JSW Steel Coke Oven Plant Consent Renewal
JSW Steel Coke Oven Plant Consent Renewal
JSW STEEL LIMITED - COKE OVEN PLANT II (3 MTPA) BATTERY A,B,C,D)/CO/UAN No.MPCB-
Page 1 of 18
CONSENT-0000155156/Indus-Id.218 (22-08-2023 05:49:00 pm) /QMS.PO6_F02/00
Sr Maximum
Product UOM
No Quantity
2 Coke Oven Gas 150000 m3/hr
3 Tar 131386 MT/A
4 Sulphur 8500 MT/A
5 Crude Benzene , Toluene, Xylene 37248 MT/A
6 Carbon Black Oil / Pitch 104756 MT/A
7 Anthracite / Heavy Oil 7666 MT/A
8 Light Oil 3832 MT/A
9 Three Mix Oil 25550 MT/A
JSW STEEL LIMITED - COKE OVEN PLANT II (3 MTPA) BATTERY A,B,C,D)/CO/UAN No.MPCB-
Page 2 of 18
CONSENT-0000155156/Indus-Id.218 (22-08-2023 05:49:00 pm) /QMS.PO6_F02/00
6. Non-Hazardous Wastes:
Sr
Type of Waste Quantity UoM Treatment Disposal
No
Coal and Coke Dust
100% Recycled in Sinter
1 From De-dusting 30000 MT/A Recycle
& Blast Furnace
system
100% Recycled in Sinter
2 Coke Breeze 147436 MT/A Recycle
& Blast Furnace
7. Conditions under Hazardous & Other Wastes (M & T M) Rules 2016 for
Collection, Segregation, Storage, Transportation, Treatment and Disposal of
hazardous waste:
Sr Category
Quantity UoM Treatment Disposal
No No./ Type
Sale to MPCB Sale to MPCB
5.1 Used or
1 60000 Ltr/A authorized recycler/re- authorized recycler/re-
spent oil
processor / CHWTSDF processor / CHWTSDF
Sale to MPCB Sale to MPCB
29.5 Spent
2 32 MT/A authorized recycler/re- authorized recycler/re-
catalysts
processor / CHWTSDF processor / CHWTSDF
35.3
Chemical
sludge Pre-processing / Co- Pre-processing / Co-
3 450 MT/A
from waste processing / CHWTSDF processing / CHWTSDF
water
treatment
13.4
Decanter 100% recycle for coke
4 312.5 MT/A Recycle
tank tar making
sludge
5.2 Wastes
Incineration / Use as Incineration / Use as
or residues
5 450 Kg/Annum Fuel in Furnace / Fuel in Furnace /
containing
CHWTSDF CHWTSDF
oil
8. Conditions under Batteries (Management & Handling) Rules, 2001:
Sr
Type of Waste Quantity UoM Disposal Path
No
Sale to Send back to Original Manufacturer
1 Waste Batteries 2500.00 Nos./Y
/ MPCB authorized recycler/re-processor
JSW STEEL LIMITED - COKE OVEN PLANT II (3 MTPA) BATTERY A,B,C,D)/CO/UAN No.MPCB-
Page 3 of 18
CONSENT-0000155156/Indus-Id.218 (22-08-2023 05:49:00 pm) /QMS.PO6_F02/00
9. Conditions under Plastic Waste Management Rules, 2016 (Notification dtd.
18/03/2016):
Sr No Type of Waste Quantity UoM Disposal Path
Sale to MPCB authorized recycler/re-
1 Plastic Waste 5.00 MT/A
processor
10. Conditions under E-Waste Management:
Sr No Type of Waste Quantity UoM Disposal Path
Send to MPCB Authorized recycler / re-
1 E-Waste 25.00 MT/A
processor
11. The Board reserves the right to review, amend, suspend, revoke this consent and the
same shall be binding on the industry.
12. This consent should not be construed as exemption from obtaining necessary NOC/
permission from any other Government authorities.
13. Industry shall comply with the EIA notification, dtd. 14.09.2006 and Amendments
thereto and consent shall treat as cancelled if industry violates the same.
14. The PP shall comply with the conditions of the Environmental Clearance granted vide
letter No. J-11011/76/2003-IA II (I) dtd. 25.08.2015 and IA-J-11011/497/2017-IA.II(I) dtd.
01.02.2018, Environmental Clearance conditions vide no. F.No.J-11011/76/2013-IA-II(I)
dtd. 16.06.2020 and amendment dtd. 22.11.2021 and amendment thereof if any.
