0% found this document useful (0 votes)
14 views22 pages

Section E

Uploaded by

omsaiearthworks
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views22 pages

Section E

Uploaded by

omsaiearthworks
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 22

SECTION - E

SCHEDULE OF QUANTITIES, SCHEDULE OF STAGE


PAYMENTS & PRICE BID

Page-538
NOA : NIL NOI:NIL AE-I/SCPD-II AE-II/SCPD-II AE (E)/SCPED EE/SCPD-II EE (E) /SCPED
NOC-NIL NOW:NIL
E1: SCHEDULE OF QUANTITIES

Item
Description of Items Qty Unit Rate Estimate Cost (Rs.)
No.

(A) Civil work.

1.0 Planning, Design, Construction, Testing


and Commissioning of Court/ office
building along with all services (Civil),
External Development (Boundary wall,
Gates, Roads, Paths, Ramps, Water
Supply System, Sewerage System,
Drainage System, Service Connections,
Rain Water Harvesting System).
Relocation of existing services i/c
demolition of work existing structures
etc. complete as per scope of work &
related specifications and terms &
conditions provided in this tender
document including obtaining 5 Star
rating certification from GRIHA & BEE for
the Building Complex etc. Complete as
per the direction of Engineer-in-Charge.

1.1 All Civil Works & Services:

1.1. Phase-I 1 Job 148,35,96,108/- 148,35,96,108/-


1 (a) Planning, Design & Approvals
: Site Survey, Soil Investigation,
detailed Architectural & structural
working design and drawings,
Structural design, planning and
design of required Services,
Obtaining necessary Local body &
Statutory approvals required before
& during execution of work and
statutory approvals on completion
plans (e.g. obtaining fire clearance,
obtaining occupancy certificate/
completion certificate from the local
bodies, water connection, consent to
operate etc.), preparation &
submission of all 'As built drawings'
on completion of work.
(b) Shifting of services:
Relocating of underground R.C.C
sump of drinking water & fire etc.

Page-539
NOA : NIL NOI:NIL AE-I/SCPD-II AE-II/SCPD-II AE (E)/SCPED EE/SCPD-II EE (E) /SCPED
NOC-NIL NOW:NIL
and other related services from
construction site of Phase-I, for
smooth operation of Supreme Court
of India.
(c) Basement along with
Foundation (Built-up Plinth Area
of 12958.19 sqm): Construction of
Basement with RCC Raft foundation/
recommended type of foundation as
per structural design, retaining walls
& framed structure, designed to take
load of Superstructure along with
pre-construction anti-termite
treatment, waterproofing treatment
etc. complete in all respects.
(d) Superstructure i/c
Foundation if any (except where
Basement/ Raft provided) (Built-
up Plinth Area of 25294.16 sqm)
: Construction of Super Structure
along with Services, Fitting &
fixtures, Finishing i/c Architectural
Features (e.g. Cladding, Façades,
Structural Glazing), Metal Mesh,
Projections, Pergolas, Support
Structure for Solar Panels, RCC/ SMC
water storage tank of required size
as per NBC 2016, Underground
Sump of 100KL capacity for storage
of Rain Water & 700 KL for water
storage of drinking and fire etc.
complete as shown in Conceptual /
Indicative Architectural Drawings &
3D views of the Buildings complete
in all respects.
1.1. Phase-II 1 Job 184,61,73,499/- 184,61,73,499/-
2 (a) Planning, Design & Approvals
: Site Survey, Soil Investigation,
detailed Architectural & structural
working design and drawings,
Structural design, planning and
design of required Services,
Obtaining necessary Local body &
Statutory approvals required before
& during execution of work and

Page-540
NOA : NIL NOI:NIL AE-I/SCPD-II AE-II/SCPD-II AE (E)/SCPED EE/SCPD-II EE (E) /SCPED
NOC-NIL NOW:NIL
statutory approvals on completion
(e.g. obtaining fire clearance,
obtaining occupancy certificate/
completion certificate from the local
bodies, water connection, consent to
operate etc.), preparation &
submission of all 'As built drawings'
on completion of work.

(b) Basement along Foundation


(Built-up Plinth Area of 17876.32
sqm): Construction of Basement
with RCC Raft foundation/
recommended type of foundation as
per structural design, retaining walls
& framed structure, designed to take
load of Superstructure along with
pre-construction anti-termite
treatment, waterproofing treatment
etc. complete in all respects.
(c) Superstructure i/c
Foundation if any (except where
Basement/Raft provided) (Built-
up Plinth Area of 30429.28 sqm)
: Construction of Super Structure
along with Services, Fitting &
fixtures, Finishing i/c Architectural
Features (e.g. Cladding, Façades,
Structural Glazing), Metal Mesh,
Projections, Pergolas, Support
Structure for Solar Panels, RCC/ SMC
water storage tank of required size
as per NBC 2016, Underground
Sump of 100KL capacity for storage
of Rain Water etc. complete as
shown in Conceptual / Indicative
Architectural Drawings & 3D views of
the Buildings complete in all
respects.
Total (A) 332,97,69,607/-

(B) Electrical Work

1.2 All E&M Services ( sub work D1


to D16) (for Built-up Areas as
above & External Development) :

