0% found this document useful (0 votes)
71 views1 page

G+1 Bungalow, Bakrawadi

Uploaded by

Niraj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views1 page

G+1 Bungalow, Bakrawadi

Uploaded by

Niraj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6

6' - 1 1/2" (1867) 13' - 6 1/2" (4127) 14' - 10 1/2" (4534) 5' - 9" (1753) 5' - 9 1/2" (1765) 9' - 11 1/2" (3036) 9' - 6 3/4" (2914)

BARS IN SPAN EXTRA BARS AT SUPPORT STIRRUPS


BEAM BEAM SIZE TOP EXTRA (TE1/TE2) AT SUPPORT REST
MARK TYPE BOTTOM BOTTOM TOP TOP (LEFT/RIGHT HAND
FULL CURT. FULL CURT. SUPPORT) DIA SPACING DIA SPACING
7' - 2 7/8" (2205)
1B01 A1 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
1B02 A1 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
1B03 D 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
1B04 B1 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - - 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
1B01 1B02
1B05 B2 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
F 1B06 D 9" X 12" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
1B07 D 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - - 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
6' - 2 3/4" (1898)

1B03 1B08 D 9" X 12" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN

3' - 0 7/8" (936)


1B08A D 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - - 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
5' - 0" (1524) 3' - 9 3/4" (1161)

1B27A
1B09 A1 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN

9' - 4"
1B04 1B05 1B10 B1 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN

E 1B11
1B12
B2
B1
9" X 16"
9" X 16"
2-T16 + 1-T12
2-T16 + 1-T12
-
-
1-T16+2-T12
1-T16+2-T12
-
-
2-T12
-
8T
8T
100 C/C- 10 NOS FROM SUPP
100 C/C- 10 NOS FROM SUPP
8T
8T
150 C/C- REST AT MID SPAN
150 C/C- REST AT MID SPAN
1B20

1B22

1B25

6' - 0" (1829)


S1 1B12A B2 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - - 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
BEAM

5' - 3"
1B13 B1 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12
8' - 3 3/4" (2534)

BOTTOM 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
1B06 1B07
S2 1B13A B2 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
S1
1B14 D 9" X 12" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN

4' - 5 1/2"
1B08 1B08A
FC3 FC3 1B15 A1 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN

2' - 6 1/8" (764)

2' - 11 1/4"
1B27
1B16 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12

6' - 9"
S2 A1 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN

1B30
1B09 1B10 1B11 1B17 B1 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
3' - 8 1/2" (1129)
D 1B18 B2 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN

1B32
1B19 B1 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
4' - 5" (1347)

S2
1B20 A1 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
SB
S1 1B21 A1 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - - 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
1B12 1B12A 1B22 A1 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
C 5' - 0" 8' - 4 1/2" 5' - 0"
1B23 A1 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - - 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
1B24 D 9" X 12" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN

6' - 3 1/8" (1910)


S1 1B25 B1 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN

1B33
S1 S1 1B26 B2 9" X 12" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
S2
1B21

1B23

1B24

1B26
1B27 B1 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - - 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
12' - 1 1/2" (3695)

1B27A B2 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
1B13 FC4 1B13A
1B28 B2 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
1B28A B1 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN

1B28
1B14

1B31
1B29 B1 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
S1
S1 1B30 A1 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN

1B34
1B31 A1 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN

1B29
1B32 D 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN

S1 1B33 D 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
1B15 1B16
B 1B34 D 9" X 16" 2-T16 + 1-T12 - 1-T16+2-T12 - 2-T12 8T 100 C/C- 10 NOS FROM SUPP 8T 150 C/C- REST AT MID SPAN
3' - 0" (914)

1B28A
1B17 1B18 1B19
A LEGEND

COL ABOVE AND BELOW

COL BELOW TO BE CLOSED

GROUND FLOOR CEILING SLAB LAYOUT (EL= +12' - 0") COL ABOVE (FLOATING)
1
1/4" = 1'-0"

SCHEDULE OF RCC SLAB (M25,Fe500)

REINFORCEMENT

SLAB SLAB BOTTOM REINF TOP REINF


MARK THICKNESS
ALONG LONG SPAN ALONG SHORT SPAN b c TYPE
(mm) a FULL LENGTH OVER CONTINOUS
FULL LENGTH (DIST STEEL FOR ONE WAY SLAB) SUPPORT

S1 150 T10 @ 125 C/C T10 @ 125 C/C T8 @ 300 C/C TWO WAY

S2 150 T10 @ 125 C/C T10 @ 125 C/C T8 @ 300 C/C ONE WAY