0% found this document useful (0 votes)
72 views1 page

L1 Entrance Level (Part 5 of 11) 1: Seepage Water Holding Tank

Uploaded by

shreegunali147
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
72 views1 page

L1 Entrance Level (Part 5 of 11) 1: Seepage Water Holding Tank

Uploaded by

shreegunali147
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

8-8

8-9 ABBREVIATIONS:

9600 8-10 SWP Sewer Waste Pipe


4800 VP Vent Pipe
4800

-DR-LPL-7304
WP Drain Waste Pipe

5 6 7 8 FD Floor Drain
11400 11400 11400

SEM
FT Floor Trap

-DR-LPL-7311
CR117-POCCL-CR13-L1-B-
.
MATCH TO DRAWING NO
34200 FW Floor Waste
GT Gully Trap

SEM
(CR117)

CR117-POCCL-CR13-L1-B-
.
MATCH TO DRAWING NO
CWP Cold Water Pipe
Dia.50 C/S NEW WATER PIPE
IC Inspection Chamber
(CR117)
(CR117) Ø150 S Dia.100 C/S WATER SUPPLY PIPE WS Waster Sump
8-A WP (CR117) IC-G-02 MH Manhole
CAST IN PIPE (33. WS: 900 X 700 SERVICE TRENCH C/W
77m 1:90)
OPG: 600 X 600 REMOVABLE COVERS SAD Supply Air Duct
TL: 9.505 (TO BE BACKFILL WITH SAND)
IL: 8.385 RAD Return Air Duct
D: 1.120m
SSL: 8.435 (CR117)
FAD Fresh Air Duct

225
Dia.150 C/S WATER SUPPLY PIPE

830
1475 EAD Exaust Air Duct

150
335 CR117 -PSS Ø150 FR/TR Fire Rated Trunking

225
225
FS/ES 1 ES 3 CR117 -PSS Ø100 300 FO W/O KERB
370 FO Floor Opening
5450

FO W/ KERB 230
FFL: 11.055 CR117 -PSS Ø100 WO Wall Opening
CR117 -PSS Ø100 FO W/O KERB
SFL: 10.955 PS Pipe Sleeve
FO W/O KERB
CR117 -PSS Ø200
PF Puddle Flange
FO W/O KERB

5810
SEEPAGE WATER HOLDING BULK WATER METER

(CR117) Ø150 SW P
TANK CR117 - PSS Ø100

1:90)
FFL: 9.655 PS -1275 AFFL
335 LEGEND:

CAST IN PIPE (9.311m


SFL: 9.605 370 CR117 - PSS Ø150
CR117 - SAN Ø150
8-B PS 3470 AFFL
PS -1275 AFFL
= 100(W) x 100(H) Kerb,
CR117 -PSS Ø100 unless indicated as different Height
C1009 - FPS Ø100
FO W/O KERB
PS 3635 AFFL
CR117 -PSS Ø150 = 100(H) Plinth,
CR117 - SAN Ø150 335

460
370 FO W/O KERB

405
unless indicated as different Height

535
FCC PS 2240 AFFL

1700
FFL: 11.055 CR117 - PSS Ø100
= Cladding/ Panel

1165
SFL: 10.955 500 PS 2650 AFFL
BINPOINT C1009 - FPS Ø100
= Concrete Wall

255
PS 3635 AFFL
FFL: 9.655 ACCESS SPACE

3800
18350

405 CR117 -PSS Ø100


SFL: 9.605 FO W/ KERB = Light Weight Concrete Wall
GT FFL: 9.655

2630
CR117 100ø C/S SFL: 9.605 (CR117) Ø100 SWP
480 = Column
Vent T/A 2900
CAST IN PIPE (1.8m 1:90)
FT

880
12900

C1009 - FPS Ø100 (CR117) IC-G-03


WS: 900 X 700

H
PS 3635 AFFL OPG: 600 X 600
TL: 9.510
3180 CR117 - PSS Ø100 IL: 7.595
D: 1.915m FFL
PS 4080 AFFL SSL: 7.645
CR165 -COM 100 x 100 (CR117) Ø100 SWP All rectangular opening measured
WO 3950 AFFL from bottom of opening
CAST IN PIPE (7.176m 1:90)
CR165 -COM 100 x 100
(CR117) Ø100 SWP
WO 3950 AFFL
2005 CAST IN PIPE (7.225m 1:90)

NPL CR117 -DRN Ø150 930 1000


CAS (C R
FFL: 9.705 FO W/ KERB T IN 117
PIP ) Ø
E (4 22
SFL: 9.605 C1009 - FPS Ø200 2 4.3m 5 S W
5235

1:90 P

H
PS 235 AFFL
NEWATER PUMP RM )
C1009 -FPS Ø200
1725
2230

FFL: 9.655 FFL


FO W/ KERB
950 550 510 CR117 - DRN Ø100
SFL: 9.605 ES 8 1
40 FD CAST-IN W/O KERB All circular opening measured from
1 bottom of opening
2895 FFL: 9.655 CR117 -DRN Ø150
1375

