CEA LTR 25feb23 Revised Report NER Sikkim 2030 1
CEA LTR 25feb23 Revised Report NER Sikkim 2030 1
भारत सरकार
Government of India
विद्युत मंत्रालय
Ministry of Power
कें द्री य वि द्यु त प्रा धि क र ण
Central Electricity Authority
वि द्यु त प्र णा ली यो ज ना ए वं मू ल् यां क न प्र भा ग - I I
Power System Planning & Appraisal Division-II
CEA vide letter dated 27th September, 2022 submitted report on ‘Intra state
transmission system strengthening requirement of North Eastern States and Sikkim by
the year 2030’ to MoP.
To discuss the report, a meeting was held under the chairmanship of Secretary
(Power) on 17.11.2022. In the meeting, it was decided that CEA shall revise the report.
Accordingly, the report has been revised and the same is enclosed herewith.
Encl.: As above.
सेवाभवन, आर.के .पुरम-I, नईदिल्ली-110066 टेलीफोन: 011-26732347 ईमेल: [email protected] वेबसाइट: www.cea.nic.in
SewaBhawan, R.K Puram-I, New Delhi-110066Telephone: 011-26732347 Email: [email protected] Website: www.cea.nic.in
Intra State Transmission System
strengthening requirement of North
Eastern states & Sikkim by the year
2030
February 2023
February, 2023
1.3. After several round of discussions held with NER states & Sikkim, system
study of each proposal and cost estimation were done by CEA.
1.4. The peak electricity demand for the year 2029-30 as per 20th EPS Report is
given below. Some states requested to consider revised demand figures and
accordingly the same has been considered for transmission planning studies.
The demand projections as per 20th EPS Report and the demand figures
considered for the study/analysis is given below:
States Actual Peak Projected Peak Estimated
Electricity Electricity demand in 2030
Demand Demand in as per the
2021-22 2029-30 States
(MW) as per 20th EPS (MW)
Report
(MW)
Arunachal Pradesh 197 259 378
States Actual Peak Projected Peak Estimated
Electricity Electricity demand in 2030
Demand Demand in as per the
2021-22 2029-30 States
(MW) as per 20th EPS (MW)
Report
(MW)
Assam 2126 3683 3300
Manipur 258 404 550
Meghalaya 408 546 699
Mizoram 169 289 285
Nagaland 173 221 316
Tripura 328 645 703
Sikkim 133 214 211
1.5. Based on the analysis, recommendation on the proposals of respective States
has been made and chapter of each state along with intra-state transmission
system recommended by 2030 was finalized.
1.6. Summary of state-wise transmission system augmentation required by 2030
and tentative expenditure required for implementation of the transmission
schemes is given below:
*****
Contents
1. Introduction ................................................................................................................................. 1
2. Power System in NER & Sikkim ............................................................................................. 5
3. Intra State Schemes under implementation ....................................................................... 7
4. Broad Requirement posed by States.................................................................................. 10
5. Arunachal Pradesh .................................................................................................................. 11
6. Assam ......................................................................................................................................... 20
7. Manipur ....................................................................................................................................... 41
8. Meghalaya .................................................................................................................................. 48
9. Mizoram ...................................................................................................................................... 62
10. Nagaland .................................................................................................................................... 70
11. Tripura......................................................................................................................................... 78
12. Sikkim ......................................................................................................................................... 89
13. Recommendations................................................................................................................... 96
1. Introduction
1.1. MoP vide letter No. 6/5/2022-Trans dated 16.02.2022, had requested CEA to
ascertain further requirements of North Eastern States to augment their
transmission systems. Copy of the letter is attached as Annexure-I.
1.2. Accordingly, to discuss the same, a meeting was held under the Chairmanship
of Chairperson (CEA) with participation from NERPC, STUs/Electricity
Departments of NER, PGCIL and CTUIL. In the meeting, it was agreed that all
the NER states & Sikkim shall submit the transmission system
strengthening requirement up to year 2030 to NERPC. All the NER states were
individually requested to send their proposals for augmentation of transmission
network. NERPC was required to compile the requirement of the states and
submit the same to CEA.
1.3. Subsequently, NERPC had obtained transmission requirement of each states of
NER and submitted the same to CEA vide email dated 10.03.2022. The
information as provided by NERPC was compiled and a preliminary report was
submitted by CEA to MOP vide CEA’s letter dated 25.03.2022. The proposal
submitted by the states included proposals for new transmission/distribution
lines, new substations, augmentation of transformation capacity at existing
substations, reconductoring of existing transmission/distribution lines etc.
Summary of proposals submitted by the States is given below:
Estimated
Transform Estimated
Proposed cost of Total
ation cost of
transmission Transmission/ Cost
State Capacity proposed
lines Distribution (Rs.
proposed substations
(ckm) lines Crores)
(MVA) (Rs. Crores)
(Rs. Crores)
Arunachal
144 165 348 265 613
Pradesh
Assam 4268 7460 3761 2562 6323
Manipur 1573 280 1441 364 1805
Meghalaya 4304 4475 4744 2390 7134
Mizoram 1873 2745 2171 1081 3252
Nagaland 505 980 440 427 867
Tripura 1592 2113 1064 889 1953
Total Costs 13,969 7,978 21,947
1.4. In addition to above, states of NER have also submitted their requirement of
OPGW/communication system for various 132 kV and 33 kV lines at an
estimated cost of Rs. 251 Crs. Accordingly, as per the NER States, total fund
required for the proposals upto 2030 would be around Rs. 22,000 Crores.
Page | 1
1.5. Further, CEA vide mail dated 07th April, 2022 requested Sikkim to submit the
proposals of requirement of intra-state transmission system strengthening by
2030. Sikkim submitted the system requirement vide mail dated 25th April, 2022.
1.6. Electricity Demand forecast for NER states and Sikkim as per 20th EPS Report
and the estimated demand as per the states is given below:
States Actual Peak Peak Electricity Estimated
Electricity Demand in demand by 2030
Demand 2029-30 as per States
2021-22 th
as per 20 EPS (MW)
(MW) Report
(MW)
Arunachal Pradesh 197 259 378
Assam 2126 3683 3300
Manipur 258 404 550
Meghalaya 408 546 699
Mizoram 169 289 285
Nagaland 173 221 316
Tripura 328 645 703
Sikkim 133 214 211
1.9. Distribution system strengthening proposals (33 kV and below voltage level) had
also been submitted by the states. In the meeting, states were advised to revise
Page | 2
their proposals and submit the revised proposals pertaining to transmission
network as directed by MoP. The distribution system strengthening schemes may
be included in other schemes such as Revamped Distribution Sector Scheme
(RDSS). However, in order to avoid creation of stranded transmission assets and
keeping end utilization of proposed transmission system in view, associated
distribution proposals have also been mentioned in the report, without
considering the cost implications.
1.10. Based on the discussions in the meetings with states, states were advised to
submit the following details to CEA:
Segregation of proposals, voltage-wise and scheme-wise (transmission and
distribution proposals).
Node wise present and anticipated demand data (by 2030).
State Power Map indicating the existing, under implementation and proposed
networks.
PSSE load flow study files having present, under construction and proposed
network.
Conductor details of the lines in case of reconductoring proposals.
Justification of each proposal.
1.11. Summary of updated proposals for new transmission lines, new substations,
augmentation of transformation capacity at existing substations, reconductoring
of existing transmission lines submitted by states of NER is given below:
State Propos Transform Estimated Estimated Total
ed lines ation cost of cost of Cost
(ckm) Capacity Transmission proposed
(Rs.
proposed /distribution substations
Crores)
(MVA) lines (Rs. Crores)
(Rs. Crores)
Arunachal Pradesh 144 165 348 265 613
Assam 4268 7460 3761 2562 6323
Manipur 1573 280 1441 364 1805
Meghalaya 4304 4475 4744 2390 7134
Mizoram 1873 2745 2171 1081 3252
Nagaland 505 980 440 427 867
Tripura 1592 2113 1064 889 1953
Total Costs 13,969 7978 21947
1.12. After receipt of above data from all the states of NER and Sikkim, system studies
and cost estimation were done by CEA. Based on the analysis, recommendation
on each proposal has been made and an interim report was prepared.
Page | 3
1.13. The Interim report was submitted to states of NER and Sikkim vide mail dated
20.07.2022 seeking comments/observations from states on the proposals of
intra-state transmission system.
1.14. To discuss the observations received from states, meetings with each state were
held at CEA, Delhi (for Manipur and Meghalaya, meeting was held through Video
Conferencing) in the month of August and September 2022. Based on the
discussion in these meetings, chapter of each state along with intra-state
transmission system recommended by 2030 was finalized. Details of the
meetings are given below:
States Date Mode
Arunachal Pradesh 29.08.2022
Sikkim 12.09.2022
Physical
Nagaland 09.09.2022
Tripura 07.09.2022
Mizoram 17.08.2022
Assam 24.08.2022
Meghalaya 17.08.2022 Online
Manipur 05.09.2022 Online
1.15. In the above meetings, states also mentioned that their estimated peak demand
(MW) by 2030 needs to be modified. The peak demand figures a per 20th EPS
Report and the estimated deamand figures as per the States is given below:
Peak Electricity
Actual Peak
Demand in Estimated
Electricity
2029-30 demand in 2030
States Demand in
as per 20th EPS as per States
2021-22
Report (MW)
(MW)
(MW)
Arunachal Pradesh 197 259 378
Assam 2126 3683 3300
Manipur 258 404 550
Meghalaya 408 546 699
Mizoram 169 289 285
Nagaland 173 221 316
Tripura 328 645 703
Sikkim 133 214 211
1.16. While carrying out the analysis, the estimated demand by 2030 as provided by
states have been considered.
1.17. Analysis of the proposals and recommendations for each state are given in the
subsequent chapters.
Page | 4
2. Power System in NER & Sikkim
2.1. Indian power grid is demarcated into five regions i.e. Northern, Western,
Southern, Eastern and North-Eastern. National grid was formed with the
commissioning of Raichur – Sholapur 765 kV S/c line in December, 2013.
2.2. North Eastern Region covers the state of Arunchal Pradesh, Assam, Manipur,
Meghalaya, Mizoram, Nagaland and Tripura. Peak electricity demand (in MW)
and Electrical Energy Requirement (in MU) of NER States for the year 2029-30,
as per the 20th EPS Report is given below:
Peak electricity demand/
Electrical energy
requirement as per 20th
EPS Report (2029-30)
Peak electricity
demand (MW) 5835
Electrical energy
requirement (MU)
29539
Peak electricity
demand (MW)
214
Electrical energy
requirement (MU)
974
2.4. Total Installed generating capacity in NER is 4,944 MW as on 31st March, 2022.
Most of the generation comes from Hydro and gas plants. Installed Generating
capacity of NER vis-à-vis other regions is given below:
Page | 5
Installed generating capacity (in MW) as on 31.03.2022
THERMAL
R.E.S.
REGION HYDRO LIGNIT NUCLEAR TOTAL
COAL GAS DIESEL TOTAL
E
NORTHERN 20632 56137 1580 5781 0 63498 1620 27071 112821
WESTERN 7563 73716 1400 10806 0 85923 1840 33650 128975
SOUTHERN 11820 45699 3640 6492 434 56265 3320 46908 118313
EASTERN 4764 27757 0 100 0 27857 0 1745 34366
N.EASTERN 1944 770 0 1720 36 2526 0 474 4944
ISLANDS 0 0 0 0 40 40 0 38 78
ALL-INDIA 46723 204080 6620 24900 510 236109 6780 109885 399497
% 11.70 51.08 1.66 6.23 0.13 59.10 1.70 27.51 100.00
2.6. Details of Intra- State transmission network in NER and Sikkim is given below:
Transmission lines Transformation Capacity
(in ckm) (in MVA)
Under Under
State Existing construction/planned Existing construction/planned
Arunachal
Pradesh 454 2063 223 699
Assam 4813 1088 7768 6722
Manipur 866 133 1065 110
Meghalaya 900 675 527 2030
Mizoram 546 190 303 0
Nagaland 283 166 428 292
Tripura 577 963 733 1935
Sikkim 47.5 66 25 720
Page | 6
3. Intra State Schemes under implementation
3.1. The road-map for development of power sector specifying the need for
strengthening of overall Transmission, Sub-transmission and Distribution system
in NER and Sikkim was brought out in the “Pasighat Proclamation on Power”
released during the first Sectoral Summit of North Eastern Council at Pasighat in
Arunachal Pradesh in January, 2007.
3.2. Pursuant to recommendations of Pasighat summit, a Sub-Group was constituted
under the Chairmanship of Member (Power Systems), CEA, on transmission, sub-
transmission and distribution related issues in North Eastern Region. Accordingly,
a comprehensive scheme for strengthening of transmission, sub-transmission and
distribution system was evolved by CEA in consultation with POWERGRID and
States of North Eastern Region and Sikkim.
3.3. Under the subject project, implementation of the scheme in six states of NER viz.
Assam, Meghalaya, Tripura, Mizoram, Manipur and Nagaland was envisaged
through funding from World Bank / Govt. of India and implementation in Arunachal
Pradesh and Sikkim was envisaged under a separate project funded by Govt. of
India.
3.4. Accordingly, sanctions for two schemes i.e. North Eastern Region System
Improvement Project (NERPSIP) and Comprehensive Scheme for strengthening
of Transmission & Distribution in Arunachal Pradesh and Sikkim (CSAS) were
accorded by Govt. of India.
Page | 7
Revised Cost Estimates Rs. 6700.00 Cr. (Approved in Dec’20)
Funding 50:50 (Govt. of India: World Bank)
Completion schedule December 2018 (48 months from date of
release of 01st installment)
Anticipated Schedule March, 2023
3.5.4 Progress:
3.6.1 When the CSAS scheme was conceived, only 5 out of 20 Districts of Arunachal
Pradesh were connected to the transmission network at 132/220 kV level. The
33 kV system was backbone of power distribution system in the State. Due to
low population density spread over its geographical area of 84,000 sq.km,
power demand in Arunachal Pradesh was scattered. Hence, it was necessary
to strengthen 132 kV network in the state for proper voltage management and
Page | 8
lower losses. Similarly, the distribution system in Sikkim mainly relied on 66 kV
network, which needed to be strengthened substantially. In view of this, it was
proposed to take up projects for strengthening intra-state T&D systems of the
two States through 31 new 132 kV sub-stations, 12 substations of 66/11 kV,
2,153 km of transmission lines (220 kV ,132 kV and 66 kV) and 1923 km of
transmission lines (33 kV). The project is being implemented through
POWERGRID.
3.6.2 General Details:
3.6.3 PROGRESS:
Page | 9
4. Broad Requirement posed by States
4.1 The states have submitted proposals for new transmission lines, new substations,
augmentation of transformation capacity at existing substations, reconductoring of
existing transmission lines etc. Summary of proposals as received from the NER
States is given below:
State Proposed Transformat Estimated Estimated Total
lines ion Capacity cost of cost of Cost
proposed Transmissi substations
(ckm) (Rs.
on proposed
(MVA) Crores)
/distributio (Rs. Crores)
n lines
(Rs.
Crores)
Arunachal 144 165 348 265 613
Pradesh
Assam 4268 7460 3761 2562 6323
Manipur 1573 280 1441 364 1805
Meghalaya 4304 4475 4744 2390 7134
Mizoram 1873 2745 2171 1081 3252
Nagaland 505 980 440 427 867
Tripura 1592 2113 1064 889 1953
Total Cost 13,969 7978 21947
Page | 10
5. Arunachal Pradesh
5.1 Demographics:
5.1.1 Arunachal Pradesh, situated in the extreme North-East of India is the largest
state of the Region. The state remains as a hidden treasure of minerals and
natural resources till today. Development was extremely slow till it became a
state in 1987. Electricity was not known to the Rural People even up to late
sixties.
Page | 11
5.2.2 Inter State Transmission system in the state:
The state has five nos. of 132/33 kV ISTS substations, having total capacity of
205 MVA at Roing, Tezu, Namsai, Ziro and Nirjuli. Further, a 220/132 kV, 320
MVA ISTS substation at Namsai is under implementation.
State has total 887 ckm of existing ISTS network and 1042 ckm of planned /
under construction ISTS network. Brief details of the ISTS network are given
below:
Under Construction/
Voltage level Existing
Planned
ii) NERSS-X:
Roing (POWERGRID) – Chapakhowa (AEGCL) 132 kV D/c line alongwith
asscoiated bays (40 km)
A. Under Construction
Page | 12
Pare HEP (NEEPCO, Ar. Pradesh) – North Lakhimpur (AEGCL) 132 kV D/c
line with one circuit via Nirjuli (POWERGRID) (with ACSR Zebra conductor) –
(55 km + 5 km for LILO)
B. Planned
i) NERSS-XV: 36 months from the SPV transfer (only Arunachal Pradesh portion)
Page | 13
5.5. Analysis of proposals:
5.5.1 Proposed new Substations/Augmentation of existing substations alongwith
associated transmission lines:
Estimat
Name of Details of Demand
ed Brief Justification by
the downstream by 2030
Sl.No (MW) cost by State/
Sub- netwworks
State Remarks CEA Remarks
Station /LV feeders
(Rs Cr.)
