0% found this document useful (0 votes)
34 views55 pages

BQ Bassura City

Uploaded by

Ageng Subarkah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views55 pages

BQ Bassura City

Uploaded by

Ageng Subarkah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 55

BILL OF QUANTITY

PENAWARAN
PROYEK SHABU HACHI BASSURA CITY
PAKET PEKERJAAN ME
REKAP BILL OF QUANTITY
PROYEK SHABU HACHI BASSURA CITY
PAKET PEKERJAAN ME

JUMLAH HARGA (Rp)

NO URAIAN PEKERJAAN TOTAL HARGA KETERANGAN


UPAH (RP) MATERIAL (RP) (UPAH +
MATERIAL) (RP)

I PEKERJAAN ELEKTRIKAL Rp 259,708,699 Rp 465,114,300 Rp 724,822,999

SUB TOTAL 1 Rp 724,822,999


PPN 11 % Rp 79,730,530
GRAND TOTAL Rp 804,553,529
DIBULATKAN Rp 804,600,000

768992603.xlsx REKAP. Page 2 of 55


BILL OF QUANTITY
PROYEK SHABU HACHI BASSURA CITY
PAKET PEKERJAAN ME

HARGA SATUAN JUMLA HARGA


ITEM PEKERJAAN SPESIFIKASI & KETERANGAN TAMBAHAN VOLUME SAT TOTAL HARGA
MATERIAL MATERIAL
UPAH (RP) UPAH (RP) (UPAH +
(RP) (RP)
MATERIAL) (RP)

I PEKERJAAN ELEKTRIKAL
LANTAI 1
1 Panel Box
- PP. 82 Kva 1.00 unit 52,500.00 577,500.00 52,500 577,500 630,000
- PP. KIT. HG 1.00 unit 52,500.00 315,000.00 52,500 315,000 367,500
- PP. HVAC HG 1.00 unit 52,500.00 315,000.00 52,500 315,000 367,500
- PP. LP DR 1.00 unit 52,500.00 315,000.00 52,500 315,000 367,500
- PP. LP HG 1.00 unit 52,500.00 315,000.00 52,500 315,000 367,500
- PP. RESTO 1.00 unit 52,500.00 315,000.00 52,500 315,000 367,500

2 Kabel Feeder
- NYY 4 x 70 mm2 + BCC 35 mm2 1.00 ttk 525,000.00 525,000 - 525,000
- NYY 4 x 4 mm² + BC 4 mm² 1.00 ttk 262,500.00 262,500 - 262,500
- NYY 4 x (2x300) mm2 + NYY 1 x 240 mm2 1.00 ttk 1,575,000.00 1,575,000 - 1,575,000
- NYY 4 x 300 mm² + BC 120 mm² 1.00 ttk 1,575,000.00 1,575,000 - 1,575,000
- NYY 4 x 50 mm² + BC 25 mm² 1.00 ttk 525,000.00 525,000 - 525,000
- NYY 4 x 4 mm² + BC 4 mm² 1.00 ttk 257,500.00 257,500 - 257,500

3 MCCB & MCB


- PP. KIT. HG
1. MCCB 3P, 36 kA 50-80 A 1.00 unit 52,500.00 756,000.00 52,500 756,000 808,500
- PP. LP DR -
1. MCB 3P, 6 kA 20 A 1.00 unit 42,000.00 357,000.00 42,000 357,000 399,000
2. MCB 3P, 6 kA 10 A 1.00 unit 15,750.00 210,000.00 15,750 210,000 225,750
3. MC16 A 2.00 unit 15,750.00 73,500.00 31,500 147,000 178,500
4. MCB, 1P, 6 kA 3.00 unit 15,750.00 67,200.00 47,250 201,600 248,850
- PP. LP HG -
1. MCB 3P, 6 kA 20 A 1.00 unit 52,599.00 357,000.00 52,599 357,000 409,599
2. MC16 A 2.00 unit 15,750.00 77,700.00 31,500 155,400 186,900
3. MCB, 1P, 6 kA 3.00 unit 10,500.00 57,750.00 31,500 173,250 204,750
- PP. RESTO HG -
1. MCB 3P 10 kA, 40 A 32.00 unit 52,500.00 472,500.00 1,680,000 15,120,000 16,800,000
-
4 Lampu & Saklar (1A/LP-DR dst. masuk ke PP. LP. DR) -
LANTAI 1 -
- Pendant light LED 5 W 15.00 bh 89,250.00 378,000.00 1,338,750 5,670,000 7,008,750
- Downlight LED eyeball 7 W 50.00 bh 89,250.00 194,250.00 4,462,500 9,712,500 14,175,000
- Logo Lamp 100 W 3.00 bh - - - -
- LED Panel 40 W 18.00 bh 183,750.00 672,000.00 3,307,500 12,096,000 15,403,500
- Insect Killer 20 W 5.00 bh 131,250.00 640,500.00 656,250 3,202,500 3,858,750
- Lamp 13 W 6.00 bh 78,750.00 157,500.00 472,500 945,000 1,417,500
- Saklar engkel 2.00 bh 15,750.00 60,900.00 31,500 121,800 153,300
LANTAI 2 -
- Pendant light LED 5 W 80.00 bh 89,250.00 378,000.00 7,140,000 30,240,000 37,380,000
- Downlight LED eyeball 7 W 115.00 bh 89,250.00 194,250.00 10,263,750 22,338,750 32,602,500
- Logo Lamp 100 W 1.00 bh - - - -
- Spot light 33.00 bh 183,750.00 672,000.00 6,063,750 22,176,000 28,239,750
- Insect Killer 20 W 10.00 bh 131,250.00 640,500.00 1,312,500 6,405,000 7,717,500
- LED Panel 40 W 18.00 bh 131,250.00 483,000.00 2,362,500 8,694,000 11,056,500
- Lamp 13 W 11.00 bh 36,750.00 110,250.00 404,250 1,212,750 1,617,000
-
5 Lampu & Saklar (1A/LP-OFFICE dst. masuk ke PANEL 82 kVA) -
- Downlight LED eyeball 7 W 2.00 bh 89,250.00 194,250.00 178,500 388,500 567,000
- LED Panel 40 W 20.00 bh 131,250.00 483,000.00 2,625,000 9,660,000 12,285,000
- Lamp 13 W 2.00 bh 36,750.00 110,250.00 73,500 220,500 294,000
- Saklar engkel 5.00 bh 15,750.00 60,900.00 78,750 304,500 383,250
- Saklar seri 3.00 bh 21,000.00 78,750.00 63,000 236,250 299,250
-
6 Stop Kontak (01/KIT. DAISUKI dst. masuk ke masuk ke PANEL 82 kVA) -
- Stop kontak charger / servis 29.00 bh 36,750.00 131,250.00 1,065,750 3,806,250 4,872,000
-
7 Stop Kontak (01/SK. OFFICE dst. masuk ke PANEL 82) -
- Stop kontak equipment 20.00 bh 26,250.00 141,750.00 525,000 2,835,000 3,360,000
- Stop kontak mesin 4.00 bh 131,250.00 404,250.00 525,000 1,617,000 2,142,000
- Stop kontak water heater 2.00 bh 68,250.00 141,750.00 136,500 283,500 420,000
57,750.00 -
8 Stop Kontak Gruping Panel Meja Resto 36,750.00 -
- Stop kontak kompor induksi 164.00 ttk 36,750.00 288,750.00 6,027,000 47,355,000 53,382,000
- Stop kontak filter 48.00 ttk 36,750.00 141,750.00 1,764,000 6,804,000 8,568,000
- Stop kontak grill 48.00 ttk 131,250.00 141,750.00 6,300,000 6,804,000 13,104,000
- Stop kontak charger / servis 57.00 ttk 26,250.00 131,250.00 1,496,250 7,481,250 8,977,500
68,250.00 -
9 Stop Kontak Gruping panel Kitchen Hachi Grill (PP - KIT HG) 168,000.00 -
- Stop kontak mesin 4.00 ttk 252,000.00 404,250.00 1,008,000 1,617,000 2,625,000
- Stop kontak equipment 26.00 ttk 168,000.00 141,750.00 4,368,000 3,685,500 8,053,500
- Stop waterheater 4.00 ttk 210,000.00 141,750.00 840,000 567,000 1,407,000
1,575,000.00 -
10 Kabel Instalasi 525,000.00 -
- NYM 2 x 2,5 mm² + Konduit PVC ∅ 20 mm 121.00 ttk 1,260,000.00 546,000.00 152,460,000 66,066,000 218,526,000
- NYY 4x4 mm² + NYA 2,5 mm² + Konduit PVC ∅ 20 mm 24.00 ttk 262,500.00 1,522,500.00 6,300,000 36,540,000 42,840,000
- NYY 3x2,5 mm² + Konduit PVC ∅ 20 mm 31.00 ttk 315,000.00 656,250.00 9,765,000 20,343,750 30,108,750
- NYY 4x2,5 mm2 + NYA 2,5 mm2 + Konduit PVC ∅ 20 mm 4.00 ttk 315,000.00 1,365,000.00 1,260,000 5,460,000 6,720,000
MCCB 3P, 36 kA PP-DP HG 252,000.00 -
- NYY 4 x 300 mm2 + BC 120 mm2 1.00 ttk 252,000.00 - 252,000 - 252,000
- NYY 4 x 50 mm2 + BC 25 mm2 1.00 ttk 33,600.00 - 33,600 - 33,600
- NYY 4 x 95 mm2 + BC 50 mm2 1.00 ttk 42,000.00 - 42,000 - 42,000
- NYY 4 x 4 mm2 + BC 4 mm2 1.00 ttk 52,500.00 - 52,500 - 52,500
- NYY 4 x 6 mm2 + BC 4 mm2 1.00 ttk 31,500.00 - 31,500 - 31,500
- NYY 4 x 6 mm2 + BC 6 mm2 1.00 ttk 157,500.00 - 157,500 - 157,500
MCCB 3P, 36 kA PP-Resto HG 157,500.00 -
- NYM 4 x 4 mm² + NYA 4 mm² 15.00 ttk 157,500.00 1,522,500.00 2,362,500 22,837,500 25,200,000
- NYM 4 x 6 mm² + NYA 4 mm² 17.00 ttk 157,500.00 1,522,500.00 2,677,500 25,882,500 28,560,000
-
11 Kabel Tray -
LANTAI 1 -
- 300 mm (W) x 100 mm (H) 55.00 m1 32,000.00 306,600.00 1,760,000 16,863,000 18,623,000
- 400 mm (W) x 100 mm (H) 15.00 m1 40,000.00 425,250.00 600,000 6,378,750 6,978,750
- 500 mm (W) x 100 mm (H) 11.00 m1 50,000.00 577,500.00 550,000 6,352,500 6,902,500
LANTAI 2 -
- 200 mm (W) x 100 mm (H) 64.00 m1 30,000.00 294,000.00 1,920,000 18,816,000 20,736,000
-
12 Ekhaust Fan -
Ekshaust fan uk. 30x30 cm ex. Panasonic -
- R. panel 1.00 unit 150,000.00 693,000.00 150,000 693,000 843,000
- Toilet 2.00 unit 150,000.00 693,000.00 300,000 1,386,000 1,686,000
- LMR 1 1.00 unit 150,000.00 693,000.00 150,000 693,000 843,000
- LMR 2 1.00 unit 150,000.00 693,000.00 150,000 693,000 843,000

