Uttar Pradesh Rural Water Supply Plan
Uttar Pradesh Rural Water Supply Plan
1000
OF CONCRETING.
M S ANGLE IRON POST WALKWAY SLAB 5. THE CONTRACTOR SHALL FULLY SATISFY AND OBTAIN PRIOR
℄
(50 X 50 X 6) APPROVAL OF THE ENGINEER IN CHARGE REGARDING ALL ASPECTS
@ 1500 C/C 2- Brick edge protection OF THE SPECIFICATION WORK MAIN SHIP AND ISI STANDARD BEFORE
Well compacted 100mm COMMENCEMENT AND PLACEMENT OF ALL.
6. THE CONTRACTOR SHOULD NOT BE PERMITTED TO INSTALL
subgrade with coarse CONDUITS PIPES ,DUCTS, SLEEVES OR ANY CUTTING WORK THAT
EL +12000mm sand ARE NOT SHOWN ON THE PLANS OR NOT APPROVED BY THE
ENGINEER OR ARCHITECT.
WALKWAY Plinth Protection (section 3-3) 7- GRADE OF CONCRETE SHALL BE M25 WITH MINIMUM CEMENT ON
LIGHTNING ARRESTER MAIN RING BEAM 715 300Kg/m CUB WITH NOMINAL AGGREGATE SIZE OF 20mm.
8-ALL REINFORCEMENT BARS SHALL BE HYSD BARS OF GRADE Fe500
BEAM (RB1) CONFORMING TO IS:1786.
9-CLEAR COVER TO MAIN REINFORCEMENT SHALL BE :
TANK DIA=5690 a) COLUMN =40mm
b) BEAMS=30mm
c) SLABS=30mm
COLUMN d) FOOTING =50mm
e) STAIRCASE=30mm
MAN HOLE RAILING MAN HOLE 10- ALL LAPS SHALL BE 49 TIMES DIA OF BAR FOR M25 GARDE OF
CONCRETE .
11- PIPE DETAILS SHOWN ARE TENTATIVE. PIPE DETAILS REFER
DETAIL OF M S POSTS AND PIPES FOR RAILING COLUMN MECHANICAL G.A DRAWINGS
12- NET SBC CONSIDERED SHALL BE 80KN/SQ M.
+ 4950 + 3300 13- OVER EXCAVATION SHALL BE FILLED WITH PCC 100mm
100MM EXTRA PCC SHOULD BE PROVIDED AT ID & OD OF RAFT.
M.W.L
LVL. LVL. LIGHTNING ARRESTER &WATER INDICATOR:-
447 10X300=3000 447 SPOT DETAIL -D
EXTERNAL LADDER 5 96 Lightening Arrestor:-Shall be of copper bars 25 mm dia and 1000 mm long to be
96 5 provided at the top periphery of OHT. This is to be connected by aluminium Strip of 25
WITH CAGE OVER FLOW PIPE 10 60 10 mm wide and 3 mm thick.This conductor strip shall be connected to a 450x450x3mm
INLET PIPE
80X80X8 THK. thick copper plate to be embedded below the average ground level by digging a pit.
1000
7
44
B1
INSERT
44
30°
B1
Water level indicator:- Providing and fixing water level indicator consisting of an
7
30°
20
SS
approved G.I. float and iron counter weight connected by steel flexible wire rope
PLATE(M.S)
SS
passing over frictionless aluminum pulleys will be fixed as provided in elevation. The
4250
scale shall be calibrated in centimeters and should consist of iron sheet 8 gauge fixed
over wooden planks with in angle iron frame of 35x35x5 mm and painted with white
2 2
10
0
enamel base and letters in black and red fluorescent paint
00
INTERNAL LADDER
X3
20 40
1
=3
0
00
0=
00
OUTLET PIPE 10
X3
30
DRAIN PIPE
00
10
10
00 2NO.8Ø LUG
2537
EL +12000mm DETAIL OF HAND RAIL INSERT PLATE
(T.O.C.)
44
44
7
90
°
°
600
90
715 + 6600 600 1000
5074
+ 1650 80X80X8 THK.