15. PP shall carry out season Environmental monitoring of the project to assess the impact
of the project on the surrounding environment.
16. PP shall provide Fogging Cannons and required APC system in the area to suppress
fugitive emissions and do needful to improve the Ambient Air Quality.
17. This consent shall be consider cancelled if industry violates the various environmental
laws, rules and regulations.
18. This consent is issued in pursuance to the clarification issued by MCZMA, GoM vide
letter dtd. 31.10.2017 & 22.06.2022.
19. PP shall obtain permission from CRZ authority regarding disposal of effluent into the
creek and Industry shall comply with the CRZ Notification 2011 and as amended time
to time.
20. Industry shall carryout carrying capacity of the area from recognized renowned
institute like NEERI / IIT with one year as industry is having various units in the said
premises under the integrated steel plant & submit the report to the Board.
21. PP shall provide CDQ system within 3 months.
22. PP shall provide monitoring system for Benzo (a) Pyrene (BaP) parameter.
23. PP shall submit upgradation plan for control of fugitive emission generated from coke
oven battery section, coke pushing in coke oven and during quenching operation
within one month period.
24. PP shall implement the recommendations mentioned in the Corporate Responsibility
for Environmental Protection (CREP) of CPCB issued for the steel plants included coke
oven plant.
25. This consent is issued without prejudice to order passed / to be passed by Hon'ble High
Court, Mumbai & Hon'ble NGT and Hon'ble NGT in the matter of Original Application
No. 165/2020.
JSW STEEL LIMITED - COKE OVEN PLANT II (3 MTPA) BATTERY A,B,C,D)/CO/UAN No.MPCB-
Page 4 of 18
CONSENT-0000155156/Indus-Id.218 (22-08-2023 05:49:00 pm) /QMS.PO6_F02/00
26. PP shall install Online Continuous Monitoring System (OCMS) as per CPCB guidelines &
data to be transmitted directly from data logger to MPCB and CPCB server.
27. Industry shall comply with guidelines of MoEF & CC, issued vide OM No.
Q-18011/54/2018-CPA ,dated 10/09/2018.
28. Industry shall comply with comply with the order / judgement passed by Hon'ble
Supreme Court of India, Delhi in WP no. 13029/1985 on 24/03/2023.
29. Industry shall comply with Notification of Ministry of Commerce & Industry Department
of Commerce Directorate General of Foreign Trade vide no. 10/2023, dated 02/06/2023
regarding amendment in import policy condition 6 ( Pet Coke) under chapter 27 of
schedule-1 ( Import policy) of ITC (HS) 2022.
. This consent is issued as per communication letter dated 03/11/2022 which is
approved by competent authority of the board.
JSW STEEL LIMITED - COKE OVEN PLANT II (3 MTPA) BATTERY A,B,C,D)/CO/UAN No.MPCB-
Page 5 of 18
CONSENT-0000155156/Indus-Id.218 (22-08-2023 05:49:00 pm) /QMS.PO6_F02/00
SCHEDULE-I
Terms & conditions for compliance of Water Pollution Control:
1) A] As per your application you have combined Effluent Treatment Pant (ETP)
for treatment for Coke Oven Battery A & B and C & D of capacity 8400
CMD Consisting of Biological Oxidation Dephenolization (BOD) Plant
which consist of Pre-treatment including oil separation pool and air
flotation pool, the second stage is biological treatment stage including
anaerobic pool, anoxia pool and aerobic pool.
B] The Applicant shall operate the effluent treatment plant (ETP) to treat
the trade effluent so as to achieve the following standards prescribed by
the Board or under EP Act, 1986 and Rules made there under from time
to time, whichever is stringent.
JSW STEEL LIMITED - COKE OVEN PLANT II (3 MTPA) BATTERY A,B,C,D)/CO/UAN No.MPCB-
Page 6 of 18
CONSENT-0000155156/Indus-Id.218 (22-08-2023 05:49:00 pm) /QMS.PO6_F02/00
2) A] Sewage Effluent Treatment: The applicant shall send overflow of septic
tank and soak pit to Sewage Treatment Plant (STP) for treatment of
sewage, as comprehensive treatment system as is warranted with
reference to influent quality and operate and maintain the same
continuously so as to achieve the quality of treated effluent to the
following standards.