13 Bongkaran Outdoor AC Eksisting (termasuk dudukannya)


Area Dak Atap Material diserahkan ke owner
- Bongkaran outdoor AC 11.00 unit 525,000.00 5,775,000 - 5,775,000
Area Taman Utara
- Bongkaran outdoor AC (provisional quantity) 2.00 unit 525,000.00 1,050,000 - 1,050,000

Subtotal PEKERJAAN ELEKTRIKAL 259,708,699 465,114,300 724,822,999

768992603.xlsx BQ Page 3 of 55
REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN
TAHUN 2022

NO URAIAN PEKERJAAN HARGA


1 2 3
I #REF!
1 #REF! Err:504
2 #REF! Err:504
2 #REF! Err:504
3 #REF! Err:504
3 #REF! Err:504
4 #REF! Err:504
4 #REF! Err:504
5 #REF! Err:504
5 #REF! #REF!
6 #REF! Err:504
6 #REF! Err:504
7 #REF! Err:504
7 #REF! Err:504
8 #REF! #REF!

II #REF!
1 #REF! Err:504
2 #REF! Err:504
3 #REF! Err:504
4 #REF! Err:504
5 #REF! Err:504
6 #REF! Err:504
7 #REF! Err:504
8 #REF! Err:504
9 #REF! Err:504
10 #REF! Err:504
11 #REF! Err:504
12 #REF! Err:504
13 #REF! Err:504

III #REF!
1 #REF! Err:504
2 #REF! Err:504
3 #REF! Err:504
4 #REF! Err:504
5 #REF! Err:504
6 #REF! Err:504
7 #REF! Err:504

IV #REF!
1 #REF! Err:504
2 #REF! Err:504
3 #REF! Err:504
4 #REF! Err:504
5 #REF! Err:504
6 #REF! Err:504
7 #REF! Err:504
8 #REF! Err:504
9 #REF! Err:504
10 #REF! Err:504
11 A.4.1.1.10a Pembesian 1 kg dengan besi polos (U-24) Err:504
12 #REF! Err:504
13 A.4.1.1.13b Pembesian 1 kg dengan besi besi ulir U-35, (fy=320 kg/mm2) Err:504
14 #REF! Err:504
15 A.4.1.1.10c Pembesian 1 kg dengan besi besi ulir U-40, (fy=400 kg/mm2) Err:504
16 #REF! Err:504
NO URAIAN PEKERJAAN HARGA
1 2 3
17 #REF! Err:504
18 #REF! Err:504
19 #REF! Err:504
20 #REF! Err:504
21 #REF! Err:504
22 #REF! Err:504
23 #REF! Err:504
24 A.4.1.1.14a (K3) Pemasangan 1 m2 bekisting untuk sloof 2x pakai Err:504
25 A.4.1.1.15a (K3) Pemasangan 1 m2 bekisting untuk kolom 2x pakai #REF!
26 A.4.1.1.16a (K3) Pemasangan 1 m2 bekisting untuk balok 2x pakai #REF!
27 A.4.1.1.17a (K3) Pemasangan 1 m2 bekisting untuk lantai 2x pakai #REF!
28 A.4.1.1.18a (K3) Pemasangan 1 m2 bekisting untuk dinding 2x pakai #REF!
29 A.4.1.1.19a (K3) Pemasangan 1 m2 bekisting untuk tangga 2x pakai #REF!
30 A.4.1.1.14b (K3) Pemasangan 1 m2 bekisting untuk sloof 3x pakai Err:504
31 A.4.1.1.15b (K3) Pemasangan 1 m2 bekisting untuk kolom 3x pakai #REF!
32 A.4.1.1.16b (K3) Pemasangan 1 m2 bekisting untuk balok 3x pakai #REF!
33 A.4.1.1.17b (K3) Pemasangan 1 m2 bekisting untuk lantai 3x pakai #REF!
34 A.4.1.1.18b (K3) Pemasangan 1 m2 bekisting untuk dinding 3x pakai #REF!
35 A.4.1.1.19b (K3) Pemasangan 1 m2 bekisting untuk tangga 3x pakai #REF!
36 #REF! Err:504
37 #REF! Err:504
38 #REF! Err:504
39 A.4.1.1.29 Pemasangan 1 kg jaring kawat baja (wiremesh m8) Err:504
40 #REF! Err:504

V A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


1 A.4.2.1.1. Pemasangan 1 kg rangka kuda-kuda baja IWF #REF!

VI #REF!
1 #REF! Err:504
2 #REF! Err:504
3 #REF! Err:504
4 #REF! Err:504
5 #REF! Err:504
6 #REF! Err:504
7 #REF! Err:504
8 #REF! Err:504
9 #REF! Err:504
10 #REF! Err:504
11 #REF! Err:504
12 #REF! Err:504
13 #REF! Err:504
14 #REF! Err:504
15 #REF! Err:504
16 #REF! Err:504

VII #REF!
1 #REF! Err:504
2 #REF! Err:504
3 #REF! Err:504
4 #REF! Err:504
5 #REF! Err:504
6 #REF! Err:504
7 #REF! Err:504
8 #REF! Err:504
9 #REF! Err:504
10 #REF! Err:504
11 #REF! Err:504
12 #REF! Err:504
13 #REF! Err:504
14 #REF! Err:504
15 #REF! Err:504
16 #REF! Err:504
17 #REF! Err:504
NO URAIAN PEKERJAAN HARGA
1 2 3
18 #REF! Err:504
19 #REF! Err:504
20 #REF! Err:504
21 #REF! Err:504
22 #REF! Err:504

VIII #REF!
1 #REF! Err:504
2 #REF! Err:504
3 #REF! Err:504
4 #REF! Err:504
5 #REF! Err:504
6 #REF! Err:504
7 #REF! Err:504
8 #REF! Err:504
9 #REF! Err:504
10 #REF! Err:504
11 #REF! Err:504
12 #REF! Err:504
13 #REF! Err:504
14 #REF! Err:504
15 #REF! Err:504
16 #REF! Err:504
17 #REF! Err:504
18 #REF! Err:504
19 #REF! Err:504
20 #REF! Err:504
21 #REF! Err:504
22 #REF! Err:504
23 #REF! Err:504

