Hse Tool Box Talk June Week2

Uploaded by

nuk6349
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views6 pages

Hse Tool Box Talk June Week2

Uploaded by

nuk6349
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Effective Date: 27/5/2024

Al Hikma Building Cont. L.L.C


Document Code:
Document Title:
HBC-HSE-FRM-TBT
WEEKLY TBT Rev. No.
Page No.
1 of 3
00

Toolbox Talk: Scaffold Work (External and Internal) on Construction Sites

Hazards and Control Measures:

1. Falls from Height:


o Control Measures:
 Install guardrails and toeboards on all open sides.
 Use fall protection equipment, such as harnesses and lanyards.
 Ensure scaffolding is erected and inspected by trained and competent
personnel.
 Maintain three points of contact when climbing.
2. Scaffold Collapse:
o Control Measures:
 Conduct regular inspections to ensure structural integrity.
 Do not exceed the scaffold’s load capacity.
 Ensure scaffolds are erected on stable, level ground with proper anchoring.
 Follow manufacturer guidelines for scaffold assembly and disassembly.
3. Falling Objects:
o Control Measures:
 Use tool lanyards to secure tools.
 Install toeboards and debris nets to catch falling materials.
 Keep work areas tidy and secure loose materials.
 Establish controlled access zones below scaffolds to keep non-essential
personnel out.
4. Weather-Related Hazards:
o Control Measures:
 Monitor weather conditions and avoid working on scaffolds during high
winds, rain, or icy conditions.
 Secure scaffolding during adverse weather to prevent movement or
collapse.
 Use non-slip footwear and keep platforms clear of ice and debris.
5. Electrocution:
o Control Measures:
 Maintain a safe distance between scaffolding and power lines.
 Use insulated tools and equipment when working near electrical
installations.
 De-energize electrical equipment when possible before working near it.
 Train workers on electrical hazard awareness.

Toolbox Talk: Working in Shaft and Lift Areas on Construction Sites


Effective Date: 27/5/2024
Al Hikma Building Cont. L.L.C
Document Code:
Document Title:
HBC-HSE-FRM-TBT
WEEKLY TBT Rev. No.
Page No.
2 of 3
00

Hazards and Control Measures:

1. Falls from Height:


o Control Measures:
 Use full-body harnesses with lanyards attached to secure anchor points.
 Install guardrails and barriers around open shafts.
 Ensure proper lighting and clear marking of shaft edges.
2. Falling Objects:
o Control Measures:
 Use tool lanyards and secure all tools and materials.
 Install toeboards and debris nets.
 Prohibit work above or below other workers within the shaft
simultaneously.
3. Confined Space Hazards:
o Control Measures:
 Ensure proper ventilation in confined spaces.
 Conduct air quality tests before entry.
 Provide training on confined space entry and emergency procedures.
4. Electrocution:
o Control Measures:
 De-energize electrical equipment in the vicinity of the work area.
 Use insulated tools and wear rubber-soled shoes.
 Maintain safe distances from live electrical components.
5. Moving Equipment:
o Control Measures:
 Coordinate with lift operators to ensure lifts are not moved while workers
are in the shaft.
 Use lockout/tagout procedures for mechanical equipment.
 Ensure clear communication and establish signals between workers and
equipment operators.

Toolbox Talk: Climbing Up and Down a 24-Meter Scaffold

Hazards and Control Measures:

1. Falls from Height:


o Control Measures:
 Maintain three points of contact (two hands and one foot, or two feet and
one hand) at all times.
 Always face the ladder or access point when climbing.
Effective Date: 27/5/2024
Al Hikma Building Cont. L.L.C
Document Code:
Document Title:
HBC-HSE-FRM-TBT
WEEKLY TBT Rev. No.
Page No.
3 of 3
00

Carry tools in a tool belt or secure them to the scaffold, keeping hands free
for climbing.
 Wear a full-body harness with a lanyard attached to a secure anchor point.
2. Structural Instability:
o Control Measures:
 Inspect the scaffold regularly to ensure it is stable and properly assembled.
 Ensure scaffolding is not overloaded and weight is evenly distributed.
 Verify that the scaffold is securely anchored and set on a stable base.
3. Falling Objects:
o Control Measures:
 Use tool lanyards and secure all tools and materials while climbing.
 Ensure guardrails and toeboards are in place and secure.
 Keep the work area tidy to prevent objects from being knocked off.

Toolbox Talk: Object Fall Hazard from Slab Edges and Scaffolding

Hazards and Control Measures:

1. Falling Tools and Materials:


o Control Measures:
 Use tool lanyards to secure tools and prevent them from falling.
 Install guardrails and toeboards on slab edges and scaffolding.
 Use safety nets below working areas to catch falling objects.
 Keep work areas tidy and free of loose materials.
2. Inadequate Guardrails and Toeboards:
o Control Measures:
 Ensure guardrails and toeboards are properly installed and maintained.
 Conduct regular inspections to verify the integrity of guardrails and
toeboards.
 Train workers on the importance of maintaining these safety features.
3. Insecure Storage:
o Control Measures:
 Store materials away from the edges of scaffolding and slab edges.
 Use storage bins or racks to organize tools and materials.
 Secure all stored items to prevent them from being knocked off.
4. Inadequate PPE:
o Control Measures:
 Ensure all workers wear hard hats and safety glasses at all times.
 Provide training on the correct use and importance of PPE.
 Regularly inspect PPE for damage and replace it as necessary.
5. Poor Housekeeping:
Effective Date: 27/5/2024
Al Hikma Building Cont. L.L.C
Document Code:
Document Title:
HBC-HSE-FRM-TBT
WEEKLY TBT Rev. No.
Page No.
4 of 3
00

o Control Measures:
 Implement a regular housekeeping schedule to keep work areas clean.
 Remove debris and loose materials from work areas promptly.
 Encourage workers to keep their individual workspaces tidy.
Effective Date: 27/5/2024
Al Hikma Building Cont. L.L.C
Document Code:
Document Title:
HBC-HSE-FRM-TBT
WEEKLY TBT Rev. No.
Page No.
5 of 3
00
Effective Date: 27/5/2024
Al Hikma Building Cont. L.L.C
Document Code:
Document Title:
HBC-HSE-FRM-TBT
WEEKLY TBT Rev. No.
Page No.
6 of 3