B] The Applicant shall operate the sewage treatment system to treat the
sewage so as to achieve the following standards/ prescribed under EP
Act, 1986 and Rules made there under from time to time, whichever is
stringent.
JSW STEEL LIMITED - COKE OVEN PLANT II (3 MTPA) BATTERY A,B,C,D)/CO/UAN No.MPCB-
Page 7 of 18
CONSENT-0000155156/Indus-Id.218 (22-08-2023 05:49:00 pm) /QMS.PO6_F02/00
SCHEDULE-II
Terms & conditions for compliance of Air Pollution Control:
1) As per your application, you have provided the Air pollution control (APC)
system and erected following stack(s) and observe the following fuel
pattern-
Height
Stack Stack Attached APC Type of Quantity
in S% SO2
No. To System Fuel & UoM
Mtrs.
COG-4725
Coke Oven Battery Natural NM3/hr & BF 212464
S-1 150 0.00 0.00
A&B Draft gas 67500 Kg/Hr
NM3/Hr
Coke Oven battery
S-3 Bag Filter 40 NA 0 --NA-- 0.00 0.00
Pushing Side AB
Coke Oven battery
S-5 Bag Filter 40 NA 0 --NA-- 0.00 0.00
Charging Side AB
COAL CRUSHING
S-7 DE-DUSTING Bag Filter 20 NA 0 --NA-- 0.00 0.00
STACK (A,B,C& D)
COKE OVEN COKE
CUTTING
S-8 Bag Filter 25 NA 0 --NA-- 0.00 0.00
DEDUSTING STACK
(A,B,C,D)
COKE OVEN COKE
BUNKER
S-9 Bag Filter 30 NA 0 --NA-- 0.00 0.00
DEDUSTING STACK
(A,B,C,D)
COKE OVEN
BOILER STACK
S-10 Stack 80 GAS 4400 2200 Kg/Hr 0.00 0.00
(A,B,C & D)
NM3/HR
FLARE STACK (A, B,
S-11 Stack 80 NA 0 --NA-- 0.00 0.00
C & D)
CDQ-2 De-dusting
S-12 Bag Filter 30 DRY AIR 0 --NA-- 0.00 0.00
System
CDQ-3 De-dusting
S-13 Bag Filter 30 DRY AIR 0 --NA-- 0.00 0.00
System
Coke Oven battery
S-4 Bag Filter 40 NA 0 --NA-- 0.00 0.00
Pushing Side CD
Coke Oven battery
S-6 Bag Filter 40 NA 0 --NA-- 0.00 0.00
Charging Side CD
COG-4725
Coke Oven Battery Natural NM3/hr & BF 212464
S-2 150 0.00 0.00
C&D Draft gas 67500 Kg/Hr
NM3/Hr
(As per previous consent of existing unit.)
JSW STEEL LIMITED - COKE OVEN PLANT II (3 MTPA) BATTERY A,B,C,D)/CO/UAN No.MPCB-
Page 8 of 18
CONSENT-0000155156/Indus-Id.218 (22-08-2023 05:49:00 pm) /QMS.PO6_F02/00
2) The Applicant shall provide Specific Air Pollution control equipments as per
the conditions of EP Act, 1986 and rule made there under from time to time/
Environmental Clearance / CREP guidelines.
A1. Coke Oven Battery - Emission
Particulate Matter (PM) 50 mg/Nm3
SO2 500 mg/Nm3
NOx 500 mg/Nm3
A2. Coke Oven - Visible Fugitive emission: PLD, PLL & PLO, %
Leakage from doors - Percent Leaking Doors 5(PLD) 5
Leakage from charging lids -Percent Leaking Lids (PLL) 1
Leakage from AP covers - Percent Leaking Off takes (PLO) 2
Leakage from doors - Percent Leaking Doors (PLD)* 1
Leakage from charging lids -(Percent Leaking Lids (PLL) NA
Leakage from AP covers - Percent Leaking Off takes (PLO) NA
A3. Coke Oven - Fugitive emission: Charging emission duration, seconds
BP Recovery type - top charging 30
BP Recovery type - stamp charging 50
Non-Recovery type 30
A4. Coke Oven - Fugitive emission: Benzo-a-Pyrene
Top of the coke oven battery 5 µg/m3
Other areas of coke oven plant 2 µg/m3
3) The internal roads shall be cement concrete and shall be maintained with
adequate green belt.
4) The industry shall not cause any nuisance in surrounding area.
