0% found this document useful (0 votes)
21 views35 pages

Boq Arch

Uploaded by

Oday Bassam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views35 pages

Boq Arch

Uploaded by

Oday Bassam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 35

Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS

Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Ite Description Quantity Unit Rate Amount


m SR
DIVISION 1 – GENERAL REQUIREMENTS

General Notes:

A These general requirements are applicable to the


whole of the work, where any item of this division
that has not been priced by the contractor; the
value of such item shall be deemed to be included
in the rates for items elsewhere in the Bill of
Quantities. Note

Conditions of Contract:

B The contractor is to include for complying in all


respects with the conditions of contract, Agreement
and shall price here for any obligations for
elsewhere. Note

Specifications:

C The contractor is to include for complying in all


provisions of the specifications, including the
sections of Division 1- General Requirements. Note

Div. 1 – General Requirements To Collection


1
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Item Description Quantity Unit Rate Amount


SR
DIVISION 1 – GENERAL REQUIREMENTS

Descriptions:

A The descriptions included in the Bill of Quantities to


describe the materials and workmanship are
sufficient only to identify each item for pricing. For
future information concerning the works, reference
shall be made to the Drawings, Specifications,
Condition of contract and other relevant
documents. Note

Measurements:

B Unless otherwise stated, all works has been


measured net as fixed in its place with no
allowance made for laps or waste. Note

Pricing:

C The contractor shall satisfy himself as to the


meaning of every item in the Bill of Quantities and
the rates and prices inserted by him will be deemed
to cover all his obligation under the contract and all
matters and things necessary for the proper
construction, for all temporary work required
(including any that may be required by sub-
contractor, whether nominated or otherwise). The
price shall include for all materials and labor and for
the provision and the use of all plant whether
mechanical or non-mechanical required for proper
sequence for a shifting, altering and adapting such
temporary work and plant as may be required
during the progress of the works and removing at
completion and making good any surfaces
disturbed. Note

Div. 1 – General Requirements To Collection


2
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Item Description Quantity Unit Rate Amount


SR
DIVISION 1 – GENERAL REQUIREMENTS

Unpriced Items:

A The contractor shall price all items for all sections


which he considers have a value. If any items are
not priced, they shall be deemed to be of no value
or their value shall be deemed to have been spread
throughout the rates and prices for other items. Note

Soil Investigation

B The contractor shall satisfy himself by visiting the


site to inspect the nature of the ground and allow
specifically for carrying out full and through soil
investigation analysis necessary as a consequence
of the investigation and accordingly revise the
structural design. Item LS

Div. 1 – General Requirements To Collection


3
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Item Description Quantity Unit Rate Amount


SR
DIVISION 2 – SITE WORKS
2.1 Excavation and Earthwork
General excavation on site for foundation in
Unclassified soil including, temporary earthwork
supports, etc., complet

Mosque
2.1.1 For building foundation. 30 M3

Office Building
2.1.2 For building foundation. 34100 M3

Administrative Building
2.1.3 For building foundation). 2610 M3

Filling
Back filling and compaction using selected sub-
base material

Mosque
2.1.4 Around the building foundation 20 M3

Office Building
2.1.5 Around the building foundation 1100 M3

Administrative Building
2.1.6 Around the building foundation 240 M3

Disposal
2.1.7 Remove the surplus excavated material from site to
legal disposal point.

Mosque
2.1.8 For building foundation. 30 M3

Office Building
2.1.9 For building foundation. 34100 M3

Administrative Building
2.1.10 For building foundation. 2610 M3

Termite Control
2.1.11 Apply soil treatment for termite control under slab on
grade substructures, foundation, sides of interior
walls, around plumbing pipes, etc...
Item LS

Div. 2 – Site Works To Collection


4
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Item Description Quantity Unit Rate Amount


SR
2.2 Annexes / Under Ground Water tank / Small
structures.
Allow to construct the following structures complete
work, Includes concreting, formwork, reinforcement,
excavation, backfilling, waterproofing, and
protection, vapor barrier, etc., Finishes, Doors and
Windows and all associated Electrical and
Mechanical as detailed and as shown on dwg.

Scope of work = Structural / Masonry /


Waterproofing / Earthworks / Clear Finishes.

2.2.1 Annex building – as shown on dwg. item LS

Road & Parking Appurtenances


Supply and install Precast Wheel Stoppers along
the Parking Areas as shown in the Drawing AR –
101, 102,. The work shall also include fixing by
Anchor Bolts as per Dwg. AR – 401 Detail 2
Type = Precast units
Size = 450mm W x 300mm H x 2000mm L

2.2.2 Lower Basement NO 69

2.2.3 Upper Basement NO 72

Div. 2 – Site Works To Collection

5
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Item Description Quantity Unit Rate Amount


SR
DIVISION - 2 SITE WORKS

PLANTING /PAVING WORKS


This section deals with site works which includes
landscaping, Hardscaping, fence, swimming pool,
site furniture and equipments, etc., as per specs
and sections under DIV. 2

2.3 Plants
Plant Species = To approved sample, suitable to
local environment.
Location = Planters Box and as indicated in the
drawing.

