0% found this document useful (0 votes)
54 views16 pages

Technology Symposium EPRI Enabling Transmission Asset Management Analytics

Uploaded by

sunnysenator
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views16 pages

Technology Symposium EPRI Enabling Transmission Asset Management Analytics

Uploaded by

sunnysenator
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

Enabling Transmission

Asset Management
Analytics

Bhavin Desai
Senior Program Manager
T&D Asset Management Analytics
[email protected]
704.804.1188
© 2018 Electric Power Research Institute, Inc. All rights reserved.
Power Deliver Asset Management

Effective Use of Resources to Create Value

 **“a structured, integrated series of processes aligned with business goals and values and designed to minimize the life-cycle
costs and maximize the life cycle benefits of asset ownership, while providing required performance levels and sustaining the
system forward”
2
**Source: EPRI Guidelines for Power Delivery Asset Management (1010728) © 2018 Electric Power Research Institute, Inc. All rights reserved.
Data Based Actionable Intelligence
Advanced knowledge, technologies, and tools to enable utilities to make
informed decisions regarding the asset life-cycle

Industry focal point for collaboratively sharing


asset data to make better decisions
Acquire Maintain

Asset Analytic algorithms and visualization for


Lifecycle assets

Dispose Operate
Asset management framework, metrics and
implementation guidelines

3
© 2018 Electric Power Research Institute, Inc. All rights reserved.
Industrywide T&S Asset Performance And Failure Database
At a Glance – as of June 2018
Asset In-service Records Removed from Service* Total Number of Records Number of Utilities

Connector** 127 127 20


Glass/Porcelain Insulator 8,600 8,600 45
Line Arrester 59 59 6
Polymer Insulator 1,368 1,368 83
Bushing 67 67 7
Circuit Breaker** 61,340 12,101 73,441 12
Station Arrester 36 36 5
Transformer** 58,224 8,129 66,353 36
Extruded Cable** 17 17 11
Extruded Joint** 8 8 5
Extruded Termination** 15 15 10
Wood Poles** 2,038,254 6
Disconnect Switches 7,911 2,004 9,915 2
CCVTs 9,459 1,084 10,543 4
Conductor 2,814 131 2,945 6

*Failure, Impending Failure, Type Issue, Upgrade, Assessment


**A portion of these records are being processed
4
© 2018 Electric Power Research Institute, Inc. All rights reserved.
System where members can view and
store their failure information Compare performance with aggregate

Online System –
idb.epri.com

Ability to make selections using filters

5
© 2018 Electric Power Research Institute, Inc. All rights reserved.
Advanced Analytics Using Industry wide Equipment Failure And Performance Data (Sparse Data Analysis)

UTT Main Load Tap


Plot Legend Bushing Unknown Other
RMT Body Changer
550
LR-65
TC-525 100%
T 90%
MB 80%
LR-72
70%
60%
TLH-21
TLS
LR-48 50%
TLH 40%
LR-68 30%
LRT-200
20%
10%
V2a
UVT
RMV 0%

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016
0 2000 4000 6000 8000 10000

Typical Gas Values – Performance Assessment – by Design, Failures by Component


Transformers And Tap Changers Sub-Components and Problems

Plot Legend In-Service Failures

In-service Failed
50
45
1. Transformers 40
35

MEDIAN AGE
30
2. Tap Changers and Bushings 25
20
15
3. Circuit Breakers 10
5
0
4. Insulators

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016
5. Wood Poles Relative Performance By
Age Profile (Demographics)
Manufacturers

6
© 2018 Electric Power Research Institute, Inc. All rights reserved.
Power Transformer Expert System (PTX)
Measurements Basis for Asset Management Decisions
• DGA
• Oil Quality
• Furans
• Routine Electrical
• LTC DGA & Oil
Quality
• LTC Operation EPRI
Count PTX
Algorithms
(Rule-based)
Design
Information
• Manufacturer
• Vintage
• Nameplate Data
Transformer
Readily Belief & Likelihood of Fault Fleet Risks –
Available Data Conditions Present Short Term/Long
Term

Integrates decades of expert knowledge in a rule-based framework.


