Datum/ Date: Report no.
ZAPISNIK O IZRADI MONTAŽNOG AB ELEMENTA / ID OF RC PRECAST ELEMENT
Projekat:
Objekat:
Vrsta elementa:
Tip elementa:
Beton/Concrete: Pozicija montaže/Assembling position:
Marka betona/ Concrete class: Traka/Lane:
Vodonepropusnost/Water penetration: Polje/Span:
Otpornost na mraz /Frost Resistance: Oznaka Nosača/Beam Mark:
Vrsta Provere / Rezultat Kontrolisao/
Opis Radova / Datum/ Controlled by: Napomena /
Type of ispitivanja /
Description of Works Date Comments
inspection * Test Results Izvođač/Contractor: Nadzor/Supervisior:
Provera pre betoniranja / Inspection Before Concrete Works
Armatura / Reinforcement V
Trasa zaštitnih cevi / Ducts routes V
Oplata / Formwork V
Betoniranje / Concreting V
Provera tokom betoniranja / Inspection During Concreting
Uzimanje uzorka/
R
Test Sampling
Provere nakon betoniranja / Inspection After Concreting
Provera čvrstoće betona pre demontaže oplate/
Checking of Concrete Strength Before Formwork R
Removal
Demontaža oplate /
V
Formwork Removal
Provera čvrstoće betona nakon 28 dana/ Checking
R
of Concrete Strength After 28 Days
Provere pre prednaprezanja kablova / Inspection Before Prestressing
Užad, kotve i druge komponente /
V
Strands, Anchorages and Other Components
Provera čvrstoće betona pre utezanja kablova/
Checking of Concrete Strength Before R
Prestressing
Provere tokom utezanja kablova / Inspection During Prestressing
Faza Ia - utezanje kabla K1/
Phase Ia - Stressing cable K1 R
Utezanje kablova/ Faza Ib - utezanje kabla K1/
Post-Tensioning Phase Ib - Stressing cable K1 R
Faza II - utezanje kabla K2 (i K3)/
Phase II - Stressing cable K2 (K3) R
Faza I - Injektiranje kabla K1/
Phase I - Grouting cable K1 R
Injektiranje/
Grouting Faza II - Injektiranje kabla K2 (i K3)/
Phase II - Grouting cable K2 (i K3) R
Faza I/
Provera čvrstoće injekcione smese Phase I: R
nakon 28 dana/ Checking of Grout
Faza II/
Strength After 28 Days Phase II: R
Transport i montiranje nosača / Transport and Installation of Beams
Transportovanje nosača do mesta ugradnje/
V
Transportation of beams to the installation place
Montaža nosača na ležišnu gredu/
V
Placing of Beam on Bearing Beam
Karakteristike / Characteristics:
TIP 1; TIP 2; TIP 3;
H=1,6m TIP 4;
H=1,6m H=1,8m H=1,6m
L=24,4m L=29,4m L=35,4m L=35,4m
* 1) V = Visual inspection 2) R - Report 3) N/A - Not Applicable
Izvođač radova/Contractor Nadzorni Organ/ Engineer