Project Chapter Seven To Students
Project Chapter Seven To Students
Each group will have minimum of five and maximum of six members.
The formation of groups will be based on students’ interest; but the instructor will interfere if
necessary.
Each group should assign a representative and report to the instructor.
Absentee students during group formation should contact the instructor.
The instructor will deliver the project title randomly.
Note
All members must participate on the project work.
Participant/active and absentee/passive members should be announced to instructor.
Students can use a prepared reference material given by their instructor or they can search
appropriate additional resources by themselves.
Two weeks period is given to complete the project.
The team should develop one model with 1:1 scale on hard paper.
All students should sketch a given assignment on A3 Paper (420x297) individually.
During Presentation
2. Development of Cylinder
Development of Right Cylinder.
Group 3 & 4
3. Development of Cone
Development of Right Cone
Group 5 & 6
4. Development of Pyramid
Development of Right Pyramid.
Development of Frustum Right Pyramid.
Group 7 & 8
5. Development of Sphere
Development of Sphere by Zone Method.
Group 9
Group 9 use
Gore Method
Evaluation Criteria
Criteria Description
Two students will present and their average score will be given for
1) Performance on
the group members.
presentation
Clarity of presentation and accuracy of development technique will
(3%)
be examined.
Each student will be asked and evaluated based on their response.
If only some students are asked, their average score will be given for
2) Individual Performance
the remaining members.
(2.5%)
Asking appropriate question to other groups will be taken as a good
participation.
3) Cooperative Performance The average value of individual performance will be given to all
(2.5%) members.
The model should be prepared from a hard paper.
4) Prepared Model The model should be prepared after sketching the contour/shape with
(2%) appropriate steps.
The accuracy of contour and model will be examined.
Group
No.1
Project
Title
Development of Prism