Page-541
NOA : NIL NOI:NIL AE-I/SCPD-II AE-II/SCPD-II AE (E)/SCPED EE/SCPD-II EE (E) /SCPED
NOC-NIL NOW:NIL
Planning, Design, Supply,
Installation, Testing and
commissioning of all E&M Services (
except Stack parking system) &
Equipment to be designed as per
scope of work and Specifications,
NBC-2016/ CPWD Specifications/
GRIHA & BEE guidelines complete
in all respects as per scope of work
and specifications
(Capacity/quantum as mentioned
in the minimum requirements shall
be mandatorily provided by the
contractor even in case design
requirement is lower).
1.2. Phase-I 1 Job 75,39,22,448/- 75,39,22,448/-
1 (a) Planning, Design & Approvals
of Phase I : Site Survey, detailing
of Architectural and structural
requirements for E&M services,
preparing Basic drawings for
obtaining necessary Local body &
Statutory approvals required
before & during of execution of
work and statutory approvals on
completion plans (e.g. obtaining
fire clearance, obtaining occupancy
certificate/ completion certificate
from the local bodies, electric
connection from electricity
authorities, consent to operate
etc.), preparation & submission of
all 'As built drawings' on
completion of work.
(b)Providing Temporary E&M
services, clearing construction
site of Phase-I required for smooth
operation of Supreme Court of
India.
(c) E&M services in Basement:
providing all required E&M services
(d)E&M services in
Superstructure: providing all
required E&M services
E&M Services for Development &

Page-542
NOA : NIL NOI:NIL AE-I/SCPD-II AE-II/SCPD-II AE (E)/SCPED EE/SCPD-II EE (E) /SCPED
NOC-NIL NOW:NIL
Bulk Services providing all required
E&M services
Total for E&M Phase-I 75,39,22,448/-

1.2. Phase-II 1 Job 57,43,86,594/- 57,43,86,594/-


2 (a) Planning, Design &
Approvals of Phase II : Site
Survey, detailing of
Architectural and structural
requirements for E&M services,
preparing Basic drawings for
obtaining necessary Local body
& Statutory approvals required
before & during of execution of
work and statutory approvals
on completion plans (e.g.
obtaining fire clearance,
obtaining occupancy certificate/
completion certificate from the
local bodies, electric connection
from electricity authorities,
consent to operate etc.),
preparation & submission of all
'As built drawings' on
completion of work.
(b)Shifting of Temporary E&M
services, clearing construction
site of Phase-II as required for
smooth operation of Supreme
Court of India.
(c) E&M services in Basement:
providing all required E&M
services
(d)E&M services in
Superstructure: providing all
required E&M services
E&M Services for Development &
Bulk Services providing all required
E&M services

1.2. Providing Double Stack Car Parking 500 Stack 2,45,000/- 12,25,00,000/-
3 (Electrically operated, each stack for 2
no car parks) and Car Parking
guidance system (Sub work D16A and
D/16B) including operation and
maintenance during defect liability

Page-543
NOA : NIL NOI:NIL AE-I/SCPD-II AE-II/SCPD-II AE (E)/SCPED EE/SCPD-II EE (E) /SCPED
NOC-NIL NOW:NIL
period of 3 years
Total for E&M Phase-II 69,68,86,594/-
(1.2.2+1.2.3)
Total for E&M Phase-I & II 1,45,08,09,042/-

1.3 Operation and Comprehensive


Maintenance of E&M services provided
at Item no 1.2 aforesaid for work
completed under Phase I above, after
defect Liability period of three years of
Phase I. (Operation and
Comprehensive Maintenance for defect
liability period of three years is already
covered in construction cost and
nothing extra shall be paid for the
same)
1.3. Operation and Comprehensive 2 Year 80,00,000/- 1,60,00,000/-
1 Maintenance of Internal Electrical
Installation, Substation, Diesel
Generator Set, UPS, Solar PV
system, Lifts, Escalators
with all accessories (24 hours on each
day including Sundays and Gazetted
Holidays) including breakdown
maintenance including repair and
replacement of worn-out items with
minimum down time after the defect
liability period as per enclosed terms &
conditions
1.3. Operation and Comprehensive 2 Year 60,00,000/- 1,20,00,000/-
2 Maintenance, routine, preventive,
Breakdown maintenance of complete
HVAC system including providing
replacement /repair of worn-out /
defective items with minimum down
time after the defect liability period of
three years, as per enclosed terms &
conditions.
1.3. Operation and Comprehensive 2 Year 20,00,000/- 40,00,000/-
3 Maintenance, routine, preventive,
Breakdown maintenance of complete
Fire Fighting System, Pumping System
and STP System and all associated
instrumentation and electrical
equipment and accessories after the

Page-544
NOA : NIL NOI:NIL AE-I/SCPD-II AE-II/SCPD-II AE (E)/SCPED EE/SCPD-II EE (E) /SCPED
NOC-NIL NOW:NIL
defect liability period of three years, as
per enclosed terms & conditions.
1.3. Operation and Comprehensive 2 Year 18,00,000/- 36,00,000/-
4 Maintenance, routine, preventive,
Breakdown maintenance of Fire Alarm
system, Building Management System,
with minimum down time after defect
liability period of three years, as per
enclosed terms & conditions.
1.3. Cleaning of all Equipments, Electric 2 Year 12,00,000/- 24,00,000/-
5 Room, Sub station, Plant room,
Water bodies, Lifts , Escalators ,
Machine rooms & Pits, Roof top
Solar PV etc in a scheduled manner as
required/directed by Engineer in
Charge
1.4 Operation and Comprehensive
Maintenance of E&M services provided
at Item no 1.2 phase I and phase II
above, after defect Liability period of
three years of phase II. (Operation and
Comprehensive Maintenance for defect
liability period of three years is already
covered in construction cost and
nothing extra shall be paid for the
same)
1.4. Operation and Comprehensive 5 Year 180,00,000/- 9,00,00,000/-
1 Maintenance of Internal Electrical
Installation, Substation, Diesel
Generator Set, UPS, Solar PV
system, Lifts , Escalators
with all accessories (24 hours on each
day including Sundays and Gazetted
Holidays) including breakdown
maintenance including repair and
replacement of worn-out items with
minimum down time after the defect
liability period as per enclosed terms &
conditions.
1.4. Operation and Comprehensive 5 Year 1,40,00,000/- 7,00,00,000/-
2 Maintenance, routine, preventive,
Breakdown maintenance of complete
HVAC system including providing
replacement /repair of worn-out /
defective items with minimum down

