THIS STRUCTURAL DESIGN AND DRAWINGS HAS BEEN PREPARED ON THE BASIS OF ACCEPTED
FOOTINGS SCHEDULE
ANALYSIS AND DESIGN PRINCIPLES OF RELEVANT I.S. CODES.
THE STRUCTURE IS G + 1 STORY R.C.C. STRUCTURE
EARTQUAKE ZONE FOR DESIGN - ZONE III
Footing Size COLUMN ORIENTATION SHOULD BE AS PER ARCHITECTURAL CENTRE LINE PLAN.
Mark / Group Depth DO NOT SCALE THE DRAWING, ONLY WRITTEN DIEMENSIONS ARE TO BE FOLLOWED.
ALL DIEMENSIONS ARE IN MM UNLESS AND OTHERWISE SPECIFIED.
Mark / Group Size SAFE BEARING CAPACITY OF MURUM FOR DESIGN OF FOUNDATION HAS
BEEN TAKEN TO BE 250 KN/Sqm AT MIN. DEPTH 1.50 m
Nos - Dia Nominal Confining FOUNDATION STRATA SHOULD BE APPROVED FROM OUR OFFICE BEFORELAYING OF P.C.C.
MAXIMUM HEIGHT OF WATER TABLE IS ASSUMED TO BE WELL BELOW THE FOUNDATION STRATA
LEVEL AND HENCE NO UPLIFT PRESSURE HAS BEEN CONSIDERED IN THE DESIGN OF FOOTINGS.
C1,C2,C3,C4,C5,C6 1400 1200 380 # 10 @ 150 c/c P.C.C. IN FOUNDATION
STEEL REINFORCEMENT
UNLESS NOTED OTHERWISE ALL REINFORCEMENT SHALL BE OF TOR / HYSD / CTD / TMT BARS OF
C7,C8,C11 230 x 380 8 # 12 #8 @ 175 c/c #8 @ 175 c/c MIXING FOR ALL R.C.C. WORK MUST BE WEIGHT BATCHED.
ALL CONCRETEING MUST BE DONE BY USING CONCRETE MACHINE MIXER
MACHINE VIBRATOR MUST BE USED FOR COMPACTION OF ALL CONCRETE SECTIONS.
CONCERE BLOCKS MUST BE CASTED FOR SLABS & BEAMS.
BEFORE DESHUTTERING OF SLAB, BEAM BOTTOM FORWORK, CONCRETE BLOCKS MUST BE TESTED
FOR STRENGTH. THE STRENGTH OF RESPECTIVE BLOCKS MUST BE ATLEAST MIN. REQUIRED,
150 x 450 8 # 12
OTHERWISE EXTEND DESHUTTERING PERIOD & AGAIN TEST THE BLOCKS FOR STRENGTH.
Straight Curtail Straight Extra Normal Confining CLEAR COVER TO REINF. OF R.C.C. SECTIONS FOR MILD EXPOSURE SHALL BE AS GIVEN BELOW.
GBR GB1 GB1 GB1 230 x 380 3-#12 1-#12 2-#10 1-#12 #8@175c/c #8@175c/c 4 COLUMN
REINFORCEMENT LAPS
40 mm 5 SLAB 20 mm
MIN. LAP LENGTHS FOR DIFFERENT DIAMETER OF STEEL BARS SHALL BE AS GIVEN BELOW.
GB1 GB3 230 x 300 2-#12 2-#10 #8@175c/c #8@175c/c SHALL BE PROVIDED IN STAGGERED MANNER.
SECTION WHERE ALL BARS ARE LAPPED, THE LAP LENGTH SHOULD BE ENHANCED BY " 20 % "
CONSTRUCTION DETAILS
GBR 230 x 380 2-#12 3-#12 #8@175c/c #8@175c/c FOR SLAB PROPER CHAIRS SHOULD BE PROVIDED TO ENSURE SPECIFIED THICKNESS AND ALSO TO
MAINTAIN TOP BARS IN PROPER POSITION.
GBR GB1 AT BEAM AND COLUMN JUNCTION, BEAM BARS IF N CONFLICT WITH COLUMN BARS SHALL BE
GRADUALLY BENT IN PROPORTION 1 : 6, (1 TRANSVERSE FOR 6 LATERAL ) AND PLACED CLEAR OF
GB1 GB4 230 x 380 2-#16 2-#16 2-#12 1-#16 #8@175c/c #8@175c/c COLUMN BARS. UNDER NO CIRCUMSTANCES COLUMNS VERTICAL BARS SHALL BE BENT TO
ACCOMADATE BEAM BARS. IN THE SAME WAY T HE COLUMN OF ABOVE FLOOR REDUSES, COLUMN
BARS SHALL BE GRADUALLY BENT IN PROPORTION 1 : 6, (1 TRANS. / 6 LATERAL )
FIRST STIRUP IN BEAM SHOULD START FROM IT'S FASE.
GB5 150 x 380 3-#12 1-#12 2-#10 1-#12 #8@175c/c #8@175c/c FOR BEAM OF WIDTH 150 mm PROVIDE MAX. 3 BARS IN SINGLE LAYER & FOR 230 mm PROVIDE
MAX. 4 BARS, ELSE PROVIDE BARS IN 2 LAYERS OVER PINS.
FOR CANTILEVER BEAM / SLAB TOP REINFORCEMENT SHOULD BE ANCHORED BEHIND 60 x # OR SPAN
GB5 OF CANTILEVER WICHEVER IS GREATER AND 50 % OF TOP REINFORCEMENT BENT BACK AT BOTTOM.
ANY TYPE OF OPENING FOR PLUMBING, DRAINAGE OR ELECTRICAL WORK IS NOT PERMITTED
IN RCC BEAMS AND COLUMNS DURING OR AFTER CASTING.
GB3 GB1
FORMWORK OF CANTILEVER, CANOPY, CHAJJA etc SHOULD NOT BE REMOVED WITHOUT PERMISSION OF
STRUCTURAL CONSULTANT.
GB2 ALL COLUMNS OF FRAME SHOULD BE WELL TIED WITH BEAMS ON BOTH DIRECTION BY TIE / PLINTH
FLOOR BEAM AS WELL AS AT SECTION WHERE COLUMN REDUSES.
MAX. ALLOWABLE UNSUPPORTED HEIGTH OF COLUMN WITHOUT TIE BEAM ON THE BASIS OF WIDTH OF
GB4 COLUMN SHOULD BE AS GIVEN BELOW.
CLIENT No.
1
MAX. HEIGHT
150 mm
MIN. WIDTH
2600 mm
No.
2
MAX. HEIGHT
200 mm
MIN. WIDTH
3400 mm
No.
3
MAX. HEIGHT
230 mm
MIN. WIDTH
4000 mm
GB3 IF BOTTOM OF ADJACENT FOOTING ARE AT DIFFERENT LEVEL, MADEUP IT BY PLUM CONCRETE (M 10)
IF FOOTINGS OVERLAPS EACH OTHER NECESSARY REVISION MUST BE OBTAINED FROM OUR OFFICE.
EXPOSED SURFACE OF ALL CONCRETE MEMBERS SHALL BE CURED CONTINUOUSLY ( IN WET