2.3.1 Supply & installation Plants/ trees/ shrubs/ grass/


ground cover and as indicated in the landscape
drawing.
1 LS
2.4 Hardscaping
To be read with the Landscape Layout Site Plan.
Supply and install tiles, marble, granite, etc., as per
plan, on sand bedding & sand cement screed as
per floor pattern including required grouting. The
work shall include also proper backfilling and
compacting any required grade slab with vapor
barrier and construction of steps as shown in the
drawing.

External walkways
Refer to Site Plan / Landscaping Drawing
Location = Walkway / External Entrances.

2.4.1 Fair face concrete walkway 50mm. thk. Around the


building /external entrances 756 M2

2.4.2 Fair face concrete paving 50 mm thk. / car park


area 1020 M2

2.4.3 Hexagonal interlocking paving 60mm thk around


the site 1692 M2

2.4.4 Hexagonal interlocking paving 80mm thk /ear drive


way walkway 4567 M2

2.4.5 Random stone paving 100mm thk /main entrance


at main building 248 M2

2.4.6 Marble paving 30mm thick /offices building


entrance. 102 M2

Div. -2 Site Works To Collection

6
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Item Description Quantity Unit Rate Amount


SR
DIVISION – 2 SITE WORKS

Kerbstone
To be read with the Site Plan
Supply and lay Precast Kerbstone along the road
and other locations as shown in the site layout
plan. Bedding shall be on sand cement mortar.
The work shall also include excavation and
backfilling.
Type = Precast units
Size = 150mm W x 300mm H x 500mm L
2.4.7 Walking & parking area 2264 M2

Traffic line marker


Provide 20cm wide weather proof Asphalt Traffic
line, yellow or white color, on the driveway, on the
parking areas and required.

2.4.8 Basement – walking and parking 1 LS


Bar Gate
Electrically operated push button Bar gate,
complete with aluminum gate bar, wired, tested
and commissioned, with a written guarantee for 5
years.
Type = Pedestal with Single Arm

2.4.9 Automatic bar gate at basement rampway 2 No


entrance

Fountain
Allow for construction of free standing driveway
fountain .Overall at Plaza entrance complete
including Bianca Stetuario marble, excavation,
backfill, reinforced concrete, waterproofing,
finishing works, fountain nozzles, piping works,
fountain Pump and all associated works required
– As per Dwg., LS – 001 & 006 / detail 2

2.4.10 Foundation @ main entrance – Plaza – 40m2 1 NO

2.4.11 Foundation @ main entrance – Plaza – 20m2 1 NO

Fences
The work involves Concreting, Formwork,
Reinforcement, Excavation, Backfilling,
Waterproofing and Protection, Vapor barrier etc.,
Scope of work = Structural / Masonry /
waterproofing / Earth work / Planters box /
Cladding / Clear finishing. As per Dwg., LS – 006
& 008
2.4.12 Main & side elevations 564 LM
Div. -2 Site Works To Collection

7
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Item Description Quantity Unit Rate Amount


SR
DIVISION 4 – MASONRY WORK
This section deals with laying of hollow blocks,
solid blocks, natural stone, clay bricks, red bricks,
in courses, on mortar bed, complete with horizontal
and vertical reinforcement, fully anchored to the
column and slab, as well as Precast lintels, sills,
coping, as per specs.
a. Lintels / Sills, insitu or Precast= Refer to
DIV.3
b. Areas = Gross Area (approximate).

Office building
Lower Basement
4.1 20 cm thk. 127 M2

4.2 30 cm thk. 20 M2

Administrative Building
Upper Basement
4.3 20 cm thk. 143 M2

4.4 30 cm thik. 18 M2

Office Building
Upper Basement
4.5 20 cm thk. 213 M2

4.6 30 cm thik. 70 M2
Administrative Building
G.F.L
External 30 cm = 10 cm / 10 cm void / 10 cm
Others = 10 cm / Void / 20 cm
4.7 30 cm thik. / External 412 M2

4.8 50 cm thik. / External 24 M2

4.9 20 cm thik. / internal 120 M2

4.10 30 cm thik. / internal 190 M2


Office Building
G.F.L
External 30 cm = 10 cm / 10 cm void / 10 cm
Others = 10 cm / Void / 20 cm
4.11 30 cm thik. / External 824 M2

4.12 20 cm thik. / internal 290 M2

4.13 30 cm thik. / internal 400 M2

Div. 4 Masonry Work To Collection

8
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Item Description Quantity Unit Rate Amount


SR
DIVISION 4 – MASONRY WORK
Administrative Building
First Floor
4.14 30 cm thk. / External 355 M2

4.15 50 cm thk. / External 32 M2

4.16 20 cm thk. 215 M2

4.17 30 cm thk 180 M2

Office Building
First Floor
4.18 30 cm thk. / External 694 M2

4.19 20 cm thk. 425 M2

4.20 30 cm thk 360 M2

Administrative Building
Roof Floor

4. 21 30 cm thk./ External 82 M2

4. 22 20 cm thk. 30 M2

Office Building
Roof Floor

4.23 30 cm thk./ External 242 M2

4.24 20 cm thk. 55 M2

Parapets
Type=Typically 20cm thk or to match wall thickness
4.25 Mosque roof deck 42 M2

Administrative Building
4.26 Upper roof deck 592 M2

Office Building
4.27 Upper roof deck 1183 M2

Div. 4 Masonry Work To Collection


9
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Item Description Quantity Unit Rate Amount


SR
DIVISION 5 – METAL WORKS

THIS WORK INVOLVES DESIGN, FABRICATION


AND ERECTION OF STEEL STRUCTURE
DESIGNED AS PER THE ARCHITECTURAL
REQUIRMENTS AND SHALL INCLUDE ALL
STRUCTURAL ELEMENTS, CLADDING, FLOOR
DECK AND OTHER WORK, TO THE FUL SATIS
FACTION OF THE CONSULTANT.

