Part 18: Geosynthetics
18 GEOSYNTHETICS
18.1 GENERAL REQUIREMENTS FOR ALL GEOSYNTHETICS
18.1.1 Scope
1 This part of the specification covers the use of geotextiles and geogrids for the;
(a) reinforcement of unbound aggregates for roads, hard standing and airfield pavements
(b) reinforcement of embankment foundations over soft or weak soils
(c) reinforcement of steep earthwork fills
(d) reinforcement of retaining walls and bridge abutments
(e) repairs to earthworks embankment failures and landslides
(f) for erosion control of slopes
(g) for subsoil and sub-base drainage.
d
2 Related Sections and Parts:
This Section
ite
Part 3 Earthworks
lim
Part 4 Unbound Pavement Materials
Section 8, Drainage Works
rv
18.1.2 References
se
1 The following Standards and other documents are referred to in this part:
ro
(Grab Test)
pe
ASTM D 5035 .............Test Method for Breaking Strength and Elongation of Textile Fabrics
(Strip Method)
ASTM D 4533 .............Test Method for Trapezoidal Tearing Strength of Geotextiles
Published Document (PD) 6533, Guide to Methods for Assessing the Durability of
Geotextiles, British Standards Institute.
QCS 2014 Section 06: Road Works Page 3
Part 18: Geosynthetics
18.1.3 Submittals
1 The manufacturer shall submit comprehensive test results for the geosynthetic for the
designated tests, which shall clearly indicate whether the values are mean values measured
in current production or minimum values which the property does not fall below.
d
4
ite
The manufacturer shall submit comprehensive information of previous applications of the
material in similar conditions and environments. This information shall include the project
lim
name, contract details, type/grade of material used, quantity of material used, name of the
contract, client, consultant, and main contractor.
rv
1 The geotextile shall be supplied by a manufacturer who is certified to the ISO 9001. The
Contractor shall submit to the Engineer a copy of the ISO 9001 certificate that clearly states
ro
2 The geotextile shall be supplied by a manufacturer who provides technical assistance on the
suitability for the application and installation for the material. For the initial use of the material
on site, the Contractor shall arrange for the technical representative of the manufacturer to
be present to demonstrate the correct use of the material.
4 Joints shall be tested by the same test methods used for the main material.
5 All joints used in permanent structures designed to carry loads shall be tested in accordance
with BS EN ISO 10319 Part 1 or BS EN ISO 10321.
6 In situations where relatively small tensions are developed and, if permitted by the Engineer
overlapping joints may be used. These joints shall not be used in the primary tensile direction
of reinforced soil structures but can be in secondary tensile directions only.
7 Joints where geotextiles are sewn together shall be with one of the methods showing in
figure 5 of BS8006. These joints shall meet the performance characteristics shown in Table
8 BS8006.
QCS 2014 Section 06: Road Works Page 4
Part 18: Geosynthetics
8 Prior to delivery of the material to site the Contractor shall submit a sample of a sawn joint.
9 Bodkin joints shall have sufficient cross sectional area and strength to avoid excessive
deformation. A bodkin joint shall not be so large so as to distort the material causing stress
concentrations, bodkin joints shall be pretensioned prior to loading to reduce joint
displacement as the components lock together.
10 Any cuts, tears, splits and perforations to geosynthetics during installation shall be made
good. The method of remedial work shall be prepared and proposed by the Contractor for
approval by the Engineer.
11 The geosynthetics shall be suitable for use in the ambient soil temperature in the State of
Qatar.
12 Geosynthetics that are able to ravel shall be heat treated or bonded with an adhesive tape at
the cut. The proposed method of sealing the edges of geotextiles shall be proposed by the
Contractor and shall fully identify the geotextile material, type of scene, stitch configuration,
stitch density, sowing thread and sowing machine to be used.
d
18.1.5 Guarantees and Warranties
1
ite
The Contractor shall submit a ten-year guarantee for the geotextile material and the
lim
workmanship. The guarantee shall be worded to reflect the required performance of the
material and shall be approved by the Engineer.
1 All geotextiles shall be supplied in manageable roll or unit sizes and shall be robust enough
to withstand handling and any treatment received during the installation process.
t
pe
2 The geotextile shall comply with the minimum properties for geotextile serviceability in Table
18.1 below. The Engineer will direct as to the category that the geotextile shall meet; i.e., very
high, high, moderate or low.
Table 18.1
Minimum Properties for Geotextile Service Ability
Very
Property High Moderate Low
High
These are the minimum required values below which no test result on production material
should fall.
QCS 2014 Section 06: Road Works Page 5
Part 18: Geosynthetics
3 The Engineer may require the Contractor to carry out tests to different standards, in addition
to the test methods designated above or in the following clauses:
d
18.2.2 Drainage Applications
ite
lim
1 Geotextiles for drainage applications shall be needled polypropylene and meet the
performance specifications given in Table 18.2. The performance shall be assessed based
on regular tests on the production material. Unless a permitted variation is stated in Table
rv
18.2, the mean test values shall meet the values in the Table.
se
ro
Table 18.2
t
International Classification
1 2 3 4
According to CBR Test
deformation % 30 50 60 65
International Classification
1 2 3 4
According to CBR Test
d
d 50% ite
80 60 45 30
d 90% 110 85 65 40
lim
rv
2
Weight DIN 53854 g/m 100 140 250 500
se
ro
2 The manufacturer shall clearly identify to which international classification category the
geotextile conforms according to the CBR test.
3 The pore size of the geotextile shall be small enough to prevent the significant loss of soil
particles from the retained soil, yet have adequate permeability to allow water transmission
normal to the plain of the geotextile.
