0% found this document useful (0 votes)
11 views4 pages

Annexure of Cost Data 2018-19

Uploaded by

shanbs1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views4 pages

Annexure of Cost Data 2018-19

Uploaded by

shanbs1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Annexure to B.O.

1265/2018 (KSEB/TRAC/Cost Data /R3/2018-19) dated 16 -05-2018


Cost data of Distribution works approved by the Commission for KSEBL for the Financial year 2018-
19 vide order dated 27.4.2018
Rate approved by the Commission
SINo. Description of the work in Rupees
1 LT single phase weather proof service connection upto and 1740.00
including 5kW ( using static meter with LCD facility)
2 LT three phase weather proof service connection up to and 4220.00
including 10 KW ( using static meter with LCD display and TOD
facility)
3 LT three phase weather proof service connection above 10kW upto 14420.00
and including 25kW ( using static meter with LCD display and TOD
facility)
4 LT three phase weather proof service connection above 25kW & 21750.00
below 50kVA
5 LT three phase weather proof service connection from 50kVA and 23000.00
above upto and including 100kVA .
6 providing support pole for weather proof service connection. 5540.00

7 LT single phase over head service connection upto and including 9160+80per M of OH line
50m with max. 1 Post
8 LT single phase over head service connection above 50 m upto and 21950+80 per M of OH line above
including 100 m with max. 2 Posts 50m
9 LT single phase over head service connection above 100m up to 34450+80 per M of OH line above
and including 150m with max. 3 Posts 100m
10 LT single phase over head service connection above 150m up to 46750+80 per M of OH line
and including 200m with max. 4 Posts above150m
11 LT three phase over head service connection upto and including 11550+160 per M of OH line
50m with max. 1 Post
12 LT three phase over head service connection above 50m upto and 28880+160 per M of OH lineabove
including 100m with max. 2 Posts 50m
13 LT three phase over head service connection above 100m up to 46600+160 per M of OH line
and including 150m with max. 3 Posts above 100m
14 LT three phase over head service connection above 150m up to 64100+160 per M of OH line
and including 200m with max. 4 Posts above1 50m
15 Post insertion for LT single phase over head line (without stay) 6700

16 Post insertion for LT single phase over head line (with stay) 8170

17 Post insertion for LT single phase over head line (with strut) 13200

18 Post insertion for LT three phase over head line (without stay) 7730

19 Post insertion for LT three phase over head line (with stay) 9200

20 Post insertion for LT three phase over head line (with strut) 13850

1
21 Conversion of LT single phase weatherproof service connection to 4170
LT three phase weather proof service connection with connected
load upto and including 10kW
22 Conversion of LT single phase weatherproof service connection to 15450
LT three phase weather proof service connection with load above
10 kW up to and including 25kW

23 Conversion of LT single phase weatherproof service connection to 22800


LT three phase weather proof service connection with load above
25kW and below 50kVA
24 Conversion of LT single phase weatherproof service connection to 23800
LT three phase weather proof service connection with load 50kVA
and above up to and including 100kVA

25 Enhancement of connected load of LT three phase weather proof 14550


service connection with a max. load of 10kW into the range of 10
kW to 25 kW.
26 Enhancement of connected load of LT three phase weather proof 22550
service connection with a maximum connected load of 10 kW into
the range of 25 kW to 50 kVA.
27 Enhancement of connected load of LT three phase service 24550
connection with a maximum connected load of 10 kW into the
range of 50 kVA to 100 kVA .
28 Enhancement of connected load of LT three phase service 21210
connection with load in the range of 10kW - 25 kW into the range
25 kW - 50kVA
29 Enhancement of connected load of LT three Phase service 22510
connection with load in the range of 10kW - 25 kW into the
range of 50 kVA -100 kVA
30 Enhancement of connected load of LT three Phase service 19510
connection with load in the range of 25kW - 50 kVA into the
range of 50 kVA -100 kVA
31 Shifting Single Phase Energy Meters 610
32 Shifting Three Phase EnergyMeters 800
33 Shifting Three Phase CT Meters 1400
34 HT pole insertion in HT/LT line (with stay ) 15870
35 HT pole insertion in HT/LT line (with strut using 8m pole ) 17850
36 Providing strut using LT pole 6500
37 Providing strut using HT pole 9100
38 Providing LT stay 1750
39 Providing HT stay 2310
40 Recondutoring LT line ,with Rabbit 1 conductor 55
41 Recondutoring HT line ,with Raccoon 240
42 Recondutoring HT line ,with Rabbit 170
43 Adding one conductor (ACSR Rabbit) on the existing poles (where 85
cross arm is available) inclusive of cost of pin,insulator etc.

