The document outlines 8 steps for developing software including defining requirements, project planning, designing UX and UI, architecting the software, coding the solution, establishing integrations, rigorous testing, and setting the ready solution live in production.

Uploaded by

Sudeep
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views

Project Timeline

The document outlines 8 steps for developing software including defining requirements, project planning, designing UX and UI, architecting the software, coding the solution, establishing integrations, rigorous testing, and setting the ready solution live in production.

Uploaded by

Sudeep
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Step 1 :- Defining requirements 1 - 2 days

● Analyzing strengths and weaknesses of the competitors.

● Defining industry specific requirements.

● Defining risks and countering it.

Step 2 :- Project plan preparation 3 - 4 days

● High-level software design: functional modules, advanced capabilities,


interactions between the modules and with other softwares.
● Defining a precise project scope, deliverables, Creating a software
development project plan with major milestones and a work breakdown
structure.

Step 3 :- Design UX and UI 2 - 3 weeks

● Conducting comprehensive UX research; describing how a user will


interact with the software.
● Creating wireframes that showcase basic functionality and content layout
on each screen.
● Combining wireframes into dynamic UX prototypes, transforming the
prototypes into full-color UI mockups.
● Performing the prototype user testing.
Step 4 :- Architect the software ~ 1 week

● Defining how functional modules of future software should work at the


code level.
● Designing a secure and scalable architecture for the solution.
● Deciding on integration approaches (point-to-point, middleware-based,
iPaaS, etc.) between the software components.
● Choosing the optimal technology stack.

Step 5 :- Code the solution ~ 1 month

● Establishing development, testing, and automation environments: CI/CD.


● Writing server-side code and APIs, Turning static UI mockups into the fully
functional GUI.
● Thoroughly documenting the software and coding process.

Step 6 :- Establish integrations

● Setting secure integrations between our software and the required systems
(Hardware).
● Fixing bugs detected by testing.

Step 7 :- Run rigorous testing 2 - 3 months

● Creating a test plan with a testing scope, test types addressing all
functional and non-functional software requirements, reporting procedures.
● Creating test cases and checklists, Writing and running automated test
scripts (API and UI tests).
● Fixing bugs detected by testing.
● Conducting unit testing and static code analysis in parallel with
development, carrying out functional, performance, security, integration
testing.

Step 8 :- Setting the ready solution live

● Deploying software in the production environment.


● User training and familiarity.
● Software performance monitoring and fixing the bugs that users discover.
● Planning improvements and new features to be added based on user
feedback.

Step 5 work division :-

Week 1 :- Researching about the technology stack to dump the results of the
code onto the hardware side from the windows (client).

Week 2 :- Coding the server side as well as the hardware side for smooth
handshaking. Developing multiple versions of solutions.

Week 3 :- Resolving errors and testing the compatibility.

Week 4 :- Continuing the testing process.