965
965
SSB1
SPOT DETAIL -A 2 LVL. SSB1 LVL. INSERT PLATE
RB1 6
GB1/GB2
40 8
3300
44
7
52
2537
7
SPOT DETAIL -D
40 8Ø LUG
10
00
SECTION 2-2
X3
00
0
EL +8700mm 10
=3
00
00
=3
(T.O.C.) 3
30°
X3
0 00
10
SS 0.5
TB3 TB3 TB3 +0
B1
0L M S ANGLE FRAME
SS
LEVEL INDICATOR 30° VL 35 X 35 X 4 MM 1.0
.
B1
44
7
FLEXIBLE STEEL
96
3300
+ 8250 447
SPOT DETAIL -C 2.0
LVL. BRACING AT
1465 2930 1465 EVERY
900 MM APART BE
EL +2100mm + 12000
2537
(T.O.C.) LVL.
60
MS SHEET PAINTED WITH
B1
0
ENAMEL PAINT SPOT DETAIL -C
SS
62
TB1 TB1 TB1
2
90
°
2100
600 1000
5074
+ 11550
1113
PLINTH PROTECTION ALL
AROUND
2 SSB1 LVL. UNIVERSAL MEP PROJECTS & ENGINEERING
SERVICES LTD - A TATA ENTERPRISE
EGL +00mm
3 CLIENT :
STATE WATER AND SANITATION MISSION (SWSM), UTTAR
7
44
LIGHTNING ARRESTER PRADESH NAMAMI GANGE AND RURAL WATER SUPPLY
2537
1000
1000 TANK SUPPLY PROJECTS IN THE STATE OF UTTAR PRADESH UNDER
00
3 THE JAL JEEVAN MISSION.
2000
30
THIS DRAWING IS UNDER COPYRIGHT OF
250
30° 30°
1465 2930 1465
SS
7
44
5860
44
GRADE
7
700
>H/4
3. DRAWINGS SHOULD BE CHECKED AND VERIFIED AS PER SITE
450 450 CONDITION BEFORE EXECUTION OF THE WORK BY THE EXECUTIVE
ENGINEER CONCERNED.
4-No. #16Ø 4-No. #16Ø 4. ANY DISCREPANCY OR DOUBTS ARISING FROM THE STUDY OF ALL
COLUMN
H
RELEVANT DRAWING SHALL BE BROUGHT TO THE NOTICE OF THE
(8+8+8)-#10ØSTIRRUPS #8Ø@150C/C 4-No. #10Ø 4-No. #10Ø EL(-1300MM) ENGINEER IN CHARGE FOR CLARIFICATION BEFORE COMMENCEMENT
FB1 OF CONCRETING.
600
600
700
#10Ø100C/C #10Ø150C/C 5. THE CONTRACTOR SHALL FULLY SATISFY AND OBTAIN PRIOR
2-10Ø ON EITHER APPROVAL OF THE ENGINEER IN CHARGE REGARDING ALL ASPECTS
4-#16Ø #10Ø@150C/C
>H/4
#10Ø@100C/C FACE OF THE SPECIFICATION WORK MAIN SHIP AND ISI STANDARD BEFORE
700
#8Ø@100C/C #10Ø100/150C/C COMMENCEMENT AND PLACEMENT OF ALL.
CONFINEMENT
4-No. #16Ø
TB3
6-No. #16Ø 6. THE CONTRACTOR SHOULD NOT BE PERMITTED TO INSTALL
R
ZONE
41 . . . . . .. .. . .. . . . . .
CONDUITS PIPES ,DUCTS, SLEEVES OR ANY CUTTING WORK THAT
50 . . . . . . . . .
400 400 ARE NOT SHOWN ON THE PLANS OR NOT APPROVED BY THE
700
>H/4
ENGINEER OR ARCHITECT.
4-No. #12Ø 4-No. #12Ø 7- GRADE OF CONCRETE SHALL BE M25 WITH MINIMUM CEMENT ON
300Kg/m CUB WITH NOMINAL AGGREGATE SIZE OF 20mm.
