0% found this document useful (0 votes)
30 views1 page

R C CdesignZoyasheikh

Uploaded by

kaustubh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views1 page

R C CdesignZoyasheikh

Uploaded by

kaustubh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

GENERAL NOTES

THIS STRUCTURAL DESIGN AND DRAWINGS HAS BEEN PREPARED ON THE BASIS OF ACCEPTED

FOOTINGS SCHEDULE
ANALYSIS AND DESIGN PRINCIPLES OF RELEVANT I.S. CODES.
THE STRUCTURE IS G + 1 STORY R.C.C. STRUCTURE
EARTQUAKE ZONE FOR DESIGN - ZONE III

COLUMN SCHEDULE Footing Steel


FOR DIMENSIONS , LEVELS AND GENERAL ARRANGEMENT REFER ARCHITECTURAL DRAWINGS.
SOME OF THE COLUMNS AND THEIR SIZES ARE PROVIDED AS PER ARCHITECTURAL REQUIRMENT.

Footing Size COLUMN ORIENTATION SHOULD BE AS PER ARCHITECTURAL CENTRE LINE PLAN.

Mark / Group Depth DO NOT SCALE THE DRAWING, ONLY WRITTEN DIEMENSIONS ARE TO BE FOLLOWED.
ALL DIEMENSIONS ARE IN MM UNLESS AND OTHERWISE SPECIFIED.

Main Steel Stirrup Steel Length Bredth Bothway S.B.C. OF FOUNDATION

Mark / Group Size SAFE BEARING CAPACITY OF MURUM FOR DESIGN OF FOUNDATION HAS
BEEN TAKEN TO BE 250 KN/Sqm AT MIN. DEPTH 1.50 m

Nos - Dia Nominal Confining FOUNDATION STRATA SHOULD BE APPROVED FROM OUR OFFICE BEFORELAYING OF P.C.C.
MAXIMUM HEIGHT OF WATER TABLE IS ASSUMED TO BE WELL BELOW THE FOUNDATION STRATA
LEVEL AND HENCE NO UPLIFT PRESSURE HAS BEEN CONSIDERED IN THE DESIGN OF FOOTINGS.
C1,C2,C3,C4,C5,C6 1400 1200 380 # 10 @ 150 c/c P.C.C. IN FOUNDATION

C1,C2,C3,C4,C5, 230 x 380 6 # 12 #8 @ 175 c/c #8 @ 175 c/c C8,C9,C10,C12,C13,


USE "1: 4 : 8" PLAIN CEMENT CONCRETE FOR P.C.C. WORK

STEEL REINFORCEMENT
UNLESS NOTED OTHERWISE ALL REINFORCEMENT SHALL BE OF TOR / HYSD / CTD / TMT BARS OF

C6,,C9,C10 GRADE - "Fe 500" CONFIRMING TO I.S. : 1786


ALL REINFORCING STEEL SHALL BE OF TESTED QUALITY.

C7,C8,C11 1400 1200 450 # 10 @ 150 c/c CONCRETE


UNLESS NOTED OTHERWISE CONCRETE MIX FOR ALL R.C.C. WORK SHALL BE OF GRADE - "M 20"
CONFIRMING TO I.S. 456 - 2000 & AS PER MIX DESIGN.

C7,C8,C11 230 x 380 8 # 12 #8 @ 175 c/c #8 @ 175 c/c MIXING FOR ALL R.C.C. WORK MUST BE WEIGHT BATCHED.
ALL CONCRETEING MUST BE DONE BY USING CONCRETE MACHINE MIXER
MACHINE VIBRATOR MUST BE USED FOR COMPACTION OF ALL CONCRETE SECTIONS.
CONCERE BLOCKS MUST BE CASTED FOR SLABS & BEAMS.
BEFORE DESHUTTERING OF SLAB, BEAM BOTTOM FORWORK, CONCRETE BLOCKS MUST BE TESTED
FOR STRENGTH. THE STRENGTH OF RESPECTIVE BLOCKS MUST BE ATLEAST MIN. REQUIRED,

150 x 450 8 # 12
OTHERWISE EXTEND DESHUTTERING PERIOD & AGAIN TEST THE BLOCKS FOR STRENGTH.

