Translated Garis Panduan Lukisan Terukur (Pelan Susun Atur Ruang)
Translated Garis Panduan Lukisan Terukur (Pelan Susun Atur Ruang)
2
Machine Translated by Google
3
Machine Translated by Google
4
Machine Translated by Google
5
Machine Translated by Google
6
Machine Translated by Google
Appreciation
i
Machine Translated by Google
iii
CONTENTS
Appreciation i
Content iii
Glossary v
Abbreviation vii
1.0 Purpose 1
2.0 Background 1
3.0 Objectives 1
4.0 Scope 2
11.0 Competence 16
12.0 References 16
13.0 Appendix 16
13.1 List of Equipment 17-18
13.2 Equipment Checklist 20
13.3 Symbols 21-24
iv
GLOSSARY
i
Machine Translated by Google
vii
ABBREVIATIONS
viii
Machine Translated by Google
1.0 PURPOSE
This document is a uniform guide and practice for JKR and agencies
government to provide Measured Drawings (Layout Plans). Painting
Measured (Space Layout Plan) contains information on the area of the space, the number
room and space, function/ use/ height of space, position of room and space, type
floor / wall / ceiling finishes, interior design conditions, position and direction
window and door openings. This information is essential in preparation activities
ready-to-build drawings for asset maintenance and improvement purposes.
2.0 BACKGROUND
3.0 OBJECTIVES
3.2 Facilitate the preparation of scope, budget and implementation of asset management
Machine Translated by Google
4.0 SCOPE
4.1 Building assets under the responsibility and control of government agencies.
5.1 These guidelines should be consulted together with the Asset Management Procedure
Immovable Assets (TPATA) and Immovable Asset Data Collection Guidelines
(PeDATA).
Machine Translated by Google
i. Identify the building / premises that need a space layout plan ii. Identify provisions iii.
Choose an implementation
method iv. Appoint a Measured
Drawings Task Force (PPLT) or consultant v. Receive Measured Drawing Execution
Report
Refer to Figure 1:
The implementation of survey work can be chosen between two methods as below, which are:
a. Measure Draw
implemented on site.
b. Measure Notes
DRAW
Figure 2: Flow Chart of the Steps for the Implementation of Surveying and Drawing Work
Machine Translated by Google
i. site plan
i. site photo
iii. previous and current use of the site
iv. renovation work (addition and demolition)
v. other information that can help measured drawing work
BLOCK A
BLOCK E BLOCK C
BLOCK B BLOCK D
10
11
12
ii) Sketch the floor plan of the zone containing the spaces
. Name and code the spaces in the zone floor plan as below. Refer to the door opening symbol and
window.
Figure 7: Sketch of the floor plan of the zone containing the rooms
Machine Translated by Google
13
b) Measure every opening in the room (doors, windows and passageways if any)
(Refer to Appendix 11.2)
3000 3000
900 900
900
4000
1100 3000 1100 900
14
- Sketch drawing
- Measurement data
- Space drawings that have been verified in the form of soft copy and
hard copy.
Machine Translated by Google
15
i. Scale Drawing
(refer to mySPATA).
i. Every space opening such as doors and windows needs to be specified
clearly.
vii. The direction of the door and window openings should be the same as the opening direction
on site.
viii. The use of dotted lines is used for openings in the wall
like a path.
ix. Measurement dimensions are encouraged to be placed outside the plan drawing.
16
11.0 COMPETENCE
The Measured Drawings Task Force (PPLT) needs to have basic criteria and
12.0 REFERENCES
13.0 APPENDIX
13.3 SYMBOLS
17
1. Graph Paper
Eraser, etc.)
5. Tape Measure
18
6. Digital Camera
8. Flashlight
9. Rope
19
12. Compass
20
Block:
1. Graph Paper
5. Measuring tape
6. Digital Camera
8. Flashlight
9. Rope
12. Compass
13.