IX #REF!
1 #REF! Err:504
2 #REF! Err:504
3 #REF! Err:504
4 #REF! Err:504
5 #REF! Err:504
6 #REF! Err:504
7 #REF! Err:504
8 #REF! Err:504

X A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 A.4.5.2.1. Pemasangan 1 m2 atap genteng press mini Pejaten #REF!
2 A.4.5.2.4. Pemasangan 1 m’ bubungan genteng press mini Pejaten #REF!
3 A.4.5.2.3. Pemasangan 1 m2 atap genteng Kodok Good Yaer #REF!
4 A.4.5.2.3b. Pemasangan 1 m2 atap genteng Kodok Lestari #REF!
5 A.4.5.2.6. Pemasangan 1 m’ bubung genteng Kodok goodyear #REF!
6 A.4.5.2.6b. Pemasangan 1 m’ bubung genteng Kodok lestari #REF!
7 A.4.5.2.7. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 1,80 m x 5 mm #REF!
8 A.4.5.2.9. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana #REF!
9 A.4.5.2.10. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai #REF!
NO URAIAN PEKERJAAN HARGA
1 2 3
XI A.4.6.1. HARGA SATUAN PEKERJAAN KAYU
1 A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I #REF!
2 A.4.6.1.2.Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II #REF!
3 A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II #REF!
4 A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II kamp #REF!
5 A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau #REF!
6 A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi, kayu kelas I atau #REF!
7 A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II kruing te #REF!
8 A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II #REF!
9 A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II kamper #REF!
10 A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I kamper #REF!
11 A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan I #REF!
12 A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau II #REF!
13 A.4.6.1.20.Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III #REF!
14 A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II k #REF!
15 A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II ka #REF!
16 A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau #REF!
17 A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II #REF!
18 A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I kamper #REF!
19 A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) c #REF!
21 A.4.6.1.32. Pemasangan 1 m’ lisplank ukuran 3 x 10 cm, kayu kelas I atau kelas II kam #REF!
22 A.4.6.1.33. Pemasangan 1 m’ lisplank ukuran 3 x 15 cm, kayu kelas I atau kelas II kam #REF!
23 A.4.6.1.37.Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu Krui #REF!
24 A.4.6.1.38.Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu Seseh #REF!
25 A.4.6.1.40.Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu Albes #REF!
26 A.4.6.1.41. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu Albesia #REF!
27 A.4.6.1.42. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu Seseh bentang #REF!
28 A.4.6.1.45. Pemasangan 1 m3 konstruksi gordeng, kayu Albesia Err:504
29 A.4.6.1.46. Pemasangan 1 m3 konstruksi gordeng, kayu Seseh Err:504
30 A.4.6.1.47. Pemasangan 1 m2 rangka atap genteng press mini pejaten, kayu Albesia ren Err:504
31 A.4.6.1.49. Pemasangan 1 m’ lisplank ukuran 2 x 12 cm, kayu Meranti #REF!
32 A.4.6.1.50. Pemasangan 1 m’ lisplank ukuran 3 x 15 cm, kayu Albesia #REF!
33 A.4.6.1.53. Pemasangan 1 m’ Tatab ukuran 2 x 7 cm, kayu Meranti #REF!

XII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


1 A.4.6.2.1. Pemasangan 1 buah kunci Pintu #REF!
2 A.4.6.2.2. Pemasangan 1 buah engsel pintu #REF!
3 A.4.6.2.2.a Pemasangan 1 buah engsel pintu #REF!
4 A.4.6.2.2.b Pemasangan 1 buah engsel pintu Tipe H 80x50 #REF!
5 A.4.6.2.3. Pemasangan 1 buah engsel jendela #REF!
6 A.4.6.2.3.a Pemasangan 1 buah engsel jendela #REF!
7 A.4.6.2.4. Pemasangan 1 buah engsel angin #REF!
8 A.4.6.2.5. Pemasangan 1 buah Grendel #REF!
9 A.4.6.2.6. Pemasangan 1 buah kait angin #REF!
11 A.4.6.2.11. Pemasangan 1 m rel pintu sorong #REF!
12 A.4.6.2.12. Pemasangan 1 m2 kaca tebal 3 mm #REF!
13 A.4.6.2.13. Pemasangan 1 m2 kaca tebal 5 mm #REF!
14 A.4.6.2.15. Pemasangan 1 m2 kaca cermin tebal 5 mm #REF!
15 A.4.6.2.16. Pemasangan 1 buah Pintu PVC #REF!

XIII #REF!
1 #REF! Err:504
2 #REF! Err:504
3 #REF! Err:504
4 #REF! Err:504
5 #REF! Err:504
6 #REF! Err:504
7 #REF! Err:504
8 #REF! Err:504
9 #REF! Err:504
NO URAIAN PEKERJAAN HARGA
1 2 3

XIV A.6 HARGA SATUAN ELEKTRIKAL


1 #REF! Err:504
2 #REF! Err:504
3 #REF! Err:504
4 #REF! Err:504
5 #REF! Err:504
6 #REF! Err:504
7 #REF! Err:504
8 #REF! Err:504

XV #REF!
1 #REF! Err:504
2 #REF! Err:504
3 #REF! Err:504
4 #REF! Err:504
5 #REF! Err:504
6 #REF! Err:504
7 #REF! Err:504
8 #REF! Err:504
9 #REF! Err:504
10 #REF! Err:504
11 #REF! Err:504
12 #REF! Err:504
13 #REF! Err:504
14 #REF! Err:504
15 #REF! Err:504
16 #REF! Err:504
17 #REF! Err:504
18 #REF! Err:504
19 #REF! Err:504
20 #REF! Err:504
21 #REF! Err:504
22 #REF! Err:504
23 #REF! Err:504
24 #REF! Err:504

XVI A.5.1.2 HARGA SATUAN PERPIPAAN LUAR GEDUNG


1 #REF! Err:504
2 #REF! Err:504
3 #REF! Err:504

XVII HARGA SATUAN BUIS BETON


1 #REF! Err:504
2 #REF! Err:504
3 #REF! Err:504
4 #REF! Err:504

XVIII HARGA SATUAN PEKERJAAN LAIN - LAIN ( TAMBAH )


1 A.4.6.1.44 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu lama #REF!
2 A.4.6.1.48. Pemasangan kembali 1 m2 Usuk Lama #REF!
3 A.4.6.1.52. Pemasangan Kembali 1 m’ lisplank kayu lama #REF!
4 A.4.6.1.54 .Pemasangan kembali 1 m’ Tatab kayu lama #REF!
NO URAIAN PEKERJAAN HARGA
1 2 3
XVIII A.8.4.9 HARGA SATUAN PEKERJAAN SOFTSCAPE
1 A.8.4.9.01 Pek. 1 m3 Urugan tanah subur Err:504
2 A.8.4.9.01a Pek. 1 m3 Pupuk Kompos Err:504
3 A.8.4.9.02. Pek. 1 m2 Tanaman Rumput Jepang Err:504
4 A.8.4.9.03 Pek. Tanaman Pandan Merah Err:504
5 A.8.4.9.04 Pek. Tanaman Jaburan Hijau Err:504
6 A.8.4.9.05 Pek. Tanaman Jaburan Putih Err:504
7 A.8.4.9.06. Pek. Tanaman Leli Err:504
8 A.8.4.9.07 Pek. Tanaman Sirih Belanda Err:504
9 A.8.4.9.08. Pek. Tanaman Rosalia Err:504
10 A.8.4.9.09. Pek. Tanaman Pandan Afrika Err:504
11 A.8.4.9.10 Pek. Tanaman Pasok 1,5 m Err:504
12 A.8.4.9.11 Pek. Tanaman Andong 1 m Err:504
13 A.8.4.9.12 Pek. Tanaman Kembang Sepatu 1,5 m Err:504
14 A.8.4.9.13 Pek. Tanaman Puring 0,9 m Err:504
15 A.8.4.9.14 Pek. Tanaman Onje 1,2 m Err:504
16 A.8.4.9.15 Pek. Tanaman Soka 1 m Err:504
17 A.8.4.9.16 Pek. Tanaman Bunga Portulaca Err:504
18 A.8.4.9.18. Pek. Tanaman Ketapang Kencana tinggi 3 m Err:504
19 A.8.4.9.22. Pisang Karibia Err:504
20 A.8.4.9.23. Cortadera Selloana Err:504
21 A.8.4.9.24. Bambusa Vulgaris (Bambu Kuning) Err:504
22 A.8.4.9.25. Calathea Lutea Err:504
23 A.8.4.9.26. Ruellia Brittoniana Err:504
24 A.8.4.9.27. Lantana Camara Err:504
25 A.8.4.9.28. Pohon Pucuk Merah Tinggi 100 cm Err:504
26 A.8.4.9.29. Penanaman 1 polybag Le kwan yew Err:504
27 A.8.4.9.30. Pohon Dolar Err:504
28 A.8.4.9.31. Penanaman 1 polybag Pohon Kaki Laba - Laba Err:504
29 A.8.4.9.32. Penanaman 1 polybag Pohon Corrymbousa Mini Err:504
30 A.8.4.9.33. Penanaman 1 polybag Pohon Pangkas kuning Err:504
31 A.8.4.9.34. Penanaman 1 polybag Pohon Kacang - kacangan Err:504
32 A.8.4.9.35. Penanaman 1 rumpun Pohon Bambu Jakarta Err:504
33 A.8.4.9.36. Penanaman 1 buah Pohon Puring Kirana Err:504
34 A.8.4.9.37. Penanaman 1 buah Pohon Puring Nuri Err:504
35 A.8.4.9.38. Penanaman 1 buah Pohon Puring Bor merah Err:504
36 A.8.4.9.39. Penanaman 1 buah Pohon Puring Bor Kuning Err:504
37 A.8.4.9.40. Penanaman 1 buah Pohon Soka India Err:504
38 A.8.4.9.41. Penanaman 1 buah Pohon Walisongo Err:504
39 A.8.4.9.42. Penanaman 1 buah Pohon Bougenville Variegata Err:504
40 A.8.4.9.43. Bunga Pukul Sembilan per polybag Err:504
41 A.8.4.9.48. Pek. 1 m2 Tanaman Rumput Mutiara Err:504
42 A.8.4.9.49 Penanaman 1 buah Pohon Santos Lemon Kuning Err:504
43 A.8.4.9.50 Penanaman 1 buah Pohon Santos Lemon Merah Err:504
44 A.8.4.9.51 Pek. Tempat Pot Bunga ( Pas. Bata Merah ) Err:504
45 A.8.4.9.52 Pek. Perosotan Anak Err:504
46 A.8.4.9.53 Pek. Ayunan Anak Err:504
47 A.8.4.9.54 Pek. Plenter Box Err:504
48 A.8.4.9.55. Penanaman 1 bh Pohon Tabebuya T=2-3 m; DB= 10 cm Err:504
A.4.1.1a HARGA SATUAN PEKERJAAN BEKISTING 2 X PAKAI