4-No. #10Ø 4-No. #10Ø EL(+12000MM) 8-ALL REINFORCEMENT BARS SHALL BE HYSD BARS OF GRADE Fe500
R1550 2-#16Ø 770 4-#16Ø 770 2-#16Ø RB1 CONFORMING TO IS:1786.
600
600
#8Ø100C/C #8Ø150C/C 9-CLEAR COVER TO MAIN REINFORCEMENT SHALL BE :
a) COLUMN =40mm
b) BEAMS=30mm
LONGITUDINAL SECTION OF FOUNDATION BEAM (FB1) LAP LENGTH
4-No. #12Ø 4-No. #12Ø #8Ø100/150C/C c) SLABS=30mm
SCHEMATIC LAP d) FOOTING =50mm
H
COLUMN e) STAIRCASE=30mm
LAP ZONE
400 400
10- ALL LAPS SHALL BE 49 TIMES DIA OF BAR FOR M25 GARDE OF
CONCRETE .
6-No. #16Ø
4-No. #16Ø 11- PIPE DETAILS SHOWN ARE TENTATIVE. PIPE DETAILS REFER
#8Ø@150C/C MECHANICAL G.A DRAWINGS
COLUMN 4-No. #10Ø 4-No. #10Ø EL(+12000MM)
12- NET SBC CONSIDERED SHALL BE 80KN/SQ M.
13- OVER EXCAVATION SHALL BE FILLED WITH PCC 100mm
GRID BEAM
600
600
>H/4
#8Ø@100C/C 100MM EXTRA PCC SHOULD BE PROVIDED AT ID & OD OF RAFT.
700
#10Ø100C/C #10Ø150C/C
CONFINEMENT
700
TB2 LEGENDS:
700
#10Ø100/150C/C
ZONE
4-No. #16Ø 4-No. #16Ø FGL- FINISHED GROUND LEVEL
2-#16Ø 2-#16Ø 2-#16Ø EGL- EXISTING GROUND LEVEL
735 735
700
>H/4
BOC- BOTTOM OF CONCRETE
200 200
TOC- TOP OF CONCRETE
GB-GRID BEAM
2-No. #16Ø 2-No. #16Ø EL- ELEVATION
2-No. #16Ø EL(+2100MM) SSB- STAIRCASE SUPPORTING BEAM
EL(+5400MM) PB- PLINTH BEAM
. . . . . . . . . . . . . . . . . .
LAP LENGTH TB1,TB2 2-No. #10Ø 2-No. #10Ø TB- TIE BEAM
600
600
EL(+8700MM)
2000
LAP ZONE
2-#16Ø 2-#16Ø 2-#16Ø 2-No. #16Ø 2-No. #16Ø #8Ø150C/C COC- CENTER OF CONCRETE
EITHER FACE
1550 2600
230 230
4150 #8Ø@150C/C EL(+00MM)
COLUMN (17)-#8ØSTIRRUPS 3-No. #16Ø 3-No. #16Ø EL(+1650MM)
EL(+3300MM)
>H/4
#8Ø@100C/C
EXCAVATION PLAN
700
400
400
8Ø@150C/C 8Ø@150C/C EL(+4950MM)
CONFINEMENT
LONGITUDINAL SECTION OF TIE BEAM (TB) TB1 SSB1
3-No. #12Ø 3-No. #12Ø
EL(+6600MM)
EL(+8250MM)
ZONE
EL(+9900MM)
EL(+11550MM) #8Ø150C/C
COLUMN EL(+12000MM)
700
>H/4
SCHEDULE OF COLUMN
0 0
15 15
825 COLUMN MARKED C1
H
#8Ø@150C/C TOP OF COLUMN EL+12M FROM E.G.L.
BEAM SSB1 VERTICAL REINF. 7No. #16Ø
8Ø @ 150 MM C/C FGL
TIES #8Ø@100/150c/c
LATERALLY
300
7-12Ø
CROSS SECTION
400
>H/4
OF COLUMN
NOTE:-Provide #8Ø@100 links in confinement zone for C1
700
#8Ø@150 links outside confinement zone for C1 column #8Ø@100C/C
150 150 mm thick #8Ø@100 links in lap zone
Provide lapping of main reinforcement in lap zone
#8Ø@100/150c/c
and staggered lapping of alternate bars as shown COLUMN SIZE 400Dia.