Page-545
NOA : NIL NOI:NIL AE-I/SCPD-II AE-II/SCPD-II AE (E)/SCPED EE/SCPD-II EE (E) /SCPED
NOC-NIL NOW:NIL
time after the defect liability period of
three years for the period mentioned
below, as per enclosed terms &
conditions.
1.4. Operation and Comprehensive 5 Year 30,00,000/- 1,50,00,000/-
3 Maintenance, routine, preventive,
Breakdown maintenance of complete
Fire Fighting System, Pumping System
and STP System and all associated
instrumentation and electrical
equipment and accessories after the
defect liability period of three years for
the period mentioned below, as per
enclosed terms & conditions.
1.4. Operation and Comprehensive 5 year 36,00,000/- 1,80,00,000/-
4 Maintenance, routine, preventive,
Breakdown maintenance of Fire Alarm
system, Building Management System,
with minimum down time after defect
liability period of three years as per
enclosed terms & conditions.
1.4. Cleaning of all Equipment’s, 5 year 24,00,000/- 1,20,00,000/-
5 Electric Room, Substation, Plant
room, Water bodies, Lifts ,
Escalators, Machine rooms & Pits,
Roof top Solar PV etc in a schedule
manner as required/directed by
Engineer in Charge
1.4. Operation and comprehensive 3500 Per 1,000/- 35,00,000/-
6 Maintenance of E&M services provided stack
at Item no 1.2.3 above for seven per
years, after defect Liability period of year
three years (Qty 500 stack x 7 years)
Total Operation & Comprehensive
Maintenance
Total (Electrical works) 169,73,09,042/-

Total Estimated cost of Civil and E&M works 502,70,78,649/-

Page-546
NOA : NIL NOI:NIL AE-I/SCPD-II AE-II/SCPD-II AE (E)/SCPED EE/SCPD-II EE (E) /SCPED
NOC-NIL NOW:NIL
E2 : SCHEDULE OF STAGE PAYMENTS FOR CIVIL WORKS
Unless explicitly stated otherwise in the Tender Documents, the payment shall be as per
provisions of schedule ‘F’ and payment shall be as per actual measurements on submission
bill by the agency. All running / intermediate & final payments shall be made to the agency
in accordance with the following schedule:
Cumulative
Individual Stage
Sub- Stage
Activity percentage
Head percentage
Payment
Payment
A Planning, Design and Approvals [As percentage of Total Quoted 1.50%
amount against the item 1.1] - Total share of this sub-head.
Phase-I Phase-II
1 Site Survey & Soil Investigation, clearance of 0.05% 0.05% 0.10%
site including demolition of existing
structures.
2 Submission and approval of inception report, 0.05% 0.05% 0.20%
submission of Architectural drawings for
approval of local bodies.
3 On Submission of structure design and NOC 0.10% 0.05% 0.35%
by Engineer-in-charge.
4 After approvals of Plans from local body, EIA 0.10% 0.10% 0.55%
clearance & other applicable Statutory
Approvals/ clearances
5 Clearance from Forest Department, felling of 0.10% 0.10% 0.75%
tree (if any), transportation &
transplantation completed. (Part of site
development)
6 After submission of all working drawings, 0.10% 0.10% 0.95%
Services Drawings on pro rata basis after
issue of NOC by Engineer-in-charge.
7 Submission of completion drawings, 0.25% 0.30% 1.50%
obtaining occupancy certificate/ completion
certificate from the local bodies), obtaining 5
Star rating certification from GRIHA & BEE
and preparation & submission of all 'As built
drawings'.
B Basement (Civil works & Services) [As percentage of Total 31.47%
Quoted amount against the item - 1.1] - Total share of this
sub-head
1 Excavation & Disposal of Excess Earth 2.50% 2.50% 6.50%
2 Anti-termite Treatment, PCC, Waterproofing 8.00% 8.00% 22.50%
below RCC Raft foundation/ recommended
type of foundation as per structural design,
Sheet Piling & Completion of RCC Raft
foundation/ recommended type of foundation
as per structural design including all RCC
works of UG tanks
3 Construction & Commissioning of RCC 0.87% 0.10% 23.47%
Storage Tank of 7.0 Lakh Litre Capacity and
Providing & Commissioning of SMC Storage
Page-547
NOA : NIL NOI:NIL AE-I/SCPD-II AE-II/SCPD-II AE (E)/SCPED EE/SCPD-II EE (E) /SCPED
NOC-NIL NOW:NIL
Tank of 4.0 Lakh Litre Capacity

