0% found this document useful (0 votes)
83 views18 pages

Nm2 Sci HT 1 Exc DG 0001 C Vfe

Detailed Design of headrace tunnel

Uploaded by

Joseph Nguyen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
83 views18 pages

Nm2 Sci HT 1 Exc DG 0001 C Vfe

Detailed Design of headrace tunnel

Uploaded by

Joseph Nguyen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 18
° NAM MO 2 HYDROPOWER COMPANY LIMITED 88, Nonghenk-Tay village, Sikhottabong district, Vientiane Capital, 10 PDR. NAM MO 2 HYDROPOWER PROJECT- LAO PDR DETAILED DESIGN HEADRACE TUNNEL FROM PK0+00 TO PK 2+100 TECHNICAL MANAGER : NGO VU AN SCI CONSULTING JOINT STOCK COMPANY DESIGN MANAGER SCI JOINT STOCK COMPANY 8} Kt. TONG GAM DOC PHO TONG GLAM BOC ‘ ad s1AM BOC ‘PHO Gl Pham Vin Nghia Ling thé Vo SCT mcieescmerrenictemme |" sarong NM2-SCLHT.4-£X0-06-0001.0-VFE BANG THONG KE BAN VE / LIST OF DRAWINGS 'sTT/No| DRAWING NAME /TEN BAN VE (GENERAL INSTRUCTIONS, VOLUME TABLE DETALS, SECTIONS NM2-SCIHT-1-£XC-DG-0001 2 [PLANAND LONGMTUDNAL PROFLE a 3 | PLANOF NLETHEADRACE TUNNEL 03 4 |sectiono1.01 o 5 |secTioND2-02 Nv2-SCHHT-1-£X0-D6-0001 05 6 |sectonnint NM2-SCHHT-1-£X0-DG-0001 08 7 [DETALRENFORCED NM2-SCHHT-1-Ex0-D6.0001 or 08 08 ‘SECTION TYPE 1A, SECTIONS NW2-SCIHT-1-EXC-DG-0001 10 ISECTONTYPE 1:2 NM2-SCHHT-1-£x¢-DG-0001 " [SECTION TYPE 3:4 NM2-SCLHT-4-£xc-0-0001 2 [DETAL OF NICHES NM2-SCHHT-1-£XC-06-0001 13 DETAIL OF STEEL ARCH TYPICAL NM2-SCHHT-1-£XC-06-0001 4 15 DETAL OF STEEL ARCH TYPICAL NM2-SCHHT-4-EXC-DG-0001 “ DETAL OF STEEL ARCH TYPICAL NM2-SCHHT-1-£XC-DG-0001 6 16 VOLUME TABLE OF STEEL ARCH NM2-SCHHT-1-£XC-DG-0001 16 1, LEGAL BASIS/ CAN CU’ PHAP LY sas Oo tan 2 ron te prey SIC Sok Cee ‘wai targa Eeon tesco pasos ete oe ae meer rao APPLICABLE STANDARDS AND REGULATIONS TIEU CHUAN VA QUY PHAM AP DUNG Toate 987 E n-Cate roetn ck andatn TOM 8 ge ea a ga a -TOWe%82012 Hyer: nb ere cep cnn snd cae, Te osrarz cng en ey Aan i pons php i gro -Ton9152012 nl ttn -Coods Peo Hd Tek “Tost 2072 Cog you Hn vg Bt Ton ses 20'0 ase sss. ci wl wa ih nding comnt oa nn Te 8 cng eh yn cng ean Og ln harm rod mt ‘Ch ch, opm nec nga, MAIN CONSTRUCTION METHOD STATEMENT BIEN PHAP THI CONG CHU BAO Crencen omen owhason ra ns i Sieg ng gn tg sy. Dare ene tag re eng ormorame oy exis eer le id a 2D Sam “at eg aug pains nun on ha use ng gn on 2 nm gg ty gente dugg nacin 2378 bane ea eae eet ac “oattieg hop nyc 238 ny egy 8 tn chpnratuainicaronsaesary avon cope Sgr can gc nr bo ose snage oman TABLE OF MAIN QUANTITY SUMMARY. % ‘Won ame! Ten eg ie Sa aaaTORST Sac G2 We ve ag cn GE “tsi cong Saree ig 72 sual neha Oe a et oe Ta TE 35 bags ol 20 Vega mag CTS Satan evi Seal stots ap RES She/ele fSlelelalaisolala als a)o[a