1. Kimin Existing and 8 78 Presently, the town DoP, Arunachal
(Papum upcoming is powered through Pradesh had
Pare) local 33 kV lengthy unreliable informed that
132/33 feeders and 33 kV Sub- the length of
kV, 2x10 Sub- Transmission lines existing 33 kV
MVA S/s Stations of all the way from distribution line
LILO of Kimin area. Naharlagun and Ziro feeding Kamim
Naharlagu which travers area is around
n - through thick 47 km and the
Gerukamu jungles. Proposed area faces
kh 132 kV Sub-Station shall be frequent
S/c line at fed from the trippings,
132/33 kV upcoming voltage/power
Kimin S/s Naharlagun- quality issues
(7.5km) Gerukamukh 132 kV etc.
line through LILO Considering the
arrangement to be above, to
included in the Sub- supply reliable
Station project. and quality
power supply
to Kimim area,
the proposal
is
recommended
2. Raga, Existing and 8 75 Presently Raga is The
(Kamle) upcoming fed power with long approximate
132/33 local 33 kV 11 kV local feeders distance
kV, 2x10 feeders and from Tamen 33/11 between Ziro to
MVA S/s Sub- kV Sub-Station Raga is around
LILO of Stations of which again draws 45 km.
Ziro- Kamle unreliable power via Presently,
Daporijo district. a lengthy 33 kV power supply at
132 kV radial line passing Raga is through
S/c line at through dense low voltage
Raga jungles from Ziro long lines which
(Kamle)- 132/33 kV Sub- faces frequent
(6.5 km) Station. trippings and
voltage
regulation
issues. As
such, to
provide
reliable and
quality power
Page | 14
Estimat
Name of Details of Demand
ed Brief Justification by
the downstream by 2030
Sl.No (MW) cost by State/
Sub- netwworks
State Remarks CEA Remarks
Station /LV feeders
(Rs Cr.)
to Raga, the
proposal is
recommended
.
Page | 15
5.5.2 New transmission lines proposed:
Sl.No Name of Cost Brief Justification by State CEA Remarks
line (Rs. Crs)
Likabali- 225 The upcoming 400 km Considering the
1.
Basar 132 enhancement in
long 'Khuppi-Pasighat
kV S/c line- reliability of two long
132 kV line via Seppa,
(80 km) Rilo, Sagalee, lines, proposal is
Naharlagun, recommended.
Gerukamukh, Likabali,
Niglok, Napit and
Pasighat' under
Comprehensive Scheme
shall be running in parallel
to the existing 132 kV
long radial line of RHEP to
Pasighat via Ziro,
Daporijo, Aalo and
Pasighat of equal length
without any inter-
connecting anchoring and
power source in between.
Hence, for stabilizing
power flow of both these
two lines and increase
redundancies, the
proposed inter-
connecting line is
essential.
2. LILO of 25 The existing Pare- After strengthening of
Pare- Chimpu line with ISTS i.e. Gogamukh-
Chimpu associated system has Gerukamukh 132 kV line,
132 kV S/c power sources at Pare LILO of Pare-Chimpu line
line at 132 and Ranganadi HEPs and at Naharlagun / Yupia S/s
kV grid connectivities at BNC will not be required.
400/220/132 kV Sub-
Naharlagun
Station via Gohpur; while
/ Yupia S/s- the upcoming
(2 km) Naharlagun/Yupia 132/33
kV Sub-Station under
Comprehensive Scheme
is connected on the long
132 kV Khuppi-Pasighat
line under the same
scheme without any
intermediate anchoring
and connectivity to any
power source or grid
Page | 16
Sl.No Name of Cost Brief Justification by State CEA Remarks
line (Rs. Crs)
system till Pasighat.
Hence, for stabilized
power flow on the Khuppi-
Pasighat line corridor, the
proposed LILO
connectivity is essential.
KaHEP- 60 As deliberated in various Based on load flow
3.
Khuppi 132 meetings of Transmission studies, the proposal
kV D/c Line Planning forum, the gets justified as S/c line
(10 km) Khuppi-Kime (KaHEP) is observed to be 80%
old S/c line is critically loaded. The proposal is
overloaded. Hence, to recommended.
alleviate the overloading, Availability of space for
the proposed Double 132 kV bays at 400 kV
Circuit line between Kameng HEP of NEEPCO
KaHEP/Kime and Khuppi needs to be ensured.
132 kV Sub-Station is
essentially vital.
Niglok- 30 For ensuring reliability of This is ISTS level
4.
Jonai 132 the grid systems of both connection between
kV D/c line the states of Arunachal Assam and Arunachal
(5 km) Pradesh and Assam. Pradesh, hence, not
recommended as intra-
state transmission
system.
Page | 17
Chimpu is presently
connected to the grid
through several lines and
serves as node for Inter-
State power exchange
wherein the loading
capacity of ACSR Lynx is
found to be limiting and
needs upgradation to
meet any contingent
scenario. Therefore the
line is proposed to be
restrung with ACSR
Panther.
Page | 18
Sl.No. Name of the proposal Downstream network of Estimated Cost
the proposed as per DoP,
substations Arunachal
Pradesh
(Rs. Crs.)
LILO of Likabali-Basar ii) 33/11 kV Substation at
132 kV S/c line at Gensi (under
132/33 kV Garu, Lepa construction)
Rada S/s-(5 km) iii) 33/11 kV Substation at
Ego (under
construction)
v) KaHEP-Khuppi 132 -NA- 60
kV D/c Line (10 km)
vi) Reconductoring of -NA- 3.3
Lekhi-Chimpu 132 kV
S/c line (14.5 km).
vii) Replacement of -NA- 35
132/33 kV, 2x20 MVA
ICT with 2x50 MVA,
ICT at Chimpu,
Itanagar S/s*.
Total 533.3
*2x20 MVA ICT replaced from Chimpu shall be utilized at Lekhi 132/33 kV S/s
Note: State to ensure inter-connection of existing 33/11 kV S/s with the New
132/33 kV S/s recommended above in matching timeframe.
Page | 19
6. Assam
6.1. Demographics
6.1.1. Assam is a state in North Eastern India, South of the Eastern Himalayas along
the Brahmaputra and Barak River valleys. Assam covers an area of 78,438 sq
km (30,285 sq mi). The state is bordered by Bhutan and Arunachal Pradesh to
the North; Nagaland and Manipur in the East; Meghalaya, Tripura, Mizoram and
Bangladesh in the South; and West Bengal in the West via the Siliguri Corridor,
a 22 kilometres (14 mi) wide strip of land that connects the state to the rest of
India. Assamese and Bodo are the official languages of Assam, while Bengali
is official language in the Barak Valley.
Page | 20
Central 422 403 0 436 0 838 0 25 1285
Lower Subansiri – Biswanath Chariyali 400 kV 2xD/c (Twin Lapwing) line (359
ckm & 371 ckm): Matching with Lower Subansiri (2000 MW) HEP.
ii) NERSS-III:
Page | 21
iii) NERSS-XI (only Assam portion):
Installation of 3rd 220/132 kV, 1x100 MVA ICT, along with associated bays at
Salakati (POWERGRID)
Reconductoring of Siliguri – Bongaigaon 400 kV D/c Twin Moose line with Twin
HTLS conductor alongwith bay upgradation at both ends
Pare HEP (NEEPCO, Ar. Pradesh) – North Lakhimpur (AEGCL) 132 kV D/c
line with one circuit via Nirjuli (POWERGRID) (with ACSR Zebra conductor) –
(55 km)
Page | 22
6.3. Under implementation Intra State transmission/distribution schemes:
6.3.1 A total of 15 Nos. of packages which consists of 5 packages of transmission
lines, 4 packages of substations, 4 packages of distribution system,1 package
of pile work of TL have been considered under North Eastern Region Power
System Improvement Project. All the packages have been awarded.
Page | 23
3 New transmission line 30 784 1192 - 633
nd
including LILO and 2 Ckt
Stringing
4 Reconductoring of 6 366 366 - 303
transmission line
Page | 24
S.No Name of the Demand Estimated Brief Justification by State CEA Remarks
proposal by 2030 Cost by
(in MW) State (Rs.
Crs)
(AEGCL-Existing)
D/c Line – (26km)
3. Establishment of 140 105.03 Already agreed. The proposal
new 220/132 kV (2 (1st NERSCT) has already
x 160 MVA) GIS been agreed in
Substation at the 01st
Rowta NERSCT.
95.9 Assam had
informed that
they are
seeking
Rowta (AEGCL- funding from
New) - Rangia other sources
(AEGCL-Existing) as the
220 kV D/c Line – proposal is of
(80km) urgent nature.
As such, the
proposal has
not been
considered.
4. Establishment of 70 98.78 Already agreed. As the proposal
new 220/33 kV (2x ( 1st NERSCT) has already
100 MVA) GIS been agreed in
Substation at the 01st
Boragaon NERPC-TP, the
(Jalukbari) proposal is
Boragaon (Jalukbari) 20.16 recommended.
(AEGCL-New) -
Kukurmara (AEGCL-
Existing) D/c Line –
(21km)
5. Establishment of 70 98.78 Already agreed. The proposal
new 220/33 kV (2x ( 1st NERSCT) has already
100 MVA) GIS been agreed in
Substation at the 01st
Panjabari
NERSCT.
3.37
Assam had
informed that
they are
seeking
LILO of Sonapur-
Sarusajai (AEGCL- funding from
Existing) 220 kV S/c other sources
Line at Panjabari as the
(AEGCL- New) – (3 proposal is of
km) urgent nature.
As such, the
proposal has
not been
considered.
Page | 25
S.No Name of the Demand Estimated Brief Justification by State CEA Remarks
proposal by 2030 Cost by
(in MW) State (Rs.
Crs)
6. Establishment of 200 114.27 North Bank of Lower Assam Considering the
new 220/132 kV (2 (132 kV Rangia-Barnagar- present loading
x160 MVA) and Dhaligaon Section) is already and anticipated
220/33 kV, 2x100 overloaded condition. This part load, the
MVA GIS
of the system is more than 50 proposal is
Substation at
Barnagar GIS years old. Also two new recommended.
Substation substations i.e., Barpeta and
LILO of one circuit of 29.52 Nathkuchi are also coming up
Rangia (AEGCL- in the section. Load flow
Existing) - Salakati studies have already
(AEGCL-Existing) established the need for the
220 kV D/c Line at substation.
Barnagar (AEGCL-
New)-(24km)
Barnagar(New)- 0.62
Barnagar (existing)
132 kV D/c Line –
(0.5km)
7. Establishment of 180 86.17 Already agreed. The proposal
new 220/132 kV (2 (3rd NERPC-TP) had already
x160 MVA) and been agreed in
220/33 kV, 2x100 the 03rd
MVA GIS
NERPC-TP.
Substation at New
Dhaligaon Assam had
informed that
4.92
they are
seeking
LILO of both circuits
of Rangia (AEGCL- funding from
Existing) - Salakati other sources
(AEGCL-Existing) as the
220 kV D/c Line at proposal is of
New Dhaligaon urgent nature.
(AEGCL- New) – As such, the
(4km) proposal has
not been
considered.
8. Establishment of 25 97.67 Haflong is the District HQ of Halflong is
new 220/33 kV (2 x Dima Hasao District which is presently
100 MVA) connected with
completely tribal dominated
Substation at one S/c line
Halflong (GIS) territory and Haflong is the
only tourist hill station of from Halflong
Halflong (AEGCL- 115.62
Assam which is frequented by (PG).
New) - Silcoorie
(AEGCL-New) 220 thousands of tourists every The projected
kV D/c Line – (94km) load doesn’t
year. For the last several years
182.04 justify the
the district has witnessed
Halflong (AEGCL- requirement of
insurgency activities by
New) - Diphu 220/33 kV S/s.
different militant groups. However, to
(AEGCL-New) 220
kV D/c Line – During the recent flood satisfy ‘N-1’
(148km) situation, Haflong has criteria at 132
remained without any power kV level, the
Page | 26
S.No Name of the Demand Estimated Brief Justification by State CEA Remarks
proposal by 2030 Cost by
(in MW) State (Rs.
Crs)
for more than 3 (three) days as following
both 132 kV connectivity transmission
through PGCIL transmission system is
network had been under recommended:
outage due to collapse of Halflong
transmission towers. It is to be (AEGCL)-
noted that 132 kV Haflong- Srikona 132 kV
D/c line (55 km)
Jiribam section (PGCIL) has
witnessed repeated collapse of
towers due to severe
landslides. Considering these
perennial problems & in view
of the larger social issues like
development of tribal areas,
encouragement of tourism
industry etc. NERPC tabled a
special agenda for exploring an
alternative route to Haflong.
Accordingly, 2-3 no of
transmission routes have been
identified.
9. Establishment of 60 58.36 Already agreed. As the proposal
new 220/33 kV (2 x (03rd NERPC-TP) has already
100 MVA) been agreed in
Substation at the 3rd NERPC-
Diphu (AIS)
TP, the
Halflong (AEGCL- 182.04
proposal of
New) - Diphu
(AEGCL-New) 220 establishing
kV D/c Line – (148 new 220/33 kV
km) (2x100 MVA)
New Mariani 190 S/s at Diphu is
(PGCIL- Existing) - recommended
Diphu (AEGCL-New) with the
220 kV D/c Line – following
(155 km) connectivity:
99.63 i) New Mariani
(PGCIL-
Existing) -
Sankardev Nagar Diphu (AEGCL-
(AEGCL- New*) - New) 220 kV
Diphu (AEGCL-New) D/c Line – (155
220 kV D/c Line – km)
(81km) ii) Sankardev
Nagar (AEGCL-
* Substation under
New*) - Diphu
implementation
(AEGCL-New)
220 kV D/c line
– (81 km)
Page | 27
S.No Name of the Demand Estimated Brief Justification by State CEA Remarks
proposal by 2030 Cost by
(in MW) State (Rs.
Crs)
10. Establishment of 180 172.17 220/132/33 kV grid S/S at Proposed 220
new 220/132 kV (2 Silcoorie is proposed to infuse kV lines are
x 160 MVA) and 220 kV connectivity to Barrak found to be very
220/33 kV, 2x100 valley. This S/S will be lightly loaded.
MVA Substation at connected through 220 kV Further, outage
Silcoorie (GIS) Mariani – Diphu – Haflong – of complete
Halflong (AEGCL- Silcoorie connectivity. This 220 substation
115.62
New) - Silcoorie kV connectivity will act as should not be
(AEGCL-New) 220 sufficient redundancy in case of considered.
kV D/c Line – (94km) outage of 400 kV supply to Therefore, the
13.2 Silchar (Powergrid) S/S. From proposal is not
Silcoorie S/S, 132 kV link with justified.
Srikona(AEGCL- upcoming Ghungur S/S is
Existing) - Silcoorie proposed. Further, 220/33 kV
(AEGCL-New) 132 transformation at Silcoorie will
kV D/c Line – (15km) ease the future overloading
proposition at Panchgram and
Srikona S/S.
11. Establishment of 180 63.78 220/132/33 kV S/S at Amguri is As per the
new 220/132 kV (1 proposed (from S/c LILO of 220 system studies,
x 160 MVA) and kV Namrup – Mariani D/c line). power flow on
220/33 kV, 1x50 A solar power plant is coming the 132 kV lines
MVA Substation at
up very soon at Amguri. This are very less.
Amguri (AIS)
grid S/S is proposed in the Therefore, the
LILO of one circuit of 12.3
Namrup (AEGCL- immediate vicinity of the proposal is not
Existing) - Mariani upcoming solar plant. From justified.
(AEGCL-Existing) Amguri distribution loading is
220 kV D/c Line at proposed at 220/33 kV level.
Amguri (AEGCL- Further, from Amguri the 132
New) AIS – (10km) kV connectivity will also be
established through 132 kV
Amguri – Dikhowmukh –
Amguri (AEGCL-
Betbari D/c line. This will
New)-Dikhowmukh
(AEGCL-New) 132 immensely ease the power
kV D/c line – (28km) 24.64 supply position in the entire
eastern and northern part of
Sivasagar district.
12. Establishment of 24 70.23 Already agreed. The proposal
new 132/33 kV (2x (1st NERSCT) has already
50 MVA) GIS been agreed in
Substation at the 01st
Lumding
NERSCT.
8.05
LILO of Assam had
Shakardevnagar informed that
(AEGCL- Existing) - they are
Diphu (AEGCL- seeking
Existing) 132 kV S/c funding from
Line at Lumding other sources
(AEGCL-New) –
as the
(10km)
proposal is of
Page | 28
S.No Name of the Demand Estimated Brief Justification by State CEA Remarks
proposal by 2030 Cost by
(in MW) State (Rs.
Crs)
urgent nature.
As such, the
proposal has
not been
considered.
13. Establishment of 30 50.01 Already agreed. The proposal
new 132/33 kV (2 x (6th SCM) has already
50 MVA) AIS been agreed in
Substation at the 06th SCM of
Agamoni
NER.
15.41
Assam had
informed that
they are
seeking
LILO of Gossaigaon
- Gauripur (AEGCL- funding from
Existing) 132 kV S/c other sources
Line at Agamoni as the
(AEGCL- New) – proposal is of
(10km) urgent nature.
As such, the
proposal has
not been
considered.
