0% found this document useful (0 votes)
39 views44 pages

Logbook

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views44 pages

Logbook

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 44

P.

C KINYANJUI TECHNICAL TRAINING


INSTITUTE

ATTACHMENT LOGBOOK
DEPARTMENT: …………………………….
OUR MOTTO

“EXCELLENCE IN TECHNOLOGY”

P.O BOX 21280 - 00505


NAIROBI.

TEL. 020 2042736/8

Cell: 0721 480 199 /0773 829 417


Email – [email protected]
[email protected]
www.kinyanjuitechnical.ac.ke

1
PREAMBLE

Prior to the introduction of the 8:4:4 system of education, placing attachés on industrial attachment was not a
challenge as all attachés entering the Technical Training system were required to have employer’s sponsorship.

However, with the advent of the 8:4:4 system, opportunities opened up for non – sponsored attachés to join
technical training institutions but there was no guarantee for self-sponsored attachés to secure opportunities
for industrial attachment.

The National Industrial Training Authority (NITA) is a state corporation that was established under the
Industrial Training (Amendment) Act of 2011 to assist all attachés in tertiary institutions and universities to
secure attachment places. It coordinates industrial attachment under its Industrial Attachment Programme. It
links industry and institutions for placement of attachés at the work place for acquisition of practical skills and
appropriate work-ethics.

The main purpose of the attachment is to expose the attachés to the application of the skills they have learned
in their trade in theory in real practice where others are earning their living from and also to the world of work
and the ethics associated thereof.

Industrial attachment is therefore an important part of technical training and is therefore a compulsory
session for each attaché. It is meant to give the attaché exposure in real-work situation. It also gives the
attaché an opportunity to interact with the industry and apply the knowledge and skills acquired at various
levels of training to real life experiences in a typical environment in the industry.

Some of the aims of industrial attachment include:

i. Exposure of attachés to latest technology in the industry


ii. For industry to assess relevance of skills the attaché has acquired and advises trainers.
iii. Gain insight into serious interpersonal and teamwork relationship that exists in industry.
iv. Attain a certificate of performance necessary for the award of respective Diplomas and Certificates at
the end of the course in line with Technical and Vocational Entrepreneurship Training (TVET)
reforms.

2
THE LOG BOOK

INTRODUCTION

This book aims to assist the attaché to keep a record of the day to day activities during the attachment
period. It will show the organization in which the attaché has worked on attachment and the period of time
spent in that organization.

ATTACHMENT PROGRAMME

The attaché must follow the set out attachment programme formulated by the department where he/she is
attached. This programme should be given to the attaché at the beginning of the activity. The department should
provide an atmosphere for learning desired competencies.

REPORT WRITING

The attaché is expected to write a daily report on the experiences acquired during the attachment. The supervisor
should give some information on the organization and contact address.

DAILY REPORT

The daily work carried out during the period of attachment is to be recorded clearly with sketches and
diagrams where applicable. This is a summary of work done in a week and should cover all the activities and
the level of accomplishment of each. Attachés are required to present the Logbook to the Supervisor/Trainer
(Technician) for assessment of content and progress at the end of each week.

3
INDUSTRIAL ATTACHMENT TOOLS

a. Attaché’s letter of introduction – containing attaché details, list of areas of practice and
familiarization as well as any other important information. The letter is to be distributed to attachés
by their respective Departmental Attachment Officers (DAO’s) three months before the beginning of
attachment period.

b. Logbook - to be distributed to attachés by the respective DAO two weeks before the end of the
term prior to attachment period. The log book is to be filled on a daily basis during the
attachment period.

c. Industrial Attachment Assessment Form - to be duly filled and then handed over in duplicate to
the Industrial Attachment Officer (ILO) on completion of attachment period. (pages 42 and
43)

4
Attaché’s Particulars
Last Name:…………………………………………………………………………….

Other Names:……………………..…………………………………………………...

Identity Card No:………………………………………………………………….......

Admission No:………………………………………………………………………...

Date of Birth: Date……………......Month………….……..Year…………………….

Course…………………………Level………………..Year/Module………………….

Home Address……………………………Code…………..Town…………………….
.
Telephone……………………………………………………………………………….