alla} Beis, Le ‘ented ye? PC erarage (SOP perv oars ast Loe er rn Fa te Tap OB ae 22S oaam or ae ‘tomaeneeery Se eee Te TERESI ET nn en aes ae eee TABLE OF TUNNEL CONSOLIDATION QUANTITY SUMMARY D6 bag ob hae phan hy ty to dara mc ch eee ane) 2m 4. SAFETY! AN TOAN gee | Siem |Pomame | ee, | ene oes es, ai tel ee Unlcnysarcacirnemesnuntseoetoonanae Sree | time | Sars (Sees es ee Sa ida cinco et tes ee om le oa | ian cal Sramocem nine cunts gyro ee weep se au simone sopapiennan ton teraapereaeonacgecepiiea. | — Newt —| tam —| aa a zs re Natsaiguaniuacgewapiesnicmenravantiess |—at— {ea —[ re aa 7 i is Soe ee tonnterenat tere soot ee ee a oe san ae Fp teeny shea eran hn = ne Sa ae 8. NOTE/ GHI CHU TSR | mam soem | care | ows | sem [enan| ose | ase [am [oman we | aes |u| sonst | ru “cay heetneret econ mtg onion os ciate lee : “nitrates tact tien nn Prectite NAM MO.2 HYDROPOWER PROJECT - LAO PDR Sg ect en ONE sp SCI scrconsustid ‘coupany] rutile ch se ata acl gedegsiantira. Dyewing submission stats: Fanci | Nghe Se HEADRACE TUNNEL Seema atlamsnaatacteevonarbes Pel ae ——— buieschioon Ta Kini] _ FROM PKO%00 TO PK 210) eer reer] NT [ee Manage Ngo Ve AE 22a} GENERALINSTRUCTIONS, VOLUME TELE 0 | owes check [Phan Van Husa[L [11.2023] Drawing no, \Rev|Sheet | [Rev] Dave Description | ‘Drawn | Check [Approved [Design _|Le Anh Heo frtacas] MEMACHTE-LENC- ORO Tar FROM KM0+000 TO KM 2+100.00 LONGITUDINAL PROFILE OF HEADRACE TUNNEL SCALE 1:5000 & beans raccmace (A) no ne [ site COORDINATES OF POINT NOTE/ GHI CHU: ere NAM MO 2 HYDROPOWER PROJECT - LAO PDR = {eetemnenamomsrmyraramameecneme [SCT secon ton on™ a eters a feos] MEADRACE TUNNEL a me occas eet eee '3_AY__ 305166 1906 | 2105660-7.29] [r-atenager|Ngo Vu PLAN AND LONGITUDINAL PROFILE [creck _[Pran von Sea 92025) NW2SCHT--£XC-06-0001 Rev ate Deccsion| Drawn_| cheek [Approved [design [Le Anhiioo Fees PLAN OF INLET HEADRACE TUNNEL / il if \\| | "4 ||) ni ifr \ | ALLEL ANatBE a LEGENDS ‘ence tn pt, ek Shalmocr aan cam not Ses Poeswie NAM MO 2 HYDROPOWER PROJECT - LAO PDR re Sse HEADRACE TUNNEL FS estate fae RON PKov00-TO 26100 0 [T-Manager|Ngo PLAN OF INLET HEADRACE TUNNEL EE wees =| o Tee [ren age al [Rev| Date Description Pesin [Le Ann Hao: NWGSCHNT-HEXC-DG-0001 = SECTION D ee ae aay sane ! pt ! ieee sao0 i ae ; 3 i z pare iff = [= [= og] 3 a oe x 88 8 $ 8 a3 a 8 venertciet qa $ : g Pd id GEOLOGICAL BOUNDARY NOTES: eee —____ Neen ce — 1. Adan wei natn Pease NAM MO 2 HYDROPOWER PROJECT - LAO PDR we SCI re somioy inte esanovans — — CE) 2 saa mang in enn ig ‘801 ONSULTINGSJBHFESTOGK COMPANY] eae a ea oinaee eer a Sar] HEADRACE TUNNEL senda na 88 — nape oana ie Firzozs] FROM PKO¥00 TO PK 24100 oy 8 7 | race |e cocoon