14. Establishment of 25 50.01 Already agreed. The proposal
new 132/33 kV (2 x (1st NERSCT) has already
50 MVA) AIS been agreed in
Substation at the 01st
Serfanguri
NERSCT.
14.49
Assam had
informed that
they are
seeking
Serfanguri (AEGCL- funding from
New) - Kokrajhar other sources
(AEGCL-Existing) as the
132 kV D/c Line – proposal is of
(18km)
urgent nature.
As such, the
proposal has
not been
considered.
15. Establishment of 30 50.01 Already agreed. As the proposal
new 132/33 kV (2 x (1st NERSCT) has already
50 MVA) AIS been agreed in
Substation at the 01st
Dhing
NERSCT, the
Dhing (AEGCL- 19.09
proposal is
New) - Nagaon
(AEGCL- Existing) recommended.
132 kV S/c Line –
(35km)
Page | 29
S.No Name of the Demand Estimated Brief Justification by State CEA Remarks
proposal by 2030 Cost by
(in MW) State (Rs.
Crs)
16. Establishment of 40 50.01 Already agreed. The proposal
new 132/33 kV (2 x (1st NERSCT) has already
50 MVA) AIS been agreed in
Substation at the 01st
Udarbond (Silchar-
NERSCT.
2)
Assam had
4.02
informed that
they are
seeking
LILO of Pailapool funding from
(AEGCL- New) - other sources
Srikona (AEGCL- as the
Existing) 132 kV D/c proposal is of
Line – (5km) urgent nature.
As such, the
proposal has
not been
considered.
17. Establishment of 30 70.23 Already agreed. As the proposal
new 132/33 kV (2 x (1st NERSCT) has already
50 MVA) GIS been agreed in
Substation at the 01st
Titabor
NERSCT, the
Titabor (AEGCL- 16.1
proposal is
New) - Mariani
(AEGCL-Existing) recommended.
132 kV D/c Line – (20
km)
18. Establishment of 25 50.01 Already agreed. As the proposal
new 132/33 kV (2 x (1st NERSCT) has already
50 MVA) AIS been agreed in
Substation at the 01st
Chabua
NERSCT, the
LILO of Tinsukia 6.44
proposal is
(AEGCL-Existing) -
Dibrugarh (AEGCL- recommended.
Existing) 132 kV S/c
Line at Chabua
(AEGCL-New) –
(8km)
19. Establishment of 30 50.01 Already agreed The proposal
new 132/33 kV (2 (1st NERSCT) has already
x50 MVA) AIS been agreed in
Substation at the 01st
Morigaon
NERSCT.
16.1
Assam had
informed that
Baghjhap (Existing)- they are
Morigaon (New) 132 seeking
kV D/c Line – (20 km) funding from
other sources
as the
Page | 30
S.No Name of the Demand Estimated Brief Justification by State CEA Remarks
proposal by 2030 Cost by
(in MW) State (Rs.
Crs)
proposal is of
urgent nature.
As such, the
proposal has
not been
considered.
20. Establishment of 30 50.01 Already agreed. The proposal
new 132/33 kV (2 x (1st NERSCT) has already
50 MVA) AIS been agreed in
Substation at the 01st
Amayapur
NERSCT.
20.13
Assam had
informed that
they are
seeking
Amayapur (AEGCL- funding from
New) - Hajo other sources
(AEGCL-Existing) as the
132 kV D/c Line – (25 proposal is of
km)
urgent nature.
As such, the
proposal has
not been
considered.
21. Establishment of 25 50.01 Already agreed. As the proposal
new 132/33 kV (2 x (1st NERSCT) has already
50 MVA) AIS been agreed in
Substation at the 01st
Dhupdhara
NERSCT, the
Dhupdhra (AEGCL- 20.13
proposal is
New) - Boko
(AEGCL-Existing) recommended.
D/c Line – (25 km)
22. Establishment of 25 49.57 132/33 kV S/S at Lala is After the
new 132/33 kV (2 x proposed with connectivity discussion,
50 MVA) AIS through 132 kV Haliakandi – Assam stated
Substation at Lala Lala line. The area in and that the
17.6 around Lala suffers from low proposal may
Hailakandi(AEGCL- voltage and frequent be required
Existing)- interruption of power on beyond 2030
Lala(AEGCL-New) account of longer 33 kV route. and had
132 kV S/c line – Establishment of Lala grid S/S withdrawn the
(20km)
will improve the quality of proposal.
supply to these areas.
23. Establishment of 30 51.05 132/33 kV Patharkandi S/S is Considering
new 132/33 kV (2 x proposed (from LILO of 132 kV the
50 MVA) AIS Dullavcherra – Dharmanagar approximate
Substation at S/c line). Patharkandi comes distance
Patharkandi
almost midway between between
Karimganj(AEGCL- 30.8
Dullavcherra and Dullavcherra
Existing)-
Patharkandi(AEGCL Dharmanagar (Tripura) which to
Page | 31
S.No Name of the Demand Estimated Brief Justification by State CEA Remarks
proposal by 2030 Cost by
(in MW) State (Rs.
Crs)
-New) 132 kV S/c are separated by a distance of Dharmanagar
line – (35km) more than 60 km. The area (Tripura)
14.08 faces perennial low voltage (37.3 km) and
problem due to longer 33 kV supply of
route. Once a grid S/S comes power through
LILO of one circuit of up at Patharkandi from the 33 kV low
Dullavchara LILO of 132 kV Dullavcherra – voltage,
(AEGCL-Existing)-
Dharmanagar S/c line, along proposal is
Dharmanagar
(PGCIL-Existing) with additional 132 kV recommended
132 kV D/c line at connectivity from Karimganj so as to
Patharkandi – grid S/S, reliability of not only supply reliable
(16km) the Patharkandi will vastly power in that
improve but also the reliability area.
of Karimganj S/S will also
improve manifold.
24. Establishment of 25 50.86 132/33 kV S/S at Dikhowmukh Proposed lines
new 132/33 kV (2 x is proposed with back to back are found to be
50 MVA) AIS connectivity of 132 kV Amguri - very lightly
Substation at Dikhowmukh- Betbari loaded. As
Dikhowmukh
(Sibasagar) link. This S/S will such, the
Amguri(AEGCL- 24.64
cater to the expected load proposal is not
New)-
Dikhowmukh(AEGC growth of Gaurisagar and justified.
L-New) 132 kV D/c Dikhowmukh area. It is worth
line – (28km) mentioning that the historic
28.16 shrine of Azan Pir, the
seventeenth century sufi saint,
is situated in this area thereby
possessing a very good
Betbari(AEGCL- potential for growth of tourism.
Existing)- Further, connecting the Betbari
Dikhowmukh(AEGC
S/S from Dikhowmukh will
L-New) 132 kV D/c
line – (32km) increase reliability of Betbari as
presently there is no
redundancy for Betbari which
caters to the load of major part
of Sibasagar township.
25. Establishment of 30 70.23 132/33 kV S/S at Digboi is Based on the
new 132/33 kV (2 x proposed (from LILO of 132 kV load flow
50 MVA) GIS Tinsukia – Rupai S/c) to meet studies, the
Substation at up the high load growth of proposal is
Digboi
Digboi area and the IOC-Digboi justified.
LILO of 8.8
which presently depends on 33 Therefore,
Margherita(Ledo)
(AEGCL-Existing) - kV supply from Margherita. recommended.
Tinsukia (AEGCL-
Existing) 132 kV S/c
Line at Digboi
(AEGCL-New) – (10
km)
Page | 32
S.No Name of the Demand Estimated Brief Justification by State CEA Remarks
proposal by 2030 Cost by
(in MW) State (Rs.
Crs)
26. Establishment of 30 50.86 132/33 kV S/S at Jonai is Based on the
new 132/33 kV (2 x proposed through radial anticipated
50 MVA) AIS connection from 132 kV Simen demand, the
Substation at Jonai Chapori GSS. The 33 kV Jonai substation is
36.08 S/S of APDCL caters to the required.
load of eastern most parts of Therefore, the
Jonai (AEGCL- New) Dhemaji district. Jonai S/S, proposal is
- Silapathar once commissioned shall be recommended.
(AEGCL-New) 132 able to cater to the load of
kV S/c Line on D/c eastern part of Dhemaji district
Tower – (41 km) as well as the border area of
Assam and Arunachal
Pradesh.
27. Establishment of 30 50.86 Already agreed. As the proposal
new 132/33 kV (2 x (3rd NERPC-TP) has already
50 MVA) AIS been agreed in
Substation at the 03rd
Ghilamora
NERPC-TP, the
LILO of one circuit of 22
proposal is
North Lakhimpur
(AEGCL- Existing) - recommended.
Dhemaji (AEGCL-
Existing) 132 kV D/c
Line at Ghilamora
Substation – (25 km)
28. Establishment of 25 50.07 132/33 kV Belisiri S/S is Dhekiajuli is
new 132/33 kV (2 x proposed (132 kV Dhekiajuli – connected to
50 MVA) AIS Belsiri line) to meet up the Rowta and
Substation at growing demand of Missamari Depota through
Belsiri
area of Sonitpur district. After a 132 kV S/c
24.64
few years from now it will not be lines. From load
possible for Dhekiajuli GSS flow studies, it
alone to cater to the growing was observed
demand of the area as a that even after
number of Tea-estates along addition of 25
Dhekiajuli(AEGCL-
Existing)- Belsiri with vital defence installations MW of load, the
(AEGCL-New) 132 are located in this area. system remains
kV S/c line on D/c N-1 compliant.
tower – (28 km) As such, the
scheme is not
required.Theref
ore, the same is
not
recommended.
29. Establishment of 30 50.86 One 132/33 kV S/S is prposed Based on the
new 132/33 kV (2 x - either at Bezera (Kamrup- load flow
50 MVA) AIS Rural district) or at studies, the
Substation at Dumunichowki (Darrang proposal is
Dumunichowki
district) through 132 kV justified. As
Sishugram(AEGCL- 18.48
Sishugram – Bezera D/c line to such, the
Existing)-
Dumunichowki cater to the high growth of
Page | 33
S.No Name of the Demand Estimated Brief Justification by State CEA Remarks
proposal by 2030 Cost by
(in MW) State (Rs.
Crs)
(AEGCL-New) 132 demand in and around these Proposal is
kV S/c line on D/c locations as the proposed state recommended.
tower – (21 km) capital region and the
upcoming bridge across
Brahmaputra from
Bharalumukh area of Guwahati
to North Guwahati connecting
the proposed AIIMS will
obviously give rapid boost to
the development of the area.
Further, for establishment of
transmission linkage for this
S/S, the Right of Way of
existing 132 kV Sishugram –
PBSL line may be used. Also,
the required land for the S/S
may be acquired from the
government land which is
abundantly available within the
complex of PBSL. The
reliability of Sipajhar S/S at
Mangaldoi will be increased
through back to back
connection of Sishugram –
Dumunichowki - Sipajhar
transmission link.
30. Establishment of 30 50.86 132/33 kV Doulasal S/S is Considering the
new 132/33 kV (2 x proposed (from LILO of 132 kV projected
50 MVA) AIS Barpeta-Amayapur D/c line) to demand, the
Substation at meet up the growing demand of proposal is
Doulasal
the southern parts of Nalbari recommended.
52.8
district as well as the eastern
part of Barpeta district. The
Barpeta(AEGCL- reliability of Barpeta GSS will
Existing)- Amayapur be enhanced through
(AEGCL-New) 132 connection of 132 kV
kV D/c line with LILO Amayapur-Doulasal-Barpeta
of one circuit at
link as the new link will create
Doulasal
redundancy for Barpeta in the
event of loss of connectivity
from Dhaligaon-Nalbari LILO.
31. Establishment of 25 50.86 132/33 kV North Salmara S/S After
new 132/33 kV (2 x is proposed with S/c Line from discussions,
50 MVA) AIS 132 kV APM (Jogighopa) to Assam had
Substation at North cater to the high growth of stated that the
Salmara
demand in and around the proposal may
North Salmara 10.56
location and APM S/S will not be required
(AEGCL-New) -
APM (AEGCL- be able to cater to all the load beyond 2030
Existing) 132 kV S/c growth. and had
line – (12 km)
Page | 34
S.No Name of the Demand Estimated Brief Justification by State CEA Remarks
proposal by 2030 Cost by
(in MW) State (Rs.
Crs)
withdrawn the
proposal.
32. Establishment of 25 50.86 Already agreed. The proposal
new 132/33 kV (2 x (3rd NERPC-TP) has already
50 MVA) AIS been agreed in
Substation at the 03rd
Tikrikilla
NERPC-TP.
7.04
However,
Assam had
informed that
they are
seeking
LILO of Agia -
Hathsingimari funding from
(AEGCL-Existing) other sources
132 kV S/c Line at as the
Tikrikilla – (8km) proposal is of
urgent nature.
As such, the
proposal has
not been
considered.
33. Establishment of - 50.86 Already agreed. The proposal
new 132/33 kV (2 x (3rd NERPC-TP) has already
50 MVA) AIS been agreed in
Substation at the 03rd
Modertoli (Kampur)
NERPC-TP.
8.88
However,
Assam had
informed that
they are
LILO of one circuit of
seeking
Samaguri (AEGCL-
Existing) - funding from
Sankardevanagr other sources
(AEGCL-Existing) as the
132 kV D/c Line at proposal is
Modertoli (Kampur) – urgent in
(10 km) nature. As
such, the
proposal has
not been
considered.
Page | 35
6.4.2. New transmission lines:
S.No Transmission lines Estimated Brief Justification by State CEA Remarks
proposed Cost by
State
(Rs. Crs)
1. Amingaon-Mirza 140 220 kV Amingaon Sub- From load flow studies,
220 kV D/c Line – station is coming up under 220 kV Amingaon is
(38 km) NERPSIP scheme being observed to be N-1
implemented by PGCIL on compliant in case of
behalf of AEGCL. The 220 outage of one circuit of
kV connectivity is only 220 kV Amingaon-
through a S/c LILO of D/c Rangia new line. As
line between existing such, the proposal is not
220/132/33 kV Rangia Sub- recommended.
Station and 400/220 kV
Rangia new Sub-station.
2. Rowta-Sonabil 92.25 Already agreed. As the proposal has
220 kV D/c Line – (3rd NERPC TP) already been agreed in
(75 km) the 03rd NERPC-TP, the
proposal is
recommended.
3. 2nd Ckt Stringing 35.03 2nd ckt of 220 kV Namrup- The proposal is
of Namrup-Mariani Mariani Line is required for recommended for
220 kV S/c on D/c Grid security and reliability. enhancement in
Line – (146 km) Moreover, Namrup reliability.
Replacement Power Plant
(NRPP) (100 MW) is coming
up along with 70 MW Solar
plant at Amguri between
Mariani and Namrup. 2nd ckt
is of urgent necessity for
Grid operation.
4. Revival of one 93.92 220 kV Samaguri-Mariani The proposal is of
circuit of line-1 has been under very restoration of a line and
Samaguri-Mariani long outage. It is a very to be covered under
220 kV D/c Line – important link between O&M expenses. As
(168 km) Samaguri and Mariani S/S such, the proposal is not
and new substations are recommended.
also coming up in the
section. Revival of this link is
of utmost importance.
5. North Lakhimpur- 55.44 Already agreed. The proposal has
Dhemaji 132 kV (3rd NERPC-TP) already been agreed in
D/c Line – (63 km) the 03rd NERPC-TP.
Assam had informed
that they are seeking
funding from other
sources as the
proposal is of urgent
nature. As such, the
proposal has not been
considered.
Page | 36
S.No Transmission lines Estimated Brief Justification by State CEA Remarks
proposed Cost by
State
(Rs. Crs)
6. Diphu-Bokajan 44 Already agreed. As the proposal has
132 kV S/c Line – (3rd NERPC-TP) already been agreed in
(50 km) the 03rd NERPC-TP, the
proposal is
recommended.
7. 2nd circuit 55 132/33 kV Grid S/S is at For enhanced reliability
stringing of Agia- Tikrikilla approved through and redundancy, the
Hathsingimari 132 LILO of 132 kV Agia – proposal is
kV S/c on D/c Line Hatsingimari, primarily due recommended.
– (110 km) to the fact that the said route
length of the line is more
than 110 km and there is no
Grid sub-station between
Agia and Hatsingimari. 2nd
Ckt of Agia-Hathsigimari is
required for redundancy and
stability of the Grid.
8. Naharkatia 31.98 Load flow studies have To provide downstream
(AEGCL-New) - already established the connectivity from
Behiating need for the line. proposed Naharkatia
(AEGCL-Existing) 400 kV Substation, the
220 kV D/c Line – proposal is
(40 km) recommended.
Page | 37
6. Amingaon- North Bank of Lower Based on the load flow studies,
Dhaligaon 132 kV Assam (132 kV the proposal may be required.
Section except Rangia-Barnagar- However, Assam had
Rangia-Nathkuchi- Dhaligaon Section) is informed that they are
Barnagar 132 kV already under seeking funding from other
Section – (140 km) overloaded condition. sources as the proposal is of
This part of the urgent nature. As such, the
system is more than proposal has not been
159.6 50 years old. Also two considered.
new substations i.e.,
Barpeta and
Nathkuchi are also
coming up in the
section. Load flow
studies have already
established the need
for the substation.
