0% found this document useful (0 votes)
48 views1 page

Business Services Cost Breakdown

Uploaded by

Elliott
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views1 page

Business Services Cost Breakdown

Uploaded by

Elliott
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PT.

KALAPA TEKNOLOGI PUTERA


Gedung Menara Rajawali lt.10.
Jl DR Ide Anak Agung Gde Agung Lot #51
Kawasan Mega Kuningan, Jakarta, 12950-Indonesia.
QUOTATION
No. 035/KAL-INT/IV/INT/2024
NOTES:
-Term of Payment 15 calendar days.
-Include PPN 11%
-Excluded Public Holiday Allowance, Shift allowance IDR 50.000 per shift (by reimburse) if any
-Quotation valid within 30 (calendar) days of quotation date
-Minimum contract 3 months
-Premise: Provide by Kalapa DKI Jakarta, Operational Office Hour Mon-Fri
-Manpower: 2 Agents
- Exclude Telco cost IDR 8 per second (will be charged based on actual usage)
-All prices in state IDR (Rupiah)
Premise Location: DI Yogyakarta

No. Item Item Description & Specifications Price/Agent

PERSONNEL COST COMPONENT


I. Manpower Cost - Fixed Cost 3,000,000
a Basic Salary Fixed Income (Price per Agent) 3,000,000
II. Manpower Cost - Variable Cost 303,500
1. Training
2. Psikotest & Typing Test
a Supporting Function 303,500
3. Motivational Program
4. Replacement (SLA 14 working days)
NON-PERSONNEL COST COMPONENT
III. Premises Facilities 1,655,000
Work Station, Electricity, Office Maintenance,
a Premises Office Facilities and Sharing Room and Electricty
overtime
Finger Print, Locker, Drinking Water, Security, 1,655,000
b Office Supply
Cleaning Service, CCTV, AC, Fire Extinguisher
1. Manager Room
c Additional Facilities
2. Parking Area
IV. Technology 1,545,000
- Data management and Security includes
Prospect Management and Campaign & Product
Management
- Assignment Management includes automatic &
manual assignment and re-assignment
- Contact Management includes customer Profile,
History Contact Call attempt, Status contact, call
result, appointment, redial
- Flagging Data Call and Recycle
- Follow Up Management
- Preview & Predictive Dialing Management
a Outbound Telephony System 600,000
- Reporting (please refer to RFP) includes
Outcome/result, Data tracking, Call tracking,
Tracking history call, productivity and result,
Duration call, and Absence/login report
- Integrated System includes CRM Telesales
Application & Integration Database, Softphone,
Voice Recording Management
- Bulletin Board System includes Dashboard
Activity Call [Login/off/ online/busy] and Script
Template: To accommodate guideline, product
brief/ FAQ, custom script requested by Client
b Internet Connection Dedicated (Main & Backup) 150,000
- USB Block
c IT Security 25,000
- One user ID for one Agent/staff
d Laptop Laptop Intel Pentium Dual Core or i5 475,000
e Headset Advance Noise Cancelation 175,000
Please specify what is included for the
Networking including the specifications and
Networking (i.e switch, router, cabling, licenses below:
f 120,000
etc) 1. Fortiner Firewall
2. Swits Core Layer 3
3. XBC for Outbound security
V. Management Fee 10% 330,350
PPN 11% 36,339
Agent Cost/Month Rp 6,870,189
Total Agent Rp 2
Total Cost/Month Rp 13,740,377
Grand Total Per Month Rp 13,740,377

PT. Kalapa Teknologi Putera PT Inti Teknologi Bersama

Name: Yessica Ayu Putri Name: Bapak Ferdian


Title : Business Development Title :
Manager

You might also like