0% found this document useful (0 votes)
51 views1 page

Construction of Water Tank Pump Room 2 3

Uploaded by

Vinod
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views1 page

Construction of Water Tank Pump Room 2 3

Uploaded by

Vinod
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Construction of Pump Room 2 3 03-Jun-24 22:19

# Activity ID Activity Name Original Start Finish 2024


Duration
May Jun Jul Aug Sep Oct Nov
1 Construction of Pump Room 2 & 3
2 Authority Approval
3 A1000 Submission of shoring design to authority 5 03-Jun-24 07-Jun-24 03-Jun-24 07-Jun-24
4 A1010 Demarcation 2 05-Jun-24 06-Jun-24 05-Jun-24 06-Jun-24
5 A1020 DM approval for the shoring design 9 08-Jun-24 21-Jun-24 08-Jun-24 21-Jun-24
6 A1040 Obtaining authority NOCs for de-watering 8 10-Jun-24 21-Jun-24 10-Jun-24 21-Jun-24
7 Shoring
8 A1030 Mobilization of shoring equipment 3 22-Jun-24 25-Jun-24 22-Jun-24 25-Jun-24
9 A1120 Shoring / site work execution 12 22-Jun-24 05-Jul-24 22-Jun-24 05-Jul-24
10 De-watering
11 A1050 De-watering work 60 01-Jul-24 10-Sep-24 01-Jul-24 10-Sep-24
12 Construction
13 A1060 Excavation 4 06-Jul-24 11-Jul-24 06-Jul-24 11-Jul-24
14 A1070 Levelling and compaction 1 11-Jul-24 11-Jul-24 11-Jul-24 11-Jul-24
15 A1075 200 mm roadbase 1 12-Jul-24 12-Jul-24 12-Jul-24 12-Jul-24
16 A1080 PCC 1 13-Jul-24 13-Jul-24 13-Jul-24 13-Jul-24
17 A1081 Sacrificial blockwall 2 15-Jul-24 16-Jul-24 15-Jul-24 16-Jul-24
18 A1085 Waterproofin g membrane 2 17-Jul-24 18-Jul-24 17-Jul-24 18-Jul-24
19 A1087 Protection screed 1 17-Jul-24 17-Jul-24 17-Jul-24 17-Jul-24
20 A1090 Rebar work for raft footing 3 18-Jul-24 20-Jul-24 18-Jul-24 20-Jul-24
21 A1100 Inspection and concrete 1 20-Jul-24 20-Jul-24 20-Jul-24 20-Jul-24
22 A1101 Rebar and shutter work for water tank verticals 4 22-Jul-24 25-Jul-24 22-Jul-24 25-Jul-24
23 A1102 Inspection and concrete 1 25-Jul-24 25-Jul-24 25-Jul-24 25-Jul-24
24 A1103 Deshuttering 1 26-Jul-24 26-Jul-24 26-Jul-24 26-Jul-24
25 A1104 Rebar and shutter work for water tank cover slab and beams 4 27-Jul-24 31-Jul-24 27-Jul-24 31-Jul-24
26 A1113 Inspection and concrete 1 31-Jul-24 31-Jul-24 31-Jul-24 31-Jul-24
27 A1114 Deshuttering of water tank cover slab 14 01-Aug-24 17-Aug-24 01-Aug-24 17-Aug-24
28 A1170 Rebar and shutter work for pump room verticals 2 01-Aug-24 02-Aug-24 01-Aug-24 02-Aug-24
29 A1175 Inspection and concrete 1 02-Aug-24 02-Aug-24 02-Aug-24 02-Aug-24
30 A1176 Shutter and rebar work for pump room beams and slab 4 03-Aug-24 07-Aug-24 03-Aug-24 07-Aug-24
31 A1177 Inspection and concrete 1 07-Aug-24 07-Aug-24 07-Aug-24 07-Aug-24
32 A1178 Deshuttering 10 08-Aug-24 20-Aug-24 08-Aug-24 20-Aug-24
33 A1179 Water tank inner wall surface preparation 3 19-Aug-24 21-Aug-24 19-Aug-24 21-Aug-24
34 A1180 Installation of GRP lining and ladder works 5 22-Aug-24 27-Aug-24 22-Aug-24 27-Aug-24
35 A1183 Blockwork for pump room 3 22-Aug-24 24-Aug-24 22-Aug-24 24-Aug-24
36 A1184 Cutting, chasing & MEP 1st fix 2 26-Aug-24 27-Aug-24 26-Aug-24 27-Aug-24
37 A1185 Rebar and shutter work for machine foundation 2 28-Aug-24 29-Aug-24 28-Aug-24 29-Aug-24
38 A1187 Concrete 1 30-Aug-24 30-Aug-24 30-Aug-24 30-Aug-24
39 A1190 Plaster work 3 31-Aug-24 03-Sep-24 31-Aug-24 03-Sep-24
40 A1191 MEP 2nd fix 4 04-Sep-24 07-Sep-24 04-Sep-24 07-Sep-24
41 A1200 Paint work 2 09-Sep-24 10-Sep-24 09-Sep-24 10-Sep-24
42 A1210 Metal doors, signage installation 1 10-Sep-24 10-Sep-24 10-Sep-24 10-Sep-24
43 A1220 MEP final fix 3 11-Sep-24 13-Sep-24 11-Sep-24 13-Sep-24
44 A1240 Testing and commissioning 2 14-Sep-24 16-Sep-24 14-Sep-24 16-Sep-24