0% found this document useful (0 votes)
18 views3 pages

R.A. Temp. Electrical installations@ASCON-HSE-RA-MEP-014

Uploaded by

ariduniversty944
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views3 pages

R.A. Temp. Electrical installations@ASCON-HSE-RA-MEP-014

Uploaded by

ariduniversty944
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

RISK ASSESSMENT

TITLE OF THE ACTIVITY: Temporary electrical installation


RISK ASSESSMENT REFERENCE NUMBER: ASCON/HSE/RA/MEP/014
ASSESSOR: Risk Assessment Committee Assessed Date: 06.12.2006 Reviewed Dated:
RISK RATING SCORE Risk After Action By Remarks
HAZARD Likelihood Severity Risk taking Whom
HAZARDS CONTROL MEASURES
EFFECT Rating Control
measures
Using Electric shock – 5 6 30  Mention proper rating while raising indent for 1x6=6
improper minor/major/fat procurement of any electrical system/device by
rated/defect al injury, Fire, a competent person.
ive Burn.  Before installing/commissioning, competent
electrical person must check the rating and standard of
system and all the electrical system/devices.
device.  All electrical installation should be checked
periodically by competent person (preferably
MEP co-ordinators at ASCON sites).
 Ensure Earth Leakage Circuit Breaker (ELCB)
of 30mA .
 Ensure Minimum resistance of earth pit is <5
Ohms.
 Ensure system voltage as low as possible.
Improper Slip-trip-fall , 5 6 30  Place all power cables overhead as far as 1x6=6
cable Electric shock. possible.
routing  Never pass cables through water/metallic part
like steel etc.
 Do not tie cable with metallic wire
(GI/binding wire) – cable tie should be used.
 Cable should be taken through cable gland and
lugs should be used for joining the cable with
panel.
 Do not expose live part of cable .
 Cable joint should be avoided as far as possible
– joint should be allowed only with proper lugs
and male-female plug system.
 Do not allow joining of cable with insulation
tape .
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Temporary electrical installation
RISK ASSESSMENT REFERENCE NUMBER: ASCON/HSE/RA/MEP/014
ASSESSOR: Risk Assessment Committee Assessed Date: 06.12.2006 Reviewed Dated:
RISK RATING SCORE Risk After Action By Remarks
HAZARD Likelihood Severity Risk taking Whom
HAZARDS CONTROL MEASURES
EFFECT Rating Control
measures
 Power cable never be crisscrossed with
welding cable/gas cutting hose.
Exposure Short circuit/ 3 5 15  Only approved Electrical installations should 1x5=5
to water, failure of be used for outdoor application (weather &
dust and tripping fire proof)
heat. device/fire/elect  Provide Hood / overhead protection to prevent
rical shock from rain water.
 Ensure proper cable glands and rubber sleeves
to prevent dust entry.
 Electrical panel door must be always kept
closed.
Physical Material 3 5 15  Ensure hard barrication around the D.B
damage to damage.  Provide warning signs . 1x5=5
electrical  Clear the access and avoid any material
installation stacking nearby D.B.
s.  Canopy should be provided to protect from
falling objects.
Electric Electric Burn, 4 6 24  Repairing/Maintenance should be done by 1x6=6
shock, fire. Material competent/authorized electricians only.
Damage &  LOTO (Lock out & Tag out) system should be
Fatality followed during repairing/maintenance.

Signature: ___________ Signature:___________


Safety Engineer. Project Manager (ASCON)
RISK ASSESSMENT
TITLE OF THE ACTIVITY: Temporary electrical installation
RISK ASSESSMENT REFERENCE NUMBER: ASCON/HSE/RA/MEP/014
ASSESSOR: Risk Assessment Committee Assessed Date: 06.12.2006 Reviewed Dated:
RISK RATING SCORE Risk After Action By Remarks
HAZARD Likelihood Severity Risk taking Whom
HAZARDS CONTROL MEASURES
EFFECT Rating Control
measures
Likelihood ( L) Severity ( S) Risk Rating ( Lx S)
1 Very unlikely 1 Negligible 1–7 Low
Risk Likelihood
2 Unlikely 2 First-aid (Acceptable) Rating 1 2 3 4 5 6
Injury 1 1 2 3 4 5 6
2 2 4 6 8 10 12

Severity
3 May happen 3 Minor injury 8 – 16 Medium 3 3 6 9 12 15 18
4 Likely 4 Major (Unacceptable) 4 4 8 12 16 20 24
5 5 10 15 20 25 30
5 Very likely 5 Severe 17- High 6 6 12 18 24 30 36
6 Certain or imminent 6 Fatality 36