5.1 Steel shed – Main Building Entrance


Scope of work = Design / Fabricate / Erect.
Reference Drawing = AR-
Type = Sectional welded steel frames / powder
coated alum. Finish.
Others = Aluminum air foil blade.
Reference Manufacturer = Rafid industries or Local
Supplier.
5.1.1 Total Area 293 M2

5.2 Miscellaneous Metal works


Scope of Work = Design / Fabricate / Erect.
Reference Drawing = AR- 304 Detail 6
Type = Sectional welded steel frames / Powder
coated alum. Finish.
Others = Aluminum air foil blade.
Reference Manufacturer = Rafid industries or equal
approved sample.

Administrative & Office Building

5.2.1 1st FL – Main / Rear Elev. Sun-Shade AR- Detail 6 360 LM

5.2.2 1st FL – Main/ Rear Elev. Sun-Shade -AR- Detail 6 120 LM

5.2.3 GFL – Main / Elev. Sun-Shade AR- 304 Detail 6 90 LM

5.2.4 GFL – Main / Elev. Sun-Shade AR- 304 Detail 6 90 LM

5.2.5 GFL –Main/ Rear Elev. Sun-Shade -AR-304 120 LM


Detail 6

Div. 5 – Structural To Collection


10
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Item Description Quantity Unit Rate Amount


SR
DIVISION 5 – METAL WORKS
5.3 Architectural Steel Structure
Scope of work = Design / Fabricate / Erect.
Reference Drawing = Structure Dwg.
Type = Sectional welded steel channels frame,
hollow cores sub frame.
Others =Internal gypsum board & External
plastered wire mesh.

Administrative Building
5.3.1 Side elevation 48 M2

Office Building
5.3.2 Main elevation 118 M2

5.4 Steel Stair


Manufacturer = Local supplier, to consultant
approval.
Finish = Epoxy Paint.
Handrail = Included.

Office Building
5.4.1 Spiral Stair - GFL / Cafeteria 1 NO

5.5 Metal Ladder


Includes fabrication and erection of prepainted
steel ladder, made of flat bar complete with
support, braces, anchored to wall and floor.

Office Building
5.5.1 1st floor to upper roof deck. 1 NO

5.6 Metal Cladding


Involves cladding of 0.6 – 1mm thk Stainless Steel
sheet, mirror finish or as per approved sample,
complete with all required frames, sub-frames,
supports, sealants, etc., to complete the work.
Type = Stainless Steel / Mirror Finish.
Location = Entrances / Lift Lobby
Others = Metal supports and other required
accessories.
Administrative & Office Building

5.6.1 GFL – Lift lobby 9 M2

5.6.2 1st FL – Lift lobby 9 M2

5.6.3 GFL – Internal walls 11 M2

5.6.4 1st FL – Internal walls 17 M2


Div. 5 – Structural To Collection

11
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Item Description Quantity Unit Rate Amount


SR

DIVISION 5 – METAL WORKS

5.7 Hand Rails


Involves galvanized tubular steel enamel painted
complete with braces, supports, vertical members,
and fully anchored to satisfaction of the consultant.
As indicated in the drawing. AR – 402 / Detail -3

Administrative Building
5.7.1 Stair case – Upper Basement to 2nd FL 24 LM

5.7.2 GFL / West Side Entrance Ramp 12 LM

Railings
Stainless steel rectangular tube complete with
braces, supports and members, fully anchored and
as indicated in the drawing. AR – 402 , 501

Administrative Building
5.7.3 Stair case No. (3) – AR-402 Detail 1 11 LM

5.7.4 1st FL Internal steel balustrade – AR-402 Detail 2 19 LM

Office Building
5.7.5 1st FL / corridor steel balustrade – AR-402 Detail 3 10 LM

Wall mounted hand rails


Type = galvanized tubular steel enamel painted
with, supports, horizontal members, and fully
anchored to the wall
Reference Dwg = AR – 402 / Detail 7 – AR- 501

Office Building
5.7.6 Stair case – Lower Basement to upper basement 17 NO

5.7.7 Stair case - Lower Basement to Roof FL. 210 NO

5.7.8 GFL / Entrance Ramps 24 LM

5.8 Metal fabrication


Mosque / Minaret Crescent
Involves of 0.6 – 1mm thk Stainless Steel sheet,
mirror finish or as per approved sample, complete
with all required frames, sub-frames, supports,
sealants, etc., to complete the work.
Type = Stainless Steel / Mirror Finish.
Location = Mosque / Minaret Crescent
Others = Metal supports and other required
accessories.

5.8.1 Mosque / Minaret Crescent 1 NO

12
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Div. 5 – Structural To Collection

Item Description Quantity Unit Rate Amount


SR
DIVISION 6 – Wood Works
6.1 Wood cladding / Internal wood cladding –
(polyuthane finished wood cladding ) (natural
cherry finish )
To be read with Schedule of Finishes.
Includes fabrication and installation of pre-
fabricated wood cladding, as per approved detail
drawings and shall include fixing accessories
required with finishes as per schedule subject to
approved sample.

