DOH Administrative Ordero No 2020 0062
DOH Administrative Ordero No 2020 0062
Department of Health
OFFICE OF THE SECRETARY
DEC 29 2020
ADMINISTRATIVE ORDER
No. 2020- 0062
SUBJECT: Guidelines for the Implementation of Projects Funded Under the Health
Facilities Enhancement Program (HFEP) Fiscal Year 2020
I. RATIONALE
The approved budget for the Health Facilities Enhancement Program (HFEP) in the
General Appropriations Act (GAA) 2020 is primarily apportioned for the purchase of medical
equipment for the DOH hospitals, LGU hospitals, Rural Health Units (RHU) and Barangay
Health Stations (BHS). The approved budget also provides fund for the construction of thirty
(30) new BHS and for the completion, repair, renovation, rehabilitation of RHUs, City Health
Offices (CHOs) and BHS. The GAA also includes the approved fund for the procurement of
eighteen (18) Medical Transport Vehicles for Local Government Unit (LGU) Health Facilities.
II. OBJECTIVE
This Administrative Order provides the guidelines for the procurement and
implementation of HFEP funded projects for equipment, infrastructures, and medical transport
vehicles as prescribed in the Republic Act (R.A.) No. 11465 otherwise known as the General
Appropriations Act for Fiscal Year 2020.
III. SCOPE
This Order covers the implementation of projects under the HFEP FY 2020 by the
Central Office, Centers for Health Development (CHDs), DOH hospitals, Ministry of Health.
Bangsamoro Autonomous Region in Muslim Mindanao (MOH-BARMM) pursuant tq Re.
a~
11054 Organic Law for the BARMM, and other government health facilities. 8@
Ko =
i
IV. DEFINITION OF TERMS |
—
feo > > |
BERETS
{£5
| Mm
1. Health Facility - refers to an establishment, whether stationary or mobile, lapd
based or otherwise, that provides healthcare services such as diagnostic, therape
rehabilitative, palliative, and/or related health services.
a
oo
tig aa
=
Building 1, San Lazaro Compound, Rizal Avenue, Sta. Cruz, 1003 Manila ® Trunk Line 651-7800 loc 1113, 1108, 1135
(>
Direct Line: 711-9502; 711-9503 Fax: 743-1829 e URL: http://www.doh.gov.ph; e-mail: [email protected]
DD
2. Implementing Unit refers to the health facility or the Center for Health
—
Development (CHD) or other DOH offices or operating units where the fund is
appropriated and capable of carrying out the implementation of the proposed
project(s).
4. Slippage -is a delay in work execution occurring when actual accomplishment falls
below the target as measured by the difference between the scheduled and actual
accomplishment of the Work by the Contractor as established from the work
schedule. This is actually described as a percentage of the whole Works.
5. Variation Order — may either be in the form of a Change Order, Extra Work Order,
or Supplemental Agreement, issued to cover any increase or decrease in work
quantity, including introduction of new work items not included in the original
contract, including the reclassification of work items that are due to change of plans
and specifications.
V. GENERAL GUIDELINES
1. Budget. The total approved budget for the implementation of HFEP projects in the DOH-
Central Office, CHDs, DOH Hospitals, other DOH facilities and LGU health facilities is
Eight Billion Three Hundred Fifty One Million Six Hundred Ten Thousand Pesos
(P8,351,610,000.00) shall be used exclusively for the following purposes:
Php 8,351,610,000.00
Total approved budget for the Implementation of HFEP Projects under GAA 2020
2. Release of Budget
a. Upon the release of the budget from the Department of Budget and Management
~
_- ~~~ (DBM), the DOH Central Office shall sub-allot or transfer the fund to the implementing
units the CHDs, DOH Hospitals, Corporate Hospitals and MOH-BARMM. The
such as
~sub-aHetment or transfer shall be in accordance with the National Budget Circular
No.'578 issued by the DBM.
ah Os
a
i
/
CRUZ
Rn SECTION
Cranartment of Health
b. For the projects under the For Later Release classification, the DBM requirements for
the issuance of the Special Allotment Release Order (SARO) or General Allotment
Release Order (GARO) are specified in Annex A: Requirements for the release of
funds for the projects under For Later Release.