Page | 38
S.No Name of the proposal Details of Estimated cost as
Downstream per SoR of Assam
newtork (Rs. Crs)
New Mariani (PGCIL- Existing) - Diphu (AEGCL- Dillai, Diphu 325.5
New) 220 kV D/c Line – (155km) Medical College
Page | 39
S.No Name of the proposal Details of Estimated cost as
Downstream per SoR of Assam
newtork (Rs. Crs)
Bezera, 33.6
Sishugram(AEGCL-Existing)- Dumunichowki
(AEGCL-New) 132 kV S/c line on D/c tower – (21
Bhagdhora,
km) Dipila
Page | 40
7. Manipur
7.1. Demographics
7.1.1. Manipur is a state in Northeast India, with the city of Imphal as its capital. It is
bounded by the Indian states of Nagaland in the North, Mizoram in the South
and Assam in the West. It also borders two regions of Myanmar, Sagaing
Region in the East and Chin State (Myanmar) in the South. The state covers an
area of 22,327 square kilometres (8,621 square mi) and has a population of
almost 3 million, including the Meiteis, Nagas, Kukis, Zomis and other smaller
communities who speak a variety of Sino-Tibetan languages. Manipur has been
at the crossroads of Asian economic and cultural exchange for more than 2,500
years.
Page | 41
Central 113.6 24.8 0.00 96.6 0.00 121.4 0.00 1.13 236.13
Total 114.2 24.8 0.00 96.6 36.00 157.4 0.00 6.795 278.4
% 41 15.8 0.00 61.4 22.9 56.5 0.00 2.5 100.00
A. Under Construction
i) NERSS-XI:
Installation of 420 kV, 2x63 MVAr switchable line reactors, one in each circuit
of Silchar (POWERGRID) – Imphal (POWERGRID) 400 kV D/c line at Imphal
end.
iii) NERSS-XII:
Reconductoring of Dimapur – Imphal-Leimatak and Leimatak (Loktak) –
Jiribam 132 kV lines alongwith bay upgradation at both ends and tower
strengthening, if necessary.
Page | 42
B. Planned
NERES-XVII:
Page | 43
S.No Name of line Estimated Brief Justification by State CEA Remarks
Cost by
State
(Rs. Crs)
Tamenglong- 103.98 Tamenglong is connected in Considering the N-1
1. Karong 132 kV S/c the intra state grid feeding from reliability at
line-70 km Rengpang. Connectivity with Tamenlong,
Karong will enhance the proposal may be
reliability of the power supply required. MSPCL
system in Tamenglong as informed that the
Karong is connected to NER terrain doesn’t allow
Grid Tamenglong to be
connected to other
nodes.
As such, the
proposal is
recommended.
2nd circuit stringing 13.21 Both the S/c lines were erected In case of
2. of Rengpang- in D/c tower.The 2nd ckt are contingency at
Tamenglong 132 kV being planned in view of the Tamenglong-
S/c on D/c lines-30 increasing demand of the areas Karong 132 kV S/c
km for future prospect. line (recommended
at sl.no.1), the
loading at
Rengpang-
Tamenglong 132 kV
S/c increases. To
have N-1 reliability at
Tamenglong, the
proposal is
recommended.
3. LILO of Imphal- 11.42 Dimapur-Imphal 132 kV Karong is being
Dimapur 132 kV line transmission line is being re- upgraded to 3x20
at 132 kV Karong conductored with HTLS. Hence MVA and Imphal-
S/s by HTLS-6 km the LILO transmission line at Dimapur 132 kV line
Karong on Imphal-Dimapur line is being upgraded
is also proposed for with HTLS.
reconductoring with HTLS As scuh, for optimum
utilization of
enhanced capacity,
LILO of Dimapur-
Imphal at Karong
with HTLS is
recommended.
4. 132 kV 11.74 For enhanced reliability. To meet N-1
Yaingangpokpi- reliability at
Hundung 2nd circuit Hundung, the
stringing – 25 km proposal is
recommended.
5. 132 kV Kakching- 11.74 For enhanced reliability. Load at Chandel and
Chandel 2nd circuit Moreh is very less
stringing – 27.5 km and presently fed
Page | 44
S.No Name of line Estimated Brief Justification by State CEA Remarks
Cost by
State
(Rs. Crs)
6. 132 kV Kakching- 19.06 radially. As such, the
Moreh 2nd circuit proposals is not
stringing - 55 km recommended.
Page | 45
S. Name of line Cost Brief Justification by State CEA Remarks
No. (Rs. Crs)
bay equipments arrangement will
at Kongba-(78 facilitate
km) transmission of
6. 115.10 power supply from
another section of
Ningthoukhong - the ring. Hence the
Yurembam 132 complete ring circuit
kV D/c line – requires
(27.5 km) upgradation to
HTLS and is
recommended.
Page | 46
6. Ningthoukhong - Yurembam 132 kV D/c line- (27.5 km) 115.10
Total 729
Page | 47
8. Meghalaya
8.1. Demographics
Meghalaya was previously part of Assam, but on 21st January 1972, the districts
of Khasi, Garo and Jaintia Hills became the new state of Meghalaya. The
population of Meghalaya as of 2014 was estimated to be 3,211,474. Meghalaya
covers an area of approximately 22,430 square kilometres.
8.2. Electricity profile of state
8.2.1. Power generation-demand scenario of state:
In the FY 2021-22, Meghalaya had peak electricity demand of 408 MW and
total electrical energy requirement of 2,256 MU. As on 31.03.2022, state has
installed capacity of 248.56 MW in central sector which includes hydro plants
(87.27 MW) and thermal plants (161.29 MW). In addition, installed capacity in
state sector is 354.53 MW and installed capacity in private sector is 17.95 MW.
Per capita consumption of the state was 751 kWh in the year 2021-22.
The projected peak electricity demand as per 20th EPS report will be 546 MW
in the year 2029-30.
Peak electricity demand (MW) of Meghalaya for the year 2030 as per the 20 th
EPS Report and demand estimated for the year 2029-30 as per the state is
given below:
Peak electricity Estimated Peak
Actual peak
demand as per electricity
electricity
Year 20th demand
demand
EPS Report for for the year
(2021-22)
the year 2029-30 2029-30
Peak electricity
demand (MW) 408 546 699
Page | 48
State has total 585 ckm of existing ISTS network and 282 ckm of planned /under
construction ISTS network. Brief details of the ISTS network are given in the
table below:
Voltage level Under Construction/
Existing
Planned
132 kV 168 ckm 37 ckm
400 kV 417 ckm 245 ckm*
Total 585 ckm 282 ckm
*Initially operated at 220 kV
Detailed progress of under implementation/planned ISTS system in Meghalaya
by POWERGRID and under TBCB (as on April, 2022) are as given below:
Under Construction & Planned ISTS under ISTS
A. Under Construction
Page | 49
8.3. Transmission proposals submitted:
The brief of the proposals submitted by state are given in table below:
Page | 50
8.4. ANALYSIS OF PROPOSALS:
8.4.1. Proposed new substations alongwith their associated transmission lines:
Sl.No. Name of the Project Estimated Brief CEA remarks
Substation ed Cost (Rs. Justificati
demand Crs) on/remark
by 2030 s by State
(MW)
1. Mynkre 400/220, 2x315 150 400 Evacuation Considering the projected load,
MVA and 220/132 kV, of ISTS requirement of 400/220 kV S/s at
2x160 MVA Sub power and Mynkre, is not justified. However,
station 210 MW 220/132 kV, 2x160 MVA S/s at
LILO of both circuits of 21 New Mynkre is recommended with
Silchar-Azara 400 kV Leshka II 220 kV connectivity as given
D/c line at Mynkre – (6 HEP below:
km) LILO of both the circuits of under
Nangalbibra (ISTS)- 1032 construction Nangalbibra-New
Mynkre (via Ichamati) Shillong 220 kV D/c line at
400 kV D/c line Mynkre (2x80 km).
(charged at 220 kV) –
(295 km)
Mynkre -Mustem 220 210
kV D/c Line – (60 km)
2. New Shillong, 400/220 350 250 Evacuation Considering the projected load, in
kV, 2x315 MVA Sub of ISTS the load flow studies, the 400 kV
station power and lines proposed was observed to
Ring main be very lightly loaded. Therefore,
LILO of one circuit of 35
of the proposal is not justified.
Silchar- Byrnihat 400 kV
NERPSIP However, for disbursal of power
D/c line at New Shillong
220 kV from Leshka-II HEP, connectivity
– (10km)
from Sohra at 220 kV level have
LILO of both the circuits 45 been considered and Sohra
of Nangalbibra(ISTS) - 220/132 kV, 2x160 MVA S/s is
New Shillong 220 kV recommended with following
D/c line on Multi Circuit connectivity:
towers at Mustem – LILO of both the circuits of
(10km) Nangalbibra-New Shillong at
LILO of both the circuits 105 Sohra (2x30km).
of Nangalbibra (ISTS) -
New Shillong 220 kV
D/c line on Multi Circuit
towers at Sohra –
(30km)
3. Ichamati 220/132 kV, 45 200 Govt of Considering the load of 45 MW by
2x160 MVA S/s and Meghalaya 2030, the establishment of
132/33 kV, 2x50 MVA sanctioned 220/132 kV S/s is not justified.
S/s Survey, However, 132/33 kV, 2x50 MVA
Mawphlang - Ichamati 158 DPR Ichamati S/s may be
220 kV D/c line completed implemented. As informed by
including LILO of both Meghalaya, Ichamati being a
the circuits at Sohra – border area with BSF
(45 km)
Page | 51
Sl.No. Name of the Project Estimated Brief CEA remarks
Substation ed Cost (Rs. Justificati
demand Crs) on/remark
by 2030 s by State
(MW)
120 establishment and therefore,
needs quality reliable power.
Ichamati –Sohra 132
For better reliability, 132 kV D/c
kV D/c line – (40 km)
line from Ichamati to Sohra is
recommended.
4. Nongstoin 220/132 kV 200 200 Evacuation Considering the projected load as
2x160 MVA Substation from per EPS data, the requirement of
LILO of one circuit of 875 Nangalbibr 220/132 kV S/s at Nongstoin
proposed Killing - a ISTS doesn’t get justified. However, to
Nongalbibra (ISTS) 400 keep the system N-1 reliable, one
kV D/c Line (charged at additional 132 kV connectivity
220 kV) at Nongstoin – may be explored. Therefore, the
(250km) proposal is not recommended.
Page | 52
Sl.No. Name of the Project Estimated Brief CEA remarks
Substation ed Cost (Rs. Justificati
demand Crs) on/remark
by 2030 s by State
(MW)
9. Bhoilymbong (near 25 60 Evacuation Considering the load as per 20th
Umroi Airport) 132/33 of power EPS, requirement of 132 kV S/s
kV, 2x25 MVA Sub from New is not justified. Therefore, the
station Shillong S/s proposal is not recommended.
New Shillong -
Bhoilymbong 132 kV
D/c line and
Bhoilymbong –Nongpoh
132 kV D/c line –(60 km)
10. Balat 132/33 kV, 2x25 30 65 For reliable Considering the projected
MVA S/s and Bay power demand as per 20th EPS, the
extension at Sohra S/s supply in requirement of 132/33 kV S/s is
Sohra - Balat 132 kV 150 Balat area not justified. Therefore, the
D/c line – (50 km) presently proposal is not recommended.
Ichamati- Balat 132 kV 348 fed through
D/c line – (116 km) long 33 kV
lines.
11. Pongtung (near 30 60 For reliable Pongtung (near Mawlynnong) is
Mawlynnong) 132/33 power a toursit destination as well as
kV, 2x25 MVA Sub supply in border area and needs reliable
station Pongtung power supply. As such, to resolve
LILO of one circuit of 180 area the issue of long 33 kV lines, the
Sohra- New Shillong presently proposal of Pongtung (near
(Approved during the fed through Mawlynnong) 132/33 kV, 2x 25
22nd NERPC meeting long 33 kV MVA Sub station is
on 28.03.2022.) 132 kV lines. recommended with the following
D/c line at Pongtung & connectivity:
Umiew – (60 km) Sohra-Pongtung 132 kV D/c line
(25 km)
12. 132/33 kV, 2x25 MVA 30 60 Power Radial distance measured from
Sub station at Umiew supply Google maps, shows Umiew to
Upper Shillong reliablity in N.Shillong distance of around 6
Upper km. As per the projected demand,
Shillong 33 kV n/w is sufficient enough to
area and meet the load. Therefore, the
suburb . proposal is not recommended.
13. Mawlynrei 132/33 kV, 50 100 Meeting Radial distance measured from
3x25 MVA GIS load Google maps, shows Mawlynrei
Substation demand of to N.Shillong distance of around
Old 7 km.
NEIGRIHMS - 30
Shillong, The projected load can be easily
Mawlynrei 132 kV D/c
NERPC & met with downstream network of
(with HTLS) – (10 km)
PGCIL 33 kV network. Therefore, the
Complex proposal is not recommended.
and
evacuation
of power
from New
Shillong
(NERPSIP)
Page | 53
Sl.No. Name of the Project Estimated Brief CEA remarks
Substation ed Cost (Rs. Justificati
demand Crs) on/remark
by 2030 s by State
(MW)
14. Nongkhlaw 132/33 kV, 25 60 Evacuation As discussed with MePTCL, the
2x25 MVA Substation from Stage- substation is required beyond
III Power 2030. As such, the proposal is not
Station, considered.
Ring main
Stage III Power House - 285 power
Nongkhlaw (near supply to
Mairang) 132 kV D/c new District
line and Nongkhlaw – Hq of
Nongstoin 132 kV D/c Mairang
line – (95 km)
15. Shangpung 132/33 kV, 25 60 Load Radial distance of Shangung to
2x25 MVA Substation demand Khlieriahriat is around 14 km. As
LILO of both the circuits 105 growth of per the projected demand, the
of proposed New Laskein proposal may not be required.
Shillong –Khliehriat(PG) block and System was observed to be N-1
132 kV D/c at N-1 relief of compliant. Hence the proposal is
Shangpung – (70km) Khliehriat not recommended.
Page | 54
8.4.2. New Transmission lines:
Estimated Brief
Sl. No. Name of the transmission line Cost Justification/remarks CEA Remarks
(Rs Cr) by States
Due to uncertainty in
N-1 Evacuation of commissioning schedule of
MLHEP-II - Sohra 220 kV power from Leshka Generating stations, intra-state
1. 297.50
D/c line – (85 km) II Hydro Project of transmission proposals for
210 MW evacuation of power have not
been considered.
Load details, present
Power Evacuation connectivity at IIM not provided.
New Shillong- IIM 132 kV D/c
2. 24.00 from New Shillong The proposal could not be
line (8 km)
S/s (NERPSIP) studied and hence is not
recommended.
Presently 132 kV
Mendipathar-
Ronkhon-Ampati- Projected load can be met with
Phulbari is radial the transmission system
Mendipathar – Phulbari 132
3. 234.00 line. With the already in place/under
kV D/c line (78 km)
proposed line, N-1 construction. As such, the
will be fulfilled for proposal is not recommended.
Ronkhon, Ampati,
Phulbari areas.
Baghmara 132/33 kV S/s has
Ring Main Power
been agreed for
supply to Baghmar
implementation with
Ampati-Dalu-Baghmara 132 and southern Garo
4. 300.00 connectivity from Ampati and
kV D/c line (100 km) Hills and power
Nangalbibra 132 kV D/c lines.
corridor to
As such, the proposal is not
Bangladesh.
recommended.
Stringing of 2nd Circuit of Providing alternate
Based on the power flow
Ganol - Ampati 132 kV S/c N-1 for Ganol Hydro
5. 135.00 studies, the proposal is not
line on existing Towers (45 project and Ampati
recommended.
km) region
Power evacuation of
Wah Umiam Stage-III – the proposed 85
6. Ichamati 132 kV D/c line (170 510.00 MW, Wam Umiam-
km) III HEP under
NEEPCO Due to uncertainty in
Power evacuation of commissioning schedule of
Wah Umiam Stage-I - Sohra the proposed 50 Generating stations, intra-state
7. 210.00 transmission proposals for
S/S 132 kV D/c line (70 km) MW, Wam Umiam-I
HEP evacuation of power have not
been considered.
Power evacuation of
Wah Umiam Stage-II - Balat the proposed 100
8. 330.00
132 kV D/c line (110 km) MW, Wam Umiam-II
HEP
Power flow on the lines is
Mynkre (NERSIP) – Power evacuation
observed to be very less.
9. Lumshnong 132 kV D/c line 60.00 from Mynkre S/S
Therefore, the proposal is not
(20 km) (NERPSIP)
recommended.
Page | 55
8.4.3. Reconductoring of Existing Transmission lines:
S. Estimat CEA Remarks
Justification/
No. Name of the ed Excsisting
COD remarks by
line Cost Conductor
State
(Rs Cr)
1. NEHU- Loading observed on the lines
Mawlyndep- Increase in are well within the thermal
Mustem- ACSR current capacity. Hence, the proposal is
126 1996
Khliehriat 132 Panther carrying not recommended.
kV S/c line – capacity
(56 km)
2. Stage 1 - Increase in Loading observed on the lines
Umiam 132 kV ACSR current are well within the thermal
14 1991
S/c line – (6 Panther carrying capacity. Hence, the proposal is
km) capacity not recommended.