C12, C13 #8 @ 175 c/c #8 @ 175 c/c STRIPPING TIME TABLE


MINIMUM STRIPPING / DESHUTTERING PERIOD FOR R.C.C. MEMBERS SHALL BE AS GIVEN BELOW.

GROUND / PLINTH BEAM SCHEDULE No. R.C.C. MEMBER TIME PERIOD


16 - 24 HOURS
No. R.C.C. MEMBER TIME PERIOD
COLUMN, WALL, SIDES OF BEAM 2 CANTILEVER SLAB / BEAM 28 DAYS
3 SLAB OF SPAN L < 3.50 m 7 DAYS 4 BEAM OF SPAN L < 3.50 m 14 DAYS
Bottom Steel Top Steel Stirrups SLAB OF SPAN L > 3.50 m 14 DAYS BEAM OF SPAN L > 3.50 m 21 DAYS

Mark / Group Size REINFORCEMENT COVER

Straight Curtail Straight Extra Normal Confining CLEAR COVER TO REINF. OF R.C.C. SECTIONS FOR MILD EXPOSURE SHALL BE AS GIVEN BELOW.

No. MEMBER COVER No. MEMBER COVER No. MEMBER COVER


1 FOOTING 50 mm 2 BEAM 25 mm 3 WALL 40 mm

GBR GB1 GB1 GB1 230 x 380 3-#12 1-#12 2-#10 1-#12 #8@175c/c #8@175c/c 4 COLUMN

REINFORCEMENT LAPS
40 mm 5 SLAB 20 mm

MIN. LAP LENGTHS FOR DIFFERENT DIAMETER OF STEEL BARS SHALL BE AS GIVEN BELOW.

GB2 230 x 380 2-#16 - 2-#12 1-#16 #8@175c/c #8@175c/c No.


1
WALL
45 x #
No.
2
SLAB
60 x #
No.
3
BEAM
60 x #
No.
4
COLUMN
45 x #
NOT MORE THAN " 50 % " OF BARS SHALL BE LAPED AT ANY SECTION OF A MEMBER. LAPING

GB1 GB3 230 x 300 2-#12 2-#10 #8@175c/c #8@175c/c SHALL BE PROVIDED IN STAGGERED MANNER.
SECTION WHERE ALL BARS ARE LAPPED, THE LAP LENGTH SHOULD BE ENHANCED BY " 20 % "
CONSTRUCTION DETAILS

GBR 230 x 380 2-#12 3-#12 #8@175c/c #8@175c/c FOR SLAB PROPER CHAIRS SHOULD BE PROVIDED TO ENSURE SPECIFIED THICKNESS AND ALSO TO
MAINTAIN TOP BARS IN PROPER POSITION.

GBR GB1 AT BEAM AND COLUMN JUNCTION, BEAM BARS IF N CONFLICT WITH COLUMN BARS SHALL BE
GRADUALLY BENT IN PROPORTION 1 : 6, (1 TRANSVERSE FOR 6 LATERAL ) AND PLACED CLEAR OF

GB1 GB4 230 x 380 2-#16 2-#16 2-#12 1-#16 #8@175c/c #8@175c/c COLUMN BARS. UNDER NO CIRCUMSTANCES COLUMNS VERTICAL BARS SHALL BE BENT TO
ACCOMADATE BEAM BARS. IN THE SAME WAY T HE COLUMN OF ABOVE FLOOR REDUSES, COLUMN
BARS SHALL BE GRADUALLY BENT IN PROPORTION 1 : 6, (1 TRANS. / 6 LATERAL )
FIRST STIRUP IN BEAM SHOULD START FROM IT'S FASE.

GB5 150 x 380 3-#12 1-#12 2-#10 1-#12 #8@175c/c #8@175c/c FOR BEAM OF WIDTH 150 mm PROVIDE MAX. 3 BARS IN SINGLE LAYER & FOR 230 mm PROVIDE
MAX. 4 BARS, ELSE PROVIDE BARS IN 2 LAYERS OVER PINS.
FOR CANTILEVER BEAM / SLAB TOP REINFORCEMENT SHOULD BE ANCHORED BEHIND 60 x # OR SPAN

GB5 OF CANTILEVER WICHEVER IS GREATER AND 50 % OF TOP REINFORCEMENT BENT BACK AT BOTTOM.
ANY TYPE OF OPENING FOR PLUMBING, DRAINAGE OR ELECTRICAL WORK IS NOT PERMITTED
IN RCC BEAMS AND COLUMNS DURING OR AFTER CASTING.