Next of Kin

Name:………………………………….Relationship:………………………..……….

Postal Address:……………………..Postal Code:……………..Tel:………………….

Details of Attachment Place:

Name of Organization:………….……………………..……………………………….

Postal Address……………………………………..Code:…………………………….

Tel…………………………………Fax / E-mail ……………….……….……………

Name of Industry Based Supervisor:……………………………………………………

Position/ Designation:…………………………………………………………………..

Mobile Contact …………………………………………………………………………

Attachment duration period:


From: ……………………………………….………To: ………………………………

5
DAILY INDUSTRIAL ATTACHMENT PROGRESS RECORD

PART I –To be filled by the Attaché

Week…………………………

Date: From……………………….To:………………………………….

DAY/DATE DESCRIPTION OF NEW SKILLS LEARNT


WORK/ACTIVITY DONE
MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 6


PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log Book
Remarks by the Attaché:
……………………………………………………………………………………………………………
……………………………………………………………………………………………………………

Name………………………………….Sign……………………..Date…………………………………..
.

PART II – To be filled by the Industry Based Attachment Trainer/Technician

Comments…………………………………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..

Name………………………………….Signature………………………..…Date…………………….….

.
PART III – To be filled by the Industry Based Attachment Supervisor

Comments…………………………………………………………………………………………………
…………………………………………………………………………………………………………….
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
………………………………………………………………………………………………………….….

Name………………………………….Signature………………………..…Date…………………….….

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 7


ANY OTHER RELEVANT INFORMATION OR USEFUL DRAWINGS/
DIAGRAMS/SKETCHES/CHARTS/PROCESSES/NOTES/
CALCULATIONS E.T. C

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 8


DAILY INDUSTRIAL ATTACHMENT PROGRESS RECORD

PART I –To be filled by the Attaché

Week…………………………

Date: From……………………….To: ………………………………….

DAY/DATE DESCRIPTION OF NEW SKILLS LEARNT


WORK/ACTIVITY DONE
MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 9


Remarks by the Attaché:
……………………………………………………………………………………………………………
……………………………………………………………………………………………………………

Name………………………………….Sign……………………..Date…………………………………..
.

PART II – To be filled by the Industry Based Attachment Trainer/Technician

Comments…………………………………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..

Name………………………………….Signature………………………..…Date…………………….….

.
PART III – To be filled by the Industry Based Attachment Supervisor

Comments…………………………………………………………………………………………………
…………………………………………………………………………………………………………….
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
………………………………………………………………………………………………………….….

Name………………………………….Signature………………………..…Date…………………….….

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 1


ANY OTHER RELEVANT INFORMATION OR USEFUL DRAWINGS/
DIAGRAMS/SKETCHES/CHARTS/PROCESSES/NOTES/
CALCULATIONS E.T. C

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 1


DAILY INDUSTRIAL ATTACHMENT PROGRESS RECORD

PART I –To be filled by the Attaché

Week…………………………

Date: From……………………….To: ………………………………….

DAY/DATE DESCRIPTION OF NEW SKILLS LEARNT


WORK/ACTIVITY DONE
MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 1


Remarks by the Attaché:
……………………………………………………………………………………………………………
……………………………………………………………………………………………………………

Name………………………………….Sign……………………..Date…………………………………..
.

PART II – To be filled by the Industry Based Attachment Trainer/Technician

Comments…………………………………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..

Name………………………………….Signature………………………..…Date…………………….….

.
PART III – To be filled by the Industry Based Attachment Supervisor

Comments…………………………………………………………………………………………………
…………………………………………………………………………………………………………….
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
………………………………………………………………………………………………………….….

Name………………………………….Signature………………………..…Date…………………….….

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 1


ANY OTHER RELEVANT INFORMATION OR USEFUL DRAWINGS/
DIAGRAMS/SKETCHES/CHARTS/PROCESSES/NOTES/
CALCULATIONS E.T. C

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 1


DAILY INDUSTRIAL ATTACHMENT PROGRESS RECORD

PART I – To be filled by the Attaché

Week…………………………

Date: From……………………….To:………………………………….