3. Increase in Loading observed on the lines
Umiam-NEHU
ACSR current are well within the thermal
S/c line – (14 32 1991
Panther carrying capacity. Proposal is not
km)
capacity recommended.
4. Stage 1- Increase in Loading observed on the lines
Mawlai 132 kV ACSR current are well within the thermal
28 1964
S/c line (12.35 Panther carrying capacity. Proposal is not
km) capacity recommended.
5. Increase in Loading observed on the lines
Stage 1- Stage
ACSR current are well within the thermal
2 132 kV S/c 7 1969
Panther carrying capacity. Proposal is not
line – (3.1 km)
capacity recommended.
6. Increase in Loading observed on the lines
Umtru-Stage-III
ACSR current are well within the thermal
132 kV D/c line 95 1964
Panther carrying capacity. Proposal is not
– (42.1 km)
capacity recommended.
7. Umtru- Increase in Loading observed on the lines
Kahilipara 132 ACSR current are well within the thermal
26 1964
kV D/c line – Panther carrying capacity. Proposal is not
(11.6 km) capacity recommended.
8. Increase in Loading observed on the lines
NEHU- Mawlai
ACSR current are well within the thermal
132 kV S/c line 14 1996
Panther carrying capacity. Proposal is not
– (6 km)
capacity recommended.
9. Increase in Sarusajai (Assam)-UPS
UPS-Sarusajai
ACSR current (Megalaya) is an ISTS line and
132 kV D/c line 45 1996
Panther carrying not recommended under intra-
– (20 km)
capacity state.
10. To cater to Loading observed on the lines
132 kV the increase are well within the thermal
Khliehriat- in ISTS capacity. Proposal is not
ACSR
Khliehriat (PG) 18 1997 power flow recommended.
Panther
– circuit- 1 (7.8 due to
km) increase in
demand
Page | 56
S. Estimat CEA Remarks
Justification/
No. Name of the ed Excsisting
COD remarks by
line Cost Conductor
State
(Rs Cr)
11. To cater to Loading observed on the lines
132 kV the increase are well within the thermal
Khliehriat- in ISTS capacity. Proposal is not
ACSR
Khliehriat (PG) 12 2006 power flow recommended.
Panther
– circuit- 2 due to
(5.35 km) increase in
demand
Page | 57
S.No. Name of substation Proposed Load Estimated Brief CEA Remarks
capacity demand Cost Justification/rema
(MVA) by 2030 (Rs. Crs) rks by state
(MW)
GIS S/s at 2030. As such,
Lumshnong the proposal is
not considered.
6. Upgradation and 2x25 40 60 Augment, Present
modernisation of Upgrade, configuration of
Khliehriat 132/33 kV Modernise old the substation
SubStation including substations to was not
providing 33 kV ensure reliability , provided.
Switchyard and extend life Therefore, the
span proposal have
not been
considered.
7. Replacement of 2x50 90 15 Augment, As discussed
132/33 kV 2x20 MVA Upgrade, with MePTCL,
ICTs with 2x50 MVA Modernise old the substation
ICTs at Rajabagan substations to augmentation is
EPIP-I S/s ensure reliability , required beyond
and extend life 2030. As such,
span the proposal is
not considered.
8. Replacement of 2x50 90 10 Augment, Based on the
132/33 kV 1x50 MVA Upgrade, projected load,
ICT with 2x50 MVA Modernise old the proposal is
ICTs at EPIP-II substations to recommended.
Norbong S/s ensure reliability ,
and extend life
span
9. Replacement of 2x25 30 10 Augment, Based on the
132/33 kV, 1x20 Upgrade, projected load,
MVA ICT with 2x25 Modernise old the proposal is
MVA ICTs at substations to recommended.
Nongstoin S/s. ensure reliability , 01 No. 20 MVA
and extend life ICT to be utilized
span from other
substations
10. Replacement of 2x50 80 60 Augment,
132/33 kV 2x20 MVA Upgrade,
ICTs with 2x50 MVA Modernise old
ICTs at Mawphlang substations to
S/s ensure reliability ,
and extend life
span
11. Replacement of 2x50 80 25 Augment,
132/33 kV 2x20 MVA Upgrade,
ICTs with 2x50 MVA Modernise old
ICTs at Umiam S/s substations to As discussed
alongwith new 33 kV ensure reliability , with MePTCL,
AIS Switchyard and extend life the substation
span augmentation
12. Replacement of 2x50 70 15 Augment, from sl.no. 10 to
132/33 kV 2x20 MVA Upgrade, 13 is required
ICTs with 2x50 MVA Modernise old beyond 2030. As
ICTs at Mawlyndep substations to such, the
S/s ensure reliability , proposal is not
and extend life considered.
span
Page | 58
S.No. Name of substation Proposed Load Estimated Brief CEA Remarks
capacity demand Cost Justification/rema
(MVA) by 2030 (Rs. Crs) rks by state
(MW)
13. Replacement of 2x50 70 15 Augment,
132/33 kV 2x20 MVA Upgrade,
ICTs with 2x50 MVA Modernise old
ICTs at Mendipathar substations to
S/s ensure reliability ,
and extend life
span
Page | 59
S.No. Details of the substations Details of Downstream Estimated
network Cost as
Associated Transmission system per
Meghalaya
SoR
(Rs. Crs)
v) Killing (New) 132/33 kV, 2x25 33/11 kV S/S 58.63
MVA GIS (a) Killing 1x5 MVA
(b) Khanapara 2x2.5 MVA
Killing-Killing(New) 132 kV D/c (c) Mawsmai 2x2.5 MVA 11.4
line (2.5 km) (d) USTM Medical College
1x2.5 MVA
(e) 33 kV Industrial load
vi) Nongpoh 132/33 kV, 2x25 MVA 33/11 kV S/S 30
(a) Nongpoh 2x5 MVA
(b) Jyntru 1x5 MVA
(c) Umsohlait 1x2.5 MVA
LILO of both the circuits of Stage- 23
(d) Umsning 1x2.5 MVA
III Power House- Umtru Power
(e) Umden 1x2.5 MVA
House 132 kV D/c line on Multi
(f) Umlaper 1x2.5 MVA
circuit towers at Nongpoh – (2x10
km)
vii) Pongtung* (near Mawlynnong) 33/11 kV S/S 30
132/33 kV, 2x25 MVA (a) Pongtung 2x2.5 MVA
(b) Jaklon (Pynursla) 2x5 MVA
Sohra-Pongtung 132 kV D/c line 57
(c) Umsyiem Dawki 2x2.5
(30 km)
MVA
(d) Prospective Tourism load
10 MVA.
Total 1032.03
*2x20 MVA ICTs to be utilized from ICTs being replaced from other substations
as mentioned under 6.6.1.3
6.6.1.2 Augmentation of substations:
S.No. Name of substation Utilization of ICTs from other Estimated Cost as per
substations Meghalaya SoR
(Rs. Crs)
1. Replacement of 132/33 -NA- 15
kV 2x20 MVA ICTs with
2x50 MVA ICTs at Nehu
S/s
2. Replacement of 132/33 01 No. 20 MVA ICT to be 0
kV 45 (2x20+1x5) MVA utilized from other substations
ICTs with (3x20) i.e. 60
MVA ICTs at Rongkhon
S/s
3. Replacement of 132/33 -NA- 7.5
kV 1x50 MVA ICT with
Page | 60
S.No. Name of substation Utilization of ICTs from other Estimated Cost as per
substations Meghalaya SoR
(Rs. Crs)
2x50 MVA ICTs at EPIP-
II Norbong S/s
4. Replacement of 132/33 01 No. 20 MVA ICT to be 0
kV, 1x20 MVA ICT with utilized from other substations
2x25 MVA ICTs at
Nongstoin S/s.
5. Replacement of 132/33 15
kV 1x12.5 MVA ICTs with
2x50 MVA ICTs at Sohra
S/s
Total 37.5
Note: Upgradation of 33 kV Switchyard shall not be included in the scope of this
scheme. State may get it included in other distribution schemes such as
RDSS.
Page | 61
9. Mizoram
9.1. Demographics
9.1.1. Mizoram is a state in Northeastern India, with Aizawl as its seat of Government
and capital city. The name of the state is derived from "Mizo", the self-described
name of the native inhabitants, and "Ram", which in the Mizo language means
"land." Thus "Mizo-ram" means "land of the Mizos". Within India's northeast
region, it is the southernmost landlocked state, sharing borders with three of
the Seven Sister States, namely Tripura, Assam and Manipur. The state also
shares a 722-kilometre (449 mi) border with the neighbouring countries of
Bangladesh and Myanmar.
Private 0 0 0 0 0 0 0 0 0
Central 60 0 0 0 0 0 0 0 60
Page | 62
% 86.23 0 0 0 0.46 0.46 0 6.92 100.00
Page | 63
9.5. Analysis of proposals:
Justification/
Sl. Name of Amount Downstream Remarks
remarks CEA Remarks
No. Scheme (Rs connectivity by State
By State
Crore)
On N-1
contingency of
Zuangtui-Melriat
(PG) 132 kV D/c
line, the other
Planned : circuit gets
33/11 kV Improvement overloaded and
Re-conductoring
Sub-Stations in reliability Zuangtui-
of Zuangtui to
at Sairang and Sihhmui 132 kV
Sihhmui 132 kV
1 n/a (2.5 MVA), redundancy in S/c line is almost
S/c line with at
Lengpui (2.5 power supply 50% loaded. To
least 1000 A
MVA), at State relieve the
HTLS conductor
Rawpuichhip Capital loading of
(1.6 MVA) Zuangtui-Melriat
132 kV D/c line
on N-1
contingency, the
proposal is
recommended.
Planned : Line is owned by
Improvement
2nd circuit 33/11 kV POWERGRID
in reliability
stringing of Sub-Stations and not intra-
and
Melriat at Zuangtui state
2 n/a redundancy in
(Powergid) to (L) (15.1 transmission
power supply
Zuangtui (Old) MVA), Chite system. Hence
at State
132 kV S/c line (Ongoing) (20 not considered.
Capital
MVA),
33/11 kV Based on the
Improvement
Re-conductoring Sub-Stations load flow
in reliability
of Luangmual to at Tlangnuam studies, the
and
Melriat 132 kV (12.6 MVA), proposal is
3 n/a redundancy in
S/c line with at Aibawk (2.5 recommended.
power supply
least 1000 A MVA),
at State
HTLS conductor Sialsuk (2.5
Capital
MVA)
33/11 kV N-1 contingency
Sub-Stations of Zuangtui-
at Saitual 132 kV
Improvement
Re-conductoring Chhingchhip S/c line, leads to
in reliability
of Zuangtui to (2.5 MVA), overloading of
and
Bukpui 132 kV Sialsuk (2.5 Zuangtui-Bukpui
4 n/a redundancy in
S/c line with at MVA), 132 kV S/c line.
power supply
least 1000 A Thenzawl As such, the
within the
HTLS conductor (2.5 MVA), proposal is
State
Buarpui (2.5 recommended.
MVA),
Thenhlum
Page | 64
Justification/
Sl. Name of Amount Downstream Remarks
remarks CEA Remarks
No. Scheme (Rs connectivity by State
By State
Crore)
(2.5 MVA),
Hnahthial (2.0
MVA),
S.Vanlaiphai
(2.5 MVA),
Sangau (2.5
MVA)
33/11 kV Load details for
Sub-Stations Bukpui-Khawiva
at Lunglei was not
(12.6 MVA), provided. The
Sazaikawn proposal was
(6.3 MVA), studied with
Re-conductoring Improvement
Theiriat (6.3 details available
of Bukpui to in reliability
MVA), with us. Line
Khawiva via and
Lungsen (5.0 loadings
5 Kawmzawl132 n/a redundancy in
MVA), observed to be
kV S/c line with power supply
Tlabung (3.2 very less.
at least 1000 A within the
MVA), Proposal is not
HTLS conductor State
Mualthuam recommended.
(1.6 MVA),
Tawipui N
(1.6 MVA),
Chawngte
(1.6 MVA)
33/11 kV From the load
Sub-Stations flow details,
at Lunglei installation of
(12.6 MVA), Capacitive
Sazaikawn Reactor is not
(6.3 MVA), recommended.
Improvement
25 MVAr Theiriat (6.3
in reliability
Capacitive MVA),
and
Reactor at Lungsen (5.0
6 n/a redundancy in
Khawiva 132/33 MVA),
power supply
kV, 2x25 MVA Tlabung (3.2
within the
S/s MVA),
State
Mualthuam
(1.6 MVA),
Tawipui N
(1.6 MVA),
Chawngte
(1.6 MVA)
Improvement Line loadings
2nd circuit 33/11 kV
in reliability observed to be
stringing of Sub-Stations
and very less. N-1 is
Melriat at Tlangnuam
7 n/a redundancy in also being
(Powergid) to (12.6 MVA),
power supply complied.
Melriat132 kV Aibawk (2.5
within the Proposal is not
S/c line using at MVA),
State recommended.
Page | 65
Justification/
Sl. Name of Amount Downstream Remarks
remarks CEA Remarks
No. Scheme (Rs connectivity by State
By State
Crore)
least 1000 A Sialsuk (2.5
HTLS conductor MVA)
Proposal already
agreed for
33/11 kV implementation
Sub-Stations under 15th SSG.
at Champhai Therefore, the
Improvement
(6.3 MVA), proposal if
in reliability
Khawzawl to Khuangleng Posted included in this
and
Champhai 132 (2.0 MVA), under SSG scheme, then
8 21.46 redundancy in
kV S/c on D/c Hnahlan (1.6 of the 15th Mizoram needs
power supply
line. MVA), FC to ensure non-
at Champhai
Khawbung duplicacy of
District
(2.5 MVA), works and the
Farkawn (1.0 proposal shall
MVA) have to be
dropped from
15th SSG.
33 kV S/S at
Saiha (5 To meet the
MVA), electricity
Previous
Lawngtlai (5 Improvement demand
estimate
MVA), in reliability projected by
amounting
Hnahthial to Chawnhu (4.1 and 2030, the
to Rs
Siaha via Sangau MVA), redundancy in proposal is not
9 84.93 crore
132 kV S/c on 120.35 Meisatla power supply recommended.
was
D/c line. (3.25 MVA), at Saiha &
updated
Tuipang (1.6 Lawngtlai
using SoR
MVA), Phura District
of 2020
(1.6 MVA) &
Bualpui NG
(2.5 MVA)
At present,
Darlawn 132/33
kV S/s is
Improvement connected to
Existing in reliability only Saitual S/s
Tuirial HEP to 33/11 kV sub- and at 132 kV level.
Darlawn via stations at redundancy in As such, to
New
10 Sakawrdai 132 Darlawn (5 power supply provide N-1
118.64 Proposal
kV S/c on D/c MVA) & & evacuation reliability at
line. Sakawrdai of power from Darlwan, the
(1.6 MVA) 60MW Tuirial proposal of
HEP Tuirial HEP to
Darlawn 132 kV
S/c on D/c is
recommended.
Page | 66
Justification/
Sl. Name of Amount Downstream Remarks
remarks CEA Remarks
No. Scheme (Rs connectivity by State
By State
Crore)
As load at
Sakawrdai can
be met with the
present 33 kV
infrastructure,
132 kV
connectivity at
Sakawrdai may
not be needed.
Mizoram to
ensure space for
2 Nos. of 132 kV
bays at Tuirial
HEP (NEEPCO)
Construction of
Existing
132 kV S/c
33/11 kV
Khawzawl to
Sub-Stations
Champai was
at E.Lungdar Improvement
already
Champhai to E. (2.5 MVA), in reliability
approved. E.
Lungdar via S.Khawbung and
New Lungdar is
11 S.Khawbung 132 97.71 (2.5 MVA), redundancy in
Proposal connected to
kV S/c on D/c Farkawn (1.0 power supply
Bukpui and
line. MVA), at Eastern
Khawzawl via
Khawlailung Mizoram
132 kV S/c lines.
(2.5 MVA),
As such,
N.Vanlaiphai
proposal is not
(2.5 MVA)
recommended.
Hnathial is to be
Existing connected to
33/11 kV Bukpui via 132
Sub-Stations Improvement kV D/c line.
at Hnahthial in reliability Bukpui is
Khawiva to (2 MVA), and connected to
New
12 Hnahthial 132 kV 58.73 S.Vanlaiphai redundancy in Khawiva via 132
Proposal
D/c line. (2.5 MVA), power supply kV S/c line.
Sangau (2.5 at Hnahthial Therefore,
MVA) & District considering the
Theiriat (6.3 above, the
MVA) proposal is not
recommended.
10 Nos 33/11 Considering the
Improvement
kV Sub- load demands,
in reliability
Stations proposal of 132
and
Darlawn to within kV S/s at
redundancy in New
13 Ngopa 132 kV 69.00 Khawzawl Darlawn and
power supply Proposal
S/c on D/c line. and Ngopa is not
at Khawzawl
Champhai jusitifed. As
& Champhai
District can such, proposal
District
be fed
Page | 67
Justification/
Sl. Name of Amount Downstream Remarks
remarks CEA Remarks
No. Scheme (Rs connectivity by State
By State
Crore)
through this may is not
line recommended.
