Haf01 ZZ01 PFB06 00301 Ou110168599 R4

PID

Uploaded by

tapasmohanty2u
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views1 page

Haf01 ZZ01 PFB06 00301 Ou110168599 R4

PID

Uploaded by

tapasmohanty2u
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

9 10 11 12 13 14 15 16

CLL-509-1523-150H-HC CLEANING LIQUOR


HAF01-ZZ01-00303
4 NOTE 3 TO PAN FILTER FEED PUMP NOTES: A
NOTE 4
3%
250 1) PP ONLY ON PLATFORMS IN AREAS ACCESSIBLE FOR PERSONAL (ABOVE 2,1 M FROM PLATFORM LEVEL).
150 PHS-509-1520-150F-PP HYDRATE SLURRY
VAN102 HAF01-ZZ01-00302 2) EQUIPMENT SHALL BE DESIGNED FOR CAUSTIC CLEANING
FV3102 3) PLEASE CONSIDER A DRAIN VALVES WHERE IS NOT POSSIBLE TO MAKE A SLOPE OR ANY DEAD LINES
3% V02285
4) FLANGES TO BE PROVIDED AT EVERY 18M.
HYDRATE SLURRY NOTE 4 PHS-510-1473-250F-PP TO PAN FILTER FEED TANK
PCA03-ZZ01-00011 5) OVERFLOWLINE TO BE PROVIDED WITH PAIR OF FLANGE AT THE BOTTOM. DN50 DRAIN VALVE SHALL BE
FROM BATTERY LIMIT PROVIDED UPSTREAM OF FLANGE.
PHS-509-1955-250F-PP 6) SEND LAH TO CLIENT
250
7) PLEASE CONSIDER IN ALL CAUSTIC TIE IN POINTS AS A BLIND RACK.
VAN102
8) GRAVITY LINE.
V02287 80
FV3101 NOTE 4 B
150 3% 9) PIPE ROUTING GUIDELINES:
FV3102 250 V03093 PHS-509-1519-250F-PP HYDRATE SLURRY -3D ELBOWS TO BE USED PREFERABLY. CONSIDERING MINIMUM SLOPE OF 8% FOR THE PHS
VAN102 HAF01-ZZ01-00302
V03585 PIPELINES.
3% V03581 80
TO PAN FILTER FEED TANK
HYDRATE SLURRY -USE AS MAXIMUM AS POSSIBLE DIRECTION CONNECTION BETWEEN THE POINTS (e.g BL AND
NOTE 4 PHS-510-1474-250F-PP FV3101 HYDRATE SLURRY TANKS FEED).
PCA03-ZZ01-00011
FROM BATTERY LIMIT V03094
250 -AVOID DEAD LEGS IN THE HORIZONTAL PIPES.
VAN102 4 -DRAIN VALVES HAS TO BE PROVIDED IN ANY PIECE OF PIPE WHERE HIGHER SLOPES CANNOT BE
V02286 ADOPTED.
80 NOTE 4 NOTE 8 -THE LAYOUT OF THE PIPELINES NOT NECESSARILY HAS TO FOLLOW THE AXIS YZX IN THE 3D
PHS-509-1956-250F-PP FV3101
MODEL. FLEXIBILITY TO CONNECT DIRECT THE EQUIPMENT S.
V03095 HYDRATE SLURRY
50 4 C
