MAA4301
OPTIMIZATION TECHNIQUES
Time: 3 Hours Maximum: 100 Marks
PART A (10 x 2 = 20 marks) CO BTL
Answer ALL questions
All questions carry equal marks
1. Define Objective Function 1 1
2. What are the limitations of solving a LPP using Graphical method in Operations 1 1
Research?
3. Write down the general form of Linear Programming problem. 1 1
4. Define Decision Variables 1 1
5. Write any two limitations of Operations Research in Engineering. 1 1
6. Define No feasible solution in Graphical Method. 1 1
7. How do we convert a minimization problem to a maximization problem while 2 1
solving an LPP?
8. What does ‘M’ stands for in Big M Method? When do we apply Big M Method in 2 1
LPP?
9. Define Slack and Surplus variables. 2 1
10. Write the dual problem of the following LPP 2 2
Min Z=3𝑥 + 2.5𝑥
Subject to
2𝑥 + 4𝑥 ≥ 40,
3𝑥 + 2𝑥 ≥ 50, and 𝑥 , 𝑥 ≥
0.
11. Define Optimum solution. 2 1
12. Write down all the characteristics of canonical form. 2 1
13. Define Pure Integer Programming Problem 3 1
14. Write the General form of Integer Programming Problem 3 1
15. List out the methods to solve Integer Programming Problem. 3 1
16. Define Integer Programming Problem. 3 1
17. Write the methods for solving an Integer Programming problem. 3 1
18. Define Unbalanced Assignment Problem. 4 1
19. Write any two difference between Transportation and Assignment Problem 4 1
20. Define Assignment Problem. 4 1
21. Write the methods of finding Initial Basic Feasible Solution in Transportations 4 1
Problem.
22. Define an activity. 5 1
23. Define Predecessor. 5 1
24. Define Successor. 5 1
25. Define PERT. 5 1
26. Draw a network for the following B,C,D > A ; E > B,C,D. 5 2
27. In a PERT network if 𝑡 = 2, 𝑡 = 5, 𝑡 = 8 , then find the value of expected duration 𝑡 . 5 2
3𝑥 + 2𝑥 ≤ 5, 𝑥 ≤ 2,
and 𝑥 , 𝑥 ≥ 0 and are integers.
Source/Destination 1 2 3 Demand
1 2 7 4 5
2 3 3 1 8
3 5 4 7 7
4 1 6 2 14
Supply 7 9 18 34
49. Consider the problem of assigning 5 jobs to 5 persons. The assignment 4 3
costs are given as follows:-
Jobs
1 2 3 4 5
A 8 4 2 6 1
B 0 9 5 5 4
C 3 8 9 2 6
Persons
D 4 3 1 0 3
E 9 5 8 9 5
signment schedule and optimum assignment
Find the optimum ascost.
50. Find the IBFS for the following transportation problem by VAM 4 3
D1 D2 D3 D4 Availability
S1 11 13 17 14 250
S2 16 18 14 10 300
S3 21 24 13 10 400
Requirement 200 225 275 250
51. Given the following data, Draw a network with usual notation 5 3
Activity Time in weeks
1-2 4
1-3 2
1-4 10
2-5 12
3-5 6
2-6 12
5-6 9
4-6 8
52. A small project is composed of activities whose time estimates are given in 5 3
the following table:
Time required
Activity Duration(hrs)
1-2 1
2-3 5
2-4 3
3-5 4
4-5 2
4-6 5
4-7 9
5-7 4
6-7 2
7-8 2
54. A project consists of the following activities and different time estimates. 5 3
Time required
𝑥+𝑥≤3
and 𝑥 , 𝑥 ≥ 0.
58. Solve the following LPP by graphical method 1 3
Min Z = − 2𝑥 − 3𝑥
Subject to
𝑥 − 𝑥 ≤ 2,
𝑥 + 𝑥 ≥ 4, and 𝑥 , 𝑥 ≥ 0.
