Logbook
Logbook
ATTACHMENT LOGBOOK
DEPARTMENT: …………………………….
OUR MOTTO
“EXCELLENCE IN TECHNOLOGY”
1
PREAMBLE
Prior to the introduction of the 8:4:4 system of education, placing attachés on industrial attachment was not a
challenge as all attachés entering the Technical Training system were required to have employer’s sponsorship.
However, with the advent of the 8:4:4 system, opportunities opened up for non – sponsored attachés to join
technical training institutions but there was no guarantee for self-sponsored attachés to secure opportunities
for industrial attachment.
The National Industrial Training Authority (NITA) is a state corporation that was established under the
Industrial Training (Amendment) Act of 2011 to assist all attachés in tertiary institutions and universities to
secure attachment places. It coordinates industrial attachment under its Industrial Attachment Programme. It
links industry and institutions for placement of attachés at the work place for acquisition of practical skills and
appropriate work-ethics.
The main purpose of the attachment is to expose the attachés to the application of the skills they have learned
in their trade in theory in real practice where others are earning their living from and also to the world of work
and the ethics associated thereof.
Industrial attachment is therefore an important part of technical training and is therefore a compulsory
session for each attaché. It is meant to give the attaché exposure in real-work situation. It also gives the
attaché an opportunity to interact with the industry and apply the knowledge and skills acquired at various
levels of training to real life experiences in a typical environment in the industry.
2
THE LOG BOOK
INTRODUCTION
This book aims to assist the attaché to keep a record of the day to day activities during the attachment
period. It will show the organization in which the attaché has worked on attachment and the period of time
spent in that organization.
ATTACHMENT PROGRAMME
The attaché must follow the set out attachment programme formulated by the department where he/she is
attached. This programme should be given to the attaché at the beginning of the activity. The department should
provide an atmosphere for learning desired competencies.
REPORT WRITING
The attaché is expected to write a daily report on the experiences acquired during the attachment. The supervisor
should give some information on the organization and contact address.
DAILY REPORT
The daily work carried out during the period of attachment is to be recorded clearly with sketches and
diagrams where applicable. This is a summary of work done in a week and should cover all the activities and
the level of accomplishment of each. Attachés are required to present the Logbook to the Supervisor/Trainer
(Technician) for assessment of content and progress at the end of each week.
3
INDUSTRIAL ATTACHMENT TOOLS
a. Attaché’s letter of introduction – containing attaché details, list of areas of practice and
familiarization as well as any other important information. The letter is to be distributed to attachés
by their respective Departmental Attachment Officers (DAO’s) three months before the beginning of
attachment period.
b. Logbook - to be distributed to attachés by the respective DAO two weeks before the end of the
term prior to attachment period. The log book is to be filled on a daily basis during the
attachment period.
c. Industrial Attachment Assessment Form - to be duly filled and then handed over in duplicate to
the Industrial Attachment Officer (ILO) on completion of attachment period. (pages 42 and
43)
4
Attaché’s Particulars
Last Name:…………………………………………………………………………….
Other Names:……………………..…………………………………………………...
Admission No:………………………………………………………………………...
Course…………………………Level………………..Year/Module………………….
Home Address……………………………Code…………..Town…………………….
.
Telephone……………………………………………………………………………….
Next of Kin
Name:………………………………….Relationship:………………………..……….
Name of Organization:………….……………………..……………………………….
Postal Address……………………………………..Code:…………………………….
Position/ Designation:…………………………………………………………………..
5
DAILY INDUSTRIAL ATTACHMENT PROGRESS RECORD
Week…………………………
Date: From……………………….To:………………………………….
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
Name………………………………….Sign……………………..Date…………………………………..
.
Comments…………………………………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
Name………………………………….Signature………………………..…Date…………………….….
.
PART III – To be filled by the Industry Based Attachment Supervisor
Comments…………………………………………………………………………………………………
…………………………………………………………………………………………………………….
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
………………………………………………………………………………………………………….….
Name………………………………….Signature………………………..…Date…………………….….
Week…………………………
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
Name………………………………….Sign……………………..Date…………………………………..
.
Comments…………………………………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
Name………………………………….Signature………………………..…Date…………………….….
.
PART III – To be filled by the Industry Based Attachment Supervisor
Comments…………………………………………………………………………………………………
…………………………………………………………………………………………………………….
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
………………………………………………………………………………………………………….….
Name………………………………….Signature………………………..…Date…………………….….
Week…………………………
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
Name………………………………….Sign……………………..Date…………………………………..
.
Comments…………………………………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
Name………………………………….Signature………………………..…Date…………………….….
.
PART III – To be filled by the Industry Based Attachment Supervisor
Comments…………………………………………………………………………………………………
…………………………………………………………………………………………………………….
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
………………………………………………………………………………………………………….….