A.4.1.1.14a (K3) Pemasangan 1 m2 bekisting untuk sloof 2x pakai

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.5200 Err:504 Err:504
Tukang kayu L.02 OH 0.2600 Err:504 Err:504
Kepala tukang L.03 OH 0.0260 Err:504 Err:504
Mandor L.04 OH 0.0260 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Kayu Terentang/Begesting M3 0.0262 Err:504 Err:504
Paku 5 -12 cm Kg 0.3000 Err:504 Err:504
Minyak bekisting Ltr 0.1000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.4.1.1.15a (K3) Pemasangan 1 m2 bekisting untuk kolom 2x pakai

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.6600 Err:504 Err:504
Tukang kayu L.02 OH 0.3300 Err:504 Err:504
Kepala tukang L.03 OH 0.0330 Err:504 Err:504
Mandor L.04 OH 0.0330 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Kayu kelas III M3 0.0212 #REF! #REF!
Paku 5 cm – 12 cm Kg 0.4000 #REF! #REF!
Minyak bekisting Ltr 0.2000 Err:504 Err:504
Balok kayu kelas II M3 0.0079 #REF! #REF!
Plywood tebal 9 Lbr 0.2013 #REF! #REF!
mm
Bambu  8- 10cm –panj 4 m Batang 1.2000 #REF! #REF!
10cm –panj 4 m JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.1.16a (K3) Pemasangan 1 m2 bekisting untuk balok 2x pakai

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.6600 Err:504 Err:504
Tukang kayu L.02 OH 0.3300 Err:504 Err:504
Kepala tukang L.03 OH 0.0330 Err:504 Err:504
Mandor L.04 OH 0.0330 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Kayu kelas III M3 0.0218 #REF! #REF!
Paku 5 cm – 12 cm Kg 0.4000 #REF! #REF!
Minyak bekisting Ltr 0.2000 Err:504 Err:504
Balok kayu kelas II M3 0.0098 #REF! #REF!
Plywood tebal 9 mm Lbr 0.2013 #REF! #REF!
Bambu  8- 10cm –panj 4 m Batang 1.1111 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.1.1.17a (K3) Pemasangan 1 m2 bekisting untuk lantai 2x pakai

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.6600 Err:504 Err:504
Tukang kayu L.02 OH 0.3300 Err:504 Err:504
Kepala tukang L.03 OH 0.0330 Err:504 Err:504
Mandor L.04 OH 0.0330 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Kayu kelas III M3 0.0229 #REF! #REF!
Paku 5 cm – 12 cm Kg 0.4000 #REF! #REF!
Minyak bekisting Ltr 0.2000 Err:504 Err:504
Balok kayu kelas II M3 0.0086 #REF! #REF!
Plywood tebal 9 mm Lbr 0.2013 #REF! #REF!
Bambu  8- 10cm –panj 4 m
Batang 3.6000 #REF! #REF!
10cm –panj 4 m
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.1.18a (K3) Pemasangan 1 m2 bekisting untuk dinding 2x pakai

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.6600 Err:504 Err:504
Tukang kayu L.02 OH 0.3300 Err:504 Err:504
Kepala tukang L.03 OH 0.0330 Err:504 Err:504
Mandor L.04 OH 0.0330 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Kayu kelas III M3 0.0169 #REF! #REF!
Paku 5 cm – 12 cm Kg 0.4000 #REF! #REF!
Minyak bekisting Ltr 0.2000 Err:504 Err:504
Balok kayu kelas II M3 0.0113 #REF! #REF!
Plywood tebal 9 mm Lbr 0.2013 #REF! #REF!
Bambu  8- 10cm –panj 4 m Batang #REF! #REF!
1.6364
10cm –panj 4 m
Penjaga jarak Buah 4.0000 -
bekisting/spacer JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.1.19a (K3) Pemasangan 1 m2 bekisting untuk tangga 2x pakai

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.6600 Err:504 Err:504
Tukang kayu L.02 OH 0.3300 Err:504 Err:504
Kepala tukang L.03 OH 0.0330 Err:504 Err:504
Mandor L.04 OH 0.0330 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Kayu kelas III M3 0.0171 #REF! #REF!
Paku 5 cm – 12 cm Kg 0.4000 #REF! #REF!
Minyak bekisting Ltr 0.1500 Err:504 Err:504
Balok kayu kelas II M3 0.0086 #REF! #REF!
Plywood tebal 9 mm Lbr 0.2013 #REF! #REF!
Bambu  8- 10cm –panj 4 m
Batang 1.2000 #REF! #REF!
10cm –panj 4 m
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.1.1b HARGA SATUAN PEKERJAAN BEKISTING 3 X PAKAI

A.4.1.1.14b (K3) Pemasangan 1 m2 bekisting untuk sloof 3x pakai

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.5200 Err:504 Err:504
Tukang kayu L.02 OH 0.2600 Err:504 Err:504
Kepala tukang L.03 OH 0.0260 Err:504 Err:504
Mandor L.04 OH 0.0260 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Kayu Terentang/Begesting M3 0.0157 Err:504 Err:504
Paku 5 -12 cm Kg 0.3000 Err:504 Err:504
Minyak bekisting Ltr 0.1000 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.4.1.1.15b (K3) Pemasangan 1 m2 bekisting untuk kolom 3x pakai

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.6600 Err:504 Err:504
Tukang kayu L.02 OH 0.3300 Err:504 Err:504
Kepala tukang L.03 OH 0.0330 Err:504 Err:504
Mandor L.04 OH 0.0330 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Kayu kelas III M3 0.0141 #REF! #REF!
Paku 5 cm – 12 cm Kg 0.4000 #REF! #REF!
Minyak bekisting Ltr 0.2000 Err:504 Err:504
Balok kayu kelas II M3 0.0053 #REF! #REF!
Plywood tebal 9 Lbr 0.1269 #REF! #REF!
mm
Bambu  8- 10cm –panj 4 m Batang 0.8000 #REF! #REF!
10cm –panj 4 m JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.1.16b (K3) Pemasangan 1 m2 bekisting untuk balok 3x pakai

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.6600 Err:504 Err:504
Tukang kayu L.02 OH 0.3300 Err:504 Err:504
Kepala tukang L.03 OH 0.0330 Err:504 Err:504
Mandor L.04 OH 0.0330 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Kayu kelas III M3 0.0133 #REF! #REF!
Paku 5 cm – 12 cm Kg 0.4000 #REF! #REF!
Minyak bekisting Ltr 0.2000 Err:504 Err:504
Balok kayu kelas II M3 0.0060 #REF! #REF!
Plywood tebal 9 mm Lbr 0.1269 #REF! #REF!
Bambu  8- 10cm –panj 4 m Batang 0.7407 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.1.1.17b (K3) Pemasangan 1 m2 bekisting untuk lantai 3x pakai