NanageNgo WAR. Si 2 SECTION DtDt a ae © | essa neck [Phen ven NRT .2023| rave Fo Pree @ [rev| Bate Description ‘Drawn | Check [Agproved [Design |te Anh Hoo, [1 2023| NM2-SCHHT--EXC-DG-0001 FT ‘vate SECTION D2-D2 aa -{-id 4 ar $8 = = 3 8 3 | ston stn i i: :4 iG id H | va ‘om a g) ue g a a : l i i Ls 2 5 og 3 8 a 8 a 8 3 rere B 5 2 BOS a8 a 6 5 ‘GEOLOGICAL BOUNDARY NOTES: ane port ce ees Peiecete NAM. Mag HYDROPOWER PROJECT LAO PDR, seater a 01 2 Sevenamatgcin ome darn SCI SeeunssslteCW Se ee feat ea te Drang sviesion sas: raion TS [oa Sede en at A [> Menene eee | FROM PKO+00 TO PK 2+100 eed ea Od | res [pae cee in [raenegerNoo ACA SE 2025 ‘SECTION D202 endeyaset | eos Jw [Pron van 02 aca PP Rev] Dae escrpton Drawn | check [approved [Design [te anh ao [r.zoas] NN2SCHHT-LEXC-DG-0001 Tae tenn) SECTION NI-NI Neal ped eton(n) GEOLOGICAL BOUNDARY : NOTES: Leen Panam NAM MO 2 HYDROPCWER PROJECT - LAO PDR 2 Seen craura th aezanganiog ons SCT sot consuming ‘company |" os SC sce HEADRACE TUNNEL anope| icone Ts vv Te 20] FROM PK0+00 TO PK 2+100 Frmanae ao A 0 SECTIONNINI ere [Pra van a ooana| mov Fes | ome Beare | Bam [ Geek [tomo esi [teat zea] MaSoHT-Lecose [TS REINFORCED TYPE 1 REINFORCED TYPE 2 t ah Seale: 150 DRAINAGE TRENCH ‘esi 1:50, Sf anager wan aaneerdworece NOTES: Peis NAM MO 2 HYDROPOWER PROJECT - LAO PDR, SCs ee HEADRACE TUNNEL 7] FROMPKO+00 TOK 2+100 fr20z3] _DETAILREINFORCED [emerage coo marae 2 | came = [2025] owe Foret Fanaa) NNZSCHHT-LExC-DG.001 | Rev] ae ‘ecrgion Drown | creak [Approved [basin SECTION 2-2souc srs SECTION A-A soutvs DETAIL SPILLING BOLTS scars ‘STEEL REINFORCEMENT STATISTICS TABLE MAT CAT A-A sess AJ CHITIET NEO VUQT TRUOCress one] ‘Spe Sen Poe] Sma [Amare [Tome 7 Toe ane a ia S| mmanmienee fem] HS) fale rea] ath | aa i I ee sen OF « | spam Pw [me [oe [ee | mn | ne anata Sesh Gor = 1g ngs OUST ee ean snaraae Fomssie NAM MO 2 HYDROPOWER PROJECT - LAO PDR a SC soneume greater HEADRACE TUNNEL Le : iveraseltoane THREE iri2025| FROM PK0+00 TO PK 24100 ost ins prgonanasy | ss [ate comme one Naneoerno w A! 202s] __ DETAILS, SECTIONS Liammeneoenemereomne name [2 | 2 fone [Phan Von 1202 omnear Fem Gethin Sdselargomavexamnstinrernomes [Rev] Ome Descton Drawn | Greek [peered Peson [ear vo ra0zs] NMASCHAT-ExC-06-0001 [a “etic ie SECTION TYPE TA scar 120 ® SECTION 3-3 soxe 1250 ‘como sec ay Sing os ovate on a 2.21. ral | as a sno me ape SECTION 4-4 sone 1210 Cone ct net ett ti tetra co ahh, tine I Siig ta on aR, ‘eoveos Oats Fas W gene NOTE/ GHI CHU: exhoteterpbni teen 20 eNeg 2. sanaaming teenie 11¢)98e wandon vamos ayant ec wo nm ‘aegis om ae yee sr ing Dy uertonse gla | ch Wt Iter gg arene oh Ae ‘leva Bcetalnelptioancteok etal Simp emt Petite