Administrative Building
6.1.1 G.F.L 12 M2

6.1.2 F.F.L 14 M2

Office Building
6.1.3 G.F.L 26 M2

6.1.4 F.F.L 28 M2

6.2 Kitchen & Pantry Units


Supply and install Kitchen / Pantry, wall and base
cabinet, solid panel, enamel painted, varnish
stained, veneer satin finish, as per approved
sample and standard size, complete with shelves &
drawers single or double bowl stainless steel sink,
mixers, strainer, standard pantry equipments as
shown or contractors proposed layout. Counter top
shall be corian, granite or as approved sample.
Equipment = Out of scope of work
Cabinet Type = Wood Veneer Finish.

Administrative Building
6.2.1 G.F.L 24 LM

6.2.2 F.F.L 4 LM

Office Building
6.2.3 G.F.L 24 LM

6.2.4 F.F.L 7 LM

13
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Div. 6 – Wood Works To Collection

Item Description Quantity Unit Rate Amount


SR
DIVISION 7 –THERMAL AND MOISTURE
INSULATION

Water proofing work


This section deals with impermeable material to
exclude water, dampness, heat, and involves
waterproofing membrane, bituminous damproofing,
vapor control barrier, insulation, etc.,as per specs
div. 7
7.1 T & B / Washroom / Pantry
Water proofing membrane 3 mm thk.,torch applied
w / pure sand cement screed complete with water
test with water test at least 24 hours-minimum and
guarantee for 10 years.

Mosque
7.1.1 Toilet /ablution 33 M2

Administrative & Office Building

7.1.2 GFL office spaces toilet & pantry 224 M2

7.1.3 1st FL office spaces toilet & pantry 224 M2

7.2 Roof - super structure


Water proofing membrane 3 mm thk. Torch applied
or lay loose with 50 mm thk. Insulation board,
separation layer, foam concrete for proper slope,
perimeter aluminum flashing, ceramic tile or gravel
top finishing As indicated in the Dwg.,AR – 403 /
Detail – 2 & 3 complete with water test with water
test at least 24 hours and guarantee for 10 years.
It is responsibility of the contractor to maintain a
proper slope towards the drain during the
concreting of the deck.

Mosque
7.2.1 roof deck at GFL 99 M2

Administrative & Office Building

7.2.2 Roof deck at 1st FL 3041 M2

7.2.3 Stair roof deck at upper roof level 207 M2

14
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Div. 7 – Moisture Insulation To Collection

Item Description Quantity Unit Rate Amount


SR
DIVISION 7 –THERMAL AND MOISTURE
INSULATION

Roof Accessories

7.3 Plastic Skylight Units


Acrylic plastic units not less than 6mm (1/4 in.)
thick, glazed into metal framing with provision for
expansion of the plastic sheet and drainage of
condensation to the exterior; prepared for mounting
and anchorage as indicated; sizes as shown.
Ceiling skylight:
standard ceiling skylight unit of white obscure
plastic sheet with not less than 50% light
transmittance, and with standard trim and hardware
for removal.

Administrative Building

7.3.1 For main Entrance Steel shed covering 293 M2

7.4 Flashing & Trim


Aluminum flashing covers fixing with non-ferrous
clip, includes, Sealant Material, Filler Board, &
Ending angels..,etc all as per Dwg., AR – 401
Detail - 5 and as per specs & approved sample.

7.4.1 Roof sheet metal flashing 85 LM

15
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Div. 7 – Moisture Insulation To Collection

Item Description Quantity Unit Rate Amount


SR
DIVISION 8 – DOORS & WINDOWS
This section deals primarily with doors, windows,
general glazing, skylights, stairs, balustrade, etc.,
as per specs DIV. 8
8.1 Curtain walls
Glass = 24 mm thk. Double Glazed / Clear /
Reflective- Alum. Frame.
Door = Refer to the AR-details.
SS Elements = Included in cost.
Others = AS indicated in the drawing.

Administrative & Office Building


Main Elev.

8.1.1 Type Cw1 3 NO


8.1.2 Type Cw2 3 NO
8.1.3 Type Cw9 1 NO
8.1.4 Type Cw10 1 NO

Rear Elev. (2)

8.1.5 Type Cw1 6 NO


8.1.6 Type Cw3 3 NO

Side Elev.(3)

8.1.7 Type Cw6 1 NO


8.1.8 Type Cw7 1 NO
8.1.9 Type Cw8 1 NO

Side Elev.(5)

8.1.10 Type Cw 5 1 NO

Side Elev.(6)

8.1.11 Type Cw4 1 NO


8.1.12 Type Cw11 1 NO

16
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Div. 8 – Doors & windows To Collection

Item Description Quantity Unit Rate Amount


SR
DIVISION 8 – DOORS & WINDOWS

8.2 Sky Light


Consist of 24 mm double glazed clear / reflective,
fixed on aluminum profile, complete with flashing
and frame, fully sealed and written guarantee for 10
years.
Reference drawing = AR-
Others = To approved shop drawings or to
manufactures standard

Office Building

8.2.1 Stair case at upper roof level 6 NO

8.3 Doors
To be read with Schedule of Doors and Windows.
Includes wood / metal / aluminum / glass, as per
specified finish, either fixed, swing or sliding and
shall include all accessories such as lock, handle,
etc., and as per approved drawing and sample.

