OuterFrom General Arrangement 02-Mar-18 B 02 - 03 - 2018
18.0 _ VSL-SGCSB-CC-ED-670 OuterFrom - FORM TIE SUPPORT BEAM DETAILS 02-Mar-18 B 02 - 03 - 2018
19.0 _ VSL-SGCSB-CC-ED-673 OuterFrom - LADDER TYPE 1 DETAILS 02-Mar-18 B 02 - 03 - 2018
20.0 _ VSL-SGCSB-CC-ED-739 Inner Form - Tie Bar Details 28-Mar-18 B 28 - 03 - 2018
21.0 _ VSL-SGCSB-CC-ED-1011 Bulkhead Top slab wing form panel 15-May-18 A 15 - 05 - 2018
Assembly Checklist - Extradosed 25.5 m
1.0 _ VSL-SGCSB-CC-CL-001 Extradosed 25.5 Casting Cell Foundation Check list - VSL-SGCSB-CC-CL-001 Rev A 15-Feb-18 A 15 - 02 - 2018
2.0 _ VSL-SGCSB-CC-CL-002 Extradosed 25.5 Casting Cell -BSF Check list - VSL-SGCSB-CC-CL-002 Rev A 15-Feb-18 A 15 - 02 - 2018
3.0 _ VSL-SGCSB-CC-CL-003 Extradosed 25.5 Casting Cell - BHP 01 Check list - VSL-SGCSB-CC-CL-003 Rev A 19-Feb-18 A 19 - 02 - 2018
4.0 _ VSL-SGCSB-CC-CL-003a Extradosed 25.5 Casting Cell - BHP 01 Check list - VSL-SGCSB-CC-CL-003a Rev A 19-Feb-18 A 19 - 02 - 2018
5.0 _ VSL-SGCSB-CC-CL-004 Extradosed 25.5 Casting Cell - BHP 02 Check list - VSL-SGCSB-CC-CL-004 Rev A 19-Feb-18 A 19 - 02 - 2018
6.0 _ VSL-SGCSB-CC-CL-004a Extradosed 25.5 Casting Cell - BHP 02 Check list - VSL-SGCSB-CC-CL-004a Rev A 19-Feb-18 A 19 - 02 - 2018
7.0 VSL-SGCSB-CC-CL-005 Extradosed 25.5 Casting Cell - OF Check list - VSL-SGCSB-CC-CL-005 Rev A 22-Feb-18 A 22 - 02 - 2018
8.0 _ VSL-SGCSB-CC-CL-006 Extradosed 25.5 Casting Cell - IFT Check list - VSL-SGCSB-CC-CL-006 Rev A 19-Feb-18 A 19 - 02 - 2018
9.0 _ VSL-SGCSB-CC-CL-007 Extradosed 25.5 Casting Cell - IFP Check list - VSL-SGCSB-CC-CL-007 Rev A 15-Feb-18 A 15 - 02 - 2018
10.0 VSL-SGCSB-CC-CL-008 Extradosed 25.5 Casting Cell - TC Check list - VSL-SGCSB-CC-CL-008 Rev A 22-Feb-18 A 22 - 02 - 2018
11.0 _ VSL-SGCSB-CC-CL-009 Extradosed 25.5 Casting Cell - SF Check list - VSL-SGCSB-CC-CL-009 Rev A 15-Feb-18 A 15 - 02 - 2018
12.0 VSL-SGCSB-CC-CL-010 Extradosed 25.5 Casting Cell - IF Check list - VSL-SGCSB-CC-CL-010 Rev A 12-Apr-18
Assembly Checklist - Cable Stay
1.0 _ VSL-SGCSB-CC-CL-011 Cable Stay Casting Cell Foundation Check list - VSL-SGCSB-CC-CL-011 Rev A 12-Apr-18 A 12 - 04 - 2018
2.0 _ VSL-SGCSB-CC-CL-012 Cable Stay Casting Cell -BSF Check list - VSL-SGCSB-CC-CL-012 Rev A 12-Apr-18 A 12 - 04 - 2018
3.0 _ VSL-SGCSB-CC-CL-013 Cable Stay Casting Cell - BHP 01 Check list - VSL-SGCSB-CC-CL-013 Rev A 12-Apr-18 A 12 - 04 - 2018
5.0 _ VSL-SGCSB-CC-CL-014 Cable Stay Casting Cell - BHP 02 Check list - VSL-SGCSB-CC-CL-014 Rev A 12-Apr-18 A 12 - 04 - 2018
7.0 _ VSL-SGCSB-CC-CL-015 Cable Stay Casting Cell - OF Check list - VSL-SGCSB-CC-CL-015 Rev A 12-Apr-18 A 12 - 04 - 2018
8.0 _ VSL-SGCSB-CC-CL-016 Cable Stay Casting Cell - IFT Check list - VSL-SGCSB-CC-CL-016 Rev A 12-Apr-18 A 12 - 04 - 2018
9.0 _ VSL-SGCSB-CC-CL-017 Cable Stay Casting Cell - IFP Check list - VSL-SGCSB-CC-CL-017 Rev A 12-Apr-18 A 12 - 04 - 2018