3. Implementation of Projects
a. The implementing units where the fund is sub-alloted or transferred shall primarily
implement the equipment and infrastructure projects.
All procurements for infrastructure, equipment and medical transport vehicle projects
shall be in accordance with the pertinent provisions of R.A. No. 9184 or otherwise
known as Government Procurement Reform Act and its Implementing Rules and
Regulations, and other pertinent accounting and auditing laws, rules and regulations.
4. Reporting. All CHDs, DOH Hospitals, other DOH Health Facilities, LGU Health Facilities
and MOH-BARMM shall submit to the HFEP MO the monthly Physical and Financial
Performance Real-Time Report (PAFPRR) for all projects not later than the 10" day of
each succeeding month, in soft and in signed hard copies.
1. The implementing unit shall prepare the Terms of Reference (TOR) or the Purchase
Request (PR) and other pertinent procurement documents. The implementing unit shall
establish its own Technical Working Group (TWG) that shall prepare the PR or TOR.
The TWG shall be at least composed of representatives from the end-users and from
the engineering and/or biomedical department of the health facility.
The PR or TOR shall include amongst others, the detailed equipment technical
specifications, accessories, technical documents, compliance with applicable product
standards, warranty, completion period for the delivery and installation (if applicable),
functional testing and commissioning, training for end-users and maintenance staff,
preparation of the installation site (if applicable), payment terms, etc. The TWG can
use as references the available technical specifications issued by the World Health
Organization (WHO) which can be found in the WHO official website
(http://bit.ly/WHO-TS).
The TWG shall have the responsibility and accountability to ensure that no item in the
PR or TOR is referenced to a specific brand of the equipment as provided under the
Thplementing Rules and Regulations of R.A. No. 9184, Rule VI, Sec. 18. Prior
inimencement of the procurement, the Bids and Awards Committee (BAC) of
CORAZOIN/S. CRUZ
/
DEYA
4. For radiologic equipment, the implementing unit shall use the TOR (and its
amendments, if any) issued by HFEP-MO and cleared by the Physics Laboratory
Support Division, Central Services Laboratory of the Food and Drug Administration.
5. For equipment that requires the preparation of installation site, the implementing unit
shall ensure that prior to procurement, the installation site has the required infrastructure
including the electrical utilities and if necessary, adequate water supply. The installation
site must be ready and must not cause any delay in the delivery, installation and
commissioning of the equipment. The implementing units shall likewise ensure the
availability of the trained personnel for the operation of the equipment.
6. The implementing unit shall verify that the suppliers participated in the bidding for the
equipment projects are not included in the current Government Procurement Policy
Board (GPPB) list of blacklisted entities (gpbb.gov.ph/blacklistedsuppliers.php).
7. Immediately after the completion of the procurement, the implementing unit shall
ensure that the equipment is properly classified and recorded in the books of assets of
the health facility.
8. For the equipment procured by the CHD for the LGU health facilities, the turnover of
the equipment shall be accompanied by the corresponding Deeds of Donation as
appropriate, and shall be in accordance with the Government Accounting and Auditing
Manual (GAAM).
1. The implementing units shall ensure that the infrastructure projects conform to the
GAA 2020 General and Special Provisions for infrastructure projects.
2. The implementing unit shall submit the approved Schematic Floor Plan to the DOH-
Health Facilities Services Regulatory Bureau (HFSRB) or to the respective CHD-
Regulations, Licensing and Enforcement Division (RLED) and secure a Permit to
Construct (PTC) prior to the preparation of the Detailed Architectural and Engineering
Design (DAED).