Office Building
Lower Basement

8.3.1 Type D4 8 NO

Administrative & Office Building


Upper Basement

8.3.2 Type D4 11 NO

8.3.3 Type D7 – Fire Rated Door 7 NO

Administrative & Office Building


G.FL

8.3.4 Type D1 13 NO

8.3.5 Type D2 3 NO

8.3.6 Type D3 8 NO

8.3.7 Type D4 24 NO

8.3.8 Type D5 12 NO

8.3.9 Type D6 3 NO

17
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Div. 8 – Doors & windows To Collection

Item Description Quantity Unit Rate Amount


SR
DIVISION 8 – DOORS & WINDOWS

8.3.10 Type D7 - Fire Rated Door 3 NO

8.3.11 Toilet WC Door 15 NO

8.3.12 Type D11 – Sliding- Folding Wood Door 1 No

Administrative & Office Building


1st FL

8.3.13 Type D1 13 NO

8.3.14 Type D3 8 NO

8.3.15 Type D4 24 NO

8.3.16 Type D5 11 NO

8.3.17 Type D7 - Fire Rated Door 3 NO

8.3.18 Type D8 1 NO

8.3.19 Type D9 – Sliding Door 1 NO

8.3.20 Toilet WC Door 18 NO

Access Doors And Panels


To be read with the schedule of doors and
windows. And shall include Steel frame with in
laid ceramic tiles in adhesive and all accessories
such as lock, handle, etc., as per Dwg. AR – 402
Detail 6 and as approved sample.

Administrative & Office Building


8.3.21 G.FL. / office toilets 12 NO

8.3.22 1st FL / office toilets 12 NO

18
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Div. 8 – Doors & windows To Collection

Item Description Quantity Unit Rate Amount


SR
DIVISION 8 – DOORS & WINDOWS

Glass partitions
To be read with schedule doors and windows
includes 24mm/12mm/8mm/6mm; with aluminum
powder coated frame fixed and shall include all
accessories as per approved drawing and
sample.
Glass = 24mm thk. Double glazed /clear /
reflective Alum. Frame. SS Elements = included
in cost. Others = stainless steel sheets finish as
indicated in drawing.

Office Building
GFL

8.3.23 Type GL-1 12 No.

8.3.24 Type GL-2 1 No.

1st FL

8.3.25 Type GL-1 12 No.

8.3.26 Type GL-2 1 No.

19
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Div. 8 – Doors & windows To Collection

Item Description Quantity Unit Rate Amount


SR
DIVISION 9 – FINISHES
This section deals with internal finishing for wall,
floor, ceiling and skirting as per specs and sections
under DIV. 9

9.1 Plastering works / internal


To be read with Schedule of finishes.
Includes application of 1 coat of slurry over the
whole surface with mesh wire anchored on joints
between reinforced concrete and block, application
of one layer 20 mm thk., sand cement plaster or
gypsum plaster as per schedule, trowel led to a
smooth or rough finish free from any irregularities
and ready to receive painting work or tiling work for
toilet, bathroom and kitchen.
The work shall include also all galvanized
accessories such as corner bead, stop bead,
construction joint, bonding agent, curing compound
including supply and erection of scaffolding.

Wall Cement Plaster / internal


Areas = Net approximate

Office Building
9.1.1 Lower basement - stairs / store / Ramp 147 M2

9.1.2 Lower basement – external face of wall 180 M2

Administrative & Office Building


9.1.3 Upper Basement 239 M2

9.1.4 Upper Basement – External face of wall at lift


303 M2
storage area

9.1.5 GFL 2727 M2

9.1.6 1st FL 2539 M2

9.1.7 GFL – with stainless steel strips inlay at


Entrance/lift lobby/ hallway 176 M2

9.1.8 1st FL – with stainless steel strips inlay at


Entrance/lift lobby/ hallway 196 M2

9.1.9 Roof FL. 409 M2

20
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Div. 9 – Finishes To Collection

Item Description Quantity Unit Rate Amount


SR
DIVISION 9 – FINISHES
Wall rought cement plaster for ceramic

Administrative & Office Building


9.1.10 GFL – / Office toilets 910 M2

9.1.11 1st FL – Office toilets 784 M2

Ceiling cement plaster

Office Building
9.1.12 Lower Basement at storage 27 M2

Administrative & Office Building


9.1.13 Upper Basement at storage 118 M2

Plastering works / External


To be read with Schedule of finishes.
Includes application of 1 coat of slurry over the
whole surface with mesh wire anchored on joints
between reinforced concrete and block,
application of one layer 20 mm thk., sand cement
plaster or gypsum plaster as per schedule, trowel
led to a smooth or rough finish free from any
irregularities and ready to receive painting work or
tiling work for toilet, bathroom and kitchen.
The work shall include also all galvanized
accessories such as corner bead, stop bead,
construction joint, bonding agent, curing
compound including supply and erection of
scaffolding.