10.0 _ VSL-SGCSB-CC-CL-018 Cable Stay Casting Cell - TC Check list - VSL-SGCSB-CC-CL-018 Rev A 12-Apr-18 A 12 - 04 - 2018
11.0 _ VSL-SGCSB-CC-CL-019 Cable Stay Casting Cell - SF Check list - VSL-SGCSB-CC-CL-019 Rev A 12-Apr-18 A 12 - 04 - 2018
12.0 _ VSL-SGCSB-CC-CL-020 Cable Stay Casting Cell - IF Check list - VSL-SGCSB-CC-CL-020 Rev A 12-Apr-18 A 12 - 04 - 2018
Form No.: 400-SFD-206 rev.1
PROJECT NAME : GANGA SCB BETWEEN SULTANGANJ & AGUWANI GHAT
LOCATION : BIHAR
Latest Issue Date
October 8, 2018
Segment ID Document No. Latest Revision Site submission
S.No. Document Title
VSL 0/A 1/B 2/C 3/D 4/E 5/F Rev Dated
Assembly Checklist - Etradosed Wide 33.5
1.0 VSL-SGCSB-CC-CL-021 Extradosed 33.5 Casting Cell Foundation Check list - VSL-SGCSB-CC-CL-001 Rev A 25-May-18 A 25 - 05 - 2018
2.0 VSL-SGCSB-CC-CL-022 Extradosed 33.5 Casting Cell -BSF Check list - VSL-SGCSB-CC-CL-002 Rev A 25-May-18 A 25 - 05 - 2018
3.0 VSL-SGCSB-CC-CL-023 Extradosed 33.5 Casting Cell - BHP 01 Check list - VSL-SGCSB-CC-CL-003 Rev A 25-May-18 A 25 - 05 - 2018
4.0 VSL-SGCSB-CC-CL-023a Extradosed 33.5 Casting Cell - BHP 01 Check list - VSL-SGCSB-CC-CL-003a Rev A 25-May-18 A 25 - 05 - 2018
5.0 VSL-SGCSB-CC-CL-025 Extradosed 33.5 Casting Cell - OF Check list - VSL-SGCSB-CC-CL-005 Rev A 25-May-18 A 25 - 05 - 2018
6.0 VSL-SGCSB-CC-CL-026 Extradosed 33.5 Casting Cell - IFT Check list - VSL-SGCSB-CC-CL-006 Rev A 25-May-18 A 25 - 05 - 2018
7.0 VSL-SGCSB-CC-CL-027 Extradosed 33.5 Casting Cell - IFP Check list - VSL-SGCSB-CC-CL-007 Rev A 25-May-18 A 25 - 05 - 2018
8.0 VSL-SGCSB-CC-CL-028 Extradosed 33.5 Casting Cell - TC Check list - VSL-SGCSB-CC-CL-008 Rev A 25-May-18 A 25 - 05 - 2018
9.0 VSL-SGCSB-CC-CL-029 Extradosed 33.5 Casting Cell - SF Check list - VSL-SGCSB-CC-CL-009 Rev A 25-May-18 A 25 - 05 - 2018
10.0 VSL-SGCSB-CC-CL-030 Extradosed 33.5 Casting Cell - IF Check list - VSL-SGCSB-CC-CL-010 Rev A 25-May-18 A 25 - 05 - 2018
Document
1.0 - VSL-SGCSB-CC-MST-006 Casting Cell - Cable Stay Bridge (Typical Srgment) Operation Manual 11-Apr-18 A 11 - 04 - 2018
2.0 - VSL-SGCSB-CC-MST-007 Casting Cell - Extradosed Bridge ( Wide Segment) Operation Manual 24-May-18 A 24 - 05 - 2018
Stay Cable Drawings - Extradosed Bridge
1.0 _ 17-057-ADW-002 Extradosed Bridge Assembly Drawing General Cable Arrangement 29-Jan-18 3 08 - 10 - 2018
2.0 _ 17-057-ADW-047 Extradosed Bridge Assembly Drawing Pylon 3 - Saddle Recess Detail 03-May-18 2 08 - 10 - 2018
3.0 _ 17-057-SDW-082 Extradosed Bridge Shop Drawing Stay Pipe & Expansion Sleeve 28-Feb-18 1 08 - 10 - 2018
4.0 _ 17-057-SDW-083 Extradosed Bridge Shop Drawing Expansion Sleeve 28-Feb-18 1 08 - 10 - 2018
5.0 _ 17-057-ADW-084 Extradosed Bridge Typical Assembly Drawing Deck - All Units 11-Jun-18 2 08 - 10 - 2018
6.0 _ 17-057-SDW-085 Extradosed Bridge Typical Assembly Drawing Pylon - All Units 09-Mar-18 1 08 - 10 - 2018
7.0 _ 17-057-SDW-086 Extradosed Bridge Shop Drawing Bearing Plate & Guide Pipe At Deck 11-Jun-18 3 08 - 10 - 2018
