The document is a schedule of reinforced concrete columns and beams including their sizes, reinforcement details, and spacing of stirrups. It includes beam and column marks, sizes, bottom and top reinforcement, and specifications for number and spacing of stirrups and ties.

Uploaded by

Niraj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views1 page

G+3 Home

The document is a schedule of reinforced concrete columns and beams including their sizes, reinforcement details, and spacing of stirrups. It includes beam and column marks, sizes, bottom and top reinforcement, and specifications for number and spacing of stirrups and ties.

Uploaded by

Niraj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

2' - 3" RCC SECOND FLOOR CEILING BEAM SCHEDULE (Fe500.

M25) SCHEDULE OF RCC COLUMNS (M25,Fe500)


0' - 5 1/2"
140 690
EXTRA BARS AT SUPPORT STIRRUPS
1 2 3 COLUMN MARKS FC6 FC7 FC8 FC9
17' - 7 1/2" 5' - 3" 2' - 5 1/2" BEAM BEAM SIZE AT SUPPORT REST
MARK TYPE (MM) BOTTOM TOP TOP EXTRA (TE1/TE2)
0' - 6 1/2" 5372 1605 747 BOTTOM TOP COLUMN SIZE 230 x 230
FULL FULL (LEFT/RIGHT HAND
165 CURT. CURT.
SUPPORT)
2' - 0"

3B01 3B02 DIA SPACING DIA SPACING


608

REINFORCEMENT 4-T12+2-T16

3B01 B2 230 X 400 2-T16 + 1-T12 - 2-T16 + 1-T12 - 2-T16 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN TIES T8 AT 150 C/C

3B15A
(100 IN CONFINING ZONE)
230 X 400 2-T16 + 1-T12 - 2-T16 + 1-T12 - 2-T16
D 3B02 B1 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
230
5' - 6 1/2" 5' - 6 1/2" 6' - 3 1/2" 4' - 9" 3B03 C1 230 X 375 3-T16 3-T16 2-T16 + 1-T12 - 2-T16 8T 100 C/C- 10 NOS FROM SUPP 8T 100 C/C- REST AT MID SPAN

1687 1687 A 1922 1452 3B04 B1 230 X 300 3-T12 - 3-T12 - 2-T16 8T 100 C/C- 10 NOS FROM SUPP 8T 100 C/C- REST AT MID SPAN

SB

SB

SB
3B05 B1 230 X 400 2-T16 + 1-T12 - 2-T16 + 1-T12 - 2-T16 8T 100 C/C- 10 NOS FROM SUPP 8T 100 C/C- REST AT MID SPAN

3B17
8' - 4 1/2"

230
2554

3B10

3B06 B1 230 X 400 3-T16 + 2-T12 - 2-T16 + 1-T12 - 2-T16 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN

B
3B07 A1 230 X 400 3-T12 - 3-T12 - 2-T16 8T 100 C/C- 10 NOS FROM SUPP 8T 100 C/C- REST AT MID SPAN
S1
C
3B08 A1 230 X 400 2-T16+1-T12 - 2-T16 + 1-T12 - 2-T16 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN

3B03 TIES DESIGN


3B09 D 230 X 400 2-T16+1-T12 - 2-T16 + 1-T12 - - 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
C
3B10 B1 230 X 400 2-T16 + 1-T12 - 2-T16 + 1-T12 - 2-T16 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
3' - 1 1/2"

B
3B13
947

3B11 B1 230 X 400 3-T16+2-T12 2-T16 + 1-T12 - 2-T16 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN

3B18
FC6 3B04 FC7
3B12 B1 230 X 400 2-T16+1-T12 - 2-T16 + 1-T12 - 2-T16 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN LEGEND
A 3-T12 3-T12
3B13 B1 230 X 400 - 2-T16 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN COLUMN BELOW
4' - 3 1/2"

1307

S1

0' - 5 1/2"
9" 2-T16 + 1-T12
3B14

C
B 3B14 B1 230 X 400 2-T16+1-T12 - - 2-T16 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
230 COLUMN ABOVE(FLOATING)

138
S6.0
3B15 B1 230 X 400 2-T16+1-T12 - 2-T16 + 1-T12 - 2-T16 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
3B05 3B06 COLUMN BELOW TO CLOSE
B 3B15A B1 230 X 400 2-T16+1-T12 - 2-T16 + 1-T12 - 2-T16 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
3B11

FC8
A 3B16 B2 230 X 400 2-T16+1-T12 - 2-T16 + 1-T12 - 2-T16 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
S6.0
3B17 B2 230 X 400 2-T16 + 1-T12 - 2-T16 + 1-T12 - 2-T16 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
A
3B18 B1 230 X 400 2-T16 + 1-T12 2-T16 2-T16 + 1-T12 - 2-T16 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN

3B19
3B15
11' - 4 1/2"

3B19 C 230 X 400 2-T16+1-T12 - 2-T16 + 1-T12 - - 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
B
3461

SB

SB

6' - 0" 6' - 3" 5' - 9" 3B20 B1 230 X 400 2-T16+1-T12 - 2-T16 + 1-T12 - - 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
1830 1904 1757 - 3-T12 -
SB D 230 X 150 3-T12 - 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN

C
S2 9"
230
3B07 3B08 FC9
A
REINF AS PER SCHED. FC8
REINF AS PER SCHED.
B
5' - 3 1/2"

A
1609

9"
0' - 10 1/2"

3B20

S1 230
3B12

3B16
267

3B09 BEAM 3B06


FC7
1' - 3 1/2"

BEAM 3B18
395

2' - 7" 2' - 7" 2' - 7"


9' - 9" 3' - 5 1/2" 4' - 0" 7' - 4"
787 787 787
2973 1051 1218 2230

SECOND FLOOR CEILING SLAB FLOATING COLUMN SECTION A FLOATING COLUMN DETAIL B
1 1 : 40
A 1 : 15
B 1 : 15
SCHEDULE OF RCC SLAB ON FIRST FLOOR LEVEL (M25,Fe415)

REINFORCEMENT
SLAB SLAB
MARK THICKNESS
ALONG LONG SPAN ALONG SHORT SPAN EXTRA TOP TYPE OF
(mm) A B C SLAB
FULL LENGTH FULL LENGTH L/4

S1 150 T8 @ 125 C/C T8 @ 125 C/C T8 @ 150 C/C ONE-WAY

S2 150 T8 @ 125 C/C T8 @ 125 C/C T8 @ 150 C/C TWO-WAY

TITLE: SECOND FLOOR CEILING SLAB

JOB NAME: G+3 RESIDENTIAL BUILDING

LOCATION: VADODARA

ARCHITECT:

CONSULTANTS:

DATE:
01/29/24
DRAWING NO:

S6.0