9.6.2 The following projects of Mizoram were technically agreed for implementation
under 10% GBS scheme of Central Ministries/Departments vide MoP letter
dated 23.09.2021:
Sl.No. Name of the proposal Estimated Cost
(Rs. Crs)
i) Construction of 2x12.5 MVA, 132 kV S/s at 22.27
Lawngtlai
ii) Construction of 132 kV S/c on D/c tower from 46.27
Saiha to Lawngtlai (43.65 km)
iii) Construction of 132 kV D/c line on D/c tower from 63.15
Bukpui to Hnahthial (55 km)
iv) Construction of 132 kV S/c line on D/c tower from 63.60
S.Bungtlang to Lawngtlai (60 km)
v) Construction of 132 kV S/c line on S/c tower from 27.56
Marpara to Thenhlum (26 km)
vi) Augmentation of 132 kV S/s in Mizoram (7 nos.) 22.96
Total 245.81
Page | 68
9.6.3 Further, CEA vide letter dated 19.05.2022, technically agreed the proposal of
construction of Khawzawl to Champhai 132 kV S/c line on D/c tower for
inclusion in the DPR for State Specefic Grant (SSG) of 15th Finance
Commission (FC).
9.6.4 The proposals mentioned at 9.6.2 and 9.6.3 which are technically agreed for
implementation under 10% GBS and 15th FC respectively, may also be included
under this scheme with the condition that before the implementation of this
scheme, if Mizoram receives funds for these works from 10% GBS or 15th FC,
then Mizoram needs to inform Ministry of Power immediately for deletion of the
scope of works of these proposals from intra-state transmission scheme of NER
and Sikkim for 2030, so as to avoid duplicacy of works.
Page | 69
10. Nagaland
10.1. Demographics:
Nagaland is a state in North Eastern India. It is bordered by the state of Arunachal
Pradesh in the North, Assam in the West, Manipur in the South and the Sagaing
Region of Myanmar in the East. Its capital city is Kohima and its largest city is
Dimapur. It has an area of 16,579 square kilometres (6,401 sq mi) with a
population of 1,980,602 per the 2011 Census of India, making it one of India's
smallest states.
10.2. Electricity profile of state
10.2.1. Power generation-demand scenario of state:
In the FY 2021-22, Nagaland had peak electricity demand of 173 MW and
electrical energy requirement of 852 MU. As on 31.03.2022, state has installed
capacity of 189 MW in central sector which includes hydro plants (77.73 MW)
and thermal plants (115.9 MW). In addition, installed capacity in state sector is
27 MW. The per capita consumption of the state was 433 kWh in the year 2021-
22.
The projected peak electricity demand as per 20th EPS Report is 221 MW in
the year 2029-30.
Peak electricity demand (in MW) of Nagaland for the year 2030 as per the 20th
EPS Report and demand estimated for the year 2029-30 by the state is given
below:
Year Actual peak Peak electricity Estimated Peak
electricity demand as per electricity
demand 20th EPS Report demand for the
(2021-22) for the year year 2029-30
2029-30
Peak electricity 173 221 316
demand (MW)
State 0 0 0 0 0 0 0 27 27
Private 0 0 0 0 0 0 0 0 0
Page | 70
10.2.2. Inter State Transmission system in the state:
The state has a 400/220 kV, 1000 MVA ISTS substation at New Kohima.
Further the state has two nos. of 220/132 kV ISTS substations, having total
capacity of 610 MVA at Dimapur and Mokokchung.
State has total 1254 ckm of existing ISTS network. Brief details of the ISTS
network are given below:
A. Under Construction
Page | 71
10.3. Transmission proposals submitted:
The brief of the proposals submitted by state are given in table below:
220 kV Transmission system
No. Length (km) Capacity (MVA) Estimated
Cost
(Rs. Cr.)
1 New substation 1 - 300 90
2 Augmentation of existing - - - -
substation
3 New transmission line 2 3 - 9
including LILO
4 Reconductoring of - - - -
transmission line
Page | 72
S.No. Details of the Projected Estimate Brief Justification/remarks by CEA Remarks
proposal Demand Cost State
(in 2030) (Rs. Crs)
unavoidable considering the
operating voltages of the two
power transformers.
2. Mon S/s 20 33.44 Power supply to Mon district is Nagaland will be
132/33 kV, catered through the lone, phasing out 66 kV
2x25 MVA, aged, long (165 km) S/c 66 kV network from their
with sending line fed from 132/66 kV system. Further,
end bay for Substation at Mokokchung via considering age of line,
Tizit. Tuli-Naganimora-Tizit. The and reliability at Mon,
Longleng to 40.30 existing 66 kV line passes the proposal is
Mon 132 kV through a dense forest recommended.
S/c on D/c line- coupled with hilly & difficult
44 km terrain. With such a long span
of 165 km, the frequency of
un-scheduled disruption of
line is very high and due to the
remoteness of the location of
the transmission line, it takes
days to locate and rectify the
fault/ restore the transmission
line. And since there is no
alternate source of power
supply, there has been many
instances wherein the whole
district was blacked out for
almost a week.
3. Old Showuba 50 38.02 A compherensive proposal for 132/33 kV S/s at
S/s, 132/33 kV works from Sl. 3 to Sl. 11 Champang, Liphi,
2x 50 MVA, under the scheme name "132 Niuland, Old Showuba,
(near Referral kV Foothill Highway Old TPS, Diary Farm,
Hospital) transmission system build-up has already been
Dimapur with and strengthening," has been recommended under
sending end conceptualised with the main ADB funding. As such,
bay for objective to improve and the proposals from
Niuland, Old strengthen the power/ S.No.3 to 8 have not
TPS 7th Mile transmission system along the been considered.
and Diary Foothill area, which has been
Farm declared by the Government
of Nagaland as the "Special
Economic Zone" (SEZ).
Presently, power supply along
Old Showuba 13.84
the foothill areas is catered
to Diary Farm
through various aged and long
132 kV S/c on
spans of 33 kV & 11 kV lines
D/c line-12 km.
and as such the power supply
is very erratic and unreliable.
Recognizing the importance of
Old Showuba 24.35
a robust Power network so as
to Niuland 132
to facilitate and promote
kV S/c on D/c
socio-economic growth such
line-24 km.
as agro-forest products
manufacturing and processing
plants like Tea and Rubber,
4. Niuland S/s, 15 21.48
cold storages etc, the Power
132/33 kV, 1x
Department therefore
25 MVA, with
Page | 73
S.No. Details of the Projected Estimate Brief Justification/remarks by CEA Remarks
proposal Demand Cost State
(in 2030) (Rs. Crs)
sending end proposes a 132 kV system
bay for Liphi along the foothill road from
Niuland town to Champang
Niuland to 29.38 (identified petroleum oil belt in
Liphi 132 kV Nagaland) along with special
S/c on D/c line- emphasis towards
30km. Chumukedima, Old Showuba,
Dhansaripar, Ganeshnagar
etc. where the growth of socio-
5. Liphi S/s 6 18.44 economic developmental
132/33 kV, 1x expansion is very rapid.
10 MVA, with Further, the proposal has also
sending end considered a 60MW Thermal
bay for power plant that is coming up
Champang at Tuli for which a 132 kV
Liphi to 25.92 system is required for power
Champang evacuation.
132 kV S/c on With the implementation of
D/c line-25 km. this project, the whole state of
6. Champang S/s 7 27.65 Nagaland will have a complete
132/33 kV, 132 kV ring system.
2x10 MVA,
with one
sending end
bay for Tuli.
Champang to 143.09
Longnak 132
kV S/c on D/c
lines-64 km.
Page | 74
S.No. Details of the Projected Estimate Brief Justification/remarks by CEA Remarks
proposal Demand Cost State
(in 2030) (Rs. Crs)
provide
interconnection/anchor
ing point from
Longleng to either
Naganimore/Tuli.
Page | 75
S.No. Details of Estimated Brief Justification/remarks by state CEA remarks
proposal Cost
(Rs Crs)
evacuation of Therefore, the Department proposes to are linked with
power from 24 construct 132 kV S/c line for evacuation of the generation
MW Zungki generated power from the aforementioned HEP projects.
HEP-22 km and inject the power into the grid at the nearest Due to
132 kV sub-station, i.e. 132 kV Kiphire sub- uncertainty in
station. In this regard, a dedicated 132 kV bay commissioning
is also required to be constructed at 132 kV schedule of
Kiphire SS. Generating
3 Lower Tizu The 42 MW Lower Tizu HEP has been stations,
HEP to Kiphire sanctioned by the Government of India for associated intra-
132 kV S/c on funding under EAP (ADB) and is in the process state
D/c line along of completing the formalities for implementation transmission
with 132 kV end by the ADB. proposals for
equipments at However, evacuation system for the same was evacuation of
Kiphire not considered and the department was asked power have not
substation for 37 to take up separately for evacuation system. been
evacuation of Therefore, the Department proposes to considered.
power from 42 construct 132 kV S/c line for evacuation of the
MW Zungki generated power from the aforementioned HEP
HEP-35 km. and inject the power into the grid at the nearest
132 kV sub-station, i.e. 132 kV Kiphire sub-
station. In this regard, a dedicated 132 kV bay
is also required to be constructed at 132 kV
Kiphire SS.
4 Tizu-Valley The 24 MW Tizu-Valley HEP under Phek district
HEP to Meluri is under proposal and is under active
132 kV S/c on consideration by the State Government for
D/c line along funding through GoI as an EAP scheme. In this
with 132 kV end regard, the department had been advised to
equipments at take up the construction of evacuation system
Meluri 20 separately. Hence, a 132 kV S/c line with a
substation for circuit length of 20 km for evacuation of power
evacuation of from 24 MW Tizu-Valley HEP to the grid at
power from 24 132/33 kV Meluri sub-station is proposed. In this
MW Tizu-Valley proposal, construction of one no. of 132 kV
HEP-20 km. dedicated bay at 132 kV Meluri sub-station is
also considered.
Page | 76
Tuli-Mokokchung (PG) 132 kV ii) 33/11 kV Tuli 39.76
S/c on D/c line-56 km iii) Fitzroy Thermal Power Plant
Tuli-Naganimora 132 kV S/c on 24.14
D/c line – 34 km
Longleng-Tuli 132 kV S/c on 35.5
D/c line – 50 km
3. Naganimora S/s 132/33 kV, i) 33/11 kV Naginimora 23.48
2x10 MVA ii) 33/11 kV Wakching
Naganimora-Tizit 132 kV S/c 31.24
on D/c line-44 km
4. Tizit S/s 132/33 kV, 2x10 MVA. i) 33/11 kV NERPSIP Tizit SS 23.48
Tizit-Mon 132 kV S/c on D/c 21.3
line-30 km
Total 310
Page | 77
11. Tripura
11.1. Demographics:
11.1.1. Tripura is a state in North Eastern India. The third-smallest state in the
country, it covers 10,491.69 km2 (4,050.86 sq mi) and is bordered
by Bangladesh in the North, South, and West, and the Indian states
of Assam and Mizoram in the East. In 2011 the state had 3,671,032 residents,
constituting 0.3% of the country's population. Agartala, the capital, is located
on a plain to the West.
Page | 78
11.2.2. Inter State Transmission system in the state:
The state has two nos. of 400/132 kV ISTS substations having total capacity of
1,260 MVA at PK Bari and Surajmaninagar. Further, the state has a 132/33 kV,
5 MVA ISTS substation at New Kumarghat.
State has total 1678 ckm of existing ISTS network and 12 ckm of planned /under
construction ISTS network. Brief details of the ISTS network are given below:
Voltage level Under Construction/
Existing
Planned
132 kV 572 ckm -
Page | 79
11.3. Under implementation intra-state transmission/distribution schemes:
11.3.1 A total of 11 Nos. of packages which consists of 3 packages of substations, 5
packages of distribution system and 3 package of Transmission Lines have
been considered under North Eastern Region Power System Improvement
Project. All the packages have been awarded.
Page | 80
S. Name of the proposal Demand Estimated Brief Justification CEA Remarks
No. by 2030 Cost by the State
(MW) (Rs. Crs)
6.40 arrangement for present load at
Agartala City Aralia is being
met through
long 33 kV lines
which faces
LILO of one circuit of 79
frequent
Tilla Grid – Surjamaninagar
outages.
132 kV D/c line at Aralia
As such, to
(HTLS)-4 km.
provide reliable
and quality
power supply,
the proposal is
recommended.
3. Ompi AIS S/s, 132/33 kV 10 36
2x25 MVA
TSECL has
Gamaitilla - Ompi (ACSR 37.5 informed that
Panther) 132 kV D/c line they are
with associated bays-22 dismantling all
km. 66 kV network
and planning to
Ompi - Amarpur (ACSR 36.25 upgrade to 132
Panther) 132 kV D/c line kV transmission
with associated bays-21 system to feed
km. Upgradation of the demand at
4. Jatanbari S/s, 132/33 kV, 10 34 66 kV voltage these
2x25 MVA. level to 132 kV substations.
for better
Amarpur - Jatanbari (ACSR 35 redundancy. As such, the
Panther) 132 kV D/c line proposals of
with associated bays-20 km establishing
132/33 kV S/s at
5. Boxanagar S/s, 132/33 kV, 12 33 Ompi,
2x25 MVA. Jatanbari, and
Boxanagar are
recommended.
LILO of one circuit of 18.75
Rokhia – Rabindranagar
132 kV D/c line at
Boxanagar (ACSR
Panther)-15 km.
6. Tirthamukh Generation 12 60 TSECL has
sub-station, 132/33 kV informed that
2x25 MVA. Tirthamukh
Upgradation of
Generation is
66 kV voltage
28.75 being planned
level to 132 kV
to be upgraded
Tirthamukh - Jatanbari 132 for reliability.
to 15 MW
kV D/c line (ACSR Panther)
through funding
with associated bays-15km
from other
sources.
Page | 81
S. Name of the proposal Demand Estimated Brief Justification CEA Remarks
No. by 2030 Cost by the State
(MW) (Rs. Crs)
Due to
uncertainty in
commissioning
schedule of
Generating
stations, intra-
state
transmission
proposals for
evacuation of
power have not
been
considered.
Page | 82
Sl. Estimated Brief CEA remarks
No. Name of the line Cost Justification/remarks
(Rs Cr) by States
7 30 Strengthening of Since the projected load
existing transmission is very less, the proposal
Satchand - Sabroom 132 network at Sabroom, is not recommended.
kV S/c line (ACSR Panther) which is fast
with associated bays-20 km emerging as the
gateway to South
East Asia.
8 18 Kailasahar-Dharmnagar
132 kV D/c line is already
P.K. Bari - Kailashahar 132 For enhancing intra- being implemented under
kV S/c line (ACSR state system reliability NERPSIP.
Panther)-20 km and stability As such, additional
connectivity at Kailasahar
is not recommended.
9 Surjamaninagar (ISTS) - 50 Considering the projected
For enhancing intra-
Baramura 132 kV D/c line demand at Baramura, the
state system reliability
(HTLS) with associated proposal is not
and stability
bays-24 km recommended.
10 One circuit of
Surajmaninagar-
Bodhjungnagar 132 kV
LILO of 2nd circuit of
D/c line with HTLS
Surajmaninagar-
conductor at
Bodhjungnagar 132 kV D/c For enhancing intra-
Surajmaninagar (ISTS)
line with HTLS conductor at state system reliability
400/132 kV S/s has
Surajmaninagar (ISTS) and stability
already been LILOed.
400/132 kV S/s along with
As such, to avoid uneven
associated bays.
loading of the two circuits,
the proposal is
recommended.
Page | 83
Sl.No. Details of the Projected Estimate Present Brief CEA Remarks
Proposed Demand d Cost Configurati Justification
transformation (MW) (Rs. Crs)on /remarks by
Capacity (MVA) State
4 Mission Tilla 55 30 2x15 MVA
132/33 kV, 2x50 (132/11 kV)
MVA S/s and 1x15
MVA
(132/33 kV)
ICTs
5 70 45 2x25 MVA Considering the projected
Bodhjungnagar
132/33 kV load, the proposal of
132/33 kV, 3x50
ICTs augmentation of substation is
MVA S/s recommended.
6 Gamaitilla 132/33 30 25 1x15 MVA
kV, 2x25 MVA S/s 132/11 kV
ICT, 1x6.3 25 MVA 132/33 kV ICTs to be
MVA 66/33 utilized from replaced ICTs
kV ICT and from other substations.
1x10 MVA
66/11 kV
ICT
7 30 20 2x10 MVA
(132/11 kV)
Kamalpur 132/33
and 1x25
kV, 2x25 MVA S/s
(132/33 kV)
ICTs
Page | 84
Sl. Estimated
Brief Justification by
No. Cost by
Proposal State/
State CEA Remarks
Remarks
(Rs. Cr.)
6 P.K. Bari - Kumarghat 2.2
(PGCIL) 132 kV S/c line-2.5
km.
7 40 Mechanical strength The proposal is of
of the power urgent nature and
Palatana – Udaipur 132 kV conductors & IR value TSECL is seeking
S/c line-12 km. of the existing disc funding from other
insulators of the said sources. As such,
lines have the proposal has not
deteriorated to a great been considered.
