0% found this document useful (0 votes)
18 views1 page

Haf01 ZZ01 PFB06 00304 Ou110168602 R4

Uploaded by

tapasmohanty2u
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views1 page

Haf01 ZZ01 PFB06 00304 Ou110168602 R4

Uploaded by

tapasmohanty2u
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

9 10 11 12 13 14 15 16

NOTES: A
FY 1) PP ONLY ON PLATFORMS IN AREAS ACCESSIBLE FOR PERSONAL (ABOVE 2,1 M FROM PLATFORM LEVEL).
HAF01-ZZ01-00305
133 % TO WIC-143 2) EQUIPMENT SHALL BE DESIGNED FOR CAUSTIC CLEANING
3) PLEASE CONSIDER A DRAIN VALVES WHERE IS NOT POSSIBLE TO MAKE A SLOPE OR ANY DEAD LINES
4) FLANGES TO BE PROVIDED AT EVERY 18M LENGTH.
FY 5) PROVIDE 1M LONG REMOVABLE SPOOL PIECE FOR DENSITY METER.
HAF01-ZZ01-00305
134 % TO FIC-144 6) NOZZLE N03, N04, N05, N06, N07, N08 ARE AT THE SAME HEIGHT.

F(X) 7) PIPE ROUTING GUIDELINES:


HAF01-ZZ01-00305
130 FROM FIC 140 -3D ELBOWS TO BE USED PREFERABLY. CONSIDERING MINIMUM SLOPE OF 8% .
-USE AS MAXIMUM AS POSSIBLE DIRECTION CONNECTION BETWEEN THE POINTS (e.g BL AND B
FY
HAF01-ZZ01-00309 HYDRATE SLURRY TANKS FEED).
137 % TO FIC-204 -AVOID DEAD LEGS IN THE HORIZONTAL PIPES.
-DRAIN VALVES HAS TO BE PROVIDED IN ANY PIECE OF PIPE WHERE HIGHER SLOPES CANNOT BE
FY ADOPTED.
HAF01-ZZ01-00309
135 % TO WIC-203 -THE LAYOUT OF THE PIPELINES NOT NECESSARILY HAS TO FOLLOW THE AXIS YZX IN THE 3D
MODEL. FLEXIBILITY TO CONNECT DIRECT THE EQUIPMENT S.
F(X)
HAF01-ZZ01-00309
131 FROM FIC 200 4

NOTE 3 FY C
HAF01-ZZ01-00313
138 % TO FIC-244
3%
F(X)
HAF01-ZZ01-00313
132 FROM FIC 240

FY
HAF01-ZZ01-00313
136 % TO WIC-243

3%
100
FV3101
V03469 150x100
CLEANING LIQUOR
XUC01-ZZ01-00341
DI H
130 L TO CHEMICAL
150 CLEANING
150 VAB102 LIQUOR TANK
FV3102 V03538 150
NOTE 6 150 DT DIL E
V01379 FV3102
N01 VAB102 130 130
NOTE 4 V01373
3% 100 V01370 3%
HYDRATE SLURRY PHS-509-1633-150F-PP NOTE 4 HYDRATE SLURRY
HAF01-ZZ01-00303 HAF01-ZZ01-00305
FROM PAN FILTER FEED PUMP TO PAN FILTER
N03 200x150 200x150 NOTE 5
200x150 200x150 N06
150 150 DX
NOTE 1 130
150
150 NOTE 2 VAN102
VAB102 100
V03543 FV3101 V03460
N04 09PV-5176 N07
150
V03458 F
150 SLURRY POT 150
VAB102 DI H
NOTE 4 L
3% M01 V03545 131
HYDRATE SLURRY PHS-509-1637-150F-PP 600
HAF01-ZZ01-00303
FROM PAN FILTER FEED PUMP N05 N08
150 N02 150 DT DIL
200 131 131
3%
NOTE 4 HYDRATE SLURRY
100 HAF01-ZZ01-00309
G 150 VAB101 TO PAN FILTER G
VAB102 NOTE 5
V03463
150 V03527
DX
FV3102
150 131
NOTE 4 V03546 150
3% VAB102 VAN102
HYDRATE SLURRY PHS-509-1641-150F-PP 4
tkIS India / Vendor tkIS India / Vendor
V01372 V03461
HAF01-ZZ01-00303
FROM PAN FILTER FEED PUMP
150/200 200/150 DI H 1 For Approval 1 Approved
TO FLOOR SAFE LOCATION 132 L 100 2 For Review / Comments 2 Approved for Manufacturing/

Acceptance Codes
(Submission purpose)
FV3101
3 For Information Fabrication With Comments

Category Codes
as Marked

(Approval Codes)
H V03459 4 For Engineering H
150 3 Not Approved/Resubmit
FV3102 DT DIL 5 For Enquiry
4 Retained for Information/Records
132 132 6 For Order Placement
3%
V01375 5 Reviewed
HYDRATE SLURRY 7 Final & Approved
NOTE 4
6 Reviewed as Noted/Resubmit
HAF01-ZZ01-00313 8 Released for Construction
TO PAN FILTER Date : / / Name :
200x150 200x150 NOTE 5
Contract No. Project Document ID Part Rev.
DX 4
132 66-6695 OGCKG-PRC-509-FB-0012
150
VAN102
J J
V03462

1.0 MTPA ALUMINA REFINERY STREAM-5


DAMANJODI, ODISHA
Pro. Unit Con. Unit TON Group Order No. Type of Document Sheet
509 901146 FB 1 / 1
4 LINPEN 08.04.2022 OLIOFT 15.04.2022 WALPIM 29.04.2022 REVISED AS MARKED
3 BRIGAT 27.09.2021 OLIOFT 28.09.2021 WALPIM 29.09.2021 GENERAL REVISION
K 2 BRIGAT 14.06.2021 OLIOFT 15.06.2021 WALPIM 18.06.2021 AFTER HAZOP K
1 BRIGAT 18.02.2021 OLIOFT 19.02.2021 WALPIM 22.02.2021 REVISED AS MARKED
0 OLIOFT 15.12.2020 BRUKOM 15.12.2020 WALPIM 15.12.2020 FIRST ISSUE
REV. NAME DATE NAME DATE NAME DATE
REVISION TEXT
PREPARED CHECKED APPROVED
STATUS UNITS SCALE SIZE
ISSUED FOR REVIEW 1:1 A1
CUSTOMER PROJECT PHASE SITE NO.
National Aluminium Company Limited (NALCO) IMPLEMENTATION 01 S-20188
PROJECT NAME
NALCO Damanjodi Calcination Plant
REPLACED BY REPLACES LANGUAGE
L L
EN
DOCUMENT TITLE
P&I DIAGRAM
ALUMINIUM HYDROXIDE FILTRATION
GENERAL
SLURRY FEED SYSTEM
EQUIPMENT NO.
SLURRY POT
PROJECT ID PLANT CODE PLANT UNIT CODE DOCUMENT TYPE COUNTING NO. REVISION SHEET OF SHEETS
M 901146 HAF01 ZZ01 PFB06 00304 4 1 / 1 M
The content of these documents are the sole property of Outotec Oyj. Any rights not expressly granted herein DOCUMENT ID
are reserved. Reproduction, transfer or distribution of part or all of the contents in any form without prior OU110168602
written permission of Outotec is prohibited.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
ISO 5457 HAF01-ZZ01-00304 - /%ADBDIA%/V805324550-3429-10000-45.vsdx

You might also like