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.6600 Err:504 Err:504
Tukang kayu L.02 OH 0.3300 Err:504 Err:504
Kepala tukang L.03 OH 0.0330 Err:504 Err:504
Mandor L.04 OH 0.0330 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Kayu kelas III M3 0.0143 #REF! #REF!
Paku 5 cm – 12 cm Kg 0.4000 #REF! #REF!
Minyak bekisting Ltr 0.2000 Err:504 Err:504
Balok kayu kelas II M3 0.0054 4,000,000.00 21,428.57
Plywood tebal 9 mm Lbr 0.1269 #REF! #REF!
Bambu  8- 10cm –panj 4 m
Batang 2.4000 #REF! #REF!
10cm –panj 4 m
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.1.18b (K3) Pemasangan 1 m2 bekisting untuk dinding 3x pakai

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.6600 Err:504 Err:504
Tukang kayu L.02 OH 0.3300 Err:504 Err:504
Kepala tukang L.03 OH 0.0330 Err:504 Err:504
Mandor L.04 OH 0.0330 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Kayu kelas III M3 0.0094 #REF! #REF!
Paku 5 cm – 12 cm Kg 0.4000 #REF! #REF!
Minyak bekisting Ltr 0.2000 Err:504 Err:504
Balok kayu kelas II M3 0.0063 4,000,000.00 25,000.00
Plywood tebal 9 mm Lbr 0.1269 #REF! #REF!
Bambu  8- 10cm –panj 4 m Batang #REF! #REF!
0.9091
10cm –panj 4 m
Penjaga jarak Buah 4.0000 -
bekisting/spacer JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.1.19b (K3) Pemasangan 1 m2 bekisting untuk tangga 3x pakai

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.6600 Err:504 Err:504
Tukang kayu L.02 OH 0.3300 Err:504 Err:504
Kepala tukang L.03 OH 0.0330 Err:504 Err:504
Mandor L.04 OH 0.0330 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Kayu kelas III M3 0.0107 #REF! #REF!
Paku 5 cm – 12 cm Kg 0.4000 #REF! #REF!
Minyak bekisting Ltr 0.1500 Err:504 Err:504
Balok kayu kelas II M3 0.0054 4,000,000.00 21,428.57
Plywood tebal 9 mm Lbr 0.1269 #REF! #REF!
Bambu  8- 10cm –panj 4 m
Batang 0.8000 #REF! #REF!
10cm –panj 4 m
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
A.4.2.1.1. Pemasangan 1 kg rangka kuda-kuda baja IWF

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.0600 Err:504 Err:504
Tukang las L.03 OH 0.0600 Err:504 Err:504
Kepala tukang L.03 OH 0.0060 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Besi baja IWF Kg 1.1500 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.8.4.9 HARGA SATUAN PEKERJAAN SOFTSCAPE
(Mengacu Analisa Harga Satuan Dinas PUPR Kabupaten Badung dan Gianyar )
A.8.4.9.01 Pek. 1 m3 Urugan tanah subur
Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.350 Err:504 Err:504
Mandor L.04 OH 0.023 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Tanah Urug Subur Tebal 15 cm M3 1.100 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.01a Pek. 1 m3 Pupuk Kompos


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.350 Err:504 Err:504
Mandor L.04 OH 0.023 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Pupuk Kandang / Kompos 1 Zak@ 0.012 m3 zak 86.273 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.02. Pek. 1 m2 Tanaman Rumput Jepang


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.030 Err:504 Err:504
Mandor L.04 OH 0.002 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Penanaman Rumput Jepang m2 1.050 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504
A.8.4.9.03 Pek. Tanaman Pandan Merah
Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.030 Err:504 Err:504
Mandor L.04 OH 0.002 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Tanaman Pandan Merah bh 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.04 Pek. Tanaman Jaburan Hijau


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.030 Err:504 Err:504
Mandor L.04 OH 0.002 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Tanaman Jaburan Hijau bh 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.05 Pek. Tanaman Jaburan Putih


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.030 Err:504 Err:504
Mandor L.04 OH 0.002 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Tanaman Jaburan Putih bh 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504
A.8.4.9.06. Pek. Tanaman Leli
Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.030 Err:504 Err:504
Mandor L.04 OH 0.002 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Tanaman Leli bh 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.07 Pek. Tanaman Sirih Belanda


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.030 Err:504 Err:504
Mandor L.04 OH 0.002 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Tanaman Sirih Belanda bh 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.08. Pek. Tanaman Rosalia


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.030 Err:504 Err:504
Mandor L.04 OH 0.002 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Tanaman Rosalia bh 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504
A.8.4.9.09. Pek. Tanaman Pandan Afrika
Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.030 Err:504 Err:504
Mandor L.04 OH 0.002 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Tanaman Pandan Afrika bh 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.10 Pek. Tanaman Pasok 1,5 m


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.030 Err:504 Err:504
Mandor L.04 OH 0.002 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Tanaman Pasok 1,5 m bh 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.11 Pek. Tanaman Andong 1 m


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.030 Err:504 Err:504
Mandor L.04 OH 0.002 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Tanaman Andong 1 m bh 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504
A.8.4.9.12 Pek. Tanaman Kembang Sepatu 1,5 m
Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.030 Err:504 Err:504
Mandor L.04 OH 0.002 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Tanaman Kembang Sepatu 1,5 m bh 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.13 Pek. Tanaman Puring 0,9 m


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.030 Err:504 Err:504
Mandor L.04 OH 0.002 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Puring Kirana bh 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.14 Pek. Tanaman Onje 1,2 m


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.030 Err:504 Err:504
Mandor L.04 OH 0.002 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Tanaman Onje 1,2 m bh 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504
A.8.4.9.15 Pek. Tanaman Soka 1 m
Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.030 Err:504 Err:504
Mandor L.04 OH 0.002 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Tanaman Soka 1 m bh 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.16 Pek. Tanaman Bunga Portulaca


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.030 Err:504 Err:504
Mandor L.04 OH 0.002 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Tanaman Bunga Portulaca bh 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.22. Pisang Karibia


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.08 Err:504 Err:504
Mandor L.04 OH 0.02 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Pisang Karibia bh 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504
A.8.4.9.23. Cortadera Selloana
Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.01 Err:504 Err:504
Mandor L.04 OH 0.01 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Cortadera Selloana bh 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.24. Bambusa Vulgaris (Bambu Kuning)


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.02 Err:504 Err:504
Mandor L.04 OH 0.02 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Bambusa Vulgaris (Bambu Kuning) bh 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.25. Calathea Lutea


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.02 Err:504 Err:504
Mandor L.04 OH 0.01 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Calathea Lutea bh 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504
A.8.4.9.26. Ruellia Brittoniana
Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.01 Err:504 Err:504
Mandor L.04 OH 0.01 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Ruellia Brittoniana bh 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.27. Lantana Camara


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.01 Err:504 Err:504
Mandor L.04 OH 0.01 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Lantana Camara bh 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.28. Pohon Pucuk Merah Tinggi 100 cm


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.24 Err:504 Err:504
Mandor L.04 OH 0.02 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Tanaman Pucuk Merah Tinggi 1 m bh 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504
A.8.4.9.29. Penanaman 1 polybag Le kwan yew
Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.02 Err:504 Err:504
Mandor L.04 OH 0.01 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Tanaman Le Kwan Yew polybag 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.30. Pohon Dolar


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.24 Err:504 Err:504
Mandor L.04 OH 0.01 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Pohon Dolar t= 2 - 3 cm bh 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.31. Penanaman 1 polybag Pohon Kaki Laba - Laba


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.02 Err:504 Err:504
Mandor L.04 OH 0.01 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Kaki Laba - Laba ( Ararea ) polybag 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504
A.8.4.9.32. Penanaman 1 polybag Pohon Corrymbousa Mini
Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.02 Err:504 Err:504
Mandor L.04 OH 0.01 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Corrymbousa Mini polybag 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.33. Penanaman 1 polybag Pohon Pangkas kuning


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.02 Err:504 Err:504
Mandor L.04 OH 0.01 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Pangkas Kuning polybag 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.34. Penanaman 1 polybag Pohon Kacang - kacangan


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.02 Err:504 Err:504
Mandor L.04 OH 0.01 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Kacang - Kacangan polybag 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504
A.8.4.9.35. Penanaman 1 rumpun Pohon Bambu Jakarta
Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.02 Err:504 Err:504
Mandor L.04 OH 0.01 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Bambu Jakarta rumpun 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.36. Penanaman 1 buah Pohon Puring Kirana