DAY/DATE DESCRIPTION OF NEW SKILLS LEARNT


WORK/ACTIVITY DONE
MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 1


Remarks by the Attaché:
……………………………………………………………………………………………………………
……………………………………………………………………………………………………………

Name………………………………….Sign……………………..Date…………………………………..
.

PART II – To be filled by the Industry Based Attachment Trainer/Technician

Comments…………………………………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..

Name………………………………….Signature………………………..…Date…………………….….

.
PART III – To be filled by the Industry Based Attachment Supervisor

Comments…………………………………………………………………………………………………
…………………………………………………………………………………………………………….
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
………………………………………………………………………………………………………….….

Name………………………………….Signature………………………..…Date…………………….….

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 1


ANY OTHER RELEVANT INFORMATION OR USEFUL DRAWINGS/
DIAGRAMS/SKETCHES/CHARTS/PROCESSES/NOTES/
CALCULATIONS E.T. C

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 1


DAILY INDUSTRIAL ATTACHMENT PROGRESS RECORD

PART I – To be filled by the Attaché

Week…………………………

Date: From……………………….To:………………………………….

DAY/DATE DESCRIPTION OF NEW SKILLS LEARNT


WORK/ACTIVITY DONE
MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 1


Remarks by the Attaché:
……………………………………………………………………………………………………………
……………………………………………………………………………………………………………

Name………………………………….Sign……………………..Date…………………………………..
.

PART II – To be filled by the Industry Based Attachment Trainer/Technician

Comments…………………………………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..

Name………………………………….Signature………………………..…Date…………………….….

PART III – To be filled by the Industry Based Attachment Supervisor

Comments…………………………………………………………………………………………………
…………………………………………………………………………………………………………….
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
………………………………………………………………………………………………………….….

Name………………………………….Signature………………………..…Date…………………….….

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 1


ANY OTHER RELEVANT INFORMATION OR USEFUL DRAWINGS/
DIAGRAMS/SKETCHES/CHARTS/PROCESSES/NOTES/
CALCULATIONS E.T. C

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 2


DAILY INDUSTRIAL ATTACHMENT PROGRESS RECORD

PART I – To be filled by the Attaché

Week…………………………

Date: From……………………….To:………………………………….

DAY/DATE DESCRIPTION OF NEW SKILLS LEARNT


WORK/ACTIVITY DONE
MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 2


Remarks by the Attaché:
……………………………………………………………………………………………………………
……………………………………………………………………………………………………………

Name………………………………….Sign……………………..Date…………………………………..
.

PART II – To be filled by the Industry Based Attachment Trainer/Technician

Comments…………………………………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..

Name………………………………….Signature………………………..…Date…………………….….

PART III – To be filled by the Industry Based Attachment Supervisor

Comments…………………………………………………………………………………………………
…………………………………………………………………………………………………………….
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
………………………………………………………………………………………………………….….

Name………………………………….Signature………………………..…Date…………………….….

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 2


ANY OTHER RELEVANT INFORMATION OR USEFUL DRAWINGS/
DIAGRAMS/SKETCHES/CHARTS/PROCESSES/NOTES/
CALCULATIONS E.T. C

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 2


DAILY INDUSTRIAL ATTACHMENT PROGRESS RECORD

PART I – To be filled by the Attaché

Week…………………………

Date: From……………………….To:………………………………….

DAY/DATE DESCRIPTION OF NEW SKILLS LEARNT


WORK/ACTIVITY DONE
MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 2


Remarks by the Attaché:
……………………………………………………………………………………………………………
……………………………………………………………………………………………………………

Name………………………………….Sign……………………..Date…………………………………..
.

PART II – To be filled by the Industry Based Attachment Trainer/Technician

Comments…………………………………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..

Name………………………………….Signature………………………..…Date…………………….….

PART III – To be filled by the Industry Based Attachment Supervisor

Comments…………………………………………………………………………………………………
…………………………………………………………………………………………………………….
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
………………………………………………………………………………………………………….….

Name………………………………….Signature………………………..…Date…………………….….