7
© 2018 Electric Power Research Institute, Inc. All rights reserved.
PTX Deployment History

28

15

Utilities That Utilities That Utilities That


Integrated Perform Use EPRI To
with IT Periodic Implement
Systems Desktop
Analysis

8
© 2018 Electric Power Research Institute, Inc. All rights reserved.
Operating Spare Transformer Requirement
Assessment
Substation 1 Substation 2 Substation 3

 Development and application of simulation based


model to different transformer groups (e.g. 250 MVA
230/115 kV) to evaluate current spare stocking levels.
Transformers In Different
Positions

Value Time, Cost, Risk

 Independent assessment of spare levels provides


0.20
validation of utility’ internal spares assessment Spares In Storage
0.18
methodology
0.16

 Provide Technical Basis For Justifying Higher Spare 0.14

Levels

Probability
0.12
Storage Location 1 Storage Location 2

PROBABILITY
0.10

Status 0.08

 Currently implemented in R 0.06

 Prototype applied at four utilities


0.04

0.02

 Collecting utility feedback on meaningful ways to 0.00


present simulation results 0 Spares 1 Spare 2 Spares 3 Spares

Number of spares
NUMBER OF SPARES

9
© 2018 Electric Power Research Institute, Inc. All rights reserved.
Transformer Asset Management Analytics

Industry wide Transformer Spares Strategy Model Integrating EPRI Analytics In


Power Transformer Expert
Database Development Third Party Asset Health
System Software
Systems

- Contains over 55,000 - In use at several - Funded by 8 utilities - Integrated at 8 utilities


in-service and 7,000 utilities - Prototype method - In-progress at 3
failure records - Performance validated applied at 4 utilities additional utilities
- Opportunity: using blind test - Example:
- Data mining and approach Technical Basis
statistical analysis - Transformer condition For Justifying
- Replacement assessment tool – unit Higher Spare
rates as well as fleet Levels
- Uncover
issues
10
© 2018 Electric Power Research Institute, Inc. All rights reserved.
Circuit Breaker Asset Management Analytics

Performance Analysis Maintenance Ranking Replacement Ranking Removal Rates

- Corrective - Using Readily - Risk Based Approach - Statistical Analysis of


Maintenance Data Available Data, Identify To Help Identify In-service And
mining and Statistical Specific Maintenance Replacement Removal Records To
Analysis to Uncover Candidates And Candidates Develop Technical
Differences In Necessary Tasks Basis For Capital
Performance By Planning
Family, Make, Model

11
© 2018 Electric Power Research Institute, Inc. All rights reserved.
Fleet Management Strategy Development

Industry wide Database

Economics

Failure Rates
Fleet Technical Basis
Management Capital and
Plan O&M Budgets
Condition
Indices

Business Rules

Asset Health Algorithms


Action
Effectiveness Metrics

Value:
• Provides technical basis for allocating budgets with measured risk
• Metrics to assess decision effectiveness
12
© 2018 Electric Power Research Institute, Inc. All rights reserved.
Overhead Transmission Wood Pole Fleet Management

Investigate Performance of Different Wood


Species:
– Hazard rates in different climates/environments
– Different treatment types
– Changes in inspection criteria –
 Contractor to contractor variation
 Contractor variations over time
– Degradation models from data with multiple
inspections of same poles

Collect and analyze:


– Pole demographic data
 E.g. age, wood species, in-service date
– Inspection results Wood Pole Reject Rate Modeling
 E.g. date of inspection, reject status, other
observations
– Replacement history
 E.g. which, when and why

13
© 2018 Electric Power Research Institute, Inc. All rights reserved.
Polymer Insulator Population Assessment

1. Potential degradation conditions, affected location and failure modes


2. Estimated onset time and likelihood
14
© 2017 Electric Power Research Institute, Inc. All rights reserved.
Circuit Breaker Asset Power Transformer Expert Polymer Insulator Population Asset Health – Station and
Management Analytics (s/w) Systems (s/w and DLL) Assessment (s/w) Line Arresters (approach)

Asset Management
Asset Health – Protective Analytics Asset Health – Disconnect
Relays (approach) Switches (approach)

Asset Health – Overhead Lines Ground Grid and Steel Structure Transmission Wood Pole Analytics
Connectors & Conductor (approach) Corrosion Management

15
© 2018 Electric Power Research Institute, Inc. All rights reserved.
Together…Shaping the Future of Electricity