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.02 Err:504 Err:504
Mandor L.04 OH 0.01 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Puring Kirana phn 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.37. Penanaman 1 buah Pohon Puring Nuri


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.02 Err:504 Err:504
Mandor L.04 OH 0.01 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Puring Nuri phn 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504
A.8.4.9.38. Penanaman 1 buah Pohon Puring Bor merah
Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.02 Err:504 Err:504
Mandor L.04 OH 0.01 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Puring Bor Merah phn 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.39. Penanaman 1 buah Pohon Puring Bor Kuning


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.02 Err:504 Err:504
Mandor L.04 OH 0.01 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Puring Bor Kuning phn 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.40. Penanaman 1 buah Pohon Soka India


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.02 Err:504 Err:504
Mandor L.04 OH 0.01 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Soka India phn 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504
A.8.4.9.41. Penanaman 1 buah Pohon Walisongo
Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.02 Err:504 Err:504
Mandor L.04 OH 0.01 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Walisongo phn 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.42. Penanaman 1 buah Pohon Bougenville Variegata


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.02 Err:504 Err:504
Mandor L.04 OH 0.01 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Bougenville Variegata phn 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.43. Bunga Pukul Sembilan per polybag


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.02 Err:504 Err:504
Mandor L.04 OH 0.01 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Bunga Kembang Pukul Sembilan polybag 1.00 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504
A.8.4.9.48. Pek. 1 m2 Tanaman Rumput Mutiara
Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.030 Err:504 Err:504
Mandor L.04 OH 0.002 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Tanaman Rumput Mutiara m2 1.050 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.49 Penanaman 1 buah Pohon Santos Lemon Kuning


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.030 Err:504 Err:504
Mandor L.04 OH 0.002 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Santos Lemon Kuning bh 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.50 Penanaman 1 buah Pohon Santos Lemon Merah


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.030 Err:504 Err:504
Mandor L.04 OH 0.002 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Santos Lemon Merah bh 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504
A.8.4.9.51 Pek. Tempat Pot Bunga ( Pas. Bata Merah )
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 Err:504 Err:504
Tukang Batu L.02 OH 0.100 Err:504 Err:504
Kepala Tukang L.03 OH 0.01 Err:504 Err:504
Mandor L.04 OH 0.02 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Batu Bata Pasangan Kelas I Buah 70.000 Err:504 Err:504
Semen Portland Kg 6.500 Err:504 Err:504
Pasir Pasang M3 0.05 Err:504 Err:504
JUMLAH HARGA BAHAN Err:504
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.52 Pek. Perosotan Anak


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 Err:504 Err:504
Tukang L.03 OH 0.01 Err:504 Err:504
Mandor L.04 OH 0.02 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Perosotan Anak ( Bahan Serat Fiber Unit
Glass ) 3.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.53 Pek. Ayunan Anak

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

A TENAGA
Pekerja L.01 OH 0.300 Err:504 Err:504
Mandor L.04 OH 0.02 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Ayunan Anak Bahan Kayu Unit 2.500 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504
A.8.4.9.54 Pek. Plenter Box
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 Err:504 Err:504
Kepala Tukang L.03 OH 0.01 Err:504 Err:504
Mandor L.04 OH 0.02 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Planter Box Unit 1.000 Err:504 Err:504

JUMLAH HARGA BAHAN Err:504


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.8.4.9.55. Penanaman 1 bh Pohon Tabebuya T=2-3 m; DB= 10 cm


Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.30 Err:504 Err:504
Mandor L.04 OH 0.02 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Pohon Tabebuya T=2-3 m; DB= 10
Err:504 1.000 Err:504 Err:504
cm

JUMLAH HARGA BAHAN Err:504


C PERALATAN -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% Err:504
F Harga Satuan Pekerjaan (D+E) Err:504
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
A.4.5.2.1. Pemasangan 1 m2 atap genteng press mini Pejaten

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang kayu L.03 OH 0.0750 Err:504 Err:504
Kepala tukang L.11 OH 0.0075 Err:504 Err:504
Mandor L.15 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Genteng press mini Pejaten Buah 30.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 15%) 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.5.2.3. Pemasangan 1 m2 atap genteng Kodok Good Yaer

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang kayu L.03 OH 0.0750 Err:504 Err:504
Kepala tukang L.11 OH 0.0080 Err:504 Err:504
Mandor L.15 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Genteng Kodok Good year Buah 25.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 15%) 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.5.2.3b. Pemasangan 1 m2 atap genteng Kodok Lestari

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang kayu L.03 OH 0.0750 Err:504 Err:504
Kepala tukang L.11 OH 0.0080 Err:504 Err:504
Mandor L.15 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Genteng Kodok Lestari Buah 25.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 15%) 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.5.2.4. Pemasangan 1 m’ bubungan genteng press mini Pejaten

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.4000 Err:504 Err:504
Tukang kayu L.03 OH 0.2000 Err:504 Err:504
Kepala tukang L.11 OH 0.0200 Err:504 Err:504
Mandor L.15 OH 0.0020 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Genteng bubungan press mini Pejaten Buah 5.0000 #REF! #REF!
Semen Portland Kg 8.0000 #REF! #REF!
Pasir pasang M3 0.0320 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 15%) 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.5.2.6. Pemasangan 1 m’ bubung genteng Kodok goodyear

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.4000 Err:504 Err:504
Tukang kayu L.03 OH 0.2000 Err:504 Err:504
Kepala tukang L.11 OH 0.0200 Err:504 Err:504
Mandor L.15 OH 0.0020 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Genteng bubung Kodok Buah 5.0000 #REF! #REF!
Semen Portland Kg 8.0000 #REF! #REF!
Pasir pasang M3 0.0320 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 15%) 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.5.2.6b. Pemasangan 1 m’ bubung genteng Kodok lestari

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.4000 Err:504 Err:504
Tukang kayu L.03 OH 0.2000 Err:504 Err:504
Kepala tukang L.11 OH 0.0200 Err:504 Err:504
Mandor L.15 OH 0.0020 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Genteng bubung Kodok Buah 5.0000 #REF! #REF!
Semen Portland Kg 8.0000 #REF! #REF!
Pasir pasang M3 0.0320 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 15%) 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.5.2.7. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 1,80 m x 5 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.1400 Err:504 Err:504
Tukang kayu L.03 OH 0.0700 Err:504 Err:504
Kepala tukang L.11 OH 0.0070 Err:504 Err:504
Mandor L.15 OH 0.0070 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Asbes gel 92 x 250 Lmbr 0.7500 #REF! #REF!
Paku seng Kg 0.1200 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 15%) 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.5.2.9. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.2000 Err:504 Err:504
Tukang kayu L.03 OH 0.1000 Err:504 Err:504
Kepala tukang L.11 OH 0.0100 Err:504 Err:504
Mandor L.15 OH 0.0010 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Genteng metal Buah 1.3000 #REF! #REF!
Paku biasa ½”-1” Kg 0.2000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 15%) 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.5.2.10. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.2000 Err:504 Err:504
Tukang kayu L.03 OH 0.1000 Err:504 Err:504
Kepala tukang L.11 OH 0.0100 Err:504 Err:504
Mandor L.15 OH 0.0010 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Genteng metal Buah 2.0000 #REF! #REF!
Paku biasa ½”-1” Kg 0.2000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit (Contoh 15%) 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.6.1. HARGA SATUAN PEKERJAAN KAYU
A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I bengkirai

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 7.0000 Err:504 Err:504
Tukang kayu L.02 OH 21.0000 Err:504 Err:504
Kepala tukang L.03 OH 2.1000 Err:504 Err:504
Mandor L.04 OH 0.3500 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Balok kayu M3 1.1000 #REF! #REF!
Paku 10 cm Kg 1.2500 #REF! #REF!
Lem kayu Kg 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.2.Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III kamper

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 6.0000 Err:504 Err:504
Tukang kayu L.02 OH 18.0000 Err:504 Err:504
Kepala tukang L.03 OH 1.8000 Err:504 Err:504
Mandor L.04 OH 0.3000 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Balok kayu M3 1.2000 #REF! #REF!
Paku 10 cm Kg 1.2500 #REF! #REF!
Lem kayu Kg 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.3500 Err:504 Err:504
Tukang kayu L.02 OH 1.0500 Err:504 Err:504
Kepala tukang L.03 OH 0.1050 Err:504 Err:504
Mandor L.04 OH 0.0180 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Papan kayu M3 0.0400 #REF! #REF!
Paku 5 – 7 cm Kg 0.0500 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II kamper

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 1.0000 Err:504 Err:504
Tukang kayu L.02 OH 3.0000 Err:504 Err:504
Kepala tukang L.03 OH 0.3000 Err:504 Err:504
Mandor L.04 OH 0.0500 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Papan kayu M3 0.0400 #REF! #REF!
Lem kayu Kg 0.5000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II Kruing