44 100
Adding one conductor (ACSR Rabbit) on the existing poles (where
cross arm is not available) inclusive of cost of pin, insulator etc.
45 Conversion of LT single phase 2 wire line to LT Three phase 4 wire 165
line (per metre)
46 Conversion of LT single phase 2 wire line to LT Three phase 5 wire 215
line

2
47 Conversion of LT single phase 3 wire line to LT Three phase 5 wire 165
line
48 Drawing Single Phase 2 wire line under existing HT line 130
49 Drawing Single Phase 3 wire line under existing HT line 200
50 Drawing Three Phase 4 wire line under existing HT line 250
51 Drawing Three Phase 5 wire line under existing HT line 310
52 Construction of LT single phase, 2 wire line 340
53 Construction of LT single phase, 3 wire line 400
54 Construction of LT 3 phase, 4 wire line 460
55 Construction of LT 3 phase, 5 wire line 520
56 Construction of 1Km of 11KV line using ACSR Rabbit (with out tree 605
cutting compensation )
57 Construction of 1Km of 11KV line using ACSR Racoon (with out 670
tree cutting compensation ) using 24 no of poles and 21nos of
stays
58 Laying 1KM of HT XLPE UG Cable (3x300 mm2 single run) 1770
59 Construction of 1 Km of 11KV line using ACSR Racoon with A Pole 960
(with out tree cutting compensation )
60 1880
Construction of 1Km of 11KV line using ACSR Racoon with 4
Legged tower (with out provision for tree cutting compensation )
61 Installation of 1 No. 11 KV/ 433 V , 25 KVA Transformer 282000
62 Installation of 1 No. 11 KV/ 433 V , 100 KVA Transformer without 390000
stay( pole mounted )
63 Installation of 1 No. 11 KV/ 433 V , 160 KVA Transformer without 547000
stay (pole mounted)

64 Installation of 11KV/433V 250 KVA Transformer without stay 561000


65 Installation of 1 No.11 KV/ 433 V , 500 KVA, Transformer 874000

66 Installation of Data Acquisition compatible Extensible type Ring 425350


Main Unit without VCB -CCC (E) (Cable -Cable -Cable )

67 482000
Installation of Data Acquisition compatible Extensible type Ring
Main Unit with VCB -CTC (E) (Cable -Transformer -Cable )
68 Installation of Data Acquisition compatible Extensible add-on type 371500
Ring Main Unit without VCB (Single Switch C-Extension)

69 Installation of Data Acquisition compatible, Extensible, add-on type 443700


Ring Main Unit with VCB (Single Switch T-Extension)

70 Installation of Data Acquisition compatible Extensible type Ring 338000


Main Unit with provision for isolation and earthing facility on both
sides (GCG)

3
71 Drawing 1Km of 11 kV ABC of size 3X150 + 1X120 sqmm on 9 1340213.03
mts supports with an average span of 20-25 mts
72 Ddrawing 1Km of 11 kV ABC of size 3X120 + 1X95 on 9 mts 1197653.03
supports with an average span of 20-25 mts
73 Drawing 1Km of 11 kV ABC of size 3X95 + 1X70 on 9 mts 1156073.03
supports with an average span of 20-25 mts
74 Drawing 1Km of LT ABC of size 3X95 + 1X70 +1X16 on 8 mts 883334.27
supports with an average span of 20-25 mts
75 Ddrawing 1Km of LT ABC of size 3X70 + 1X50 +1X16 on 8 mts 841754.27
supports with an average span of 20-25 mts
76 Drawing 1Km of LT ABC of size 3X50 + 1X35 +1X16 on 8 mts 794894.27
supports with an average span of 20-25 mts

Note : GST will be collected extra as per rules applicable