8 Udaipur – Rokhia 132 kV S/c 10.5 extent due to overlong
line-46 km. use causing frequent
9 79 Tilla Grid - Mohanpur 132 14 intra-state grid
kV S/c line-16 km. disturbance by
10 Mohanpur - Dhalabil 132 kV 23 conductor snapping
S/c line-26 km. and failure of
11 Dhalabil - Kamalpur 132 kV 31 insulators. This
S/c line-36 km. results in restriction in
12 Kamalpur - P.K. Bari 132 kV 27 adequate power flow
S/c line-31 km. through the lines. In
13 79 Tilla Grid – 8.6 view of the
Bodhjungnagar 132 kV S/c importance of the
line-10 km. lines, re-conductoring
14 Bodhjungnagar – Jirania 132 12 the said lines with The loadings on
kV S/c line-13.5 km. HTLS conductor with these lines are well
15 Jirania – Baramura 132 kV 11 allied accessories are within the thermal
S/c line-12.5 km. proposed to cope up capacity, therefore
16 Baramura – Gamaitilla 132 5 with increased power the proposals have
kV S/c line-6 km. flow with improved not been
17 Gamaitilla – Ambassa 132 kV 28 reliability. recommended.
S/c line-33 km.
18 P.K. Bari – MissionTilla 132 31
kV S/c line-36.5 km.
19 MissionTilla – Churaibari 132 10
kV S/c line-11.5 km.
20 Ambassa – Kamalpur 132 kV 27
S/c line-31 km.
21 Gamaitilla – Dhalabil 132 kV 26
S/c line-30.5 km.
22 Satchand - Sabroom 9
(with ACSR Panther) 132 kV
S/c line-15 km.
23 P.K. Bari - Kailashahar 16
(with ACSR Panther) 132 kV
S/c line-26 km.
Page | 85
11.6. Recommendations on the proposals of the state:
11.6.1. Based on the technical analysis, the following proposals of Tripura are
recommended in the intra-state scheme for 2030:
New 132/33 kV Substations alongwith their associated transmission lines
Sl.No. Proposal Downstream Network Estimated Cost
as per TSECL’s
SoR
(Rs. Crs.)
1. Badharghat GIS S/s, i) Amtali 115.39
132/33 kV, 2x50 MVA ii) Charipara
iii) University
LILO of one circuit of 79 iv) Surajmaninagar 11.05
Tilla Grid-Rokhia 132 kV v) Stadium
D/c line at Badharghat vi) NS RCC
(HTLS)-5 km. vii) Rampur
Surajmaninagar- 33.16
Badharghat (HTLS) 132 kV
D/c line-15 km.
2. Ompi AIS S/s, 132/33 kV i) Ompi Bazaar (New) 42.51
2x25 MVA ii) Taidu (U/c)
iii) Chechua (U/c)
Gamaitilla - Ompi (ACSR 57.53
Panther) 132 kV D/c line
with associated bays-22
km.
Page | 86
New 132 kV Lines
Sl. Estimated Cost
No. Name of the line as per TSECL’s
SoR (Rs Cr)
1. Palatana - Udaipur 132 kV S/c line (HTLS) 32.21
with associated bays-12 km
2. 2nd circuit stringing of Bagafa - Satchand 132 kV S/c line (ACSR 24.62
Panther)-40 km
3. Surjamaninagar (TSECL) - Udaipur 132 kV D/c line 94.11
with associated bays (ACSR panther)-45 km
4. LILO of 2nd circuit of Surajmaninagar (TSECL)-Bodhjungnagar 22.34
132 kV D/c line with HTLS at Surajmaninagar (ISTS) 400/132 kV
S/s along with associated bays at ISTS S/s- (7 kms).
Total 173
11.6.2. To provide reliable power supply at the existing 33 kV S/s, the following
proposals of Tripura are recommended as the intra-state transmission system
requirement by 2030:
New substations alongwith their associated bays:
Sl. Name of the proposal Downstream Network Estimated Cost
No. as per TSECL’s
SoR
(Rs. Cr.)
1. Aralia GIS S/s, 132/33 kV i) College Tilla 91.88
2x50 MVA ii) Adarsh Colony
iii) Gabardi
LILO of one circuit of 79 iv) Khayerpur 8.84
Tilla Grid – Surjamaninagar v) Ranir Bazaar
Page | 87
132 kV D/c line at Aralia
(HTLS)-4km.
Total 101
Page | 88
12. Sikkim
12.1. Demographics
12.1.1. Sikkim, the 22nd state of India, is a mountainous state with a very rich flora
and fauna, low valleys and extremely high mountains. The entire Himalayan
belt being young fold mountains, Sikkim is constantly tormented by its fragile
geology. With a population of about 6.79 lakh within an area of 7096 sq. km,
the state is rapidly developing. Sikkim is also very strategically located sharing
international border with three countries - Nepal, Bhutan and China.
12.1.2. The transmission network in Sikkim currently comprises of a mixture of 66 kV
and 132 kV transmission lines and sub-stations within the state grid with 66
kV lines being the mainstay. Transmission lines under PGCIL comprises of
132 kV network connecting the state grid with the national grid at three
interconnection points.
Page | 89
Central 64 54 0 0 0 54 0 0 118
Total 633.00 53.57 0.00 0.00 0.00 53.57 0.00 56.79 743.36
% 85.15 7.21 0.00 0.00 0.00 7.21 0.00 7.64 100.00
Page | 90
The proposals were discussed with Power Department, Government of
Sikkim, on 12.09.2022 along with necessary technical data. Further, Sikkim
submitted few additional proposals in the meeting for consideration.
12.5. Analysis of proposals
Demand
by 2030
Sl.No. Proposal
(MW)
CEA Remarks
1. Direct interconnection of Teesta Details In the meeting, Sikkim informed that
Stage-III (6x200 MW) with state not the proposal is being discussed with
grid. provided. ERPC.
As such, the proposal has not been
considered.
2. Comprehensive scheme for Details
erection of 66 kV transmission not
lines under Dentam subdivision provided.
in West Sikkim.
3. Erection of 1x5 MVA Power Details
Transformer at Yuksam along not
with drawing of 66 kV provided.
transmission line from Pelling
control room to Yuksam in
West Sikkim.
4. Installation of additional 132/66 Details
kV 1x20 MVA Power not
Transformer along with provided. In the meeting, Sikkim had
extension of 132 kV incoming withdrawn the proposal.
bay at Kyongsha under
Geyzing subdivision in West
Sikkim.
5. Installation of 66/11 kV 5 MVA Details
transformer alongwith 66/66 kV not
bay extension at Pelling and provided.
Geyzing (Kyonsha) under
Geyzing sub division in West
Sikkim.
6. Construction of 66/11 & 11/11 Details
kV control room along with site not
leveling for developing of provided.
switchyard and its approach
road under Geyzing circle in
West Sikkim.
7. Construction of new 2x10 MVA, 5 MW The distribution strengthening
66/11 kV sub-station at Assam (present system will be taken up in
Lingzey i/c drawing of S/c 66 load). Revamped Distribution Sector
kV line from LLHP to Assam Scheme (RDSS). As such the
Lingzey and other associated proposal has not been
works. considered.
8. Drawing of 66 kV transmission Details
line for interconnection of 66/11 not
kV sub-station at Makha (under provided.
Comprehensive Scheme) and
Page | 91
Demand
by 2030
Sl.No. Proposal
(MW)
CEA Remarks
66/11 kV sub-station at
Khamdong, South Sikkim.
Page | 92
Demand
by 2030
Sl.No. Proposal
(MW)
CEA Remarks
17. Reconductoring of Conventional Details
DOG Conductor with Covered not
Conductor of D/c 66 kV provided.
Transmission line LLHP S/S to
Tadong S/S along with
Retrofitting of towers.
Page | 93
Demand
by 2030
Sl.No. Proposal
(MW)
CEA Remarks
of sag clearance, diversions, As such, the proposal has not been
etc. considered.
Page | 94
3. Augmentation of Namchi 2x2.5 Details Scheme (RDSS). As such the
MVA, 66/11 kV S/s with 2x10 not proposal is not considered here.
MVA ICTs provided.
4. Augmentation of Melli (1x5 MVA Details
+ 2x10 MVA), 66/11 kV S/s with not
1x10 MVA ICTs provided.
Total 31.82
Page | 95
13. Recommendations
13.1. Based on the technical anlaysis, the following proposals of states have been
recommended considering the electricity demand upto 2030. States are
advised to inter-connect their downstream network as mentioned against the
proposals in matching time-frame so as to ensure utilization of transmission
assets.
STATE WISE SUMMARY OF PROPOSALS IS PROVIDED BELOW:
13.1.1. Arunachal Pradesh (at an estimated cost of Rs. 533.3 Crs):
Sl.No. Name of the proposal Downstream network of Estimated Cost
the proposed as per DoP,
substations Arunachal
Pradesh
(Rs. Crs.)
viii) Kimin (Papum Pare) v) 33/11 kV Substation at 75
132/33 kV, 2x10 MVA Kimin (existing)
S/s vi) 33/11 kV Substation at
LILO of Naharlagun - Kakoi (planned)
Gerukamukh 132 kV vii) 33/11 kV
S/c line at 132/33 kV Substation at
Kimin S/s-(7.5km) Dollungmukh (existing)
viii) 33/11 kV
Substation at Potin
(planned)
ix) Raga, Kamle 132/33 kV, iv) 33/11 kV Substation at 75
2x10MVA S/s Raga (under
LILO of Ziro-Daporijo construction)
132 kV S/c line at v) 33/11 kV Tamen HEP
132/33 kV Raga, Kamle (existing)
S/s-(6.5 km) vi) 33/11 kV Murimugli
(under construction)
x) Likabali-Basar 132 kV -NA- 225
S/c line on D/c tower-
(80 km)
xi) Garu, Lepa Rada iv) 33/11 kV Substation at 60
132/33 kV, 2x5 MVA S/s Garu (planned)
LILO of Likabali-Basar v) 33/11 kV Substation at
132 kV S/c line at Gensi (under
132/33 kV Garu, Lepa construction)
Rada S/s-(5 km) vi) 33/11 kV Substation at
Ego (under
construction)
xii) KaHEP-Khuppi 132 -NA- 60
kV D/c Line (10 km)
Page | 96
Sl.No. Name of the proposal Downstream network of Estimated Cost
the proposed as per DoP,
substations Arunachal
Pradesh
(Rs. Crs.)
xiii) Reconductoring of -NA- 3.3
Lekhi-Chimpu 132 kV
S/c line (14.5 km).
xiv) Replacement of -NA- 35
132/33 kV, 2x20 MVA
ICT with 2x50 MVA,
ICT at Chimpu,
Itanagar S/s*.
Total 533.3
*2x20 MVA ICT replaced from Chimpu shall be utilized at Lekhi 132/33 kV S/s
Page | 97
Sl.No. Name of the proposal Details of Estimated cost as
Downstream per Assam SoR
newtork (Rs. Crs)
Sankardev Nagar (AEGCL- New*) - Diphu 170.1
(AEGCL-New) 220 kV D/c Line – (81 km)
* Substation under implementation
5. 33 kV DSS 50.67
Dhing, Botadroba,
Establishment of new 132/33 kV (2x50 MVA)
Jengani,
AIS Substation at Dhing
Nagabandha,
Mairabari,
Dhing (AEGCL- New) - Nagaon (AEGCL- Hahsora 56
Existing) 132 kV S/c Line – (35 km)
6. Establishment of new 132/33 kV (2x50 MVA) 33 kV DSS 49.77
GIS Substation at Titabor Titabor,
Letekujan,
Boholla, 32
Titabor (AEGCL-New) - Mariani (AEGCL-Existing)
132 kV D/c Line – (20 km) Madhopur, AIIDC
Kundargaon
7. Establishment of new 132/33 kV (2x50 MVA) 33 kV DSS 50.67
AIS Substation at Chabua Chabua, Baligan,
Tengakhat, Belbari
LILO of Tinsukia (AEGCL-Existing) -Dibrugarh 12.8
tinali
(AEGCL-Existing) 132 kV S/c Line at Chabua
(AEGCL-New) – (8 km)
8. Establishment of new 132/33 kV (2x50 MVA) 33 kV DSS 50.67
AIS Substation at Dhupdhara Dhupdhora,
Rangjuli, Tiplai,
Dhupdhra (AEGCL- New) - Boko (AEGCL- 40
Hekra
Existing) D/c Line – (25 km)
9. Establishment of new 132/33 kV (2x50 MVA) 33 kV DSS 50.67
AIS Substation at Patharkandi Patharkandi,
Karimganj (AEGCL-Existing)-Patharkandi Bubrighat, 56
(AEGCL-New) 132 kV S/c line – (35 km) Sonakhira
LILO of one circuit of Dullavchara (AEGCL- 25.6
Existing)-Dharmanagar (PGCIL-Existing) 132 kV
D/c line at Patharkandi – (16 km)
10. Establishment of new 132/33 kV (2x50 MVA) 33 kV DSS 49.77
GIS Substation at Digboi Digboi, Tingrai,
Bapapung,
LILO of Margherita (Ledo) (AEGCL-Existing) - 16
Tinsukia (AEGCL-Existing) 132 kV S/c Line at
Digboi (AEGCL-New) – (10 km)
11. Establishment of new 132/33 kV (2x50 MVA) 33 kV DSS 50.67
AIS Substation at Jonai Telam, Jonai
Jonai (AEGCL- New) - Silapathar (AEGCL-New) 65.6
132 kV S/c Line on D/c Tower – (41 km)
12. Establishment of new 132/33 kV (2x50 MVA) 33 kV DSS 50.67
AIS Substation at Ghilamora Ghilamara,
LILO of one circuit of North Lakhimpur (AEGCL- Gogamukh 40
Existing) - Dhemaji (AEGCL- Existing) 132 kV D/c
Line at Ghilamora Substation – (25 km)
13. Establishment of new 132/33 kV (2x50 MVA) 33 kV DSS 50.67
AIS Substation at Dumunichowki Bezera,
Sishugram (AEGCL-Existing)- Dumunichowki Bhagdhora, 33.6
(AEGCL-New) 132 kV S/c line on D/c tower – (21 Dipila
km)
14. Establishment of new 132/33 kV (2x50 MVA) 33 kV DSS 50.67
AIS Substation at Doulasal
Page | 98
Sl.No. Name of the proposal Details of Estimated cost as
Downstream per Assam SoR
newtork (Rs. Crs)
Bhakatpara, 73.6
Barpeta (AEGCL-Existing)- Amayapur (AEGCL-
Chenga,
New) 132 kV D/c line with LILO of one circuit at
Doulasal-(60 km) Sarthebari,
Nagaon, Mandia
Total 2032.95
Page | 99
Ningthoukhong – Churachandpur 132 kV D/c line alongwith
2. upgradation of bay equipments at Ningthoukhong 132/33 kV 104.31
S/s-(46 km)
Two circuits of Yurembam (State) - Yurembam (PGCIL) 132
3. 1.9
kV triple circuit line-(1 km)
Kakching – Churchandpur 132 kV D/c line along with
4. 117
upgradation of bay equipments at ends-(37.858 km)
Yaingangpokpi - Kakching via Kongba 132 kV S/c line
5. 181.74
alongwith upgradation of bay equipments at Kongba-(78 km)
Total 729
Page | 100
v) Killing (New) 132/33 kV, 2x25 33/11 kV S/S 58.63
MVA GIS (a) Killing 1x5 MVA
(b) Khanapara 2x 2.5 MVA
Killing-Killing(New) 132 kV D/c (c) Mawsmai 2x2.5 MVA 11.4
line (2.5 km) (d) USTM Medical College
1x2.5 MVA
(e) 33 kV Industrial load
vi) Nongpoh 132/33 kV, 2x25 MVA 33/11 kV S/S 30
(a) Nongpoh 2x5 MVA
(b) Jyntru 1x5 MVA
(c) Umsohlait 1x2.5 MVA
LILO of both the circuits of Stage- 23
(d) Umsning 1x2.5 MVA
III Power House- Umtru Power
(e) Umden 1x2.5 MVA
House 132 kV D/c line on Multi
(f) Umlaper 1x2.5 MVA
circuit towers at Nongpoh – (2x10
km)
vii) Pongtung* (near Mawlynnong) 33/11 kV S/S 30
132/33 kV, 2x25 MVA (a) Pongtung 2x2.5 MVA
(b) Jaklon (Pynursla) 2x5 MVA
Sohra-Pongtung 132 kV D/c line 57
(c) Umsyiem Dawki 2x2.5
(30km)
MVA
(d) Prospective Tourism load
10 MVA.
Total 1032.03
*2x20MVA ICTs to be utilized from ICTs being replaced from other substations as
mentioned under 13.1.4.3
Page | 101
5. Replacement of 132/33 15
kV 1x12.5 MVA ICTs with
2x50 MVA ICTs at Sohra
S/s
Total 37.5
Note: Upgradation of 33 kV Switchyard shall not be included in the scope
of this scheme. States may get it included in other distribution
schemes such as RDSS.