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 2


ANY OTHER RELEVANT INFORMATION OR USEFUL DRAWINGS/
DIAGRAMS/SKETCHES/CHARTS/PROCESSES/NOTES/
CALCULATIONS E.T. C

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 2


DAILY INDUSTRIAL ATTACHMENT PROGRESS RECORD

PART I – To be filled by the Attaché

Week…………………………

Date: From……………………….To:………………………………….

DAY/DATE DESCRIPTION OF NEW SKILLS LEARNT


WORK/ACTIVITY DONE
MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 2


Remarks by the Attaché:
……………………………………………………………………………………………………………
……………………………………………………………………………………………………………

Name………………………………….Sign……………………..Date…………………………………..
.

PART II – To be filled by the Industry Based Attachment Trainer/Technician

Comments…………………………………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..

Name………………………………….Signature………………………..…Date…………………….….

PART III – To be filled by the Industry Based Attachment Supervisor

Comments…………………………………………………………………………………………………
…………………………………………………………………………………………………………….
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
………………………………………………………………………………………………………….….

Name………………………………….Signature………………………..…Date…………………….….

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 2


ANY OTHER RELEVANT INFORMATION OR USEFUL DRAWINGS/
DIAGRAMS/SKETCHES/CHARTS/PROCESSES/NOTES/
CALCULATIONS E.T. C

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 2


DAILY INDUSTRIAL ATTACHMENT PROGRESS RECORD

PART I – To be filled by the Attaché

Week…………………………

Date: From……………………….To:………………………………….

DAY/DATE DESCRIPTION OF NEW SKILLS LEARNT


WORK/ACTIVITY DONE
MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

Remarks by the Attaché:


……………………………………………………………………………………………………………

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 3


……………………………………………………………………………………………………………

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 3


Name………………………………….Sign……………………..Date…………………………………..
.

PART II – To be filled by the Industry Based Attachment Trainer/Technician

Comments…………………………………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..

Name………………………………….Signature………………………..…Date…………………….….

PART III – To be filled by the Industry Based Attachment Supervisor

Comments…………………………………………………………………………………………………
…………………………………………………………………………………………………………….
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
………………………………………………………………………………………………………….….

Name………………………………….Signature………………………..…Date…………………….….

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 3


ANY OTHER RELEVANT INFORMATION OR USEFUL DRAWINGS/
DIAGRAMS/SKETCHES/CHARTS/PROCESSES/NOTES/
CALCULATIONS E.T. C

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 3


DAILY INDUSTRIAL ATTACHMENT PROGRESS RECORD

PART I – To be filled by the Attaché

Week…………………………

Date: From……………………….To:………………………………….

DAY/DATE DESCRIPTION OF NEW SKILLS LEARNT


WORK/ACTIVITY DONE
MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 3


Remarks by the Attaché:
……………………………………………………………………………………………………………
……………………………………………………………………………………………………………

Name………………………………….Sign……………………..Date…………………………………..
.

PART II – To be filled by the Industry Based Attachment Trainer/Technician

Comments…………………………………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..

Name………………………………….Signature………………………..…Date…………………….….

PART III – To be filled by the Industry Based Attachment Supervisor

Comments…………………………………………………………………………………………………
…………………………………………………………………………………………………………….
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
………………………………………………………………………………………………………….….

Name………………………………….Signature………………………..…Date…………………….….

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 3


ANY OTHER RELEVANT INFORMATION OR USEFUL DRAWINGS/
DIAGRAMS/SKETCHES/CHARTS/PROCESSES/NOTES/
CALCULATIONS E.T. C

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 3


DAILY INDUSTRIAL ATTACHMENT PROGRESS RECORD

PART I – To be filled by the Attaché

Week…………………………

Date: From……………………….To:………………………………….

DAY/DATE DESCRIPTION OF NEW SKILLS LEARNT


WORK/ACTIVITY DONE
MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 3


Remarks by the Attaché:
……………………………………………………………………………………………………………
……………………………………………………………………………………………………………

Name………………………………….Sign……………………..Date…………………………………..
.

PART II – To be filled by the Industry Based Attachment Trainer/Technician

Comments…………………………………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..

Name………………………………….Signature………………………..…Date…………………….….

PART III – To be filled by the Industry Based Attachment Supervisor

Comments…………………………………………………………………………………………………
…………………………………………………………………………………………………………….
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
………………………………………………………………………………………………………….….