2
1375
1375

8-C BREECHING SFL: 9.605 FO W/ KERB


C1009 -FPS Ø100
1665
1160

INLETS FO W/O KERB


MGCB
C1009 - FPS Ø200
PS 235 AFFL C1009 -FPS Ø200
FO W/ KERB
C1009 -FPS Ø200

-DR-LPL-7311
FO W/ KERB C1009 - FPS Ø200
CR165 -COM 100 x 100 PS 235 AFFL

SEM
WO 3950 AFFL

CR117-POCCL-CR13-L1-B-
.
MATCH TO DRAWING NO
-DR-LPL-7304
SEM
CR117-POCCL-CR13-L1-B-
.
MATCH TO DRAWING NO

A Qualified Person Endorsement:

0m 0.5m 2.5m 5m L1 ENTRANCE LEVEL (PART 5 OF 11)


1 1 : 50
SCALE 1: 50 FOR FINAL DESIGN

CR117 SYSTEM WIDE CONTRACTORS


Land Transport Authority
DATE
Contractor: Consultant :

SIGNAGURE In Association with:


VHA Consultants Pte Ltd
CPG Consultants Pte Ltd
NAME
Project Title:

Maintenance Commercial Info


SERVICE Track Work Signaling System Power Supply System ISCS OCR Communication System AMS Lifts Escalators AFC TVS & ECS Electrical Service Fire Protection Water Handling PSC/SMR CONTRACT CR117 DESIGN AND
Management System Communication System
CONSTRUCTION OF BRIGHT HILL
CR150 CR152 CR153 CR155 CR156 CR159 CR160 CR161 CR168 CR171A CR171B CR172B CR173B (CR1009) CR175B (CR1009) CR178B (CR1009) CR1506 CR1805 _ _ _ _ _ INTERCHANGE STATION AND TUNNELS
GENERAL NOTES:
ECS SUPPLY AIR (SAD) ELE POWER LOW VOLTAGE TWK TRACKWORK AFC AUTOFARE CONTROL DRN WASTE PIPE
• ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE STATED. 8-1 8-2 Drawing Title:
8-3 8-4 8-5 8-6 8-7

ECS RETURN AIR (RAD) ELE POWER EQUIPMENT SIG-STN SIGNAL STATION LET LIFT-ESC-TRAVELLATOR DRN PUMP PIPE
8-8 8-9 8-10 8-11
8-A

8-B
7-1 7-2 7-3 7-4

CR13 BRIGHT HILL INTERCHANGE STATION AND TUNNEL


7-5 7-6 7-7 7-8 7-9 7-10 7-11

• ALL HEIGHTS OF SERVICES ARE WALL OPENINGS ARE REFERENCED FROM GENERAL FLOOR FINISHED LEVEL 8-C 7-A

7-B

(FFL) UNLESS OTHERWISE STATED. ECS FRESH AIR (FAD) PWR HIGH TENSION CABLE SIG-TUN SIGNAL TUNNEL PSS DOMESTIC WATER PIPE ELE PLATFORM TOUCH VOLTAGE S-1 S-2

L1 ENTRANCE LEVEL - LAYOUT PLAN


S-A
7-C S-B

S-C

ECS EXHAUST AIR (EAD) FPS SPRINKLER PIPE OCR OVERHEAD CONDUCTOR RAIL PSS NEWWATER PIPE ERT EARTH MAT 5-1 5-2 5-3 5-4 5-5 5-6 5-7 5-8 5-9

6-1 6-2 6-3 6-4 6-5 6-6 6-7


(PART 5 OF 11)
• ALL KERBS AROUND FLOOR OPENINGS ARE 100MM (W) X 100MM (H) UNLESS OTHERWISE STATED.
6-8 6-9 6-10 6-11 6-12
5-A

5-B

Designed Checked Approved


ECS FIRE RATED FPS HOSEREEL PIPE FCI COMMERCIAL INFO PSS HOSEREEL PIPE SCC STRAY CURRENT
5-C
6-A

6-B

SWC ARNEL/JAMEEL THAMEEZH


• ALL STRUCTURAL INVERT LEVEL FOR ALL PITS AND INSPECTION CHAMBERS SHALL BE BASED OM THE ECS REFRIGERANT PIPE FPS DRY RISER PIPE COM COMMS STATION PSS SPRINKLER PIPE Scale Drawn Date
INDICATED INVERT LEVEL OF THE PITS/IC/WS MINUS 50MM.
ECS TRAY FPS BREECHING INLET PIPE COM COMMS TUNNEL SAN VENT PIPE 1 : 50 POC NOV 23
Drawing No: Rev.
• LIFT, ESCALATOR AND TRAVELATOR PIT AND STRUCTURAL RECESS ARE INDICATIVE ONLY. FINAL SIZE WILL
ECS CHWS SUPPLY & RETURN FPS CLEAN GAS PIPE COM ISCS STATION SAN SOIL WASTE PIPE 0
BE CAPTURED ONCE SWC FOR LIFT AND TRAVELATOR ON BOARD. SIZE SHOWN FOR ESCALATOR AND CR117-POCCL-CR13-L1-B-SEM-DR-LPL- 7305
TRAVELATOR PIT IS BASED ON LTA-TVMS GIVEN SIZE AND DIMENSION. ECS CONDERSER SUPPLY & RETURN FPS FS TRUNKING COM ISCS TUNNEL SAN PUMP PIPE 0 NOV 23 POC SUBMISSION APPROVAL SWC ARNEL/JAMEEL THAMEEZH
KEYPLAN File Name: CR117-POCCL-CR13-ZZ-B-SEM-M3-PIM-0001 SHEET 5 OF 11 A0
Rev Date Drawn By Description Designed By Checked By Approved By

You might also like