4 Completion of Structural work of basement 1.50% 1.50% 26.47%


(Retaining wall/ column/ Lift Well/ Ramps/
Stairs etc.)
5 Casting of Roof Slabs of basement 1.00% 1.00% 28.47%
6 Completion of Masonry work / Partitions with 0.25% 0.25% 28.97%
AAC Blocks/ Fly ash/ FPS in Basement
7 Waterproofing on outer face of Retaining 0.50% 0.50% 29.97%
wall, Roof and Podium area
8 Internal finish, doors and windows including 0.25% 0.25% 30.47%
fire check doors, ventilators and painting
work
9 Internal Flooring i/c skirting and stone 1.25% 1.25% 32.97%
cladding on walls/ lobby, Protective
Measures for Columns
C Superstructure i/c Foundation (except Raft) (Civil works 60.60%
& Services) [As percentage of Total Quoted amount
against the item 1.1] - Total share of this sub-head
C1 RCC Structure 10.50%
1 Ground Floor level (All Rooms complete) 0.80% 0.95% 34.72%
2 First Floor level (All Rooms complete) 0.80% 0.95% 36.47%
3 Second Floor level (All Rooms complete) 0.80% 0.95% 38.22%
4 Third Floor level (All Rooms complete) 0.80% 0.95% 39.97%
5 Fourth Floor level (All Rooms complete) 0.50% 0.50% 40.97%
6 Fifth Floor level (All Rooms complete) 0.50% 0.50% 41.97%
7 Terrace 0.25% 0.25% 42.47%
8 Dome Work 1.00% - 43.47%
C2 Masonry work 4.50%
1 Ground Floor level (All Rooms complete) 0.50% 0.50% 44.47%
2 First Floor level (All Rooms complete) 0.40% 0.40% 45.27%
3 Second Floor level (All Rooms complete) 0.40% 0.40% 46.07%
4 Third Floor level (All Rooms complete) 0.35% 0.35% 46.77%
5 Fourth Floor level (All Rooms complete) 0.30% 0.30% 47.37%
6 Fifth Floor level (All Rooms complete) 0.20% 0.20% 47.77%
7 Terrace 0.10% 0.10% 47.97%
C3 Internal Finishing works 7.00%
1 Internal Plastering 0.50% 0.50% 48.97%
2 Internal Putty, Primer, Paint etc. 0.50% 0.50% 49.97%
3 Wooden/ Veneer/ Stone Tile/ Acoustic/ 2.50% 2.50% 54.97%
Engineered Stone/ Corian Stone/ Wall
Cladding Works, SS Railing Works etc.
C4 External Finishing works 11.75%
1 External Plastering 0.20% 0.20% 55.37%
2 External Putty, Primer, Paint etc. 0.30% 0.30% 55.97%
3 Stone Cladding with MS Frame and Stone 3.00% 3.00% 61.97%

Page-548
NOA : NIL NOI:NIL AE-I/SCPD-II AE-II/SCPD-II AE (E)/SCPED EE/SCPD-II EE (E) /SCPED
NOC-NIL NOW:NIL
Moulding work
4 Structural Glazing work 1.00% 1.00% 63.97%
5 Sand Stone cladding work over RCC Circular 1.25% 1.25% 66.47%
Column
6 Stone Jali Work 0.15% 0.10% 66.72%
C5 Flooring including skirting in all areas 10.00%
i/c staircases (as per finishing
schedule)
1 Ground Floor level (All Rooms complete) 0.50% 0.50% 67.72%
2 First Floor level (All Rooms complete) 1.00% 1.00% 69.72%
3 Second Floor level (All Rooms complete) 1.00% 1.00% 71.72%
4 Third Floor level (All Rooms complete) 1.00% 1.00% 73.72%
5 Fourth Floor level (All Rooms complete) 0.75% 0.75% 75.22%
6 Fifth Floor level (All Rooms complete) 0.50% 0.50% 76.22%
7 Terrace 0.25% 0.25% 76.72%
C6 False Ceiling (as per finishing schedule) 5.10%
1 Ground Floor level (All Rooms complete) 0.25% 0.25% 77.22%
2 First Floor level (All Rooms complete) 0.60% 0.60% 78.42%
3 Second Floor level (All Rooms complete) 0.60% 0.60% 79.62%
4 Third Floor level (All Rooms complete) 0.60% 0.60% 80.82%
5 Fourth Floor level (All Rooms complete) 0.30% 0.30% 81.42%
6 Fifth Floor level (All Rooms complete) 0.30% 0.10% 81.82%
C7 Doors, Windows, Fire rated doors, 2.55%
fittings, toilet cubicles and rolling
shutters
1 Door, window & ventilator frames, and fixing 0.60% 0.65% 83.07%
at site
2 Complete joinery work including shutter for 0.30% 0.35% 83.72%
door, windows, ventilators etc.
3 Fire door Shutters with frame 0.30% 0.35% 84.37%
C8 Water proofing, Sanitary & Water 7.00%
Supply (Internal & external)
1 Internal water proofing work, i/c 0.25% 0.25% 84.87%
waterproofing at terrace level
2 Internal sanitary pipeline work 2.00% 2.00% 88.87%
3 External Sanitary & rainwater pipeline work 0.50% 0.50% 89.87%
4 Sanitary and water supply fittings and 0.75% 0.75% 91.37%
fixtures, i/c provision of aesthetic view-
cutters / architectural features / stone jalis
etc. over shaft
C9 All balance misc. Civil works for making 2.20%
the building functional
1 Testing of RCC/ SMC tanks and 0.10% 0.10% 91.57%
waterproofing in toilets, terraces etc.
2 Final touch up / Final cleaning / Mechanical 0.50% 0.50% 92.57%
Deep cleaning of
entire building before handing over
Page-549
NOA : NIL NOI:NIL AE-I/SCPD-II AE-II/SCPD-II AE (E)/SCPED EE/SCPD-II EE (E) /SCPED
NOC-NIL NOW:NIL
3 Commissioning of all civil related external 0.50% 0.50% 93.57%
services, such as water supply, drainage,
sewerage, etc. (Shall be executed/released
in conjugation with External Development
works)
D Development & bulk Services (Civil) [As percentage of 6.43%
Total Quoted amount against the item 1.1] - Total share of
this sub-head
D1 Overhead tanks 0.28%