3. The implementing unit shall prepare and approve the DAED Plans, Detailed Unit Price
Analysis (DUPA) and other bidding documents required for the procurement of the
project.
4. The building design shall strictly conform to the provisions of the latest edition of the
following Building Codes, other pertinent Laws and their Implementing Rules and
Regulations (IRR), and DOH Manuals and Standards:
7
CRTIFED TRUE BORE
a.‘National Building Code of the Philippines (PD No. 1096)
Pi hilippine Green Building Code, a Referral Code of PD No.1096
Se To d. Nafiondl Structural Code of the Philippines (NSCP) Latest Edition
Si JAaN
CRRAZON
12am
4 lg cRuz
Op? h
TSDasartment
- RECORDS SECTION
of Heal
MO
Plumbing Code of the Philippines (RA No. 1378)
New Philippine Electrical Engineering Law (RA No. 7920)
Philippine Mechanical Engineering Act of 1998 (RA No. 8495)
ER Fire Code of the Philippines (RA No. 9514)
Ecological Solid waste Management Act (RA No0.9003)
RFT
DOH Healthcare Waste Management Manual 4 Edition
Philippine Clean Air Act of 1999 (RA No. 8749)
Philippine Clean Water Act (RA No. 9275)
gr
. DOH Hospital Licensing Standards for Physical Plant (DOH AO 2012-0012)
Joint DOH and DENR Administrative Order (AO 02-2005)
°OB
Local ordinances and regulations
5. The building design shall likewise strictly adhere to the DOH Administrative Order
2020-0011 Guidelines in the Implementation of the Unified Color, Signage
Features, and Design of Identified Interior Spaces for Health Facilities
Enhancement Program (HFEP)-funded and coordinated Health Facilities and
Medical Transport Vehicles.
6. For the facility having a gross floor area of 10,000 square meters or more, the
implementing unit shall comply with the DOH Department Circular No. 2019-0059
Green Certification of Government Healthcare Facility Projects.
7. The implementing unit shall verify that the contractors participating in the bidding for
the infrastructure projects are not included in the current Construction Industry
Authority of the Philippines (CIAP) list of blacklisted contractors and GPPB list of
blacklisted entities (gpbb.gov.ph/blacklistedsuppliers.php).
8. The implementing unit shall clearly indicate in the contract that the contractor shall be
the one responsible for securing the required national and local government permits
such as Building Permit, Occupancy Permit, Utility Power Company approval, etc. The
contract shall also specify that all documents needed for the application for the permits
that are originating from the implementing unit shall be promptly provided to the
contractor.
|
9. The implementing unit shall ensure that any change in the specifications of materials
shall be permitted only if the alternative material is stronger or more durable than the
originally specified material and that the funds for any additional cost shall be
available and certified by the institution’s budget officer.
11. Prior to the installation of any equipment/assemblies/machines required for the project,
especially by a separate contractor/supplier, a pre-installation conference shall be
conducted.
CORAZON
-
RMITS
J
ZECORDBS
Depsartment of Health:
— _ —
CRUZ
SECTION s
13. The implementing unit shall conduct a weekly/bi-weekly/monthly inspection to
properly monitor the progress of the project.
14. Any Variation Orders or changes in the specifications of the materials shall be
is
permitted only if the alternative material stronger or more durable than the originally
specified material and that funds for any additional cost shall be available and certified
by the institution’s budget officer.
15. The implementing unit shall clearly indicate in the Contract the appropriate duration of
the project recommended by HFEP MO. The duration of the project with a contract cost
of below Phpl10 Million up to Php50 Million shall be in accordance with Annex B:
Duration of the project recommended by HFEP MO
16. For projects with a cost of more than Php50 Million, the duration shall be based on the
Construction Schedule considering the use of optimum additional resources. The
schedule shall be approved by the respective CHD and shall be endorsed to the HFEP
MO Project Monitoring Unit (PMU) for the monitoring and evaluation of the project.