Administrative & Office Building


9.1.14 Main elevation 1826 M2

9.1.15 Rear elevation 1966 M2

9.1.16 Side elev.(3) 48 M2

9.1.17 Side elev.(4) 300 M2

9.1.18 Side elev.(5) 283 M2

9.1.19 Side elev.(6) 237 M2

Parapets /internal side

9.1.20 Mosque roof deck 42 M2

Administrative & Office Building


21
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

9.1.21 Upper roof deck 2098 M2

Div. 9 – Finishes To Collection

Item Description Quantity Unit Rate Amount


SR
DIVISION 9 – FINISHING

Suspended ceiling
To be read with Schedule of Finishes.
This work involves installation of suspended
ceiling and shall include all galvanized hangers,
fixing accessories, primary supports, and main
and cross runners, and other accessories
required.
Ceiling Finish level = Refer to EM works prior to
start of installation.
9.2 Gypsum board false ceiling
To be read with Schedule of Finishes.
This work involves installation of suspended
ceiling and shall include all galvanized hangers,
fixing accessories, primary supports, runners,
moisture and fire resistant gypsum board,
galvanized screw channels, application of 2 coats
of joint compound on fiber mesh wire on screws,
to include cut out for all electro-mechanical
openings as per specs DIV.9, Sec 09510 , to the
satisfaction of the Consultant.
Office Building
9.2.1 Lower basement / lift lobby 27 M2

Administrative & Office Building


9.2.2 Upper basement / lift lobby 43 M2

9.2.3 GFL 2476 M2

9.2.4 GFL / office spaces toilet & pantry 257 M2

9.2.5 1st FL 2411 M2

9.2.6 1st FL / office spaces toilet & pantry 224 M2

Mirrored Glass Panel ceiling


To be read with Schedule of Finishes.
This work involves installation of suspended
ceiling and shall include all galvanized hangers,
fixing accessories, primary supports, runners as
per specs DIV.9, Sec 09550
Type = 10mm Thik.,Frosted Laminated Glass
Panels
Location = Meeting rooms / GFL & 1st FL
Reference Drawing = ID – 124 / ID - 201
Others = Metal supports & other accessories
required
9.2.7 G.FL – Frosted mirrored glass Panels 11 M2
22
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

9.2.8 1st .FL – Frosted mirrored glass Panels 11 M2


Div 9 – Finishing To Collection
Item Description Quantity Unit Rate Amount
SR
DIVISION 9 – FINISHES
9.4 (Stone / ceramic /mosaic / marble)
Floor finish internal
To be read with Schedule of finishes and Floor
Pattern.
This work involves installation of Stone /
Ceramic / Marble / Granite, etc., as per required
size and specs and or as per approved sample,
laid on sand bedding and sand cement screed or
in adhesive, as per manufactures
recommendation, set out as floor pattern,
complete with the required joint space and
grouting with polished finish.
External Floor Finish = See Schedule DIV. 2
T & B / Pantry / Washroom = Floor Area / Gross
Reference = Refer to Floor Pattern.

Office Building
Lower basement

9.4.1 Floor marble type (3) lift lobby 30 M2

9.4.2 Floor terrazzo service area 51 M2

9.4.3 Floor walkway cement tiles 606 M2

9.4.4 Floor epoxy paint – parking & driveway areas 2871 M2

Administrative & Office Building


Upper Basement

9.4.5 Floor marble – type (3) /lift lobby 45 M2

9.4.6 Floor terrazzo – service area 168 M2

9.4.7 Floor walkway cement tiles 50x50 686 M2

9.4.8 Floor epoxy paint – parking & driveway areas 3146 M2

Administrative & Office Building


GFL

9.4.9 Floor marble type (2) 2191 M2

9.4.10 Floor marble type (3) 294 M2

9.4.11 Floor marble type (4) 41 M2

9.4.12 Floor ceramic 20x20 257 M2

23
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Div. 9 – Finishes To Collection

Item Description Quantity Unit Rate Amount


SR
DIVISION 9 – FINISHES

Administrative & Office Building


1st FL.

9.4.13 Floor marble type (1) 105 M2

9.4.14 Floor marble type (2) 1942 M2

9.4.15 Floor marble type (3) 254 M2

9.4.16 Floor marble type (4) 42 M2

9.4.17 Floor ceramic 20x20 224 M2

Kerbstone
Type = Precast units
Size = 150mm W x 200mm H x 300mm L
Location = Parking & Driveway areas

9.4.18 Lower basement 755 LM

9.4.19 Upper Basement 857 LM

Floor skirting
To be read with Schedule of Finishes and Floor
Pattern.
Includes installation of 10 cm x 2 cm thk skirting
as per the specified material, such as marble,
ceramic, wood, granite, etc., or as per approved
sample, applied mechanically or by adhesive, as
per the manufactures specification.
Granite = 30 mm thk
Marble / Ceramic / Wood = 12 mm thk.