5) Industry shall install 24*7 online continuous emission monitoring system at
process stack to monitor stack emissions as per CPCB guidelines and it’s
connectivity to CPCB & MPCB Servers. PP shall Calibrate these system from
time to time according to equipment supplier specification through labs
recognized under Environment (Protection) Act, 1986 or NABL accredited
laboratories.
6) A) Control Equipment
1. Coal Handling Plant shall be provided with dust collector, complete dust
extraction arrangement automatic water sprinkling with fog nozzles shall be
provided wherever necessary for dust suppression. The following shall be
taken care as follows
JSW STEEL LIMITED - COKE OVEN PLANT II (3 MTPA) BATTERY A,B,C,D)/CO/UAN No.MPCB-
Page 9 of 18
CONSENT-0000155156/Indus-Id.218 (22-08-2023 05:49:00 pm) /QMS.PO6_F02/00
1. Dust generation points machinery will be covered by hoods.
2. Spraying of water as necessary at working area, dump area, stock piles
etc
3. Coal shall be properly covered during transportation.
4. The applicant shall carry out tree plantation along road side.
5. Black topping metalled/tarred/MBF slag mixed cement roads shall be
provided and well maintained to prevent dust formation.
6. Overloading of dumpers shall be avoided to prevent spillages.
The fugitive emissions level of suspended particulate matter (SPM) should not
exceed 2000 µg/m3.The applicant shall install de-dusting system at the following
locations & monitor the fugitive emissions levels and submit report to the board
monthly.
a. The existing industry shall comply with the standard of 2000 ug/m3
Fugitive emission shall be monitored at a distance 10 meters from the
b.
source of fugitive emissions as per following.
Sr.
Area Monitoring Location
No.
Raw material Wagon tippler, Screen area, Transfer Points, Stock
1.
handling area Bin area.
2. Crusher area Crushing plant, vibrating screen, transfer points.
Raw material feed Feeder area, Mixing area, transfer points, days
3.
area bins
Cooler discharge
4. Over size discharge area, Transfer points.
area
Intermediate stock bin area. Vibrating screens,
Product processing Magnetic Separation unit. Transfer Points, Over
5.
area Size discharge area, Product separation area,
Bagging area, hoppers/storage bins.
D) Other Conditions
JSW STEEL LIMITED - COKE OVEN PLANT II (3 MTPA) BATTERY A,B,C,D)/CO/UAN No.MPCB-
Page 10 of 18
CONSENT-0000155156/Indus-Id.218 (22-08-2023 05:49:00 pm) /QMS.PO6_F02/00
3. The factory authorities shall install a separate meter showing the
consumption of energy for operation of domestic and industrial effluent
treatment plants. The quarterly returns of the energy consumption shall be
submitted to Board Office under intimation to respective Regional & sub-
Regional Officer on each 10th of January, April, July & October.
4. The firm shall provided continuous flow meter for the measurement of flow
of the effluent.
5. The firm shall carry out tree plantation along road side, around dumps or
compulsory a forestation as per the proposal approved by Forests
Department. The tree plantation programme shall be taken up well in
advance of the actual mining activity, so that green belt of sufficient width &
height is developed between mining area /road and surrounding area.
6. The industry shall not cause any nuisance in surrounding area.
7. The industry shall monitor stack emissions & ambient air quality regularly.
8. Coal handling plant shall be provided with Dust Collector, complete dust
extraction arrangement and Automatic Water Sprinkler with fog nozzles
shall be provided where necessary for dust- suppression. Dust generation
points / machinery shall be covered by hoods.
9. Dust collector of sufficient capacity provided to coal crusher, pulverizers &
all sources of dust emission shall be operated properly.
10. Spraying of water on all working area, dump area, stock piles.
11. Coal shall be properly covered during transportation.
12. Black topper metalled roads shall be provided and well maintained to
prevent dust formation.
13. Overloading of dumpers shall be avoided to prevent spillage.
14. Water of Water mixed chemical shall be sprayed at all strategic coal transfer
points such as conveyors, loading unloading points etc. As far as practically
possible conveyors, transfer points etc, shall be provide with enclosures.
15. The crushers/pulverizers of the coal washery shall be provided with
enclosures, fitted with suitable air pollution control measures and finally
emitted through a stack of minimum height of 30 m, conforming particulate
emission standard of 150mg/Nm3 or provided with adequate water
sprinkling arrangement
16. Water sprinkling by using the fine atomizer nozzles arrangement shall be
provided on the coal heaps and on land around the crusher/pulverizers
17. Area, in and around the coal washery shall be pucca either asphalted or
concreted.
