0% found this document useful (0 votes)
51 views1 page

1162-Plot A-Layout & Schedule of First Floor

Uploaded by

gokulan.p
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views1 page

1162-Plot A-Layout & Schedule of First Floor

Uploaded by

gokulan.p
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NOTES

C1 C2 C3 600
0 # REFER ARCHITECTURAL DRAWINGS PLAN, SECTION & ELEVATION.
60 BEAM SCHEDULE FIRST FLOOR ALONG WITH THIS DRAWING.

EXTRA TOP # THIS DRAWING IS NOT TO BE SCALED.


600 FLOOR LVL. SIZE BOTTOM STIRRUPS
BEAM BOTTOM CURTAIL STEEL TOP STEEL AT SUPPORT REMARK # BUILDING IS DESIGNED FOR SLIT+3 FLOOR+
A 60
0 NUMBERS
B D
STEEL EXTRA STEEL
LEFT RIGHT DIA. LEFT MID RIGHT TERRACE FLOOR(NO PROVISION)
# USE MIX M:25 & Fe500 STEEL
# " T " INDICATES TOR STEEL
EXTRA TOP STEEL
AT SUPPORT
TOP STEEL B
L1/4
C4

Ld+10Ø
STIRRUPS AT A SPACING STIRRUPS AS PER SCHEDULE 0
60 150THK. SLAB
OF 100MM UPTO D 2ND LANDING LVL.
C5 C6 300

Ld+10Ø 300 300 BEAM


BOTTOM STEEL
COLUMN
BOTTOM CURTAIL STEEL
0
L1 60
C8 600

C7 TYPICAL DETAIL OF BEAM


BEAM RESTING ON COLUMN & BEAM
SECTION THROUGH THIRD FLIGHT
C9
600
0
C11 60
C10
2ND LANDING LVL.
C13
C12 150THK. SLAB

1ST LANDING LVL.


0
60
0
600 60
A
C14 TOP STEEL TOP STEEL ADJACENT BEAM
C15 C16 C17 Eq. Eq.
SECTION THROUGH SECOND FLIGHT

D
600 6
L 0 0
BOTTOM STEEL
C18 C20 BOTTOM STEEL COLUMN 1ST LANDING LVL.
C19 C21
60
0

TYPICAL DETAIL OF CANTILEVER BEAM


60
LAYOUT OF FIRST FLOOR 60
0 0

(PLOT- A)
60
150THK. SLAB 0
FLOOR LVL.

2T16
1T12
SECTION THROUGH FIRST FLIGHT
(EXTRA TOP STEEL )
4T16
C1 (EXTRA TOP STEEL ) 2T16
(TOP STEEL ) 950 2T16 C2
2T16 (TOP STEEL )
L1/4 (TOP STEEL ) (TOP STEEL )
300

L1/3 L2/3
LEGENDS:-
600

600
400

300 Ld. Ld. TOILET 200 SUNK


300

1T16 BALCONY & UTILITY 150 SUNK


2T20 2T16
300 (CURTAIL STEEL)
2T16 (BOTTOM STEEL ) (BOTTOM STEEL )
(BOTTOM STEEL ) L1

8T @100-150-100 C/C STIRRUPS

TYPICAL LONGITUDINAL SECTION FOR - B1


1T16
1T16 1T16 (EXTRA TOP STEEL )
(EXTRA TOP STEEL ) 2 T 12 (EXTRA TOP STEEL ) 2T12
C18
L1/4
(TOP STEEL ) 2 T 12 C14
L1/4
(TOP STEEL ) A TOP STEEL B FIRST FLOOR
(TOP STEEL ) SLAB SCHEDULE KEY PLAN KEY SECTION
Ld+10Ø