NOTE 8 HAF01-ZZ01-00302 10) FOLLOW BELOW SKETCH AS GUIDELINE:
4 VAN101 TO PAN FILTER FEED TANK
UNDERFLOW DFW-509-1825-50M-PP V03580 DFW-509-2659-50M-PP FROM SUMP PUMP 1
HAF01-ZZ01-00320
FROM STABILIZATION CYCLONE
50 NOTE 8
VAN101 NOTE 4 FROM SUMP PUMP 2
V03679 MIN 500MM
HYDRATE SLURRY
HAF01-ZZ01-00302 VERTICAL PIPELINE TO
50 TO PAN FILTER FEED TANK
AVOID BACKFLOW
VAN101
NOTE 8 V03579 200
50 TO SPECTACLE BLIND AND
UNDERFLOW DFW-509-1838-50M-PP DFW-509-1838-50M-PP FV3101
FV3102 D
HAF01-ZZ01-00320 V01977 TANK NOZZLE N14
FROM STABILIZATION CYCLONE V03096 CLEANING LIQUOR
50
XUC01-ZZ01-00342
VAN101 FROM CHEMICAL CLEANING LIQUOR TANK
V03613
200
50
FV3102
FV3101
V02387 NOTE 4
V03097 3%
250 HYDRATE SLURRY
VAN102 HAF01-ZZ01-00302
TO PAN FILTER FEED TANK
NOTE 4 V01978
3% PHS-509-2658-250F-PP E
HYDRATE SLURRY FROM LINE 1-4 PHS-510-1475-250F-PP
PCA03-ZZ01-00011
FROM BATTERY LIMIT
250
VAN102
V03677 50
FV3101
4 V03098 NOTE 4
3%
250 PHS-509-1515-250F-PP HYDRATE SLURRY
HAF01-ZZ01-00302
VAN102 TO PAN FILTER FEED TANK
HYDRATE SLURRY FROM NOTE 4 TO ATM.
3% V01976 PHS-509-2659-250F-HC F
EXISTING RESLURRY PUMP PHS-510-1476-250F-PP
PCA03-ZZ01-00011 250
FROM BATTERY LIMIT 3%
VAN102 I PHS-509-1525-150F-PP HYDRATE SLURRY
H
SUMP PUMP SLURRY
V03678 HAF01-ZZ01-00302
PSS-509-2664-150F-PP 100 FROM PAN FILTER FEED PUMP
HAF01-ZZ01-00325
FROM SUMP PUMP 80 80
FV3101 80
V03104 FV3101 FV3101
NOTE 4 3% V03099
SUMP PUMP SLURRY PSS-509-2145-150F-PP NOTE 10
V03100 M LSLL
HAF01-ZZ01-00325
FROM SUMP PUMP 100
MIN
G 50 LIT LIC H NOTE 6 G
L HAF01-ZZ01-00303
80 VAN101 50 N23 N22 100 100 TO SEL 120
FV3101 V03455 FV3101 M01 N18
N17 200 50
V03103 V03102 N16 600 N19
50 50 N20 HAF01-ZZ01-00303
N14 N15 250 250
VAN101 50 250 250 N21 TO SEL 121
N24 N25 150
tkIS India / Vendor tkIS India / Vendor
V03457 FV3101 150 N12
DFW-509-2161-50M-PP V03101 50 50 100
NOTE 8 HAF01-ZZ01-00303
TO SEL 122 1 For Approval 1 Approved
OVERFLOW N08 2 For Review / Comments 2 Approved for Manufacturing/