JSW STEEL LIMITED - COKE OVEN PLANT II (3 MTPA) BATTERY A,B,C,D)/CO/UAN No.MPCB-
Page 11 of 18
CONSENT-0000155156/Indus-Id.218 (22-08-2023 05:49:00 pm) /QMS.PO6_F02/00
E) Raw Material handling and Preparation
F) Extensive plantation/ Green belt shall be developed along the roads and
boundary line of the industry.
G) Stack, effluent, fugitive emission, noise monitoring shall be done as per CPCB
regulation and MPCB’s consent conditions.
JSW STEEL LIMITED - COKE OVEN PLANT II (3 MTPA) BATTERY A,B,C,D)/CO/UAN No.MPCB-
Page 12 of 18
CONSENT-0000155156/Indus-Id.218 (22-08-2023 05:49:00 pm) /QMS.PO6_F02/00
SCHEDULE-III
Details of Bank Guarantees:
Consent
Sr. Amt of
(C2E/ Submission Compliance Validity
No BG Purpose of BG
C2O Period Period Date
. Imposed
/C2R)
Compliance of consent
conditions and
Operation &
Rs. 25 maintenance of
1 C to O 15 days Continuous 30.06.2028
Lakh pollution control
system & to achieve
consented prescribed
standards
Towards compliance of
Rs. 50 conditions stipulated in
2 C to O 15 days Continuous 30.06.2028
Lakh Environmental
Clearance
Towards operation and
maintenance of
Rs. 10 pollution control
3 C to O 15 days Continuous 30.06.2028
Lakh systems and
compliance of consent
conditions
BG Forfeiture History
Amount of Amount of Reason of
Consent Submission Purpose
Srno. BG BG BG
(C2E/C2O/C2R) Period of BG
imposed Forfeiture Forfeiture
NA
BG Return details
Srno. Consent (C2E/C2O/C2R) BG imposed Purpose of BG Amount of BG Returned
NA
JSW STEEL LIMITED - COKE OVEN PLANT II (3 MTPA) BATTERY A,B,C,D)/CO/UAN No.MPCB-
Page 13 of 18
CONSENT-0000155156/Indus-Id.218 (22-08-2023 05:49:00 pm) /QMS.PO6_F02/00
SCHEDULE-IV
General Conditions:
1. The waste generator shall.-
a) take steps to minimize generation of plastic waste and segregate plastic waste at source
in accordance with the Plastic Waste Management Rules, 2016 or as amended from time
to time.
b) not litter the plastic waste and ensure segregated storage of waste at source and
handover segregated waste to urban local body or gram panchayat or agencies
appointed by them or registered waste pickers’, registered recyclers or waste collection
agencies;
2. All institutional generators of plastic waste, shall segregate and store the waste generated
by them in accordance with the Plastic Waste Management Rules, 2016 amendment from
time to time and handover segregated wastes to authorized waste processing or disposal
facilities or deposition centers either on its own or through the authorized waste collection
agency.
3. All waste generators shall pay such user fee or charge as may be specified in the byelaws of
the local bodies for plastic waste management such as waste collection or operation of the
facility thereof, etc.;
4. Every person responsible for organizing an event in open space, which involves service of
food stuff in plastic or multilayered packaging shall segregate and manage the waste
generated during such events in accordance with the Plastic Waste Management Rules,
2016 amendment from time to time.
5. Consumers or bulk consumers of electrical and electronic equipment listed in Schedule I
shall ensure that e-waste generated by them is channelised through collection centre or
dealer of authorised producer or dismantler or recycler or through the designated take back
service provider of the producer to authorised dismantler or recycler
6. Bulk consumers of electrical and electronic equipment listed in Schedule I shall maintain
records of e-waste generated by them in Form-2 and make such records available for
scrutiny by the concerned State Pollution Control Board
7. Consumers or bulk consumers of electrical and electronic equipment listed in Schedule I
shall ensure that such end-of-life electrical and electronic equipment are not admixed with
e-waste containing radioactive material as covered under the provisions of the Atomic
Energy Act, 1962 (33 of 1962) and rules made there under;
8. Bulk consumers of electrical and electronic equipment listed in Schedule I shall file annual
returns in Form-3, to the concerned State Pollution Control Board on or before the 30th day
of June following the financial year to which that return relates. In case of the bulk consumer
with multiple offices in a State, one annual return combining information from all the offices
shall be filed to the concerned State Pollution Control Board on or before the 30th day of
June following the financial year to which that return relates.