1 Providing of RCC/ SMC tanks 0.08% 0.10% 93.75%

2 Commissioning of RCC/ SMC tank 0.05% 0.05% 93.85%

D2 Construction of boundary wall and Entry/ 1.60%


Exit gates (if any)

1 Demolition of existing boundary wall, 0.60% 0.60% 95.05%


Construction of new boundary wall and Erection
of Entry/Exit gates (if any) as per scope of
work.

2 Finishing including cladding, lettering, Marking 0.20% 0.20% 95.45%


etc.

D3 Internal roads, pathways & ramps 1.00%

1 Development of internal roads & pathways, 0.35% 0.40% 96.20%


surface parking, placement of Kerb stones etc.

2 Construction of assessable ramps 0.10% 0.15% 96.45%

D4 Rain water harvesting system 0.30%

1 Construction of RCC Storage Tank 0.10% 0.10% 96.65%

2 Commissioning of RCC Storage Tank 0.05% 0.05% 96.75%

D5 Bulk services, such as laying of sewerage 3.25%


lines, drainage lines, cable housing pipe/
system, Fixing Signage etc.

1 Laying of drainage lines 0.10% 0.15% 97.00%

2 Laying of internal sewerage lines 0.10% 0.15% 97.25%

3 Connection of sewerage lines & drainage to STP 0.75% 0.75% 98.75%

4 Connecting waste water lines with local body 0.25% 0.25% 99.25%
sewerage system & commissioning thereof

5 Laying of water supply lines and commissioning 0.10% 0.15% 99.50%


thereof

6 Laying of external cable housing pipe/ system 0.25% 0.25% 100.00%


in conjugation with relevant E&M items, Fixing
Signages etc.

Page-550
NOA : NIL NOI:NIL AE-I/SCPD-II AE-II/SCPD-II AE (E)/SCPED EE/SCPD-II EE (E) /SCPED
NOC-NIL NOW:NIL
E3 : SCHEDULE OF STAGE PAYMENTS of E&M

Unless explicitly stated otherwise in the Tender Documents, the payment shall be as per
provisions of schedule ‘F’ and payment shall be as per actual measurements on submission
bill by the agency. All running / intermediate & final payments shall be made to the agency
in accordance with the following schedule:
Sub
Individual Stage Cumulative Stage
-
Activity percentage Payment of percentage Payment of
Hea
Corresponding Phase Corresponding Phase
d
Phase-II Phase-II
Except SOQ Phase-I Except SOQ
Phase-I
Item 1.2.3 (Rs: Item 1.2.3
(Rs:
(Rs: 75,39,22,44 (Rs:
75,39,22,448)
57,43,86,59 8) 57,43,86,59
4) 4)
In In In In
Percentage Percentage Percentage Percentage
(%) (%) (%) (%)
Planning, Design and
Approvals [As percentage
of Total Quoted amount
A 3% 3%
against the Item No 1.2.1
and 1.2.2] - Total share of
this sub-head.
Site Survey, detailing of
1 Architectural and structural 0.25 0.25 0.25 0.25
requirements for E&M services

Preparing Basic drawings for


obtaining necessary Local body
2 & Statutory approvals required 0.25 0.25 0.5 0.5
before & during of execution of
work

Obtaining Statutory Approvals


and local body approvals on
completion plans regarding fire
clearance, occupancy
3 certificate/completion 0.50 0.50 1.00 1.00
certificate from the local
bodies, electric connection
from electricity authorities,
consent to operate etc.
Submission and in principle
4 approval of Good for 0.50 0.50 1.50 1.50
construction (GFC) drawings
Preparing Shop drawings and
5 0.50 0.50 2.00 2.00
Obtaining Vetted drawings
Submission and in approval of
6 technical data sheets of 0.50 0.50 2.50 2.50
equipments
Preparation & submission of all
7 'As built drawings' on 0.50 0.50 3.00 3.00
completion of work.