Office Building
Lower basement

9.4.20 Marble base 60 CMH – lift lobby 7 LM

9.4.21 Terrazzo skirting on terrazzo floor 67 LM

Administrative & Office Building


Upper Basement

9.4.22 Marble base 60cm.H- lift lobby 7 LM

9.4.23 Terrazzo skirting on terrazzo floor 108 LM

24
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Div. 9 – Finishes To Collection

Item Description Quantity Unit Rate Amount


SR
DIVISION 9 – FINISHES
Administrative & Office Building
GFL

9.4.24 Marble base 60cm.H- lift lobby 7 LM

9.4.25 Marble skirting 15cm.H- on marble floor tiles 694 LM

9.4.26 Ceramic skirting on ceramic 20x20 floor tiles 252 LM

Administrative & Office Building


1st FL

9.4.27 Marble base 60cm.H- lift lobby 7 LM

9.4.28 Marble skirting 15cm.H- on marble floor tiles 749 LM

9.4.29 Ceramic skirting on ceramic 20x20 floor tiles 231 LM

Internal Marble Wall Finish


To be read with Schedule of finishes and Floor
Pattern.
This work involves installation of Stone /
Ceramic / Marble / Granite, etc., as per required
size and specs and or as per approved sample
with waterproof adhesive or by mechanical
means, using galvanized or stainless steel
accessories and anchoring system or as per the
manufactures recommendation, laid out as per
wall pattern, complete with the required joint
space, expansion joints, waterproof grout and
polished finish.
Type = Generally to match floor tiles, unless
indicated.

Office Building
9.4.30 Lower basement – lift lobby 9 M2

Administrative & Office Building


9.4.31 Upper basement – lift lobby 9 M2

9.4.32 GFL – lift lobby 15 M2

9.4.33 1st FL – lift lobby 15 M2

25
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Div. 9 – Finishes To Collection


Item Description Quantity Unit Rate Amount
SR
DIVISION 9 – FINISHES

Wood Sheet Wall Cladding


This work involves installation of 22 mm Plywood
wall cladding with polyethane coated natural
cherry wood veneer - as per required size and
specs and or as per approved sample & as per
Dwg. ID 303

Administrative Building
9.4.34 GFL 250 M2

9.4.35 1st FL 280 M2

Wall Ceramic
Administrative & Office Building

9.4.36 GFL 910 M2

9.4.37 1st FL 784 M2

9.5 Stone Cladding


To be read with Schedule of Finishes.
This work involves cladding of external wall with
natural stone, marble, or granite in slab or as per
standard size, and installation to be either by
sand cement mortar and grout or by mechanical
means and shall include galvanized or stainless
steel anchors, angles supports, et..,icluding
grouting and polishing.
The cost shall include also any form of scaffolding
required with all necessary platform and safety
Measures.

Perimeter Granite Base Cladding

Administrative & Office Building

9.5.1 Main Elev. (1) 185 M2

9.5.2 Rear Elev. (2) 196 M2

9.5.3 Side Elev. (3) 18 M2

9.5.4 Side Elev. (4) 19 M2

9.5.5 Side Elev. (4) 19 M2

9.5.6 Side Elev. (5) 19 M2


26
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Div. 9 – Finishes To Collection

Item Description Quantity Unit Rate Amount


SR
DIVISION 9 – FINISHES

9.6 Painting / clear finishing


To be read with Schedule of Finishes. ( Including
Parapets )
This work involves application of 1 coat of primer,
2 coats of putty or skim putty, sanding, 1 coat of
paint under coat 2 coats of final paint, with water
based paint with color and texture as per sample.
Application shall be by roller, brush spray.
The cost shall also include any form of scaffolding
required to complete the work.

Paint on gypsum board false ceiling

Office Building
9.6.1 Lower basement / lift lobby 27 M2

Administrative & Office Building


9.6.2 Upper basement / lift lobby 43 M2

9.6.3 GFL 2732 M2

9.6.4 1st FL 2634 M2

Paint on wall cement plaster

Office Building
9.6.5 Lower basement 327 M2

Administrative & Office Building


9.6.6 Upper basement 541 M2

9.6.7 GFL 2903 M2

9.6.8 1st FL 2735 M2

9.6.9 Roof FL 409 M2

Paint on ceiling cement plaster


Office Building
9.6.10 Lower basement 27 M2

Administrative & Office Building


9.6.11 Upper basement 118 M2

27
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Div. 9 – Finishes To Collection

Item Description Quantity Unit Rate Amount


SR
DIVISION 9 – FINISHES

External paint
Manufacture = Jotun / Sigma or equal
Type = granulate coating
This work involves application of 1 coat of primer,
2 coats of putty or skim putty, granulate coating
Application shall be by roller, or brush.
The cost shall also include any form of scaffolding
required to complete the work.

Administrative & Office Building

9.6.12 Main elevation 1826 M2

9.6.13 Rear elevation 1966 M2

9.6.14 Side elev.(3) 48 M2

9.6.15 Side elev.(4) 300 M2

9.6.16 Side elev.(5) 283 M2

9.6.17 Side elev.(6) 237 M2

Parapets / internal side

9.6.18 Mosque roof deck 42 M2

Administrative & Office Building

9.6.19 Upper roof deck 2098 M2

28
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Div. 9 – Finishes To Collection

Item Description Quantity Unit Rate Amount


SR
DIVISION 10- SPECIALTIES

TOILET COMPARTMENTS

10.1 Laminated plastic toilet cabinet:-


This work shall include toilet compartments and
screens as shown in the drawing and approved
sample type = plastic laminated compartment
style = floor anchored screen style = wall hung.