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.8000 Err:504 Err:504
Tukang kayu L.02 OH 2.4000 Err:504 Err:504
Kepala tukang L.03 OH 0.2400 Err:504 Err:504
Mandor L.04 OH 0.0400 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Papan kayu kruing M3 0.0240 #REF! #REF!
Lem kayu Kg 0.3000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi, kayu kelas I atau II kamper

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 1.0000 Err:504 Err:504
Tukang kayu L.02 OH 3.0000 Err:504 Err:504
Kepala tukang L.03 OH 0.3000 Err:504 Err:504
Mandor L.04 OH 0.0500 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Papan kayu M3 0.0640 #REF! #REF!
Lem kayu Kg 0.5000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II kruing tertutup (lebar sampai 90 cm)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.7000 Err:504 Err:504
Tukang kayu L.02 OH 2.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.2100 Err:504 Err:504
Mandor L.04 OH 0.0350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Papan kayu M3 0.0250 #REF! #REF!
Paku 1 cm – 2,5 cm Kg 0.0300 #REF! #REF!
Lem kayu Kg 0.5000 #REF! #REF!
Plywood tebal 4 mm Lmbr 1.0000 #REF! #REF!
Ukuran (90 x 220) cm JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II kamper

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.8000 Err:504 Err:504
Tukang kayu L.02 OH 2.4000 Err:504 Err:504
Kepala tukang L.03 OH 0.2400 Err:504 Err:504
Mandor L.04 OH 0.0400 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Papan kayu M3 0.0256 #REF! #REF!
Paku 1 cm – 2,5 Kg 0.0300 #REF! #REF!
cm
Lem kayu Kg 0.5000 #REF! #REF!
Plywood 4 mm Lmbr 1.0000 #REF! #REF!
(90 x 220) cm JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II kamper

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.6700 Err:504 Err:504
Tukang kayu L.02 OH 2.0000 Err:504 Err:504
Kepala tukang L.03 OH 0.2000 Err:504 Err:504
Mandor L.04 OH 0.3350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Papan kayu M3 0.0600 #REF! #REF!
Paku 1 – 2,5 cm Kg 0.1500 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I kamper

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.8000 Err:504 Err:504
Tukang kayu L.02 OH 2.4000 Err:504 Err:504
Kepala tukang L.03 OH 0.2400 Err:504 Err:504
Mandor L.04 OH 0.0400 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Papan kayu M3 0.0250 0 #REF! #REF!
Paku 1 – 2,5 cm Kg 0.0300 #REF! #REF!
Lem kayu Kg 0.3000 #REF! #REF!
Teakwood 4 mm Lmbr 1.0000 #REF! #REF!
90 x 220 cm JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 4.0000 Err:504 Err:504
Tukang kayu L.02 OH 12.0000 Err:504 Err:504
Kepala tukang L.03 OH 1.2000 Err:504 Err:504
Mandor L.04 OH 0.2000 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Balok kayu M3 1.1000 #REF! #REF!
Besi strip tebal 5 Kg 15.0000 #REF! #REF!
mm
Paku 12 cm Kg 5.6000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I kamper

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 6.7000 Err:504 Err:504
Tukang kayu L.02 OH 20.1000 Err:504 Err:504
Kepala tukang L.03 OH 2.0100 Err:504 Err:504
Mandor L.04 OH 0.3350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Balok kayu M3 1.2000 #REF! #REF!
Besi strip tebal 5 Kg 15.0000 #REF! #REF!
mm
Paku 12 cm Kg 5.6000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II kamper

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 6.7000 Err:504 Err:504
Tukang kayu L.02 OH 20.1000 Err:504 Err:504
Kepala tukang L.03 OH 2.0100 Err:504 Err:504
Mandor L.04 OH 0.3350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Balok kayu M3 1.1000 #REF! #REF!
Besi strip tebal 5 Kg 15.0000 #REF! #REF!
mm
Paku 12 cm Kg 3.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Kaso-kaso 5 x 7cm M3 0.0140 #REF! #REF!
Reng 2 x 3 cm M3 0.0360 #REF! #REF!
Paku 5 dan 10 cm Kg 0.2500 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Kaso-kaso 5 x 7cm M3 0.0140 #REF! #REF!
Reng (3 x 4) cm Kg 0.0570 #REF! #REF!
Paku 5 dan 10 cm Kg 0.2500 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504
A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang kayu L.02 OH 0.3000 Err:504 Err:504
Kepala tukang L.03 OH 0.0300 Err:504 Err:504
Mandor L.04 OH 0.0750 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Kaso-kaso 5 x 7cm M3 0.0154 #REF! #REF!
Paku 7 cm – 10 cm Kg 0.2000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.20.Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III kamper

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.2000 Err:504 Err:504
Tukang kayu L.02 OH 0.3000 Err:504 Err:504
Kepala tukang L.03 OH 0.0300 Err:504 Err:504
Mandor L.04 OH 0.0100 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Kaso-kaso M3 0.0163 #REF! #REF!
5 x 7 cm
Paku 7 – 10 cm Kg 0.2500 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II kamper

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Papan kayu M3 0.0108 #REF! #REF!
Paku 5 dan 7 Kg 0.1000 #REF! #REF!
cm JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II kamper

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Papan kayu M3 0.0110 #REF! #REF!
Paku 5 dan 7 cm Kg 0.0500 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III Kamper

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.1500 Err:504 Err:504
Tukang kayu L.02 OH 0.4500 Err:504 Err:504
Kepala tukang L.03 OH 0.0450 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Balok kayu M3 0.0280 #REF! #REF!
Paku 5 dan 7 Kg 0.1500 #REF! #REF!
cm JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II kamper

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.2000 Err:504 Err:504
Tukang kayu L.02 OH 0.6000 Err:504 Err:504
Kepala tukang L.03 OH 0.0600 Err:504 Err:504
Mandor L.04 OH 0.0100 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Balok kayu, 6 x 12 M3 0.0280 #REF! #REF!
Paku 5 dan 10 Kg 0.1500 #REF! #REF!
Plywood 4 mm, Lmbr 0.8600 #REF! #REF!
120 xkayu
Lem 240 Kg 0.5600 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I kamper

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.6000 Err:504 Err:504
Tukang kayu L.02 OH 1.8000 Err:504 Err:504
Kepala tukang L.03 OH 0.1800 Err:504 Err:504
Mandor L.04 OH 0.0300 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Papan kayu M3 0.0070 #REF! #REF!
Paku 5 dan 10 Kg 0.1000 #REF! #REF!
Paku skrup 10 cm Kg 0.1500 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.0250 Err:504 Err:504
Tukang kayu L.02 OH 0.0750 Err:504 Err:504
Kepala tukang L.03 OH 0.0080 Err:504 Err:504
Mandor L.04 OH 0.0010 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Plywood 4 mm Lmbr 0.4000 #REF! #REF!
Paku 1 dan 2,5 Kg 0.0500 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.6.1.32. Pemasangan 1 m’ lisplank ukuran 3 x 10 cm, kayu kelas I atau kelas II kamper

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Papan kayu M3 0.0054 #REF! #REF!
Paku 5 dan 7 Kg 0.0500 #REF! #REF!
cm JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.33. Pemasangan 1 m’ lisplank ukuran 3 x 15 cm, kayu kelas I atau kelas II kamper

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Papan kayu M3 0.0055 #REF! #REF!
Paku 5 dan 7 Kg 0.0500 #REF! #REF!
cm JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.37.Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu Kruing

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 6.0000 Err:504 Err:504
Tukang kayu L.02 OH 18.0000 Err:504 Err:504
Kepala tukang L.03 OH 1.8000 Err:504 Err:504
Mandor L.04 OH 0.3000 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Balok kayu Kruing M3 1.2000 #REF! #REF!
Paku 10 cm Kg 1.2500 #REF! #REF!
Lem kayu Kg 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.6.1.38.Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu Seseh

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 6.0000 Err:504 Err:504
Tukang kayu L.02 OH 18.0000 Err:504 Err:504
Kepala tukang L.03 OH 1.8000 Err:504 Err:504
Mandor L.04 OH 0.3000 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Balok kayu Seseh M3 1.2000 #REF! #REF!
Paku 10 cm Kg 1.2500 #REF! #REF!
Lem kayu Kg 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.40.Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu Albesia

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 6.0000 Err:504 Err:504
Tukang kayu L.02 OH 18.0000 Err:504 Err:504
Kepala tukang L.03 OH 1.8000 Err:504 Err:504
Mandor L.04 OH 0.3000 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Balok kayu Albesia M3 1.2000 #REF! #REF!
Paku 10 cm Kg 1.2500 #REF! #REF!
Lem kayu Kg 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.41. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu Albesia