13.1.4.3 Details of utilization of replaced 2x20 MVA transformers:
Sl.No. Replaced from 132/33 kV Shifted to 132/33 kV
Substation substation
i) Nehu* -Store-
ii) EPIP-II Norbong* -Store-
iii) Sohra -Store-
*Out of 05 nos. 20 MVA ICTs replaced from these substations, 04 nos. 20 MVA
ICTs to be utilized at Rongkhon, Pongtung and Nongstoin 132/33 kV S/s.
Page | 102
iii) Construction of 132 kV D/c line on D/c tower from 63.15
Bukpui to Hnahthial (55 km)
iv) Construction of 132 kV S/c line on D/c tower from 63.60
S.Bungtlang to Lawngtlai (60 km)
v) Construction of 132 kV S/c line on S/c tower from 27.56
Marpara to Thenhlum (26 km)
vi) Augmentation of 132 kV S/s in Mizoram (7 nos.) 22.96
Total 245.81
12.6.5.3 Further, CEA vide letter dated 19.05.2022, technically agreed the proposal
of implementation of Khawzawl to Champhai 132 kV S/c on D/c line for
inclusion in the DPR for State Specefic Grant (SSG) of 15 th Finance
Commission (FC).
12.6.5.4 As such, the proposals mentioned at 12.6.5.2 and 12.6.5.3 which are
technically agreed for implementation under 10% GBS and 15th FC
respectively, may also be included under this scheme with the condition that
before the implementation of this scheme, if Mizoram receives funds for
these works from 10% GBS or 15th FC, then Mizoram needs to inform
Ministry of Power immediately for deletion of the scope of works of these
proposals from intra-state transmission scheme of NER and Sikkim for
2030, so as to avoid duplicacy of works.
Page | 103
Tuli-Naganimora 132 kV S/c 24.14
on D/c line – 34 km
Longleng-Tuli 132 kV S/c on 35.5
D/c line – 50 km
Naganimora S/s 132/33 kV, 33/11 kV Naginimora 23.48
2x10 MVA 33/11 kV Wakching
Naganimora-Tizit 132 kV S/c 31.24
on D/c line-44 km
Tizit S/s 132/33 kV, 2x10 33/11 kV NERPSIP Tizit SS 23.48
MVA.
Tizit-Mon 132 kV S/c on D/c 21.3
line-30 km
Total 310
Page | 104
4. Boxanagar S/s, 132/33 kV 2x25 i) Boxanagar (New) 42.51
MVA. ii) Kamalnagar (New)
13.1.7.2. To provide reliable power supply at the existing 33 kV S/s, the following
proposals of Tripura are recommended in the intra-state scheme for 2030:
Page | 105
S. Name of the proposal Downstream Network Estimated Cost
No as per TSECL’s
SoR
(Rs. Crs)
1. Aralia GIS S/s, 132/33 kV i) College Tilla 91.88
2x50 MVA ii) Adarsh Colony
LILO of one circuit of 79 iii) Gabardi 8.84
Tilla Grid – Surjamaninagar iv) Khayerpur
132 kV D/c line at Aralia v) Ranir Bazaar
(HTLS)-4 km.
Total 100.72
Total 31.82
Page | 106
Sl. State Peak MVA Capacity Transmissi Tentative
No. Electricity Addition on Line expenditure
Demand /Augmentation addition / (in Rs. Crs)
2029-30 (in MVA) Reconducto
(MW) ring
(in ckm)
1. Arunachal 378 150 152.5 533.3
Pradesh
2. Assam 3300 2120 1701 2405.54
3. Manipur 550 0 534 869.12
4. Meghalaya 699 1340 830 1069.53
5. Mizoram 285 25 467.5 427.5
6. Nagaland 316 190 258 310
7. Tripura 703 1100 432 995.22
8. Sikkim 211 50 0 31.82
Total 4975 4375 6642
***
Page | 107
Annexure-I
Page 1 of 1
Annexure-II
Page 1 of 1
ANNEXURE-III
Page 1 of 8
S
Under construction 132 kV Line
PARE
Sagalee Under construction 220 kV Line
S
Under construction 400 kV Line
Naharlagun North Lakhimpur Planned 132 kV Line
Existing EHV Substation
Under construction Substation
Itanagar Banderdewa
Lekhi Planned 132 kV Substation
S
Generating Station
Nirjuli
to Biswanath Chariali
Holongi
to
UPPER SIANG DIBANG
Biswanath Chariali VALLEY
Gohpur
SIANG LOWER
UPPER SUBANSIRI
DIBANG
VALLEY
Dambuk
Kamba
Bameng
New Ziro Ziro Miao
PAPUM L. SUBANSIRI Gogamukh CHANGLANG
S
S
Khuppi Sagalee
S
PARE Deomali
S
DIKSHI Changlang
600 MW Naharlagun North Lakhimpur
S
Kalaktang KaHEP Itanagar
Tippi Lekhi Banderdewa
PAKKE KESSANG Nirjuli
Seijosa Khonsa
Holongi TIRAP
Gohpur
Balipara
LONGDING
To & From Biswanath
Eastern Regional Grid Chariali
ANNEXURE-III
Page 2 of 8
A. Kamalpur I. Sonapur
arh
M'wari SP= Maheswari SP Do
i(
kia
Silapathar
rug
G. Chadranpur(CTPS) pa )
su
S'guri SP= Samaguri SP R u do
Ranganadi
Dib
Tin
25 (le
g
H. Sarusajai Gogamukh 49
Chabua ita
9
itin
P'jali SP= Patanjali SP ar
aji
48 bi
ha
Itanagar Dibrugarh gh
em
40 du54
47 ar
Be
25 43 or M
Dh
AGBPP B
61 36
Digboi
Ghilamora NR
)
57 43 ul
i SP Deomali
Daifam 77
NC
BHUTAN a
)
Gelephu ar Teok
i(B
13 Nazira
uri
Jo
lip rh 22 LTPS (Lakwa)
vo
Gohpur J
ag
Ba
a
or at
P
h
Bin
65 53 at 54 80 69
Motanga
ar 10 57 W Nazira
uri (
g 13 es 1.5
g
223
i
a Row Ghoramari 8 t 31
ta
n
20 New Mari
95 Sonabil
Sil
49 BNC ani
rn 290 P 13 58
w
S 64 P
PL
Tan
ki
r gla ta 31 Tezpur 'jali 220 Mariani
Ne
aigao
290 w 49
BR
r
Ba
w
11 64 SP 40 45
218 1729 pu Ro (Depota) t
ga
Rly
105 n a Dhekiajuli 48 kha Golaghat
1728 Mokokchung
Titabor
h
ao i
Bong
Alipurduar oka
og
rna
lig ew bar ngia61 B169
ic
Sala 100 a N l ay a 44 42 35
Ba
R Golaghat
rbh
kati 6 Dh 76 Na ew
Kh
Dhing 64
o
78 m N a Misa
un
22 a
S
Agra-PG 65 3 42 et 22 A ia lo
ig 38 Mokokchung
3 rp l ng 38 Sipajhar ao Sa 124
Ba86 Ra
34 n ma
um
10 sa 119 gur
i
a
BGTPP A Sarupathar
D
n BTPS 37 (N TPC laHajo G 101 M'w 62
aigao S)
ar
160 ) 35 ari 30 NAGALAND
Goss Kokrajhar(A 24 63 Amingaon B N8 29 20 S'g SP
m
ou K
l
63 Jogighopa 201 Azara 3 E F 3014
uri
S Bokajan
D P Mirza 5 P 73 76 LEGEND
Bi 164 S C 7 11
Sa
las 24 J Bokajan
38 hip Agia KO a 4 31.5 L 76.5 39 8
70 67 Sankardev Nagar 25
th
ar
a( BO
ar H DI
Boragaon 108 113 New Kohima(KMTL) 66kV Transmissioin Substation
AS Diphu
or
) 31 h 72
N
107 Boko 15 Diphu 132kV Transmission Substation
Gauripur pd 11 18 Diphu
Dimapur Pg
Mendipathar hu CALCOM
D 220kV Transmission Substation
Nangalbibra Umtru Langpi
Kopili
400kV Transmission Substation
Umtru (Me) 11
Killing(Byrnihat)
Meghalaya 256 12 Hydro Generating Station
Khandong
217 41
42 Thermal/Coal/Gas Generating Station
Khliehriat
1 Haflong Assam Solar Power Plant
BANGLADESH Lumshnong
77 Haflong(PG)
25 Manipur 33kV Transmission Substation
Umrangshu
Panchgram M 101 33kV Lline
19
1 19 35 Pailapool Imphal(PG)
Badarpur(PG) 1 1 167 66kV Lline
28 15
Karimganj 27 Silchar Jiribam Pg
50 67
34 Ha
132kV Lline
ila
95 ka
A nd
i (A 220kV Line
Patharkandi Du EG
CL
G 29
llav
ch Lala ) 400kV Line
20 err
a
29 127 107
International Boundary
B N8 35 Dharmanagar
F K Kumarghat 160 State Boundary
3 E 3014 5 District Boundary
C MIZORAM
7 J Kolasib
11 River
Pallatana P K Bari
L Melriat
31.5 Railway Line
H D I TRIPURA
108 44 National Highway
ANNEXURE-III
Page 3 of 8
( Future )
NAGALAND
DIMAPUR(PG) KOHIMA
(NAGALAND)
(NAGALAND)
LEGEND
EHV COMMISSIONED
EHV UNDER
CONSTRUCTION
KARONG
ASSAM
MANIPUR
UKHRUL
GAMPHAJOL
HAFLONG YAINGANGPOKPI
(ASSAM) IMPHAL (PG)
PILAPOOL
(ASSAM) TAMENGLONG
IMPHAL (YUREMBAM)
BADARPUR KONGB
KONGBA
THOUBAL
HOUBAL
L
(ASSAM)
(JIRIBAM)
SILCHAR NINGTHO-
HO-
(ASSAM) NG
UKHONG
JIRIBAM RENGPANG
R
(PG) KAKCHING
105
LOKTAK
CHURACHANDPUR
CHANDEL
THANLON
MIZORAM
>> EXISTING / PRESENT
AIZWAL Proposed under 2030 400 kV
Power Map of Meghalaya (Existing, Ongoing and Proposed Projects) Transmission Lines & Sub-Stations
of 400/220/132 KV Proposed Draft Recommendation of CEA for 2030 (As on August, 2022).
KILLING(Megh) Umiam
(2x50)MVA
RNB
Stg-I PS
Killing Cements
4x10MW
(GIS) A S S A M
(2x25)MVA
New Shillong
Township
(2x50) MVA
New Umtru NEHU (NERPSIP-I)
(2x20)MW (2x50) MVA (2x160) MVA
P 220/132KV
Killing
K A M R U (GIS) (2x160)MVA
M/s Pioneer (2x25)MW
Carbide Pvt Ltd
New Umtru
(2x20)MW
M/s Nalari M/s Maithan Sai
Ferro Alloys Smelters (P) Ltd. Prakash
Umtru PS EPIP-I
11.2MW EPIP-II Rajabagan
Norbong (2x50)MVA
(2x50)MVA
M/s Pioneer
Carbide Pvt Ltd
41KM
PHULBARI Stg-IV PS (2x25)MVA
(2x50)MVA 2x30MW 2.5 KM
NERPSIP- I NORTH GARO HILLS
RI-BHOI
Stg-III PS
2x30MW
Stg-II PS
Nongk hlaw 2x20MW
(2x25) MVA
WEST KHASI HILLS Umiam
WEST GARO HILLS (2x50)MVA
RNB
Stg-I PS
Cements
4x10MW
New Shillong
Township
(2x50) MVA
NEHU (NERPSIP-I)
(2x50) MVA (2x160) MVA
Hatsingamari Ganol HEP
(Assam) 22.5MW EAST GARO HILLS (25)MVA
IIM
(Proposed)
Mawlai (1x10)MVA
(3x5
(3x50) V
x 0) MVA (2x10) NEIGRIHMS
MVA
220kV Line
66/33 kV
132kV Line 132/33 kV Naginimora
Tuli
66kV Line 132/33kV 66/33 kV
400/220/132kV
Mon Mon
HEP(existing) Mariani
66/33 kV
Tuli 132/33kV 66/11 kV
HEP(under proposal) Longleng Mon Power House
220/132 kV
Ongoing under NERPSIP Mokokchung
132/33kV S/S
220kV Line
132kV Line
132/66 kV
Proposed under 132kV Foothill (ADB) Mokokchung
132/33kV
132/33kV
Champang
132/33kV S/S Longnak
132/33 kV
220/132 kV S/S 75 MW Philimi
Doyang 66/33 kV
132/33kV S/S HEP 132/33 kV Zunheboto 66/33 kV
Sanis Tuensang
220 kV line 132/33kV
132/33kV Tuensang
132 kV line Zunheboto (Lizu)
132/33 kV
Wokha
132/33kV
132/33kV
Diary 400/220 kV
Niuland
Farm Zhadima 24 MW
220 kV PGCIL
Assam (Misa) 132/33kV Zungki
220/132 kV
Old Showuba HEP
220/132 kV 66kV Dairy Zhadima
PGCIL Farm 132/66 kV
66kV Nito
24 MW Tizu- Kiphire
farm
Valley 42 MW
HEP Lower Tizu
220/132 kV 132/66kV HEP
Tsitrongse Nagarjan Chumukedima
Peren
Chief Engineer
Department of Power (T&G)
Nagaland: Kohima
SILCHAR
KAILASHAHAR
KAMALPUR
P. K. BARI (TSECL)
PGCIL
P. K. BARI (ISTS) KANCHANPUR
HEZAMARA DHALABIL
MOHANPUR
MANU VANGMUN
R. C. NAGAR AMBASSA CHAWMANU
JIRANIA
BODHJUNG NAGAR
GAMAITILLA
BARAMURA
BISHRAMGANJ
ARALIA
UDAIPUR AMARPUR
LEGEND
ROKHIA
EXISTING U
U.C
C PROP
BOXANAGAR
PALATANA JATANBARI 400 KV LN
GUMTI
RABINDRA NAGAR
132 KV LN
66 KV LN
BAGAFA
400 KV S/S
MONARCHAK
132 KV S/S
BELONIA
66 KV S/S
33 KV S/S
SATCHAND 33 KV LN
(on 132 KV
tower)
G.T. P
SABROOM
H.E.P
PROPOSED SCHEME FOR UPGRADATION OF TRANSMISSION NETWORK OF SIKKIM
ANNEXURE-III
Page 8 of 8
MALTIN
66
KV
DC
LACHUNG
66 KV SC TL
TL
NORTH SIKKIM CHUNGTHANG
RABOMCHU
TL
DC
KV
2
13
TL
SC
KV
132/66KV SINGHIK
66
TL
132 KV DC
MEYONG 4MW
SC
66
HEP STATION
KV
KV
66
SC
TL
TL
TL
SC
KV
66
132 KV DC
PASSINGDONG
MANGAN
TL
PHODONG
(Augmentation)
DIKCHU
PANGTHANG
TL
13
SC
2
K
V
KV
DC
TL
DC
66
SICHEY
TL
KV
WESTSIKKIM
66
SC TL
MAKHA PERBING 66 KV
TL
SC
TL
SC
V
K SHERATHANG
KV
66/11KV RAVANGLA 66
66
RELICHU
66/11KV 66/11KV
SOUTH SIKKIM NHPC SS
LILO
URHP SS TADONG
TL
TL
BULBULAY
PAKYONG
66 KV SC
SC
KV
66 KV SC TL
SC
TASHIDING HEP PELLING
EAST SIKKIM
66
KV
TL
YANGANG 66
96 MW CT
L
RANGIT HEP
SC
VS
TL
TL
TL
66 K
DC
DC
SC
66 KV
KV
66
TL
66
KHAMDONG RANIPOOL
66
KV SC
0
TL
6666 KV
KV
99 MW
TL
TL
V
SC
K
V
K
66
66/11 KV LLHP SS
66
LEGSHIP POOL
TEMI
TL
66 KV DC TL
SISNEY HEP
DC
22
132
DC
TL
K
SC
KV
KV
66
V KV
2
DC
13
2
SC
13
66 KV
SC TL
RINCHENPONG
TL
SC TL
13
66 KV
TL
2K
66/11KV NAMCHI
RHENOCK (Bay Ext)
66 KV
VS
(Augmentation)
SC TL
CT
ROTHAK 22 NAMTHANG
L
66
0
KV
K OLD NAMCHI
66
KV
TL
TL
TL
SC
SC
V 66/11KV MELLI
KV
V SC
TL
66 KV
66
SC
66 K DC
TL
(Augmentation)
TL
66
SC
TL
KV
KV
TL
66
SC
TL
TL
66 KV SC
TL
66 KV SC DC SC
TL
TL
KV
SC
KV
66/11 KV KV
66
66
KV
SC
TL
0 66/11KV MAMRING
22 2
66
JORETHANG
KV
SC
TL
13
SORENG SS
TL
SC
SOMBARIA
KV
66
NEW MELLI
132/66KV 2MELLI BINNAGURI
20
(Augmentation)
KV
DC
TL
KISHANGANJ
SILIGURI
EXISTING PROPOSED
66 KV S/C PROPOSED 66 KV SC TL
66 KV SUBSTATON 66 KV D/C PROPOSED
66 KV DC TL
132 KV SUBSTATON
66 KV SC TL
66 KV S/C EXISTING
66 KV D/C EXISTING 66 KV DC TL