17. In case of Negative Slippage, the Calibrated Actions shall be in accordance with
Annex C: Negative Slippage and Calibrated Actions
18. Project Completion Phase. The Implementing Unit shall use the Forms in Annex D:
Punch-list Forms as a tool in conducting the preliminary inspection when the project
has reached ninety-five percent (95%) accomplishment of the total contract amount. A
copy of the report shall be provided to the Contractor for the preparation of the final
turnover of the project. The report shall contain, among others, the remaining works,
work deficiencies for necessary corrections, and the specific duration/time to fully
complete the project considering the approved remaining contract time. This, however,
shall not preclude the claim of the implementing unit for any liquidated damage. The
Punch-listing shall be conducted with the presence of the Contractor and the end-users
or their duly authorized representatives.
19. Post-construction Phase. The Implementing Unit shall inspect the project three (3)
months prior to the expiration of the Defects Liability Period. The Implementing Unit
shall accomplish the Form in Annex E: Post-Construction Report Form and provide
a copy to the Contractor to undertake the repair of any damage to the Works. The
expenses that will be incurred due to the repair of the damages shall be at his own
expense borne by the Contractor. Upon completion rectification/repair as stated in the
Post-Construction Report, the Implementing Unit shall issue to the Contractor the Form
in Annex F: Defects Liability Certificate together with the Certificate of Final
Acceptance.
20. The implementing units shall designate its Engineering and/or Infrastructure
Department to be the custodian of the accomplished report Forms described in Annexes
CtoF.
-.-- 21. The CHDs may enter into a Memorandum of Agreement (MOA) with the concerned
oC
LGU for the implementation of infrastructure project/s pursuant to Section 87 of the
ovisions of the GAA 2020, provided that the LGU has:
3S Ne AN
The sample template for the MOA is provided in Annex G: Sample template for
the Memorandum of Agreement (MOA) between CHDs and LGUs.
1. The TOR that shall be used for the procurement of the medical transport vehicle shall
be the Terms of Reference (and its amendments, if any) issued by HFEP-MO.
2. The requirements and procedures on the turnover of the medical transport vehicle to
the respective recipients shall be in accordance with DOH Department Order No.
2018-0338: Guidelines on the Distribution of Medical Transport Procured Under
HFEP to the Respective Recipients. All medical transport vehicles shall be turned
over to the designated recipients with corresponding Deeds of Donation as appropriate
and shall be in accordance with the Government Accounting and Auditing Manual
(GAAM).
E. Use of Savings |
Use of savings shall be pursuant to Sections 66, 67, 68, and 69 of the General Provisions
of the GAA 2020 and sec. 3.11 of NBC No.578 as shown in Annex H.
F. Penalties for Failure to Strictly Enforce the HFEP Project Implementation Guidelines
a
The concerned implementing unit shall see to itthat this Guidelines shall be strictly
enforced. Failure to do so shall, after due process, "make the responsible
officials/employees liable and subject—to~the—pemalttes for Violation of
D CORY
CERTIFI TRU
Upon the approval of the Department Order on the Sub-allotment and Disbursement of
Funds, the Administration and Financial Management Team (AFMT), through the
Financial and Management Service (FMS) shall facilitate and process the release of the
Sub-allotment Advice (SAA).
The HFEP-MO shall provide oversight functions to CHDs, DOH Hospitals, and LGU
health facilities in the implementation of HFEP Projects including the monitoring and
evaluation of the status of HFEP projects. The HFEP-MO shall likewise provide
technical assistance, if necessary, to the HFEP projects, The HFEP MO Project
Monitoring Unit (PMU) shall provide and manage all information systems required for
the implementation and coordination of HFEP projects. It shall provide technical and
logistical assistance to make operational, comprehensive and updated information
system on HFEP.
