0% found this document useful (0 votes)
347 views1 page

lm6000 Fact Sheet Product Specifications

Uploaded by

elinsbot
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
347 views1 page

lm6000 Fact Sheet Product Specifications

Uploaded by

elinsbot
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

LM6000

AERODERIVATIVE GAS TURBINE

50/60HZ

53 MW SIMPLE CYCLE OUTPUT UP TO

>40% SIMPLE CYCLE EFFICIENCY 35%


HYDROGEN
GE’S FIRST GAS TURBINE TO BE PAIRED WITH C A PA B I L I T Y
A BATTERY ENERGY STORAGE SYSTEM. FOUR
UNITS ARE ALREADY IN OPERATION, AND THE
TECHNOLOGY IS EXPANDING TO CREATE A
NEW “HYBRID” PRODUCT LINE.
LM60 0 0 PC LM60 0 0 PF+ Over 40 million operating hours and more
SC Net Output (MW) 46.6 53.9 than 1,320 units shipped makes GE’s LM6000
PERFORMANCE
SC PLANT

SC Net Heat Rate (Btu/kWh, LHV) 8,533 8,357 aeroderivative gas turbine a leader in the
SC Net Heat Rate (kJ/kWh, LHV) 9,002 8,817 +40 MW space. The LM6000 offers greater
SC Net Efficiency (%, LHV) 40.0% 40.8%
than 99 percent start and operational reliability
CC Net Output (MW) 60.3 72.4
and greater than 98 percent availability.
CC Net Heat Rate (Btu/kWh, LHV) 6,571 6,170
PERFORMANCE

Its 5-minute fast start allows operators to


1X CC PLANT

CC Net Heat Rate (kJ/kWh, LHV) 6,932 6,510


CC Net Efficiency (%, LHV) 51.9% 55.3% differentiate their dispatch capability while a
Plant Turndown – Minimum Load (%) 19.0% 37.0% simple two-spool configuration results in lower
Ramp Rate (MW/min) 30 30 overall maintenance costs. Universal
Startup Time (RR Hot†, Minutes) 30 30
and modular packaging gives the LM6000
CC Net Output (MW) 121.1 145.6
a smaller footprint and allows for faster
CC Net Heat Rate (Btu/kWh, LHV) 6,541 6,134
PERFORMANCE

installation and commissioning.


2X CC PLANT

CC Net Heat Rate (kJ/kWh, LHV) 6,902 6,472


CC Net Efficiency (%, LHV) 52.2% 55.6%
Plant Turndown – Minimum Load (%) 19.0% 18.0%
Ramp Rate (MW/min) 60 60
Startup Time (RR Hot†, Minutes) 30 30
NOTE: All ratings are net plant, based on ISO conditions and natural gas fuel. Actual performance will vary with project-specific
conditions and fuel. © 2022 GE. All rights reserved.
† Rapid Response/Hot Start
GEA32935B (11/2022)

You might also like