0% found this document useful (0 votes)
143 views9 pages

Critical Spare List

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
143 views9 pages

Critical Spare List

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

LIST OF CRITICAL SPARES

SEW POWER PRESS.


Minimum Actual
Sl No. Description of Item M/C used Lead Time
QTY QTY
1 U-Packing for HOLP Cylinder sew 2nos 2 week
2 Limit switch for Holp Pump sew 1no 1 week
3 Balancer Seal Kit sew 1 set 2 week
4 Light curtain Riken (Photo safety Device) sew 1set 1 week
5 Run Command PB sew 2sets 1 week
6 C/B Dual solenoid vale, sew 1set 1 week
7 'v' Belts sew 1set 1 week
8 Die cushion seal & bushes sew 2sets 2 week
9 HOLP Re-set Solenoid valve with coil sew 1no 1 week
10 Clutch seal Inner/outer sew 2sets 2 week
11 Grease pump sew 1no 1 week
12 Angle Indicator 'U' seal sew 2nos 2 week
13 Holp hose pipe sew 1no 1 week

Prepared By: John Approved By:Harish mk


For.No.:F-M010 Issue Date:1/Dec/11 Rev.No:00
LIST OF CRITICAL SPARES
Seyi power press.
Sl No. Discription of Item M/C used Minimum QTY Actual QTY Lead Time
1 Grease Detector IH1 Seyi 2Nos 0 2 weeks
2 Grease Distrubutor with Detector Seyi 1No 1 2 weeks
3 U-Packing for HOLP Cylinder Seyi 2Nos 2 2weeks
4 Limit swith for Holp Pump Seyi 2Nos 0 1 week
5 Balancer Seal Kit (4seals+1Bush) Seyi 2sets 1 2weeks
6 Light curtain Riken (Photo safety Device) Seyi 1set 1 weeks
7 Run Command PB Seyi 2sets 2 Ready
8 C/B Dual solenoid vale, Seyi 1No 0 1 week
9 'v' Belts Seyi 1set 0 Ready
10 Emergency switch Seyi 2Nos 2 Ready
11 Die cussion seal&bushes Seyi 2sets 0 2 weeks
12 HOLP Re-set Solenoid vale with coil Seyi 2Nos 0 1 week
13 Grease pump Seyi 1No 0 Ready
14 Photo safety device Reflector Seyi 2Nos 0 1 week
15 Oil level gauge (clutch & Brake) Seyi 2Nos 1 1 week
16 Oil level gauge (Holp & worm gear) Seyi 2Nos 0 1 week

Prepared By: Approved By:


For.No.:F-M010 Issue Date:1/Dec/11 Rev.No:00
LIST OF CRITICAL SPARES
Dongshin Power press
Sl No. Discription of Item M/C used Minimum QTY Actual QTY Lead Time
1 U-Packing for HOLP Cylinder Dong 1no 0 3 weeks
2 Limit swith for Holp Pump Dong 1no 0 3 weeks
3 Balancer Seal Kit (4seals+1Bush) Dong 2sets 0 3 weeks
4 Light curtain Riken (Photo safety Device) Dong 1set 1 3 weeks
5 Run Command PB Dong 2sets 2 Ready
6 C/B Dual solenoid vale, Dong 1set 0 3 weeks
7 'v' Belts Dong 1set 0 1 week
8 Die cussion seal&bushes Dong 1set 0 3 weeks
9 HOLP Re-set Solenoid vale with coil Dong 1no 0 3 weeks
10 Photo safety (Reflector) Dong 1no 0 3 weeks
11 Holp Hose pipe Dong 1no 1 1 week

Prepared By: John Approved By:Harish mk


For.No.:F-M010 Issue Date:1/Dec/11 Rev.No:00
LIST OF CRITICAL SPARES
Spot welding
Sl No. Discription of Item M/C used Minimum QTY Actual QTY Lead Time
1 WATER METER 1/2" 1NO 1 3 weeks
2 SCHEDULE SELECTOR SWITCH 1NO 0 3 weeks
3 SOLENOID VALVE with coil 1set 0 3 weeks
4 CONTROL TXR 380V/24V 1NO 0 3 weeks
5 CYLINDER SERVICE KIT (75KVA) 1NO 0 3 weeks
6 CYLINDER SERVICE KIT (50KVA) 1NO 0 3 weeks

Prepared By: John Approved By:Harish mk


For.No.:F-M010 Issue Date:1/Dec/11 Rev.No:00
LIST OF CRITICAL SPARES
Co2 Weld
Sl No. Discription of Item M/C used Minimum QTY Actual QTY Lead Time
1 FEED ROLLER 0.8/1.2MM 1SET 2 2 Days
2 ESAB LINER 1NO 1 2 Days
3 PANA LINER 1NO 1 2 Days
4 BINZEL LINER 1NO 1 2 Days
5 5K, 1W POT 6NOS 2 1 Day
6 MICRO SWITCH 6NOS 2 2 Days
7 CO2 REGULATOR 1NO 2 2 Days
8 REGULATOR DIAPHARM (SMALL & BIG) 10&6NOS 10 1 Day
9 REGULATOR WASHER 100NOS 50 1 Day
10 REGULATOR GUAGES 2NOS 2 1 Day
11 REGULATOR FLOW INDICATOR 1NO 0 2 Days