21
i) Basic symbols
NO THINGS SYMBOL
2 Two-Leaf Door
3 Stairs
4 Window
6 Sink
7 Transverse Dimensions
Machine Translated by Google
22
8 Vertical Dimensions
9 Radius Dimensions
10 Oblique Dimensions
11 Dimensions of a Circle
12 Angle Dimensions
13 Angle Dimensions
Machine Translated by Google
23
Wall Finishing
Example:
X = Structure
XY Y = Packaging
BB PC
K
STRUCTURE INDICATIONS AND WALL FINISH
e
Structure Packaging
m
BB: Bricks pc : Plaster & Paint
a
KT : Reinforced Concrete P : Plaster
s PK : Wood Panels
DP : Panel Wall
a DTB : Load Bearing Wall DM : Separation Wall
n DJ : Tiled Walls
C : Mirror Panel
Machine Translated by Google
24
Floor finish
Example:
X = Floor Finish
X Y
Y = Ceiling Finish KS SG
Z 2800
Z = Space Height
(from floor to ceiling)
25
JKR.PATA.GP.LT.4
13.4 TYPES OF LINES AND THICKNESS OF PENCIL & PEN POINT SIZE
Machine Translated by Google
26
27
JKR.PATA.GP.LT.6
13.6 SAMPLE SPACE LAYOUT PLAN DRAWING
Machine Translated by Google
28
Note:
The north sign is only placed on the Site Plan.
Validation stamp :
Building Name :
No. DPA ID :
No. Block:
Floor Level:
Drawing Date :
Prepared by :
Checked by :
Verified by :
Machine Translated by Google
29
30
31
10 mm
10 mm
JKR.PATA.GP.LT.10
MALAYSIA GOVERNMENT
YEAR :_____________
MINISTRY: ________________________________________
DEPARTMENT :______________________________________
PREMISES :______________________________________
DPA CODE :______________________________________
Machine Translated by Google
34
CONTENTS
1.0 INTRODUCTION
2.0 OBJECTIVES
8.0 APPENDIX
Machine Translated by Google
35
1.0 INTRODUCTION
Clarifying information about related premises.
2.0 OBJECTIVES
Explain the goal of the implementation of the measured drawing of the asset.
8.0 APPENDIX
Any document referred to in the preparation of the implementation of measured asset drawings
as per JKR.PATA.F9/1e.
Machine Translated by Google
36
37
Premises Name:
Block: Level: Level Name: Room: Start Date: Finish Date: No. Officer:
Prepared by:
Signature: .......................................
Position : ......................................
Date : ......................................
Machine Translated by Google
38
OBJECT
SOURCE AS/ TOTAL
SCOPE ACTIVITY EQUIPMENT SOURCE OUTPUT
MAN HEAD COST (RM)
PROVISIONS
PERIOD
NO. RECORD TYPE LOCATION
STORAGE
Machine Translated by Google
40
JKR.PATA.GP.LT.11
MALAYSIA GOVERNMENT
IMPLEMENTATION REPORT
MEASURED DRAWING
YEAR :_____________
MINISTRY: _______________________________________
DEPARTMENT :______________________________________
PREMISES :______________________________________
DPA CODE :______________________________________
Machine Translated by Google
41
CONTENTS
1.0 INTRODUCTION
2.0 OBJECTIVES
7.0 APPENDIX
7.2 IMAGES
Machine Translated by Google
42
1.0 INTRODUCTION
The Measured Drawing implementation report is a document used when carrying out measured
drawing measurement work.
2.0 OBJECTIVES
Explain the process of implementing the Measured Drawing of the Spatial Layout Plan so that it can
be implemented systematically, safely and perfectly.
Detailed scope of work for the work of the Measured Drawings of the Spatial Layout Plan
The organizational structure, responsibilities and communication plan need to be prepared to explain
the organization of the work implementation of the Measured Drawings of the Spatial Layout Plan.
The activities that need to be taken into account, among others, are as follows: •
Obtaining information/ premises data • Site visit and
initial survey • Work planning (work planning
schedule – duration, cost, energy, work, equipment and methods) • Implementation of measured drawing work
• Documents and record the
measured drawing
Machine Translated by Google
43
7.0 APPENDIX