Mosque
10.1.1 GFL/ prayer hall toilet 5 LM

Administrative & Office Building


10.1.2 GFL / office toilet 25 LM

10.1.3 F.FL / office toilet 28 LM

10.2 Wall and corner guards vehicle


Location = basement columns /parking & drive
way type = rubber or equal approved sample.

Administrative & Office Building


10.2.1 Columns item LS

10.2.2 Corner wall item LS

TOILET AND BATH ACCESSORIES


Supply assemble and fix the toilet and bathroom
accessories as specified

10.2.3 Paper towel Dispenser – Surface mounted – and


Disposal unit NO 16

10.2.4 Multi roll Toilet paper dispenser – Surface NO 38


mounted – stainless steel

10.2.5 Soap Dispenser– Surface mounted - stainless NO 50


steel

10.2.6 Robe Hook - Surface mounted - stainless steel NO 38

10.2.7 Hot air hand dryers NO 10

29
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Div 10 – Finishing To Collection


Item Description Quantity Unit Rate Amount
SR
DIVISION 10- SPECIALTIES

BATHROOM MIRRORS
10.2.8 6mm thick polished plate mirror glass with frame
and fixing shape & sizes as shown 50 NO
on dwgs

10.3 Signs

Supply and install directional signage as indicated


in the drawing ID – 131,132,133,134 - and shall
include all accessories as well as electro-
mechanical requirements to the full satisfaction of
the client.
Typical signs = non illuminated / dimensional
letter / number
Supplier / manufacturer = illuminated with back
up battery

10.3.1 Internal signage item LS

10.3.2 External signage item LS

30
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Div 10 – Finishing To Collection

Item Description Quantity Unit Rate Amount


SR
DIVISION 11 – EQUIPMENTS

WINDOWS WASHING & FAÇADE


MAINTENANCE EQUIPMENT
The work involves supply, install and commission a
trackless roof mounted Glass Cleaning Device with
specs as follows:
Manufacturer = Sky man International Belgium
Kone or equal.
Type = Track Roof mounted
Power Supply = Trolley and Platform

11.1 Main Roof Deck 2 NO

WASTE CHUTS & COLLECTORS


The work involves supply, fabricate, install &
commission a garbage factory assembled (or
locally fabricated as per specs, subject to sample
approved) in accordance with the specs below or
equal approved specs or sample.
Chute = 100 cm dia. /ss
Intake = 45cm x 80cm / Hand Operated Hopper
Type Intake Door
Discharge = Provide Rolling Incline Self Closing
Door.
Vent = 100cm dia. With Metal Safety Cap.
Floor Frames = Required (Angular Bars, Frames &
Support.
Accessories = 1/2" Sprinkler/Flushing Head every
2nd Intake.
Plumping = Include connection to water supply line.
Catalog, Sample, Detail drawing = Required for
approval.

11.2 Total Cost 1 NO

11.3 Mobile Container 2 NO

31
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Div. 11 – Equipments To Collection


Item Description Quantity Unit Rate Amount
SR
DIVISION 11 – EQUIPMENTS

KITCHEN EQUIPMENT
Supply and install Kitchen / Pantry Equipment,
standard pantry equipments as shown or
contractors proposed layout.

11.4 GFL- / Kitchen item LS

11.5 1st FL - kitchen item LS

COUNTERTOPS

Counter Top at Toilets


Corian / marble / granite counter top on toilet,
washroom, vanity, as per approved for proper fixing
including sealing of joints.

Counter top / vanity top = granite including WB


opening type over hang as indicated in the drawing
accessories = wall mirror, unless included in B.O.Q

Mosque

11.6 GFL / prayer hall / toilet 2 LM

Administrative & Office Building

11.7 GFL / office toilet 28 LM

11.8 1st FL/ office toilet 35 LM

32
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Div. 11 – Equipments To Collection


Item Description Quantity Unit Rate Amount
SR
Div. 14 – CONVEYING SYSTEM
This section deals with transport systems, vertical
or horizontal, which includes elevators, escalator,
dumbwaiter, As per specs and DIV.,14

ELEVATOR
Scope of Work = Supply / Install / Test &
Commission
Manufacturer = Schindler / Kone / Mitsubishi or
equal
Car Size = 1.95 x 1.4 x 2.4
Speed = 2.5 m / sec.
Capacity = 17 Passenger / 1250 KG
Opening = Automatic Sliding Central Opening ( on
one side )
Finish = Stainless Steel, Mirror Finish
Other Accessories = As per Manufacturer Standard

Administrative Building
14.1 Passenger lifts / B1 – 1st FL 2 NO

Office Building
14.2 Passenger lifts / B2 – 1st FL 3 NO

33
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

Div. 14 – CONVEYING SYSTEM To Collection


Item Description Quantity Unit Rate Amount
SR

Bill-# Summary Page No

DIV. 4 - Masonry

DIV. 5 - Metals Work

DIV. 6 - Wood Work

DIV. 7 - Thermal & Moisture Protection

DIV. 8 - Doors and Windows

DIV. 9 - Finishes

DIV. 10 - Specialties

DIV. 11 - Equipments

Div. 14 – Conveying System

DIV. 15 - Mechanical

DIV. 16 - Electrical

34
Project : ALKHORAYEF GROUP CORPORATE HEADQUARTERS
Bill #. : ADMINISTRATIVE & OFFICE BUILDING June 2005

To Collection

35