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 4.0000 Err:504 Err:504
Tukang kayu L.02 OH 12.0000 Err:504 Err:504
Kepala tukang L.03 OH 1.2000 Err:504 Err:504
Mandor L.04 OH 0.2000 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Balok kayu Albesia M3 1.1000 #REF! #REF!
Besi strip tebal 5 Kg 15.0000 #REF! #REF!
mm
Paku 12 cm Kg 5.6000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.6.1.42. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu Seseh bentang 6 meter

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 4.0000 Err:504 Err:504
Tukang kayu L.02 OH 12.0000 Err:504 Err:504
Kepala tukang L.03 OH 1.2000 Err:504 Err:504
Mandor L.04 OH 0.2000 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Balok kayu M3 1.1000 #REF! #REF!
Besi strip tebal 5 Kg 15.0000 #REF! #REF!
mm
Paku 12 cm Kg 5.6000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.43. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu Lokal bentang 6 meter


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 4.0000 Err:504 Err:504
Tukang kayu L.02 OH 12.0000 Err:504 Err:504
Kepala tukang L.03 OH 1.2000 Err:504 Err:504
Mandor L.04 OH 0.2000 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Balok kayu M3 1.1000 #REF! #REF!
Besi strip tebal 5 Kg 15.0000 #REF! #REF!
mm
Paku 12 cm Kg 5.6000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.45. Pemasangan 1 m3 konstruksi gordeng, kayu Albesia

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 6.7000 Err:504 Err:504
Tukang kayu L.02 OH 20.1000 Err:504 Err:504
Kepala tukang L.03 OH 2.0100 Err:504 Err:504
Mandor L.04 OH 0.3350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Balok kayu M3 1.1000 #REF! #REF!
Besi strip tebal 5 Kg 15.0000 #REF! #REF!
mm
Paku 12 cm Kg 3.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504
A.4.6.1.46. Pemasangan 1 m3 konstruksi gordeng, kayu Seseh

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 6.7000 Err:504 Err:504
Tukang kayu L.02 OH 20.1000 Err:504 Err:504
Kepala tukang L.03 OH 2.0100 Err:504 Err:504
Mandor L.04 OH 0.3350 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Balok kayu M3 1.1000 #REF! #REF!
Besi strip tebal 5 Kg 15.0000 #REF! #REF!
mm
Paku 12 cm Kg 3.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.4.6.1.47. Pemasangan 1 m2 rangka atap genteng press mini pejaten, kayu Albesia reng Kruing

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Kaso-kaso 4 x 6cm M3 0.0096 #REF! #REF!
Reng 2 x 3 cm M3 0.0036 #REF! #REF!
Paku 5 dan 10 cm Kg 0.2500 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504

A.4.6.1.48. Pemasangan 1 m2 rangka atap genteng press mini ex pejaten, kayu Lokal reng Kruing

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Kaso-kaso 5 x 7cm M3 0.0140 #REF! #REF!
Reng 2 x 3 cm M3 0.0036 #REF! #REF!
Paku 5 dan 10 cm Kg 0.2500 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) Err:504


E Overhead & Profit 10% x D Err:504
F Harga Satuan Pekerjaan (D+E) Err:504
A.4.6.1.49. Pemasangan 1 m’ lisplank ukuran 2 x 12 cm, kayu Meranti
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Papan kayu M3 0.0024 #REF! #REF!
Paku 5 dan 7 Kg 0.0500 #REF! #REF!
cm JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.50. Pemasangan 1 m’ lisplank ukuran 3 x 15 cm, kayu Albesia


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Papan kayu M3 0.0055 #REF! #REF!
Paku 5 dan 7 Kg 0.0500 #REF! #REF!
cm JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.51. Pemasangan 1 m’ lisplank ukuran 3 x 15 cm, kayu Lokal

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Papan kayu M3 0.0055 #REF! #REF!
Paku 5 dan 7 Kg 0.0500 #REF! #REF!
cm JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.6.1.53. Pemasangan 1 m’ Tatab ukuran 2 x 7 cm, kayu Meranti
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Papan kayu M3 0.0014 #REF! #REF!
Paku 5 dan 7 Kg 0.0500 #REF! #REF!
cm JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.6.1. HARGA PEKERJAAN PEMASANGAN KEMBALI

A.4.6.1.44 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu lama

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.0000 Err:504 Err:504
Tukang kayu L.02 OH 12.0000 Err:504 Err:504
Kepala tukang L.03 OH 1.2000 Err:504 Err:504
Mandor L.04 OH 0.2000 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Paku 12 cm Kg 5.6000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.48. Pemasangan kembali 1 m2 Usuk Lama


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 Err:504 Err:504
Tukang kayu L.02 OH 0.0500 Err:504 Err:504
Kepala tukang L.03 OH 0.0050 Err:504 Err:504
Mandor L.04 OH 0.0025 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Paku 5 - 12 cm Kg 0.1250 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1.52. Pemasangan Kembali 1 m’ lisplank kayu lama


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN

Paku 5 dan 7 cm Kg 0.0500 #REF! #REF!


JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.6.1.54 .Pemasangan kembali 1 m’ Tatab kayu lama
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN

Paku 5 dan 7 Kg 0.0500 #REF! #REF!


JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA
A.4.6.2.1. Pemasangan 1 buah kunci Pintu

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA KERJA
Pekerja L.01 OH 0.0100 Err:504 Err:504
Tukang kayu L.02 OH 0.5000 Err:504 Err:504
Kepala tukang L.03 OH 0.0500 Err:504 Err:504
Mandor L.04 OH 0.0050 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Kunci Pintu Set 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.2.2. Pemasangan 1 buah engsel pintu

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Tukang kayu L.02 OH 0.1500 Err:504 Err:504
Kepala tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0008 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Engsel pintu Buah 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.2.2.a Pemasangan 1 buah engsel pintu

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Tukang kayu L.02 OH 0.1500 Err:504 Err:504
Kepala tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0008 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Engsel pintu Buah 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.6.2.2.b Pemasangan 1 buah engsel pintu Tipe H 80x50

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Tukang kayu L.02 OH 0.1500 Err:504 Err:504
Kepala tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0008 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Engsel pintu Buah 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.2.3. Pemasangan 1 buah engsel jendela

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.0100 Err:504 Err:504
Tukang kayu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L.04 OH 0.0005 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Engsel Jendela Buah 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.2.3.a Pemasangan 1 buah engsel jendela

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.0100 Err:504 Err:504
Tukang kayu L.02 OH 0.1000 Err:504 Err:504
Kepala tukang L.03 OH 0.0100 Err:504 Err:504
Mandor L.04 OH 0.0005 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Engsel Jendela Buah 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.6.2.4. Pemasangan 1 buah engsel angin

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.1000 Err:504 Err:504
Tukang kayu L.02 OH 0.2000 Err:504 Err:504
Kepala tukang L.03 OH 0.0200 Err:504 Err:504
Mandor L.04 OH 0.0005 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Engsel angin Buah 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.2.5. Pemasangan 1 buah Grendel

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Tukang kayu L.02 OH 0.1500 Err:504 Err:504
Kepala tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Grendel Esbella Buah 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.2.6. Pemasangan 1 buah kait angin

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Tukang kayu L.02 OH 0.1500 Err:504 Err:504
Kepala tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Kait angin Buah 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.6.2.11. Pemasangan 1 m rel pintu sorong

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.0600 Err:504 Err:504
Tukang kayu L.02 OH 0.6000 Err:504 Err:504
Kepala tukang L.03 OH 0.0600 Err:504 Err:504
Mandor L.04 OH 0.0030 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Rel pintu sorong M 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.2.12. Pemasangan 1 m2 kaca tebal 3 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Tukang kayu L.02 OH 0.1500 Err:504 Err:504
Kepala tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0008 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Kaca tebal 3 mm M2 1.1000 #REF! #REF!
Sealant Kg 0.0500 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.6.2.13. Pemasangan 1 m2 kaca tebal 5 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Tukang kayu L.02 OH 0.1500 Err:504 Err:504
Kepala tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0008 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Kaca tebal 5 mm M2 1.1000 #REF! #REF!
Sealant Kg 0.0500 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.2.15. Pemasangan 1 m2 kaca cermin tebal 5 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Tukang kayu L.02 OH 0.1500 Err:504 Err:504
Kepala tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0080 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Kaca cermin 5 mm M2 1.1000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.2.16. Pemasangan 1 buah Pintu PVC

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.0150 Err:504 Err:504
Tukang kayu L.02 OH 0.1500 Err:504 Err:504
Kepala tukang L.03 OH 0.0150 Err:504 Err:504
Mandor L.04 OH 0.0008 Err:504 Err:504
JUMLAH TENAGA KERJA Err:504
B BAHAN
Pintu PVC Buah 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!