Name………………………………….Signature………………………..…Date…………………….….

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 3


ANY OTHER RELEVANT INFORMATION OR USEFUL DRAWINGS/
DIAGRAMS/SKETCHES/CHARTS/PROCESSES/NOTES/
CALCULATIONS E.T. C

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 3


DAILY INDUSTRIAL ATTACHMENT PROGRESS RECORD

PART I – To be filled by the Attaché

Week…………………………

Date: From……………………….To:………………………………….

DAY/DATE DESCRIPTION OF NEW SKILLS LEARNT


WORK/ACTIVITY DONE
MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 4


Remarks by the Attaché:
……………………………………………………………………………………………………………
……………………………………………………………………………………………………………

Name………………………………….Sign……………………..Date…………………………………..
.

PART II – To be filled by the Industry Based Attachment Trainer/Technician

Comments…………………………………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..

Name………………………………….Signature………………………..…Date…………………….….

PART III – To be filled by the Industry Based Attachment Supervisor

Comments…………………………………………………………………………………………………
…………………………………………………………………………………………………………….
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
………………………………………………………………………………………………………….….

Name………………………………….Signature………………………..…Date…………………….….

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 4


ANY OTHER RELEVANT INFORMATION OR USEFUL DRAWINGS/
DIAGRAMS/SKETCHES/CHARTS/PROCESSES/NOTES/
CALCULATIONS E.T. C

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 4


Industrial Attachment Assessment Form
(This form is to be filled by the Industry Based Supervisor in Duplicate)

Details of Attachment

Full Name of Attaché: ………………………………………………………………………………….


Admission No……………………..Attachment Contract No……………………………………………
Total length of Attachment in Months………………………………………………………….………..

Period: From: Date……………………Month……………….Year…………………………………….


To : Date……………………Month………………..Year……………………………………
Name of Training Institution:…………………………………………………………………………….
Name of Organization attached:………………………………………………………………………….

Please, give your assessment of this attaché’s performance during the period of attachment on the 5-
point scale below:
Assessment Areas Rating
Scale
Excellent Good Average Fair Poor
5 4 3 2 1
1. Punctuality
2. Adhere to regulations
3. Workmanship and Work
Output
4. Adaptability
5. Communication
6. Reliability
7. Teamwork

Total /35

Overall assessment of the attaché as determined by the average score (please tick as appropriate)
Excellent Good Average Fair Poor

Supervised by: Name………………………………Position/Designation……………………………..


Signature:………………….. Date………….Official Stamp:.................................................................

Assessed by: Name:……………………………Signature:………………......Date:………………..


Assessor’s General Remarks:….………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..

Signed by Attaché…………………………………Date………………………………………………...

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 4


Industrial Attachment Assessment Form
(This form is to be filled by the Industry Based Supervisor in Duplicate)

Details of Attachment

Full Name of Attaché: …………………………………..Female Male


Admission No……………………..Attachment Contract No……………………………………….
Total length of Attachment in Months……………………………………………………………….

Period: From: Date……………………Month……………….Year………………………………..


To: Date……………………Month………………..Year……………………………….
Name of Training Institution:………………………………………………………………………...
Name of Organization Attached:……………………………………………………………………...

Please, give your assessment of this attaché’s performance during the period of
attachment on the 5-point scale below: (to be filled in by Industry Based Supervisor)
Assessment Areas Rating Scale
Excellent Good Average Fair Poor
5 4 3 2 1
1. Punctuality
2. Adhere to regulations
3. Workmanship and Work
Output
4. Adaptability
5. Communication
6. Reliability
7. Teamwork

Total /35

Overall assessment of the attaché as determined by the average score (please tick as appropriate)
Excellent Good Average Fair Poor

Supervised by: Name………………………………Position/Designation……………………………..


Signature:………………….. Date………….Official Stamp:.................................................................

Assessed by: Name:………………………… Signature:………………......Date:………………..


Assessor’s General Remarks:….………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..

Signed by Attaché…………………………………Date………………………………………………...

PC Kinyanjui Technical Training Institute – Trainees Industrial Attachment Log 4

You might also like