4 The manufacturer shall submit test results that demonstrate the ability of the geotextile to
avoid clogging during water flow due to fine particles. Test results for the US Corps of
Engineers gradient ratio test or similar type of test shall be submitted. The test shall be
carried out using soil of the type where the geotextile is to be installed. Gradient ratios
derived from the test shall be less than 3.
1 Geotextiles for earthworks reinforcement or base use shall be woven polyester multi-filament
or multi-filament fabrics with a high rupture strength and low axial strain. The geotextile shall
have an adequate high tensile strength in all directions to resist loading imposed by uneven
filling.
QCS 2014 Section 06: Road Works Page 7
Part 18: Geosynthetics
2 The geotextile shall possess the strength for the required design life with minimal increase in
strain over time. The average geotextile strain shall be limited to 5 %.
3 Where installed between a sub-base and the underlying soil, the geotextile shall prevent the
granular material being pressed into the subsoil and also prevent an intrusion of fines from
subgrade into the sub-base.
4 The water permeability of the geotextile shall prevent build up of water pressure under the
separation layer. The short- and long-term permeability of the geotextile must be equal to or
greater than that of the subsoil. The geotextile must not become blocked.
5 The geotextile shall possess high puncture resistance and a high tearing resistance.
6 Where used as base stabilisation for embankments the type of construction equipment used
for spreading and compacting initial fill layers shall be suitable so as to avoid damage to the
geotextile. The initial layer of fill placed on the geotextile shall be free from sharp angular or
pointed material that may puncture the geotextile.
7 Trucks shall not be permitted to drive over the geotextile. The laying of the material shall be
d
co-ordinated to ensure that trucks do not damage the material.
ite
18.3 GEOGRIDS
lim
1 The geogrid shall be identified as either uniaxial for single dimension loading or biaxial for
two dimensional loading.
se
2 The design of all geotextiles or geogrid applications shall be based on an appropriate in soil
ro
3 The type of geogrid to be used shall be as shown on the drawings or as described elsewhere
in the contract documents.
4 The type of polymer used in the manufacture of the geogrid shall be clearly stated.
5 The design shall take into account any possible damage to the material during site
installation and a factor shall be introduced into the design.
6 Prior to installing the geosynthetic the Contractor shall prepare a construction trial outside of
the permanent works. The construction trial shall utilise similar ground conditions from
materials and other factors as the permanent works.
7 If directed by the Engineer the Contractor shall arrange for geotechnical investigation to be
carried out in the area where the geosynthetics are to be installed. The range and details of
the tests and investigations to be performed shall be directed by the Engineer.
QCS 2014 Section 06: Road Works Page 8
Part 18: Geosynthetics
2 The bars or ribs of the geogrid transverse to the direction of primary loading shall provide a
series of bearing points or anchors such that stress is transferred to the grid by surface
friction and also interaction.
3 The ribs of the geogrid in both the longitudinal and transverse direction shall be
manufactured to a near vertical face to provide good bearing surface for interlocking fill
particles.
4 Geogrids shall be resistant to deterioration by aqueous solutions of acids, alkalis and salts,
petrol, and diesel fuel.
d
biological attack.
6
ite
The manufacturer shall supply test results for load against strain for the material identifying
lim
all test conditions including strain rate and temperature of materials tested and test method.
7 The Contractor shall submit full technical details of the geogrid proposed for use in the works.
These details shall include the following:
rv
(c) strength of the material determined as stress strain, at strains of 2 and 5% both
t
All test results shall be expressed as a lower 95% conference limit in accordance with ISO
2602.
8 The Contractor shall submit test results for the durability of geogrids. Tests shall be in
accordance with PD 6533, - Guide To Methods for Assessing the Durability of Geotextiles.
9 The Contractor shall submit laboratory test results for prolonged exposure tests at similar
temperatures.
10 For each batch or delivery of the geosynthetic the Contractor shall submit the production
quality control test results shall be clearly related to batches delivered to site.
QCS 2014 Section 06: Road Works Page 9
Part 18: Geosynthetics
1 Prior to placing geogrids the Contractor shall prepare a detailed method statement for the
sequence of operations.
2 The methods employed shall ensure that the geosynthetic does not suffer deterioration
during placing and that any joints are formed effectively.
3 The handling and placement and installation of geogrids shall be carried out strictly in
accordance with the manufacturer’s recommendations.
4 Where the geogrid has been protected by a wrapping resistant to ultraviolet lights attack no
further protection against sunlight is necessary.
5 For geogrids, jointing shall be by a bodkin whereby two overlapping sections are coupled
together using a bar passed through the aperture of the grid. Joints shall be formed at the
highest mechanical and durability efficiency possible.
6 If necessary the Contractor shall construct a temporary access road to the site location at a
d
convenient location close to the works, the Contractor shall prepare a clean working platform
ite
in storage area to accommodate geosynthetic materials.
7 The geogrid shall extend across the full width of the embankment or area being treated in
lim
one continuous piece and no part bits of rolls shall be used. This shall be accommodated by
increasing the lap lengths.
rv
8 Prior to installation of the geogrid , the site shall be cleared in accordance with part 2 of this
se
specification
ro
9 Before placing geogrid any abrupt changes in ground profile should be levelled.
t
10 Any regulating layer of fill placed shall not impair the vertical hydraulic conductivity of the
pe
natural ground.
12 Site handling of geogrids shall ensure that damage to the product such as surface abrasions,
splitting, notching or tearing is prevented.
13 The installation of the geogrid shall be consistent with the direction of major stress.
END OF PART