The CHDs shall be the regional manager, implementing arm, and procuring entity of
the DOH for their respective programs. They shall provide technical assistance and
monitor all HFEP projects in the LGUs, maintain and regularly update the Physical and
Financial Performance Real-Time Report (PAFPRR) in coordination with the LGU units
and the HFEP MO.
VIII EFFECTIVITY
This Order shall take effect immediately upon publication in newspaper of general
circulation.
“ISCO A
Secr®tary of Health
QUE III, MD, MSc
~~
JAN 12 2002
CORAZON A.
DELY
KMNTS~ RECORDS SECTION
CRUZ
()/ 8
Daparintent ©7 Health
Annex A: Requirements for the release of funds for the projects under For
Later Release
Annex H: Relevant Provisions of the GAA 2020 and NBC No. 578 for
HFEP FY 2020
Annex A
Requirements for release of funds for the projects under For Later Release HFEP 2020
1. Request letter for the release of the funds addressed to the HFEP MO
Physical Plan
Agency certification that the project can be implemented within the validity of the
appropriation
For equipment projects: list of equipment to be procured and its Purchase Request
For infrastructure projects: Clearance from the Department of Public Works and
Highways (DPWH) for building structural integrity/resiliency; signed picture of geo-
tagged actual location of project and/or form the Department of Environmental and
Natural Resources (DENR) for environmental clearance.
Commitment from the agency head to fund the cost of maintenance and repair of the
projects
10. Certification from the agency head that the project is not fully funded from other sources.
Annex B
Standard Construction Duration per Project Construction Cost & Estimated Monthly Percentage of
Accomplishment of HFEP Infrastructure Projects
Day Day Day
Project Contra Day Day Day Day Day Day Day
Construction 121- 1561- 181- 211- 241- 271-
Duratio 31. 61- 91-
Cost 1-30 150 180 210 240 270 300
n 60 90 120
P10M & below 120CD 20% 50% 80% 100% |
Notes:
1. For projects P51M & above, computation shall be based on the Construction Schedule (Bar
Chart/S-Curve), considering the use of optimum additional resources. The Construction
Schedule are to be prepared by the CHD/DOH Hospitals Engineers. Provide approved copies
to HFEP Performance Management Unit (PMU) for proper monitoring and evaluation.
2. The above duration is applicable for New Construction Projects, provide additional 20% for
projects with existing facilities for Repair/Renovation/Rehabilitation/Improvement.
3. For existing facilities, the end-user should submit a Plan for Patient Transfer before submitting
proposals. Turn-over of the site to the Procuring Entity should be accomplished during the Pre-
procurement of the project.
is
4. The Start Date, the date when the Contractor is
obliged to commence execution of the Works.
The contractor should be granted possession the site upon issuance of the Notice to Proceed.
of
Annex C: Negative Slippage and Calibrated Actions
(Date of Issuance)
- Administrative Action on
Contracts with Negative Slippage in Accordance with the Revised Implementing Rules and Regulations
(RIRR) of R.A. 9184; you are hereby directed to submit, within seven (7) calendar days from receipt
hereof, a detailed "catch-up plan” on a two-week basis to eliminate the slippage and a revised Construction
Schedule/Bar Chart.
In the action program being required, specify therein the additional input resources such as money,
On-
manpower, materials, equipment, and management to cope up and meet the desired result accordingly.
site supervision shall likewise be intensified and evaluation of project performance shall be done every
other week.
(Date of Issuance)
This refers to your contract, (Name of Project) in the amount of (Contract Amount in words and
in numbers). Please be informed that as of (date the accomplishment was computed), due to your
fault caused by (state the reason e.g. limited equipment, materials, manpower, etc.), you have
incurred a negative slippage as follows:
Accomplishment
p
9
Name of Project
Planned Revised
-
Actual
(Name oJ _.%
:
Project) — . %
On-site supervision shall likewise be intensified and evaluation of project performance shall be done at
least once a week.