8.0 _ 17-057-SDW-087 Extradosed Bridge Shop Drawing Anti Vandalism Pipe 11-Jun-18 3 08 - 10 - 2018
9.0 _ 17-057-SDW-088 Extradosed Bridge Anti Bursting Reinforcement At Guide Pipe 11-Jun-18 3 08 - 10 - 2018
10.0 _ 17-057-SDW-089 Extradosed Bridge Shop Drawing Steel Disk For Pylon Connection 28-Feb-18 0 08 - 10 - 2018
11.0 _ 17-057-ADW-106 Extradosed Bridge Saddle Geometry 10-Apr-18 1 08 - 10 - 2018
12.0 _ 17-057-ADW-159 Extradosed Bridge General Arrangment Strands Pattern 09-May-18 1 08 - 10 - 2018
13.0 _ 17-057-ADW-161 Extradosed Bridge Deck Anchorage (Stressing End) Guide Deviator 11-Jun-18 2 08 - 10 - 2018
14.0 _ 17-057-ADW-162 Extradosed Bridge Pylon (Saddle) Tension Ring 08-May-18 1 08 - 10 - 2018
15.0 _ 17-057-ADW-163 Extradosed Bridge Deck Anchorage (At Stressing End) Anchorage assembly 08-May-18 1 08 - 10 - 2018
16.0 _ 17-057-SDW-167 Extradosed Bridge Shop Drawing Deck Anchorage (Stressing End) - AVP Seal 10-Sep-18 1 08 - 10 - 2018
17.0 _ 17-057-SDW-168 Extradosed Bridge Shop Drawing Pylon (Saddle) Steel Disk (Expansion Sleeve) Seal 10-Sep-18 1 08 - 10 - 2018
Stay Cable Drawings - Cable Stayed Bridge
1.0 _ 17-057-ADW-003 Cable Stayed Bridge Assembly Drawing General Cable Arrangement 10-Apr-18 2 08 - 10 - 2018
2.0 _ 17-057-SDW-090 Cable Stayed Bridge Shop Drawing Stay Pipe & Expansion Sleeve 12-Mar-18 1 08 - 10 - 2018
3.0 _ 17-057-SDW-091 Cable Stayed Bridge Shop Drawing Expansion Sleeve 12-Mar-18 1 08 - 10 - 2018
4.0 _ 17-057-SDW-092 Cable Stayed Bridge Shop Drawing Bearing Plate & Guide Pipe At Deck & Pylon Anchorage 12-Jun-18 5 08 - 10 - 2018
5.0 _ 17-057-SDW-093 Cable Stayed Bridge Shop Drawing Anti Vandalism Pipe 12-Jun-18 2 08 - 10 - 2018
6.0 _ 17-057-SDW-094 Cable Stayed Bridge Anti Bursting Reinforcement At Deck & Pylon Guide Pipe 12-Jun-18 2 08 - 10 - 2018
7.0 _ 17-057-SDW-095 Cable Stayed Bridge Shop Drawing Steel Disk For Pylon Connection 12-Apr-18 1 08 - 10 - 2018
8.0 _ 17-057-ADW-096 Cable Stayed Bridge Typical Assembly Drawing Deck - All Units 12-Jun-18 3 08 - 10 - 2018
9.0 _ 17-057-ADW-097 Cable Stayed Bridge Typical Assembly Drawing Pylon - All Units 12-Jun-18 3 08 - 10 - 2018
10.0 _ 17-057-ADW-160 Cable Stayed Bridge General Arrangment Strands Pattern 27-Apr-18 0 08 - 10 - 2018
11.0 _ 17-057-ADW-164 Cable Stayed Bridge Deck & Pylon Anchorage (Stressing End & Dead End) Guide Deviator 12-Jun-18 2 08 - 10 - 2018
12.0 _ 17-057-ADW-165 Cable Stayed Bridge Deck Anchorage (At Stressing End) Anchorage assembly 08-May-18 1 08 - 10 - 2018
13.0 _ 17-057-ADW-166 Cable Stayed Bridge Pylon Anchorage (At Dead End) Anchorage assembly 08-May-18 1 08 - 10 - 2018
14.0 _ 17-057-SDW-169 Cable Stayed Bridge Shop Drawing Deck Anchorage (Stressing End) - AVP Seal 10-Sep-18 1 08 - 10 - 2018
15.0 _ 17-057-SDW-170 Cable Stayed Bridge Shop Drawing Pylon Anchorage - Steel Disk (Guide Pipe) Seal 10-Sep-18 1 08 - 10 - 2018
Form No.: 400-SFD-206 rev.1