GB3 GB1
FORMWORK OF CANTILEVER, CANOPY, CHAJJA etc SHOULD NOT BE REMOVED WITHOUT PERMISSION OF
STRUCTURAL CONSULTANT.

GB2 ALL COLUMNS OF FRAME SHOULD BE WELL TIED WITH BEAMS ON BOTH DIRECTION BY TIE / PLINTH
FLOOR BEAM AS WELL AS AT SECTION WHERE COLUMN REDUSES.
MAX. ALLOWABLE UNSUPPORTED HEIGTH OF COLUMN WITHOUT TIE BEAM ON THE BASIS OF WIDTH OF
GB4 COLUMN SHOULD BE AS GIVEN BELOW.

CLIENT No.
1
MAX. HEIGHT
150 mm
MIN. WIDTH
2600 mm
No.
2
MAX. HEIGHT
200 mm
MIN. WIDTH
3400 mm
No.
3
MAX. HEIGHT
230 mm
MIN. WIDTH
4000 mm

GB3 4 300 mm 5100 mm 5 375 mm

PROVIDE C - LINKS FOR COLUMN, AT COLUMN - BEAM JUNCTION.


6400 mm 6 450 mm 7700 mm

GB3 IF BOTTOM OF ADJACENT FOOTING ARE AT DIFFERENT LEVEL, MADEUP IT BY PLUM CONCRETE (M 10)
IF FOOTINGS OVERLAPS EACH OTHER NECESSARY REVISION MUST BE OBTAINED FROM OUR OFFICE.
EXPOSED SURFACE OF ALL CONCRETE MEMBERS SHALL BE CURED CONTINUOUSLY ( IN WET

GB3 GB5 CONDOTION FOR 14 DAYS.)


UNLESS NOTED OTHERWISE IN THE DRAWING, CONSTRICTION JOINT SHALL BE AS PER IS 11817
MATERIALS, WORKMANSHIP, INSPECTION, CURING etc. AND CONSTRUCTION OF THIS BUILDING SHALL
PROJECT BE IN ACCORDANCE WITH SECTION - 2 OF IS : 456 (2000).
EXPANSION JOINT SHALL BE PROVIDED AS PER IS 3414
IMPORTANT NOTE
CONSTRUCTION OF RESIDENTIAL BUILDING OUR RESPONSIBILITY SHALL REMAIN LIMITED TO SAFE & SOUND STRUCTURAL DESIGN.
WE SHALL NOT REMAIN RESPONSIBLE FOR,
GBR GB2 GB1 AT - MAUJE SHIRDI, TAL - RAHATA. CONCRETE MIX QUALITY, SUB STANDARD CONSTRUCTION MATERIAL, INSUFFICIENT CURING, WORKMAN
- SHIP AND FAULTY CONSTRUCTION PROCEDURE.
SAFETY OF OLD STRUCTURE DURING DEMOLITION & SAFETY OF ABUTING STRUCTURE / BUILDING ANY
ACCIDENT OCCURED DUE TO CONSTRUCTION OF MEMBER NOT DESIGNED BY US.
GB3 DRAWING TITLE IN CASE OF ANY AMBIGUITY, DISCREPANCY OR OMISSIONS IN R.C.C. & ARCHITECTURAL DRAWING,
SUCH CASE SHALL BE BROUGHT TO NOTICE TO OUR OFFICE BEFORE COMMENCEMENT OF WORK.

GB1 GB1 R.C.C. DETAIL DRAWING


GB3
R.C.C. CONSULTANT - KULKARANI KAUSTUBH

GBR GB1 GB3

DATE :- 08/02/ 2023 DRN. BY :- P.T.C. DRG. NO. : - 01 COPIES :- 03