Page-551
NOA : NIL NOI:NIL AE-I/SCPD-II AE-II/SCPD-II AE (E)/SCPED EE/SCPD-II EE (E) /SCPED
NOC-NIL NOW:NIL
Providing Temporary E&M services, shifting of services and clearing construction
D0 site from E&M side for Phase-I, O&M of temporary services as required for smooth
operation of Supreme Court of India.
Total share of this sub-head 0.1% 0.0%
Supply of Main Equipment’s
1 Required for temporary
Installation
Supply of any other item
required for temporary
installation, making necessary
Electrical & Civil work in all
2
aspect for Temporary
arrangement to achieve
uninterrupted E&M service in
the whole premises
Transferring services for
retained structures to new
temporary services installed
3
and laying of additional service
lines etc as required and
commissioning of those
Commissioning of all
equipment at temporary
installation, shifting of
temporary installations to
4 designated locations and
commission of those as
required with proper Testing,
0.10 0.00 3.10 3.00
Commissioning etc all
complete.
Obtaining clearances from
local authorities as required
for energising the E&M
5
installations for Temporary
arrangement i/c Metering from
NDMC etc
Dismantling of existing E&M
installations at existing site of
Phase I, handing over of E&M
installations to department as
6 required and taking away
balance equipment after
complete Temporary
arrangement and clearing site
for construction of phase I
Operation and maintenance of
E&M installations of existing
equipment during temporary
7 installation for smooth
operation of Supreme Court of
India till successful testing and
commissioning of phase I.
E&M Services: Providing all required E&M services as per scope of work
Internal Electrical Installations, Lighting Automation , Illuminated Signages and
D1
Fountain
Total share of this sub-head 17.89% 26.58%

Page-552
NOA : NIL NOI:NIL AE-I/SCPD-II AE-II/SCPD-II AE (E)/SCPED EE/SCPD-II EE (E) /SCPED
NOC-NIL NOW:NIL
Basement -2 and Basement -1:
1 All work except wiring/cables, 1.00 2.00 4.10 5.00
Electrical fittings, sensors
Ground to 2nd Floor All work
2 except wiring/cables, 1.00 2.00 5.10 7.00
Electrical fittings, sensors
3rd to 4th floor All work
3 except wiring/cables, 1.00 2.00 6.10 9.00
Electrical fittings, sensors
5th to Terrace floor All work
4 except wiring/cables, Electrical 2.00 1.50 8.10 10.50
fittings, sensors
Basement -2 and Basement -1
5 3.00 4.50 11.10 15.00
All work complete
Ground to 2nd Floor All work
6 3.00 4.50 14.10 19.50
complete
3rd &4th floor All work
7 2.27 4.05 16.37 23.55
complete
5th to Terrace floor All work
Complete.
Fountains in Phase II and any
other work with complete
testing commissioning as per
8 4.62 6.03 20.99 29.58
scope defined and Complete
handover of the Equipments
with necessary Panels, Rising
mains, Signages , Lightning
Automations.

D2 Electrical Sub Station


Total share of this sub-head 6.84% 0.00%
Supply of HT Panels,
1 1.84 22.83 -
Transformers, HT Cable
Supply of MV/LT Panels and
2 2.00 24.83 -
Cables
Supply of all balance material/
Equipment and Installation of
3 2.00 26.83 -
all Equipment’s in substation
building and basement
Complete Testing &
Commissioning of substation
and Electrical supply is
4 1.00 27.83
received at all boards in
buildings, obtaining NOC from
CEA/Electrical inspector.

D3 Diesel Generating Sets


Total share of this sub-head 4.72% 0.00%
1 Supply of DG sets 2.00 - 29.83 -
Supply of balance
material/equipment’s and
2 Installation of DG sets and all 1.50 - 31.33 -
related equipment in the
building
Complete Testing,
3 1.22 - 32.55 -
Commissioning of the system

Page-553
NOA : NIL NOI:NIL AE-I/SCPD-II AE-II/SCPD-II AE (E)/SCPED EE/SCPD-II EE (E) /SCPED
NOC-NIL NOW:NIL
D4 UPS
Total share of this sub-head 1.37% 1.68%
1 Supply of equipment 0.75 1.00 33.30 30.58
Supply of all balance
material/equipment and
2 installation of system and all 0.40 0.50 33.70 31.08
related equipment in the
building
Testing & Commissioning of
3 0.22 0.18 33.92 31.26
the system

D5 Roof Top Solar Photo Voltaic Power Plant


Total share of this sub-
0.77% 1.01%
head
1 Supply of all equipment’s 0.40 0.70 34.32 31.96
Supply of all balance
material/equipment and
2 installation of system and all 0.20 0.20 34.52 32.16
related equipment’s in the
building
Testing & Commissioning of
the system, Net metering/Bi-
3 0.17 0.11 34.69 32.27
directional Metering from
Discom/NDMC

Fire-fighting and Wet Riser System

D6

Total share of this sub-head 5.40% 10.81%


Supply of Fire pumps and
1 2.00 2.00 36.69 34.27
Panel
Supply of all balance
material/equipment and
2 installation of system and all 2.30 5.00 38.99 39.27
related equipment’s in
basement
Installation of system and all
3 related equipment’s at Ground 0.50 2.00 39.49 41.27
to terrace
Testing & Commissioning of
4 the system, Obtaining NOC 0.60 1.81 40.09 43.08
from Fire Department

Automatic Fire Alarm, Public Address System, Rodent Repellant System and Water
D7
Leak Detection System
Total share of this sub-head 3.67% 5.94%
Supply of Fire Alarm Panel
1 ,detectors, PA System 0.50 1.00 40.59 44.08
equipment’s
Supply of all balance
material/equipment and
2 installation of system and all 0.50 1.00 41.09 45.08
related equipment’s in
basements