JSW STEEL LIMITED - COKE OVEN PLANT II (3 MTPA) BATTERY A,B,C,D)/CO/UAN No.MPCB-
Page 14 of 18
CONSENT-0000155156/Indus-Id.218 (22-08-2023 05:49:00 pm) /QMS.PO6_F02/00
9. Specific Conditions for storage, Handling and Disposal of Waste from Electrical &
Electronic equipment (WEEE):
1. Collection of WEEE - The applicant must provide appropriate and dedicated
vehicles duly identified as per the norms for transportation of Hazardous Waste.
The applicant shall obtain all the required permits for transportation of WEEE
from competent authority. The applicant shall ensure the safe transport of the
WEEE without any spillage during transportation.
Storage for disassembled parts: The applicant must provide appropriate
storage for disassembled spare parts from WEEE. Some spare parts (e.g. motors
and compressors) will contain oil and/or other fluids. Such part must be
appropriately segregated and stored in containers that are secured such that oil
and other fluids cannot escape from them. These containers must be stored on
an area with an area with an impermeable surface and a sealed drainage system.
2. Storage for other components and residues:Other components and residues
arising from the treatment of WEEE will need to be contained following their
removal for disposal or recovery. Where they contain hazardous substances they
should be stored on impermeable surface and in appropriate containers or bays
with weatherproof covering. Containers should be clearly labelled to identify their
contents and must be secured so that liquids, including rain water cannot enter
them. Components should be segregated having regard to their eventual
destinations and the compatibility of the component types. All batteries should be
handled and stored having regard to the potential fire risk associated with team.
3. Balances : WEEE Guidelines also requires that sites for handling of WEEE have
“balances to measure the weight of the segregated waste’. The objective is to
ensure that a record of weights can be maintained of WEEE entering a facility and
components and materials leaving each site (together with their destinations).
The nature of the weighing equipment should be appropriate for the type and
quantity of WEEE being processed.
4. Plastic, which cannot be recycled and is hazardous in nature, is recommended to
be land filled in nearby CHWTSDF.
5. Ferrous and nonferrous metal recycling facilities fall under the purview of existing
environmental regulations for air, water, noise, land and soil pollution and
generation of hazardous waste and the same should be followed.
6. CFCS should be either reused or incinerated in common hazardous waste
Incineration facilities at CHWTSDF.
7. Waste Oil should be either reused or incinerated in common hazardous waste
incineration facilities.
8. PCB's containing capacitors shall be incinerated in common hazardous waste
incineration facilities at CHWTSDF.
9. Mercury recovery and lead recycling facilities from batteries fall under the
Hazardous & Other Wastes (M & TM) Rules, 2016.
10. Existing environmental regulations for air; water; noise, land and soil pollution
and generation of hazardous waste and the same should be followed. In case
Mercury or lead recovery is very low, they can be temporarily stored at e-waste
recycling facility and later disposed in TSDF.
11. The industry shall maintain records of the e-waste purchased, processed in
Form-2 and shall file annual returns of its activities of previous year in Form-3 as
per Rules 11(9) & 13(3)(vii) of the E-Waste(M) Rules, 2016; on or before 30th day
of June of every year.
10. The Energy source for lighting purpose shall preferably be LED based
JSW STEEL LIMITED - COKE OVEN PLANT II (3 MTPA) BATTERY A,B,C,D)/CO/UAN No.MPCB-
Page 15 of 18
CONSENT-0000155156/Indus-Id.218 (22-08-2023 05:49:00 pm) /QMS.PO6_F02/00
11. The PP shall harvest rainwater from roof tops of the buildings and storm water drains to
recharge the ground water and utilize the same for different industrial applications within
the plant
12. Conditions for D.G. Set
a) Noise from the D.G. Set should be controlled by providing an acoustic enclosure or by
treating the room acoustically.
b) Industry should provide acoustic enclosure for control of noise. The acoustic enclosure/
acoustic treatment of the room should be designed for minimum 25 dB (A) insertion loss
or for meeting the ambient noise standards, whichever is on higher side. A suitable
exhaust muffler with insertion loss of 25 dB (A) shall also be provided. The measurement
of insertion loss will be done at different points at 0.5 meters from acoustic
enclosure/room and then average.