Prepared By: John Approved By:Harish mk


For.No.:F-M010 Issue Date:1/Dec/11 Rev.No:00
CRITICAL SPARES FOR ROBOT WELDING MACHINE
Sl No Description of Item Minimum QTY Actual QTY Leed time
1 Gas Nozzle 2 Nos 2 Nos 1 Day
3 Insulation cylinder 2 Nos 2 Nos 1 Day
4 Tip Holder 2 Nos 2 Nos 1 Day
5 Insulation cap 4 Nos 4 Nos 1 Day
6 Counter Nut 1Nos 0 1 Day
7 Torch neck 1 No 0 1 Day
8 Binzel Liner 4 Nos 4 Nos 1 Day
9 C02 gas Regulator's washers 25 Nos 25 Nos 1 Day
10 Pin Cylinder 1 No 1 No 1 month
11 Pneumatic cylinder 16X 25 1 No 1 No 1 month
12 Reed switch D-Z73L 1 No 1 No 1 month
13 Reed switch D-A93 1 No 1 No 1 month
14 AC Drive 1 No 1 No 1 month
15 Copper piece for Jig 2 1 No 1 No 2 days

Prepared By: John Approved By:Harish mk

For.No.:F-M010 Issue Date:1/Dec/11 Rev.No:00


LIST OF CRITICAL SPARES
FORK LIFT
Sl No. Discription of Item M/C used Minimum QTY Actual QTY Lead Time
1 MH 39550162 HOSE * 1 1 1 week
2 MH 39550163 HOSE * 1 1 1 week
3 MH 39550164 HOSE * 1 1 1 week
4 MH 39550101 BANJO BOLT 6 0 1 week
5 MH 39550102 WASHER 12 12 1 week
6 MH 36500002 ACCEL CABLE * 1 1 1 week
7 MH 02367750 HOSE * 1 1 1 week
8 MH 02006899 HOSE ENG TO RAD * 1 1 1 week
9 MH 02006886 PAD PEDAL STOP 1 1 1 week
10 MH 59076399 S4 ENG STOP CABLE * 1 1 1 week
11 MH 39550107 HOSE * 1 1 1 week
12 MH 39550167 HOSE * 1 1 1 week
13 MH 39550168 HOSE * 1 1 1 week
14 MH 39550117 HOSE * 1 1 1 week
15 MH 02012102 ELEMENT-GX * 2 1 1 week
16 MH 71400003 CABLE ASSLY 1 1 1 week
17 MH 59176938 BRAKE SHOE ASSLY * 4 2 1 week
18 MH 02570802 W.C.ASSLY 2 2 1 week
19 MH 02067313 BUNDY PIPE 2 2 1 week
20 MH 02014713 M.C.KIT-MAJOR * 1 1 1 week
21 MH 02354480 SPRING BRAKE-GX * 1 1 1 week
22 MH 02009548 BRG OIL SEAL 2 2 1 week
23 MH 56159109 "O" RING * 2 2 1 week
24 MH 59184539 SEAL KIT * 1 1 1 week
25 MH 39550118 HOSE * 1 1 1 week
26 MH 39550590 HOSE * 1 1 1 week
27 MH 39550134 HOSE * 1 1 1 week
28 MH 39550144 HOSE * 1 1 1 week
29 MH 39550208 HOSE * 1 1 1 week
30 MH 39550207 HOSE * 1 1 1 week
31 MH 39550209 HOSE * 1 1 1 week
32 MH 39550140 HOSE * 1 1 1 week
33 MH 36313018 OIL FILTER * 1 1 1 week
34 MH 02590437 FILT ELEM * 1 1 1 week
35 MH 02590479 FELT FILT INSERT * 1 1 1 week
36 MH 02355250 STRAINER ASSLY 2 1 1 week
Prepared By: John Approved By:Harish mk
For.No.:F-M010 Issue Date:1/Dec/11 Rev.No:00
LIST OF CRITICAL SPARES
DG SET 250KVA
Sl No. Discription of Item M/C used Minimum QTY Actual QTY Lead Time
1 K.Oil Supper 20 Ltr.can 1No 1 2 Days
2 K.Oil Supper 7.5 Ltr.can 1No 0 2 Days
3 Lub Oil Filter 1No 0 2 Days
4 Fuel Filter Kit 1No 0 2 Days
5 Air Filter 1No 0 2 Days

Prepared By: John Approved By:Harish mk


For.No.:F-M010 Issue Date:1/Dec/11 Rev.No:00
LIST OF CRITICAL SPARES
Compressor E45-7.5
Sl No. Discription of Item M/C used Minimum QTY Actual QTY Lead Time
1 OIL FILTER 1NO 1 1 week
2 AIR FILTER 1NO 0 1 week
3 BDV KIT 1NO 0 1 week
4 MPV KIT 1NO 0 1 week
5 INTAKE VALVE KIT 1NO 0 1 week
6 ELGI LUB OIL 20LTS 1 1 week

Prepared By: John Approved By:Harish mk


For.No.:F-M010 Issue Date:1/Dec/11 Rev.No:00

You might also like