825 7-12Ø
142-No. 10Ø@140 c/c COLUMN
COLUMN STARTING
TOP OF THE FOOTING
7-12Ø 350 LEVEL
spacing at outer face of beam 300 300
150
8Ø @ 150 MM C/C LATERALLY
15
0
1 50 100
75MM THICK R.C.C
SECTION OF COLUMN C1 100 P.C.C PRECAST SLAB
BEAM SSB1
300
900
REINFORCEMENT DETAIL OF 1 TO 4 FLIGHTS OF STAIR CASE E.G.L
230 230
900
CORE CORE
PIPE PIPE
2400
6-#10ΦHoops 7-#10ΦHoops
895 450 1055 1650
4050 1 125MM M15
R.C. DETAIL OF FOUNDATION PLAN P.C.C.
GENERAL SECTION(2-2) OF VALVE
2537
CHAMBER
1650
30
29 3No.#8Ø #8Ø@250C/C
5074
400
CL of Tank
200
2
.
.
EGL
.
1360 UNIVERSAL MEP PROJECTS & ENGINEERING
#8Ø@150C/C R.C. DETAIL OF PRECAST SLAB SERVICES LTD - A TATA ENTERPRISE
2537
230
CONSULTING & RESEARCH PRIVATE LIMITED
700
2000 & NOT TO BE REPRODUCED OR COPIED HANDED
8-No. #8Ø@100C/C CONFINMENT ZONE OVER TO THIRD PARTY OR USES FOR ANY PURPOSE
THAN THAT FOR IT HAS BEEN LOANED
142- No.#10Φ 2 2
450
1465 2930 1465
1200
350
TITLE-: NUMERATION & RC DETAILING OF 100KL
300 300
150 5860 12M STAGING CHAKBANDI URF GHATAILA-Deoria-Deoria
100 JOB NO.- DWG. REF. NO.- SHEET SIZE
100 P.C.C M15 GRADE A2
A B C D SCALE- REVISION- DATE OF ISSUE-
895 450 1055 1650 NTS R0 04-11-22
230
6-#10ΦHoops 7-#10ΦHoops
DWG.NO.-
2930
FOUNDATION PLAN 22/JJM/DWP/TATA/100/12/2023
N DESIGN BY- SHEET NO-
PG 2/3
R.C. DETAIL OF FOUNDATION SECTION TOP VIEW OF VALVE CHAMBER DRAWN BY- CHECKED BY-
MS NM
STRUCTURAL NOTES :-
#10Ø@150C/C(circumferential) #10Ø@150C/C(circumferential) #10Ø@150C/C(circumferential)
1. ALL DIMENSIONS ARE GIVEN IN MM.
#10/10Ø@280C/C #10/10Ø@280C/C #10/10Ø@280C/C #10/10Ø@280C/C 2. ALL WRITTEN DIMENSIONS SHOULD BE FOLLOWED.
3. DRAWINGS SHOULD BE CHECKED AND VERIFIED AS PER SITE
#10Ø@150C/C(circumferential) #10/10Ø@280C/C #10/10Ø@280C/C CONDITION BEFORE EXECUTION OF THE WORK BY THE EXECUTIVE
1300 1300 ENGINEER CONCERNED.
#10/10Ø@280C/C #10/10Ø@280C/C
700 700 4. ANY DISCREPANCY OR DOUBTS ARISING FROM THE STUDY OF ALL
RELEVANT DRAWING SHALL BE BROUGHT TO THE NOTICE OF THE
ENGINEER IN CHARGE FOR CLARIFICATION BEFORE COMMENCEMENT
OF CONCRETING.
5. THE CONTRACTOR SHALL FULLY SATISFY AND OBTAIN PRIOR
APPROVAL OF THE ENGINEER IN CHARGE REGARDING ALL ASPECTS
150
150
OF THE SPECIFICATION WORK MAIN SHIP AND ISI STANDARD BEFORE
COMMENCEMENT AND PLACEMENT OF ALL.