61. A farmer has a 100 acre farm. He can sell the tomatoes, lettuce, or radishes 1 3
he can raise. The price he can obtain is Rs 1 per kilogram for tomatoes, Rs
0.75 a head for lettuce and Rs 2 per kilogram for radishes. The average
yield per acre is 2000 kgs for radishes, 3000 heads of lettuce and 1000
kilograms of radishes. Fertilizer is available at Rs 0.50 per kg and the
amount required per acre is 100 kgs each for tomatoes and lettuce and 50
kilograms for radishes. Labour required for sowing, cultivating and
harvesting per acre is 5 man-days for tomatoes and radishes and 6 man-
days for lettuce. A total of 400 man-days of labour are available at Rs 20
per man-day. Formulate this problem as a LPP to maximize the farmer's
total profit.
62. Solve the following LPP graphically 1 3
𝑀𝑎𝑥 𝑍 = 100 𝑥 + 40 𝑥
Subject to
5𝑥 + 2𝑥 ≤ 1000
3𝑥 + 2𝑥 ≤ 900 𝑥 +
2𝑥 ≤ 500
and 𝑥 , 𝑥 ≥ 0.
63. Solve the following LPP by simplex method 2 3
Max Z=4𝑥 + 10𝑥
Subject to
2𝑥 + 𝑥 ≤ 100,
2𝑥 + 5𝑥 ≤ 200,
2𝑥 + 3𝑥 ≤ 180 and 𝑥 , 𝑥≥ 0.
64. Solve the following LPP by Two-Phase method 2 3
Max Z=5𝑥 + 3𝑥
Subject to
2𝑥 + 𝑥 ≤ 1,
𝑥 + 4𝑥 ≥ 6,
𝑥 , 𝑥≥ 0.
72. Find the optimal solution of the Assignment Problem using Hungari an 4 3
Method
1 4 6 3
9 7 10 9
4 5 11 7
8 7 8 5
73. Solve the assignment problem for maximization given the pro fit 4 3
matrix(profit in Rupees)
P Q R S
A 51 53 54 50
B 47 50 48 50
C 49 50 60 61
D 63 64 60 60
74. Solve the transportation problem with unit transportation costs in rupees, 4 3
demands and supplies as given below:
D1 D2 D3 SUPPLY
A 5 6 9 100
B 3 5 10 75
C 6 7 6 50
D 6 4 10 75
DEMAND 70 80 120
75. Draw the critical path using network diagram and also find the totalon 5 3
durati of the project given by
Activity 1-2 1-3 2-4 3-4 3-5 4-5 4-6 5-6
Duartion(Days) 6 5 10 3 4 6 2 9
76. Find the variance and standard deviation of each activity given by 5 3
Activity 1-2 1-6 2-3 2-4 3-5 4-5 6-7 5-8 7-8
𝑡 3 2 6 2 5 3 3 1 4
𝑡 6 5 12 5 11 6 9 4 19
𝑡 15 14 30 8 17 15 27 7 28
77. Find the variance and standard deviation of each activity is given by 5 3
Activity 1-2 1-3 1-4 2-4 2-5 3-4 4-5
𝑡 4 8 6 2 3 2 3
𝑡 5 9 8 4 4 3 5
𝑡 6 11 12 6 6 4 8
78. Draw the network and determinate the critical path of the given data and 5 3
find the total float, free float of each activity.
Jobs 0-1 1-2 1-3 2-4 2-5 3-4 3-6 4-7 5-7 6-7
Duration 3 8 12 6 3 3 8 5 3 8
(Days)
79. A project is represented by the following network given below: 5 3
Activity 1- 2 1-3 1-4 2-6 3-6 4-7 5-7 6-7
Optimistic time 5 18 26 15 6 7 7 3
Det Most likely time 8 20 33 20 9 10 8 4
erm
Pessimistic time 10 22 40 25 12 12 9 5
ine
the following
Expected task times and their variance.
i. ii.
The critical path.