Mount Zion College of Engineering & Technology
To Make Man Whole!!
DEPARTMENT OF COMPUTER SCIENCE AND ENGINEERING
CS3451 INTRODUCTION TO OPERATING SYSTEMS
ASSIGNMENT PLAN
S.No Date Assignment Question
Compare various types of Operating system with their features.
1 15.3.24
2 08.04.24 Find the average Turnaround time and average waiting time.
Consider the page references 7, 0, 1, 2, 0, 3, 0, 4, 2, 3, 0, 3, 2,
3 03.05.24
with 3 page frame. Find number of page fault and hit ratio using
Optimal Page replacement.
Consider the page references 7, 0, 1, 2, 0, 3, 0, 4, 2, 3, 0, 3, 2,
with 3 page frame. Find number of page fault and hit ratio using.
Course In charge HoD/CSE
Mount Zion College of Engineering & Technology
To Make Man Whole!!
DEPARTMENT OF COMPUTER SCIENCE AND ENGINEERING
SUBJECT NAME: CS3451 INTRODUCTION TO OPERATING SYSTEMS
YEAR/SEM: II/IV TOTAL MARKS: 20
GIVEN DATE:15/03/2024
SUBMISSION DATE: 18/03/2024
CO1 To list the different types of operating
systems and to know the evolution of K1-Remember
android operating system.
UNIT I INTRODUCTION Compare various types of Operating
system with their features.
Instructions
➢ Marks will be awarded based on the depth of content, concepts
related, central ideas, keywords & Peer evaluation.
➢ Marks will be reduced if plagiarism found.
Course In charge HOD/CSE
Mount Zion College of Engineering & Technology
To Make Man Whole!!
DEPARTMENT OF COMPUTER SCIENCE AND ENGINEERING
SUBJECT NAME: CS3451 INTRODUCTION TO OPERATING SYSTEMS
YEAR/SEM: II/IV TOTAL MARKS: 20
GIVEN DATE:08/04/2024
SUBMISSION DATE: 12/04/2024
Instruction
• Marks will be awarded based on the uniqueness of the solution and its concepts
contents
• Marks will be reduced if plagiarism found
Q1. There are six processes named as P1, P2, P3, P4, P5 and P6. Their arrival time and burst
time are given below in the table. The time quantum of the system is 3 units. Apply appropriate
Scheduling algorithm for the above given processes and sketch Gantt Chart and Ready queue
structure and find the average Turnaround time and average waiting time. (Marks - 15)
Q2. There are 7 processes P1, P2, P3, P4, P5, P6 and P7 given. Their respective priorities,
Arrival Times and Burst times are given in the table below. Find out the average Turn Around
time and average Waiting Time. (Marks - 15)
Course In charge HOD/CSE
Mount Zion College of Engineering & Technology
To Make Man Whole!!
DEPARTMENT OF COMPUTER SCIENCE AND ENGINEERING
SUBJECT NAME: CS3451 INTRODUCTION TO OPERATING SYSTEMS
YEAR/SEM: II/IV TOTAL MARKS: 20
GIVEN DATE:03/05/2024
SUBMISSION DATE: 06/05/2024
Instruction
• Marks will be awarded based on the uniqueness of the solution and its concepts
contents
• Marks will be reduced if plagiarism found
Q1. Consider the page references 7, 0, 1, 2, 0, 3, 0, 4, 2, 3, 0, 3, 2, with 3 page frame.
Find number of page fault and hit ratio using Optimal Page replacement. (Marks -
10)
Q2. Consider the page references 7, 0, 1, 2, 0, 3, 0, 4, 2, 3, 0, 3, 2, with 3 page frame.
Find number of page fault and hit ratio using. (Marks - 10)
Course In charge HOD/CSE