6. THE CONTRACTOR SHOULD NOT BE PERMITTED TO INSTALL
715 600
600
600
600
600
715 CONDUITS PIPES ,DUCTS, SLEEVES OR ANY CUTTING WORK THAT
600 #10/10Ø@280C/C ARE NOT SHOWN ON THE PLANS OR NOT APPROVED BY THE
#10/10Ø@280C/C ENGINEER OR ARCHITECT.
200
200
7- GRADE OF CONCRETE SHALL BE M25 WITH MINIMUM CEMENT ON
RING BEAM GRID BEAM GRID BEAM 300Kg/m CUB WITH NOMINAL AGGREGATE SIZE OF 20mm.
8-ALL REINFORCEMENT BARS SHALL BE HYSD BARS OF GRADE Fe500
(400X600) (400X550) (400X550) RING BEAM CONFORMING TO IS:1786.
9-CLEAR COVER TO MAIN REINFORCEMENT SHALL BE :
(400X600) a) COLUMN =40mm
b) BEAMS=30mm
SECTION 1-1 c) SLABS=30mm
d) FOOTING =50mm
e) STAIRCASE=30mm
400 400 400 400 10- ALL LAPS SHALL BE 49 TIMES DIA OF BAR FOR M25 GARDE OF
CONCRETE .
COLUMN 11- PIPE DETAILS SHOWN ARE TENTATIVE. PIPE DETAILS REFER
COLUMN MECHANICAL G.A DRAWINGS
12- NET SBC CONSIDERED SHALL BE 80KN/SQ M.
13- OVER EXCAVATION SHALL BE FILLED WITH PCC 100mm
100MM EXTRA PCC SHOULD BE PROVIDED AT ID & OD OF RAFT.
LEGENDS:
FGL- FINISHED GROUND LEVEL
EGL- EXISTING GROUND LEVEL
BOC- BOTTOM OF CONCRETE
5
71
#10Ø@280C/C at beam outer face
600
#10Ø@280C/C at beam outer face
5
71
70
#10Ø@150C/C(circumferential)
0
13
2000
600
00
1450
00
13
3343
3343
60
60
#10Ø@280C/C
.
0
GB1
0
GB1 1 1
#10Ø@280C/C B
62
SB
62
800 2530 800 S SS
2
3790
1
888 888
2
3805
1 GB2 1 200THK.
1113
1113
SSB1 SSB1
5523
500
#10Ø@280C/C 500
200THK. #10Ø@280C/C
#10Ø@280C/C #10Ø@280C/C
7
600 600
44
44
888 888
3790
600
600 #10Ø@280C/C
1450
2000
#10Ø@280C/C
00
3316
3343
0
00
0
10
=3
10
=3
00 00
00
600
00
X3
X3
10
10
600
R.C. DETAIL OF SLAB AT (+) 12.0M LEVEL
R.C. DETAIL OF SLAB AT (+) 12.0M LEVEL (TOP MESH)
(BOTTOM MESH)
. . . . . . . . . . . . . . . . . . . .
Ld Ld
. . . . . . . .
. . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
4-#12Ø #8Ø@150C/C
FACE 12M STAGING CHAKBANDI URF GHATAILA-Deoria-Deoria
700
#10Ø@150C/C 4-#16Ø #10Ø@150C/C JOB NO.- DWG. REF. NO.- SHEET SIZE
#10Ø@100C/C #10Ø@100C/C A2
(8+8+8)-#8ØSTIRRUPS SCALE- REVISION- DATE OF ISSUE-
NTS R0 04-11-22
COLUMN DWG.NO.- 22/JJM/DWP/TATA/100/12/2023
COLUMN COLUMN
(13+7+7+13)-#10ØSTIRRUPS N DESIGN BY- SHEET NO-
PG 3/3
LONGITUDINAL SECTION OF RING BEAM (RB1) DRAWN BY- CHECKED BY-
LONGITUDINAL SECTION OF GRID BEAM (GB1) MS NM