Name………………………………….Signature………………………..…Date…………………….….
Week…………………………
Date: From……………………….To:………………………………….
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
Name………………………………….Sign……………………..Date…………………………………..
.
Comments…………………………………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
Name………………………………….Signature………………………..…Date…………………….….
.
PART III – To be filled by the Industry Based Attachment Supervisor
Comments…………………………………………………………………………………………………
…………………………………………………………………………………………………………….
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
………………………………………………………………………………………………………….….
Name………………………………….Signature………………………..…Date…………………….….
Week…………………………
Date: From……………………….To:………………………………….
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
Name………………………………….Sign……………………..Date…………………………………..
.
Comments…………………………………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
Name………………………………….Signature………………………..…Date…………………….….
Comments…………………………………………………………………………………………………
…………………………………………………………………………………………………………….
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
………………………………………………………………………………………………………….….
Name………………………………….Signature………………………..…Date…………………….….
Week…………………………
Date: From……………………….To:………………………………….
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
Name………………………………….Sign……………………..Date…………………………………..
.
Comments…………………………………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
Name………………………………….Signature………………………..…Date…………………….….
Comments…………………………………………………………………………………………………
…………………………………………………………………………………………………………….
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
………………………………………………………………………………………………………….….
Name………………………………….Signature………………………..…Date…………………….….
Week…………………………
Date: From……………………….To:………………………………….
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
Name………………………………….Sign……………………..Date…………………………………..
.
Comments…………………………………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
Name………………………………….Signature………………………..…Date…………………….….
Comments…………………………………………………………………………………………………
…………………………………………………………………………………………………………….
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
………………………………………………………………………………………………………….….
Name………………………………….Signature………………………..…Date…………………….….
Week…………………………
Date: From……………………….To:………………………………….
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
Name………………………………….Sign……………………..Date…………………………………..
.
Comments…………………………………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
Name………………………………….Signature………………………..…Date…………………….….
Comments…………………………………………………………………………………………………
…………………………………………………………………………………………………………….
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
………………………………………………………………………………………………………….….
Name………………………………….Signature………………………..…Date…………………….….
Week…………………………
Date: From……………………….To:………………………………….
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
Comments…………………………………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
Name………………………………….Signature………………………..…Date…………………….….
Comments…………………………………………………………………………………………………
…………………………………………………………………………………………………………….
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
………………………………………………………………………………………………………….….
Name………………………………….Signature………………………..…Date…………………….….
Week…………………………
Date: From……………………….To:………………………………….
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
Name………………………………….Sign……………………..Date…………………………………..
.
Comments…………………………………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
Name………………………………….Signature………………………..…Date…………………….….
Comments…………………………………………………………………………………………………
…………………………………………………………………………………………………………….
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
………………………………………………………………………………………………………….….
Name………………………………….Signature………………………..…Date…………………….….
Week…………………………
Date: From……………………….To:………………………………….
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
Name………………………………….Sign……………………..Date…………………………………..
.
Comments…………………………………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
Name………………………………….Signature………………………..…Date…………………….….
Comments…………………………………………………………………………………………………
…………………………………………………………………………………………………………….
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
………………………………………………………………………………………………………….….
Name………………………………….Signature………………………..…Date…………………….….
Week…………………………
Date: From……………………….To:………………………………….
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
Name………………………………….Sign……………………..Date…………………………………..
.
Comments…………………………………………………………………………………………………
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
Name………………………………….Signature………………………..…Date…………………….….
Comments…………………………………………………………………………………………………
…………………………………………………………………………………………………………….
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
……………………………………………………………………………………………………………..
………………………………………………………………………………………………………….….
Name………………………………….Signature………………………..…Date…………………….….
Details of Attachment
Please, give your assessment of this attaché’s performance during the period of attachment on the 5-
point scale below:
Assessment Areas Rating
Scale
Excellent Good Average Fair Poor
5 4 3 2 1
1. Punctuality
2. Adhere to regulations
3. Workmanship and Work
Output
4. Adaptability
5. Communication
6. Reliability
7. Teamwork
Total /35
Overall assessment of the attaché as determined by the average score (please tick as appropriate)
Excellent Good Average Fair Poor
Signed by Attaché…………………………………Date………………………………………………...
Details of Attachment
Please, give your assessment of this attaché’s performance during the period of
attachment on the 5-point scale below: (to be filled in by Industry Based Supervisor)
Assessment Areas Rating Scale
Excellent Good Average Fair Poor
5 4 3 2 1
1. Punctuality
2. Adhere to regulations
3. Workmanship and Work
Output
4. Adaptability
5. Communication
6. Reliability
7. Teamwork
Total /35
Overall assessment of the attaché as determined by the average score (please tick as appropriate)
Excellent Good Average Fair Poor
Signed by Attaché…………………………………Date………………………………………………...