Page-554
NOA : NIL NOI:NIL AE-I/SCPD-II AE-II/SCPD-II AE (E)/SCPED EE/SCPD-II EE (E) /SCPED
NOC-NIL NOW:NIL
Supply of all balance
material/equipment and
3 installation of system and all 0.50 1.00 41.59 46.08
related equipment’s at Ground
to 2nd Floor
Supply of all balance
material/equipment and
4 installation of system and all 0.50 1.00 42.09 47.08
related equipment’s at 3rd
&4th Floor
Supply of all balance
material/equipment and
installation of system and all
5 0.50 - 42.59 47.08
related equipment’s at 5th
floor to Terrace and complete
at any other location
Integration of services and
Commissioning of the system,
6 1.17 1.94 43.76 49.02
obtaining NOC from Fire
Department

D8 Lift & Escalator


Total share of this sub-head 10.53% 16.07%
1 Supply of Lifts material 2.00 3.00 45.76 52.02
2 Supply of Escalators material 4.00 5.00 49.76 57.02
Supply of all balance
3 material/equipment and 2.00 3.00 51.76 60.02
installation of lifts
Supply of all balance
4 material/equipment and 1.00 3.00 52.76 63.02
installation of escalators
Testing & Commissioning of
5 1.53 2.07 54.29 65.09
the system

Heating, Ventilation and Air Conditioning System

D9

Total share of this sub-head 36.96% 25.30%


1 Supply of Chillers 4.00 - 58.29 -
Supply of pumps, Cooling
2 2.00 - 60.29 -
Towers, Panels
Supply of Precision AC
3 2.00 2.00 62.29 67.09
equipment’s
Supply of VRV system
4 2.00 2.00 64.29 69.09
equipment’s
Supply of Heat Pumps, RO and
5 2.00 1.00 66.29 70.09
Heat exchangers
Supply of Ventilation Fans of
6 2.31 2.00 68.60 72.09
basement
Supply of Fresh air, Exhaust
7 fans, pressurization fans etc 2.00 2.00 70.60 74.09
for the building
Supply of AHU’s, TFA,
8 2.00 1.00 72.60 75.09
Scrubbers, Air washers

Page-555
NOA : NIL NOI:NIL AE-I/SCPD-II AE-II/SCPD-II AE (E)/SCPED EE/SCPD-II EE (E) /SCPED
NOC-NIL NOW:NIL
Supply and installation of
9 Chilled water and Condenser 2.00 1.00 74.60 76.09
water pipe lines complete
Supply and Installation of
10 Ducting, Diffusers and grills in 2.00 2.00 76.60 78.09
Basement
Supply and Installation of
11 Ducting Diffusers and grills 2.00 2.00 78.60 80.09
from Ground to 2nd Floor
Supply and Installation of
12 Ducting Diffusers and grills 2.00 2.00 80.60 82.09
from 3rd to 4th Floor
Supply and Installation of
13 Ducting Diffusers and grills 1.08 1.00 81.68 83.09
from 5th to Terrace Floor
Installation of AHU’s, TFA
14 2.00 1.00 83.68 84.09
units, Scrubber, Air washer
Supply of all balance
material/equipment and
15 2.00 2.00 85.68 86.09
installation of Equipment’s in
Plant Room
Installation of PAC, VRV, Heat
16 1.00 1.00 86.68 87.09
exchanger with RO system
Supply of all balance
material/equipment and
17 2.00 2.00 88.68 89.09
installation of all balance items
of the system
Testing, Commissioning, 7
days complete trial and testing
18 2.57 1.30 91.25 90.39
of HVAC and complete system
in whole building

D10 Sewerage Treatment Plant


Total share of this sub-head 2.24% 0.24%
1 Supply of equipment’s 1.00 - 92.25 -
Supply of all balance
material/equipment
2 ,installation of system and all 1.00 - 93.25 -
related equipment’s in the
building
Testing & Commissioning of
the system, complete
3 0.24 0.24 93.49 90.63
integration with existing
building and new building

D11 Water Supply System,Drainage Pump and Water Treatment System


Total share of this sub-head 0.50% 0.10%
1 Supply of main equipment 0.20 0.05 93.69 90.68
Supply of all balance
material/equipment,
2 installation of system and all 0.20 0.025 93.89 90.705
related equipment’s in the
building
Testing & Commissioning of
3 0.10 0.025 93.99 90.73
the system

Motorized Steel Gates and Automatic Sliding Glass Door


D12

Page-556
NOA : NIL NOI:NIL AE-I/SCPD-II AE-II/SCPD-II AE (E)/SCPED EE/SCPD-II EE (E) /SCPED
NOC-NIL NOW:NIL
Total share of this sub-head 0.33% 0.37%
1 Supply of main equipment 0.05 0.05 94.04 90.78
Supply of all balance
material/equipment,
2 installation of system and all 0.25 0.25 94.29 91.03
related equipment’s in the
building
Testing & Commissioning of
3 0.03 0.07 94.32 91.10
the system

D13 Façade Cleaning system


Total share of this sub-head 1.32% 3.47%
1 Supply of main equipment 0.32 0.47 94.64 91.57
Supply of all balance
material/equipment,
2 installation of system and all 0.70 2.00 95.34 93.57
related equipment’s in the
building
Testing & Commissioning of
3 0.30 1.00 95.64 94.57
the system