c) Industry should make efforts to bring down noise level due to DG set, outside industrial
premises, within ambient noise requirements by proper sitting and control measures.
d) Installation of DG Set must be strictly in compliance with recommendations of DG Set
manufacturer.
e) A proper routine and preventive maintenance procedure for DG set should be set and
followed in consultation with the DG manufacturer which would help to prevent noise
levels of DG set from deteriorating with use.
f) D.G. Set shall be operated only in case of power failure.
g) The applicant should not cause any nuisance in the surrounding area due to operation of
D.G. Set.
h) The applicant shall comply with the notification of MoEFCC, India on Environment
(Protection) second Amendment Rules vide GSR 371(E) dated 17.05.2002 and its
amendments regarding noise limit for generator sets run with diesel.
13. The applicant shall maintain good housekeeping.
14. The non-hazardous solid waste arising in the factory premises, sweepings, etc. be disposed
of scientifically so as not to cause any nuisance / pollution. The applicant shall take
necessary permissions from civic authorities for disposal of solid waste.
15. The applicant shall not change or alter the quantity, quality, the rate of discharge,
temperature or the mode of the effluent/emissions or hazardous wastes or control
equipments provided for without previous written permission of the Board. The industry will
not carry out any activity, for which this consent has not been granted/without prior consent
of the Board.
16. The industry shall ensure that fugitive emissions from the activity are controlled so as to
maintain clean and safe environment in and around the factory premises.
17. The industry shall submit quarterly statement in respect of industries obligation towards
consent and pollution control compliance's duly supported with documentary evidences
(format can downloaded from MPCB official site).
18. The industry shall submit official e-mail address and any change will be duly informed to the
MPCB.
19. The industry shall achieve the National Ambient Air Quality standards prescribed vide
Government of India, Notification No. B-29016/20/90/PCI-L dated. 18.11.2009 as amended.
20. The Board reserves its rights to review plans, specifications or other data relating to plant
setup for the treatment of waterworks for the purification thereof & the system for the
disposal of sewage or trade effluent or in connection with the grant of any consent
conditions. The Applicant shall obtain prior consent of the Board to take steps to establish
the unit or establish any treatment and disposal system or an extension or addition thereto.
21. The industry shall ensure replacement of pollution control system or its parts after expiry of
its expected life as defined by manufacturer so as to ensure the compliance of standards
and safety of the operation thereof.
22. The PP shall provide personal protection equipment as per norms of Factory Act
JSW STEEL LIMITED - COKE OVEN PLANT II (3 MTPA) BATTERY A,B,C,D)/CO/UAN No.MPCB-
Page 16 of 18
CONSENT-0000155156/Indus-Id.218 (22-08-2023 05:49:00 pm) /QMS.PO6_F02/00
23. Industry should monitor effluent quality, stack emissions and ambient air quality
monthly/quarterly.
24. Whenever due to any accident or other unforeseen act or even, such emissions occur
or is apprehended to occur in excess of standards laid down, such information shall be
forthwith Reported to Board, concerned Police Station, office of Directorate of Health
Services, Department of Explosives, Inspectorate of Factories and Local Body. In case
of failure of pollution control equipments, the production process connected to it shall
be stopped.
25. The applicant shall provide an alternate electric power source sufficient to operate all
pollution control facilities installed to maintain compliance with the terms and
conditions of the consent. In the absence, the applicant shall stop, reduce or otherwise,
control production to abide by terms and conditions of this consent.
26. The industry shall recycle/reprocess/reuse/recover Hazardous Waste as per the
provision contain in the Hazardous and Other Wastes (M & TM) Rules 2016, which can
be recycled /processed /reused /recovered and only waste which has to be incinerated
shall go to incineration and waste which can be used for land filling and cannot be
recycled/reprocessed etc. should go for that purpose, in order to reduce load on
incineration and landfill site/environment.
27. An inspection book shall be opened and made available to the Board?s officers during
their visit to the applicant.
28. Industry shall strictly comply with the Water (P&CP) Act, 1974, Air (P&CP) Act, 1981
and Environmental Protection Act, 1986 and industry specific standard under EP Rules
1986 which are available on MPCB website (www.mpcb.gov.in).
29. Separate drainage system shall be provided for collection of trade and sewage
effluents. Terminal manholes shall be provided at the end of the collection system with
arrangement for measuring the flow. No effluent shall be admitted in the pipes/sewers
downstream of the terminal manholes. No effluent shall find its way other than in
designed and provided collection system.