(Date of Issuance)
This refers to your contract, (Name of Project) in the amount of (Contract Amount in words and
in numbers). Please be informed that as of (date the accomplishment was computed), due to your
fault caused by (state the reason e.g. limited equipment, materials, manpower, eic.), you have
incurred a negative slippage as follows:
. Accomplishment
Name of Project ;
Actual
Planned Revised
(‘Name oJ
Project)
i _.% _.% _.%
Pursuant to Department Order No. , Series of 2019, Annex - Administrative Action on Contracts
with Negative Slippage in Accordance with the Revised Implementing Rules and Regulations (RIRR) of
R.A. 9184; you are hereby directed to "show cause" within seven (7) calendar days from receipt hereof
why your contract should not be terminated, pursuant to Section IV.3 Appendix 4 of R.A. 9184.
NAME OF FACILITY
PROJECT DESCRIPTION
LOCATION
CONTRACT AMOUNT
CONTRACTOR
IMPLEMENTING AGENCY DATE OF INSPECTION
End-User
Head of Procuring Entity
Date: Date:
Acknowledge by:
Contractor
Date:
~
III
Annex G: Sample template for the Memorandum of Agreement (MOA) between
CHDs and LGUs
Accountant
MEMORANDUM OF AGREEMENT
for
WHEREAS, Department of Health thru the Health Facilities Enhancement Program
( Php
)
CY has appropriated the amount of
intended for the Completion of
Unit of thru transfer of
to be implemented and procured by the Local Government
Mayor/Governor
fund.
,
A. FUND UTILIZATION
Act (GAA)CY ____or Republic Act under
1. The funds skall be chargeable against the General Appropriations
of Health for Comprehensive Release (FCR)
the Health Facilities Enhancement Program of the Department
and shall be obligated On or before
implementation/procurement
transfer the fund according to the scheme or mode of project
2. CHD- shall
adopted by the Local Government Unit as set forth in Section C of this Memorandum of Agreement.
Bid and award the infrastructure project in conformity to the provisions of R.A. 9184 and its Revised IRR
Accountant
and allow CHD- personnel to act as observer in the bidding process and as member in the Technical
Working Group for prequalification and bid evaluation;
Supervise the implementation of the project following the highest standards for materials control, safety,
and quality assurance and hire or assign a quality control engineer for such purpose and secure the necessary
local permits;
PDO
Attend monitoring meetings called for by CHD- ___ and immediately act on the observations made by the
agency which would require corrections and revisions on the implementation
of the project;
Director
Raise to CHD-
for arbitration, any issues on the project implementation and must seek first the
clearance and approval of the agency for any proposed Variation Orders;
oo Ensure immediate implementation and completion of the Project within the specified duration;
the Certificate of
Together with CHD-____, conduct final inspection of the project prior to the issuance of
Completion;
and submit
10. Regularly submit the Fund Utilization Report (FUR) of the infrastructure project to CHD-___
Regional
e
least Sixty percent (60%) of the
e Fund Utilization Report (FUR) showing utilization of at
amount released in the First (1°) Tranche
Pictures with caption of the ON-GOING implementation
of the Project.
Mun./Prov.
e
e Minimum of:
e 4 - Angles Exterior and
e 5 - Angles Interior
- The remaining balance of the Project’s
Total Contract Price (PTCP) including Extra
3. Final Release
that the project has reached at least fifty percent (50%)
Work/Variation Order if any, provided
completion and the LGU has submitted the following requirements to CHD- oo - to be accomplished
III
in three (3) sets:
e Letter request of the LGU for the release of the remaining fund.
Accountant
e Fund Utilization Report ( FUR ) equivalent to at least sixty percent (60%) of the total amount
Tranche.
previously released for the 1St and 2nd
e Statement of Work Accomplished (SWA) equivalent to at least 50% of the PTCP.
e if
As-Built Plan, there are any changes in the plan or Variation order Pictures with caption of
the ON-GOING implementation of the project Minimum of:
e 4 - Angles Exterior and
5 - Angles Interior
:
e
that were previously
PDO
month.