L1/3
L2/3 SLAB SHORT SPAN STEEL LONG SPAN STEEL REMARK
NOTE THICK.
NUMBERS
600

600

STIRRUPS AS PER SCHEDULE


Ld+10Ø

Ld+10Ø Ld.
400

Ld.
300
BEAM
300 300
2T16+1T12 2T16 BOTTOM STEEL R0 23/11/2023 FOR APPROVAL
(BOTTOM STEEL ) (BOTTOM STEEL ) COLUMN REVISION DATE DESCRIPTION SIGN.
L1 L1
DRG. TITLE :-
8T @100-150-100 C/C STIRRUPS
LAYOUT OF FIRST FLOOR
TYPICAL DETAIL OF BEAM (PLOT- A)
BEAM RESTING ON BEAMS
TYPICAL LONGITUDINAL SECTION FOR - B20 PROJECT :-

PROPOSED RESIDENCE PROJECT @ CHENNAI


A STEEL ALONG LONG SPAN
B STEEL ALONG LONG SPAN
C STEEL ALONG LONG SPAN
D
DISTRIBUTION L1/4 L2/4 DISTRIBUTION L2/4 L3/4
DISTRIBUTION 300 150 SUNK 300

ARCHITECT :-

BEAM BEAM BEAM BEAM


STEEL ALONG SHORT SPAN STEEL ALONG SHORT SPAN STEEL ALONG SHORT SPAN
ALT. BAR BENT UP ALT. BAR BENT UP ALT. BAR BENT UP
L1/7 L1/5 L2/5 L2/5 L3/5 L3/7
L1 L2 L3

CLIENT :-
TYPICAL SECTION ONE WAY SLAB ---
TYPICAL DETAIL FOR SLAB (SPAN <1.2M)
DRAWN BY :- CHECKED BY :- SCALE :-
A B C D SAGAR T.S.P./S.S.S. 1:100
DRG. NO. REVISION DATE
EXTRA TOP STEEL TOP STEEL EXTRA TOP STEEL EXTRA TOP STEEL TOP STEEL EXTRA TOP STEEL EXTRA TOP STEEL TOP STEEL EXTRA TOP STEEL 2 T 12 2T20 1162/PLOT-A/05 *R0 23/11/2023
2 T 16
(TOP STEEL ) 2 T 16 (EXTRA TOP STEEL )
AT SUPPORT AT SUPPORT AT SUPPORT AT SUPPORT AT SUPPORT AT SUPPORT C17 (TOP STEEL )
L1/4 L1/3 L2/3 L2/3 L3/3 L3/4 L1/3 Ld+10Ø 2T20 (TOP STEEL )
L1/3
C11 L2/3 DESIGNAGE CONSULTING STRUCTURAL ENGINEERS.
(EXTRA TOP STEEL ) 2 T 16
Ld+10Ø
Ld+10Ø

L1/3 (TOP STEEL )


STIRRUPS AT A SPACING STIRRUPS AS STIRRUPS AT A SPACING STIRRUPS AT A SPACING STIRRUPS AS STIRRUPS AT A SPACING STIRRUPS AT A SPACING STIRRUPS AS STIRRUPS AT A SPACING
600

600

600
OF 100MM UPTO D PER SCHEDULE OF 100MM UPTO D OF 100MM UPTO D PER SCHEDULE OF 100MM UPTO D OF 100MM UPTO D PER SCHEDULE OF 100MM UPTO D
Ld. 400 Ld.
Ld
Ld+10Ø 300 300 300 300 300 300
BOTTOM STEEL BOTTOM STEEL BOTTOM STEEL
COLUMN COLUMN COLUMN COLUMN 2T20 2T16 300
BOTTOM CURTAIL STEEL BOTTOM CURTAIL STEEL BOTTOM CURTAIL STEEL 2T20 2T20
(BOTTOM STEEL ) (CURTAIL STEEL)
(BOTTOM STEEL ) (BOTTOM STEEL )
L1 L2 L3 L1
10T @100-150-100 C/C STIRRUPS

TYPICAL DETAIL OF CONTINUOUS BEAM LONGITUDINAL SECTION FOR BEAM - B43