30. Neither storm water nor discharge from other premises shall be allowed to mix with
the effluents from the factory.
31. The industry should not cause any nuisance in surrounding area.
32. The industry shall take adequate measures for control of noise levels from its own
sources within the premises so as to maintain ambient air quality standard in respect
of noise to less than 75 dB (A) during day time and 70 dB (A) during night time. Day
time is reckoned in between 6 a.m. and 10 p.m. and night time is reckoned between
10 p.m. and 6 a.m.
33. The industry shall create the Environmental Cell by appointing an Environmental
Engineer, Chemist and Agriculture expert for looking after day to day activities related
to Environment and irrigation field where treated effluent is used for irrigation.
34. The applicant shall provide ports in the chimney/(s) and facilities such as ladder,
platform etc. for monitoring the air emissions and the same shall be open for
inspection to/and for use of the Board?s Staff. The chimney(s) vents attached to
various sources of emission shall be designated by numbers such as S-1, S-2, etc. and
these shall be painted/ displayed to facilitate identification.
35. The industry should comply with the Hazardous and Other Wastes (M & TM) Rules,
2016 and submit the Annual Returns as per Rule 6(5) & 20(2) of Hazardous and Other
Wastes (M & TM) Rules, 2016 for the preceding year April to March in Form-IV by 30th
June of every year.
JSW STEEL LIMITED - COKE OVEN PLANT II (3 MTPA) BATTERY A,B,C,D)/CO/UAN No.MPCB-
Page 17 of 18
CONSENT-0000155156/Indus-Id.218 (22-08-2023 05:49:00 pm) /QMS.PO6_F02/00
36. The applicant shall install a separate meter showing the consumption of energy for
operation of domestic and industrial effluent treatment plants and air pollution control
system. A register showing consumption of chemicals used for treatment shall be
maintained.
37. The applicant shall bring minimum 33% of the available open land under green
coverage/ plantation. The applicant shall submit a yearly statement by 30th
September every year on available open plot area, number of trees surviving as on
31st March of the year and number of trees planted by September end.
38. The Board reserves its rights to review plans, specifications or other data relating to
plant setup for the treatment of waterworks for the purification thereof & the system
for the disposal of sewage or trade effluent or in connection with the grant of any
consent conditions.
39. The firm shall submit to this office, the 30th day of September every year, the
Environment Statement Report for the financial year ending 31st March in the
prescribed FORM-V as per the provisions of Rule 14 of the Environment (Protection)
(second Amendment) Rules, 1992.
40. The Applicant shall obtain necessary prior permission for providing additional control
equipment with necessary specifications and operation thereof or alteration or
replacement/alteration well before its life come to an end or erection of new pollution
control equipment.
41. The Board reserves its rights to vary all or any of the condition in the consent, if due to
any technological improvement or otherwise such variation (including the change of
any control equipment, other in whole or in part is necessary).
42. The applicant shall provide facility for collection of environmental samples and
samples of trade and sewage effluents, air emissions and hazardous waste to the
Board staff at the terminal or designated points and shall pay to the Board for the
services rendered in this behalf.
43. Whenever due to any accident or gas leakage or other unforeseen act or even, such
emission occur or is apprehended to occur in excess of standards laid down, such
information shall be forthwith Reported to Collector, Directorate of industry, Safety and
Health, Police Station, fire Brigade, Directorate of Health services, Department of
Explosives, Board and local Body the production process should be stopped by taking
all necessary safety measures. Industry shall also monitor the emission and ensure
that the emission do not cause any harm or nuisance in the surrounding. The industry
should not restart the process without the permission of the Board and other statutory
organization as require under the law.
44. The Industry shall comply with E-waste (Management) Rules, 2016.
45. The Industry shall comply with Batteries (Management and Handling) Rules, 2001.
46. Industry shall comply the provisions of Maharashtra Plastic and Thermocol Items
notification, 2018 and amendments thereto.
47. Industry shall comply the provisions of Plastic Waste Management Rules, 2016 and
amendments thereto.
JSW STEEL LIMITED - COKE OVEN PLANT II (3 MTPA) BATTERY A,B,C,D)/CO/UAN No.MPCB-
Page 18 of 18
CONSENT-0000155156/Indus-Id.218 (22-08-2023 05:49:00 pm) /QMS.PO6_F02/00