D. AMENDMENTS
This MOA may be amended or revoked only upon mutual consent of the parties provided
which
that all amendments shall be covered by Supplemental Provisions signed by both parties
shall be incorporzted by way of reference as an integral part of this MOA.
IN WITNESS WHEREOF,
at
the Parties have affixed their hands this day of
For the CHD- : For the {Municipality/Province} of
DIRECTOR 1V
|
{MAYOR/GOVERNOR}
Signed in the Presence of
{M/PHO}
PDO,
ACKNOWLEDGEMENT
|
Philippines, personally appeared
,
at
following:
Name
Type of Government Place/Date of sve
Issued ID/No.
their respective
All personally known to me, upon, competent
proof of identity indicated below
and
to be the same persons who executed the foregoing document
name and signature,
their free and voluntary act and deed.
s
acknowledged to me that the same is written
this page on which the acknowledgment
This instrument consists of 5 pages, including witnesses.
thereof by the parties and their instrumental
and signed on each and every page and at the date first abovewritten:
WITNESS MY HAND AND SEAL on the place
Notary Public
Doc No.
Page No.
Book No.
Seriesof
Annex H: Relevant Provisions of the GAA 2020 and NBC No. 578 for HFEP
FY 2020
General Appropriations Act 2020 General Provisions
of the Semate of the thilippices, the Speaker
sec. 66. Authority to Saviegs. The President of the philippines, the President
Use
Court, the Heads of the Civil Service Comsission, the Commission on
of the House of Representatives, the Chisf Justice of the Swprese to awgaest actual deficiencies
and use savings in their respective appropriatioss
Elections, and tha COA are hereby authorized fo declare
incurred for the current year in any ites of their respective appropriations.
and amnual report
foregoing constitutivaal officers authorized to use savisgs
shall be responsible for epsuring that a semestral
The
of the Semate of the philippines and the Speaker of the Howse of
be subsitted to the President
on their respective use of savings shall the sources and grounds
indicate among others, the amount of savings geserated,
Representatives, copy furnished the DBA. The report shall augsanted. They shall likewise ensure
in their respective appropriations
used therefor, and the existing program, activity ar project
websites.
that said reports are posted on their raspactive
balances of any released appropriztions in this Act which have aot been
Sec. 67. Meaning of Savings. Savings refer to partioes or
obligated as a result of any of the fallowing:
for which the appropriation is authorized; ar
(a) completion, fisal discontinuance, or abandonment of a program, activity or project
and efficiencies and thus evabled an agency to weet and deliver the
(b) isplementation of measures ressliing in improved systess
required or planned largets, programs and services approved ia this Act at a lesser cost.
(a) The beads of agencies, far Lhe following: (i) change in tha details of am activity or project without chasging its satare and
within the same operating wnit; and (ii) change In the object of expeaditure (Travelling Expemses, or Iavestsent Outlays) within
an allotment class (MOOE, or Capital Outlays);
(b) The DBM, in the following modifications: (i) From one allotseat class to another; (ii) from one operating unit to another;
(iii) within a special purpose Fuad; and (iv) for the paysest of magma carta bemefits avthorized under Section 50 bersaf; and
(c} The President of the Philippines, for the paymest of imtalligeace funds within the Executive branch.
All sodification in the allotment sball rat estail any increase in the tatal amount apprapriated for am activity or praject.
3.10.2 Modification covering allotments for MOOE and CO shall not entail
for an activity or
any Increase In the total amount appropriated
of with several activities, modification
project. In the case programs
may be done only within each activity. ¢
3.11 Use of Savings to Augment Deficient Appropriations for P/A/Ps
3.11.1 Savings as defined under Section 67, GP of the FY 2020 GAA, refer