NAM MO_2 HYDROPOWER PROJECT - LAO PDR SCI socne epee "HEADRACE TUNNEL Enos oat Fraaza] FROM PKO+00 TO PK 24100 | tar [tao esomnmesonte frmeraoefme wan fszao|_ SECTION TPE 1h, SECTIONS ‘0 | oaranzs [check [Phan Van He [11.2023] orwng no. Prev faneet | er| oe Dean [oam [erea [pono power [inane QE raza] NuBScUTEXcOGoN Ta SECTION TYPE 1 scusss0 SECTION TYPE 2 scue sso eng uml scion xara ose Vee cto cin ot 1 u tect Ponctite NAM MO 2 HYDROPOWER PROJECT - LAO PDR : SCI scious SRK coven EADRAGe TUNNEL bedi ‘GHI CHU: Toanoge| FROM PKO+00 TO PK 2+100 ercteigateccmteneteany *™* TT zs [pattem Cn we et 2 wee [rMarege| SECTION TYPE 1:2 = | nes om euro Pees Rev] ate Deserpton ‘Brawn | Check [Approved [Design NweSCHHT-VEXC-DG-O001 Fa SECTION TYPE 3 scaie 120 SECTION TYPE 4 seas 190 ebioaonnt eon ected ark <0 eosin tn ae ek 0 / SS cay Stone cnt 25 ptt Le a ie NOTE/ GHI CHU: Rovmuectora ewe gitingon coeogtngm Bi vy sem cing cnn an, 2g aca an sl eh a kn 3 ho, Neoware 01 3 senrehnse. Parcs NAM MO 2 HYDROPOWER PROJECT - LAO PDR SCT serconsucms zoyrsrackcowra]™ isin stfu: Fundion | Tone 7 fesse] ba] NEADRACE TUNNEL [bsanogelona The if czas] FROM PKO+00 TO PK 24100 1 | 12023 [emaegete tick tnt am [FeManager|Ngo Vu An 0" fi.2023| ‘SECTION TYPE 3; 4 neck [Pan Van uae [2022 mera Ferret Rev] Date Desorption Drawn_| Chek [Arproved [Dosgn [Le annioe fs-2oza] NMRSCHT--EXC-D6-c001 PLAN OF NICHE seco SECTION 1-1 sous sve NOTE/ GHI CHU: | Theor te enn ay nove demsagonecaylterek ner ze cornered pein us te 2 Omensre en tiny esc cing ere hts ents tergbin wi gon. ogra 2. Setanta mers VOLUME TABLE OF NICHE BANG KHOI LUOQNG NGACH QUAY XE SECTION 2-2 sovesco 8 oot PSS gata ‘2 _|Shotesete conrete 7em of Maw Phun wiy BS lng G25 dBy Tem) m2 ‘ase sonar a eae : = late eS es eae pas co aha ds nt ntact coe toc conoe ek Petits NAM MO 2 HYDROPOWER PROJECT - LAO PDR [SCT scr consuming son stock conan] ~~ Ge| HEADRACE TUNNEL paensge 2023] FROM PKO+00 TO PK 2+100 Frarave 023 DETAIL OF NICHE eck Cfoa.2023] orang no. Prev] seer Jhomroves peton lonaens| NieeoHrT-tExCDeAtOT FI DETAIL STEEL ARCH | scxzia DETAIL STEEL ARCH IA sous CHI TIET Vi THEP | mess CHITIET Vi THEP IA resco DETAIL STEEL ARCH II soussso a aie CHI TIET Vi THEP I reer a oe fn 08 NOTE! GHI CHU: Tif eae 020 Bae 2 ‘naan ee ee oe fh 2 puponegun coon —— vaaiigiearsea | 1 Tiawoentin econ Tabara _ csmetgh gon enter ae be hn nn at ei et, ae tind nti tnayoarunensioalg pore eri cia NAM MO 2 HYDROPOWER PROJECT - LAO PDR surat gor enorme attr rt ona eh ad ates ri Jettnae a nen 1, te a SCI seme eee, HEADRACE TUNNEL Bivereoet tow ta fr Zaza] FROM PKO+00 TO PK 2+100 7 | es [parenencaroe Manone WaT S ize] DETAIL OF STEEL ARCH TYPICAL co eck Ph Vora 112023] oonre