Acceptance Codes
TW
HAF01-ZZ01-00320

(Submission purpose)
200 3 For Information Fabrication With Comments

Category Codes
FROM STABILISATION CYCLONE 100
as Marked

(Approval Codes)
H 4 For Engineering H
3 Not Approved/Resubmit
N13 TE TIT TI 5 For Enquiry
DFW-509-2651-50M-PP PHS-509-1513-200F-PP HYDRATE SLURRY 4 Retained for Information/Records
50 100 100 100 6 For Order Placement
NOTE 8 200 HAF01-ZZ01-00302 5 Reviewed
NOTE 1 4 FROM PAN FILTER FEED TANK 7 Final & Approved
OVERFLOW VAN102 6 Reviewed as Noted/Resubmit
50 3% 8 Released for Construction
PHS-509-1953-200F-PP

HAF01-ZZ01-00302 V03578 HYDRATE SLURRY


TO PAN FILTER FEED TANK VAN101 PHS-509-1948-200F-PP Date : / / Name :
HAF01-ZZ01-00303
V03454 N05 200 TO PAN FILTER FEED PUMP Contract No. Project Document ID Part Rev.
N06 09AG-5176A 200 FV2102
200 66-6695 OGCKG-PRC-509-FB-0009 4
200 AGITATOR V03618
NOTE 8 VAN102
80 V03619
J OVERFLOW DFW-509-2163-50M-PP M02 PHS-509-1512-200F-PP HYDRATE SLURRY J
HAF01-ZZ01-00320 FV3101 200 HAF01-ZZ01-00302
FROM STABILISATION CYCLONE 600 V02389 VAN102 FROM PAN FILTER FEED TANK
N04 V03577 3%
200
M03 200 PHS-509-1950-200F-PP HYDRATE SLURRY
FV2102 HAF01-ZZ01-00303 1.0 MTPA ALUMINA REFINERY STREAM-5
600 V03620 TO PAN FILTER FEED PUMP
NOTE 8 DAMANJODI, ODISHA
200 Pro. Unit Con. Unit TON Group Order No. Type of Document Sheet
DFW-509-2653-50M-PP 50 N09 900x900 200
HAF01-ZZ01-00302
TO PAN FILTER FEED TANK 200 M05 VAN102 509 901146 FB 1 / 1
VAN101 80
FV2102 N03 FV3101 V03621 4 LINPEN 08.04.2022 OLIOFT 15.04.2022 WALPIM 29.04.2022 REVISED AS MARKED
V03456 200 HYDRATE SLURRY
V03631 NOTE 2 200 V02388 200 PHS-509-1511-200F-PP 3 BRIGAT 27.09.2021 OLIOFT 28.09.2021 WALPIM 29.09.2021 GENERAL REVISION
FV2102 HAF01-ZZ01-00302 2 BRIGAT 14.06.2021 OLIOFT 15.06.2021 WALPIM 18.06.2021 AFTER HAZOP
K 50 V03624 VAN102 FROM PAN FILTER FEED TANK K
FV3101 1 BRIGAT 18.02.2021 OLIOFT 19.02.2021 WALPIM 22.02.2021 GENERAL REVISION
NOTE 5 V01975 3%
V03630 PHS-509-1952-200F-PP HYDRATE SLURRY 0 OLIOFT 15.12.2020 BRUKOM 15.12.2020 WALPIM 15.12.2020 FIRST ISSUE
PHS-509-1954-200F-PP 09TK-5176A TO PAN FILTER FEED PUMP
HAF01-ZZ01-00303 REV. NAME DATE
PREPARED
NAME DATE
CHECKED
NAME DATE
APPROVED
REVISION TEXT

PAN FILTER FEED TANK STATUS UNITS SCALE SIZE


200 ISSUED FOR REVIEW 1:1 A1
TO FLOOR SAFE LOCATION 80 VAN102 CUSTOMER PROJECT PHASE SITE NO.
FV3101 V03625 National Aluminium Company Limited (NALCO) IMPLEMENTATION 01 S-20188
V03626 PROJECT NAME
NALCO Damanjodi Calcination Plant
REPLACED BY REPLACES LANGUAGE
L L
EN
DOCUMENT TITLE
P&I DIAGRAM
ALUMINIUM HYDROXIDE FILTRATION
GENERAL
SLURRY FEED SYSTEM
EQUIPMENT NO.
PAN FILTER FEED TANK SHEET 1
PROJECT ID PLANT CODE PLANT UNIT CODE DOCUMENT TYPE COUNTING NO. REVISION SHEET OF SHEETS
M 901146 HAF01 ZZ01 PFB06 00301 4 1 / 1 M
The content of these documents are the sole property of Outotec Oyj. Any rights not expressly granted herein DOCUMENT ID
are reserved. Reproduction, transfer or distribution of part or all of the contents in any form without prior OU110168599
written permission of Outotec is prohibited.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
ISO 5457 HAF01-ZZ01-00301 - /%ADBDIA%/V805324550-2858-10000-70.vsdx