D14 Pneumatic Solid Waste Management System


Total share of this sub-head 3.31% 3.83%
Supply of Main equipment’s
such like Pipes, chutes and
1 other capital Items of 1.00 1.50 96.64 96.07
Pneumatic Solid Waste
Management System
Supply of all balance
material/equipment,installation
2 1.00 1.00 97.64 97.07
of system and all related
equipment’s in the building
Testing & Commissioning of
3 1.31 1.33 98.95 98.40
the system
Building Management
D15
System
Total share of this sub-head 1.05% 1.60%
1 Supply of main equipment 0.30 0.50 99.25 98.90
Supply of all balance
material/equipment and
2 0.50 0.50 99.75 99.40
installation of system related
equipment’s in the building
Testing Commissioning,
handing over of the system i/c
3 0.25 0.60 100.00 100.00
Providing all Necessary
Documents

Note:

1. The above bi-furcation is only for stage payments in Running Bills and does not
specifically include all the items and component of works as per scope of work. The 100%
of quoted amount includes complete work as per scope of work, Specifications and Terms
and Conditions of the contract and nothing extra shall be paid for the component of

Page-557
NOA : NIL NOI:NIL AE-I/SCPD-II AE-II/SCPD-II AE (E)/SCPED EE/SCPD-II EE (E) /SCPED
NOC-NIL NOW:NIL
works not specifically mentioned in schedule of stage payment as payment for them is
included in the overall quoted amount.

2. The total plinth area of basement/super-structure shall be sum of plinth area at every
floor/basement to be worked out as per Annexure-II of Delhi Plinth Area Rates (DPAR)-
2023 subject to clarifications given herein unless otherwise provided in this document.

3. Built-up Plinth Area of Buildings in the Basement and Super-structure are tentative only
which have been worked out based on conceptual Architectural Drawings and there may
be changes in built-up plinth area and floor heights (marked in conceptual Architectural
drawings) to meet functional requirements or otherwise while “Good for Construction”
Drawings are prepared by the consultant engaged by the Contractor.

4. Payment shall be made on built-up plinth area of the buildings only and cost of all the
services, overhead water tanks and other ancillary works as per scope of work are
deemed to be included therein for which nothing extra shall be paid. Cost of Elevation
features, False walls, Façade Works, MS Structure for support of Façade / Projections /
Structures for Solar PV Panels, Pergolas and other features as shown in the drawings/3D-
views shall also be deemed to be included in the quoted amount thus shall not be
measured in built up plinth area of buildings.

5. Variation in Civil Works: The total tendered amount for item no. 1.1 shall be assigned
to sub-heads of the item as per Schedule of Stage Payment for Civil works. Since the
actual built-up plinth area may vary, variation shall be paid on actual Built-up Plinth area
of basement/superstructure by proportionately increasing/decreasing the amount payable
for the two sub-heads B & C however, no Variation shall be paid on Sub-head-A & D.

Variation shall also be paid/deducted for change in floor height of Superstructure and
Basement from those provided in the Conceptual Drawings /Tender Document during
actual construction, based on PAR 2023 S.No. 1.3.2 (for Superstructure) / 1.4.2 (for
Basement) for change in height and adjusted for quoted percentage by the contractor for
the item as below:

Add/deduct for change in actual height of basement/superstructure w.r.t. the


height as per conceptual drawings = Base Price as per S.No. 1.3.2 (for
Superstructure) / 1.4.2 (for Basement) PAR-2023 x Affected area x (change in height in
meter unit / 0.30) x Quoted bid Percentage (above/below) by the contractor.

6. Variation in E&M Works: The total tendered amount for item no. 1.2.1 & 1.2.2 of
Schedule of Quantity(E-1) shall be assigned to sub-heads of the item as per Schedule of
Stage Payment for E&M Works. Since the actual built-up plinth area may vary, variation
shall be paid by proportionately increasing/decreasing the amount payable for the sub-
heads D1, D6, D7, D9, D15 based on actual Built up plinth area. For other Sub-heads
D2, D3, D4, D5, D10, D11, variations shall be paid @50% of Plinth area rates by
increasing/decreasing the amount payable as per actual installed capacity of capital
Equipment/Plant.

7. Pricing for Variation beyond the deviation limit prescribed in Schedule F under Clause12.3
of GCC, shall also be worked out as per provisions of above para 5 & 6

8. However, no payment for variations up to the limit mentioned in clause 12.2 i.e. 0.25%
of Tendered amount . For Variations beyond this limit shall be paid after deducting 0.25%
of tendered cost from the total variation amount worked out as above.

Page-558
NOA : NIL NOI:NIL AE-I/SCPD-II AE-II/SCPD-II AE (E)/SCPED EE/SCPD-II EE (E) /SCPED
NOC-NIL NOW:NIL
E4: PRICE BID

CENTRAL PUBLIC WORKS DEPARTMENT

NIT No. 02 /SE/SCP&MC/EE-II/2024-25

Name of Work: Expansion of Supreme Court Building for creating Additional


Court Rooms including Constitutional Court, Chambers for the
Judges and facilities for Lawyers & Litigants (EPC Mode-I).

.
Name of Contractor:

Quoted Percentage
S. (at par/above/below) Total Tendered
Component of Work Estimated Cost (Rs.)
No. the Total Estimated Amount (Rs.)
Cost

Civil Works - As
1. per Item No. 1.1 of 332,97,69,607.00
Schedule of Qty

E&M Works - As
2. per Item No. 1.2 of 145,08,09,042.00
Schedule of Qty

E&M Works - As
3. per Item No. 1.3 of 3,80,00,000.00
Schedule of Qty

E&M Works - As
4. per Item No. 1.4 of 20,85,00,000.00
Schedule of Qty

Total 502,70,78,649.00