7 LT single phase over head service connection upto and including 9160+80per M of OH line
50m with max. 1 Post
8 LT single phase over head service connection above 50 m upto and 21950+80 per M of OH line above
including 100 m with max. 2 Posts 50m
9 LT single phase over head service connection above 100m up to 34450+80 per M of OH line above
and including 150m with max. 3 Posts 100m
10 LT single phase over head service connection above 150m up to 46750+80 per M of OH line
and including 200m with max. 4 Posts above150m
11 LT three phase over head service connection upto and including 11550+160 per M of OH line
50m with max. 1 Post
12 LT three phase over head service connection above 50m upto and 28880+160 per M of OH lineabove
including 100m with max. 2 Posts 50m
13 LT three phase over head service connection above 100m up to 46600+160 per M of OH line
and including 150m with max. 3 Posts above 100m
14 LT three phase over head service connection above 150m up to 64100+160 per M of OH line
and including 200m with max. 4 Posts above1 50m
15 Post insertion for LT single phase over head line (without stay) 6700
16 Post insertion for LT single phase over head line (with stay) 8170
17 Post insertion for LT single phase over head line (with strut) 13200
18 Post insertion for LT three phase over head line (without stay) 7730
19 Post insertion for LT three phase over head line (with stay) 9200
20 Post insertion for LT three phase over head line (with strut) 13850
1
21 Conversion of LT single phase weatherproof service connection to 4170
LT three phase weather proof service connection with connected
load upto and including 10kW
22 Conversion of LT single phase weatherproof service connection to 15450
LT three phase weather proof service connection with load above
10 kW up to and including 25kW
44 100
Adding one conductor (ACSR Rabbit) on the existing poles (where
cross arm is not available) inclusive of cost of pin, insulator etc.
45 Conversion of LT single phase 2 wire line to LT Three phase 4 wire 165
line (per metre)
46 Conversion of LT single phase 2 wire line to LT Three phase 5 wire 215
line
2
47 Conversion of LT single phase 3 wire line to LT Three phase 5 wire 165
line
48 Drawing Single Phase 2 wire line under existing HT line 130
49 Drawing Single Phase 3 wire line under existing HT line 200
50 Drawing Three Phase 4 wire line under existing HT line 250
51 Drawing Three Phase 5 wire line under existing HT line 310
52 Construction of LT single phase, 2 wire line 340
53 Construction of LT single phase, 3 wire line 400
54 Construction of LT 3 phase, 4 wire line 460
55 Construction of LT 3 phase, 5 wire line 520
56 Construction of 1Km of 11KV line using ACSR Rabbit (with out tree 605
cutting compensation )
57 Construction of 1Km of 11KV line using ACSR Racoon (with out 670
tree cutting compensation ) using 24 no of poles and 21nos of
stays
58 Laying 1KM of HT XLPE UG Cable (3x300 mm2 single run) 1770
59 Construction of 1 Km of 11KV line using ACSR Racoon with A Pole 960
(with out tree cutting compensation )
60 1880
Construction of 1Km of 11KV line using ACSR Racoon with 4
Legged tower (with out provision for tree cutting compensation )
61 Installation of 1 No. 11 KV/ 433 V , 25 KVA Transformer 282000
62 Installation of 1 No. 11 KV/ 433 V , 100 KVA Transformer without 390000
stay( pole mounted )
63 Installation of 1 No. 11 KV/ 433 V , 160 KVA Transformer without 547000
stay (pole mounted)
67 482000
Installation of Data Acquisition compatible Extensible type Ring
Main Unit with VCB -CTC (E) (Cable -Transformer -Cable )
68 Installation of Data Acquisition compatible Extensible add-on type 371500
Ring Main Unit without VCB (Single Switch C-Extension)
3
71 Drawing 1Km of 11 kV ABC of size 3X150 + 1X120 sqmm on 9 1340213.03
mts supports with an average span of 20-25 mts
72 Ddrawing 1Km of 11 kV ABC of size 3X120 + 1X95 on 9 mts 1197653.03
supports with an average span of 20-25 mts
73 Drawing 1Km of 11 kV ABC of size 3X95 + 1X70 on 9 mts 1156073.03
supports with an average span of 20-25 mts
74 Drawing 1Km of LT ABC of size 3X95 + 1X70 +1X16 on 8 mts 883334.27
supports with an average span of 20-25 mts
75 Ddrawing 1Km of LT ABC of size 3X70 + 1X50 +1X16 on 8 mts 841754.27
supports with an average span of 20-25 mts
76 Drawing 1Km of LT ABC of size 3X50 + 1X35 +1X16 on 8 mts 794894.27
supports with an average span of 20-25 mts