Fo Peal rex| ne Daceaen | om | creer [Aopoves fpesan [team ino fizz] M2SoHMT--ExC DG [Ts SPACE MODEL DETAIL 6 sans MOHINH CHITIET 6 “Tifa \ts/ 6-6 ee an fromates oa ee is \ } Tea \' a a Tal Sag8 ‘ 1 Ves oan Bote ns FE seta i 10 Ve 5 . " cto 80 a| w |e! 8 | Abie I 28 Siena = came goacas Sonsnaa wea 4 na ba ; ana g Awa a | pane Am | oe ener NAM MO 2 HYDROPOWER PROJECT - LAO PDR et Bl coapae [SC serconsusry@enrzvecx conrn]™, Slated Drawing submission stats: Funcion | vase OTT Bary NEADRACE TUNNEL U Manage Roandl th Wr Fix2023| FROM PK0#00 TO PK 2+100 Meee eH CH ecateecenmenen — LL BaG [aime areefiae WRA\_SCt_,°*-forzza| DETAIL OF STEEL ARCH TYPICAL ioea—wenereee © [can eck [Phan Vi A 12025 |tonraro Fw [Rev| Dew Deserpton Drawn | Oreck [Arprove Psion [be Annee francs] NNOSCHIT-VEXCDG-COO1 PT DETAIC STEEL ARCH Ul ensie DETAIL OF STEEL RIBS CONNECTION sous +20 = fh === SECTION 9-9 scue ss snes besten) i a ea aie t § ae = sues Cab ' | eS ' NOTE/ GHI CHU: [Paice NAM MO 2 HYDROPOWER PROJECT - LAO PDR \ || / : Pecerrirtlopenniurpeetrepe aca SCI scrconsutrna. eK COMPANY] Fae NO + pf 2 re rhea SS maT eeep oa] HEADRACE TUNNEL \ j anage ioaa Th izes] FROM PK0+00 TO PK 2+100, a | eae | omar arr cata Managerfigo wu All jj 2028] DETAIL OF STEEL ARCH TYPICAL . : ic eck __ Phan van HOS -2020] oaaramm or) NVZSOHT-EXC-06-001 Rew] Darapeon | Dawn | Grek [roraved peson Fearn hae | ja VOLUME TABLE OF STEEL ARCH BANG KHOI LUONG Vi THEP. ‘Amount Sé lwgng | Length’ | Total volume! } Categories/ Vi tri | Species/Logithép | No. Total ae Unit Mae ee ‘i 400, 2800 ton 42,202 12 4 200, 8640 ton 47,206 | | 13 1 200 5500 ton 30,050. ‘Section Type |, 1A Flat steel 250X200X10mm_ 6 1200 ton 4,710. [Steel L50X100X6mm_ 2 400 ton 0,424 4 B00 i ton | 1,381 [Bolts M20, L=65mm_ 8 1600 bolts 1.600 Wt 7: 80 2730 ton 5,315 Tr i 40 | 6910 | ton] 6.726 Flat steei 200X200x70mm 6 [240 ton] 0.754 Steel L50X100X6mm_ = 80 ton 0,085 4 160 ‘ton’ 0,276 Bolts M20, L=65mm_ 8 320 bolts 320 4 2 8 6000 ton 1,809 m2 He 4 5500, ton 0,601 Flat steel 250X200X10mm_ 6 24 ton 0,094 ZZ 8 ton 0,014 Bots M20, L=65mm 3 32 Bolts 32 ton 121,87 |Flat steel 250X200X10mm fon 4,80 [Steel L50X100XEmm fon | 0.42 = ton | 4,39) (Bolts M20, L=65mm_ bolts 1.632, ‘Téng kh6i long ton | 12,04 Flat steel 200x200X70mm ton | 0.754 [Steel L50X100X6mm ton 0,085. ton 0,085. jolts M20, L=65mm_ bolts 320 NAM MO 2 HYDROPOWER PROJECT - LAO PDR SC ser consuming St cowrar]™ Dring subinon sts Tag'7 oF TSeAC| bap] HEADRACE TUNNEL ag Tn Taiz] FROM PKO*00 TO PK 2+100 Change vat [rmanager|Ngo Vu An \ F202s| VOLUME TABLE OF STEEL ARCH Pon var roan CT DC fi 2025] Bonn rs Description [Le Anh Hao hi.z0za] NM2-SCHHT-1-ExC-06-0001 [<>

You might also like