Memo 097.7 - 030718 - BRS Requirements Approval New Standard Pay Items
Memo 097.7 - 030718 - BRS Requirements Approval New Standard Pay Items
~;1b#-
Republic of the Philippines D:?rYJ- ~/;
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE SECRETARY
Manila
March 7, 2018
MEMORANDUM
Forwarded for reference is the copy of the received email dated March 6, 2018 from Engr.
Jennifer D. Largueza of Standards Development Division- BRS, relative to the Special Items
of Work (SPLs) submitted by the various Implementing Offices (IOs) in Luzon for approval.
Be informed that the BRS hold in abeyance their action on the concerned, pending
submission of Generic Technical Specification which are required per their memoranda dated
December 7, 2017 and January 16, 2018 addressed to the concerned Offices ..
Attached are the names of the concerned Offices and the needed requirements for the
approval of new Standard Pay Items as shown in Annexes A and B for reference and
guidance.
In this regard, you are directed to submit immediately to BRS the needed documents, copy
furnished the undersigned for information and/or appropriate action.
)
DIMAS S. ~LON' CESO II
Undersecret ry or Regional Operations
Regions I, II, I, IV-A, V and CAR
2.4 LCA/AVS/DSS
0-8)
.!!pO, Eugenio Jr. R.
From: Largueza, Jennifer D.
Sent: Tuesday, March 06, 2018 5:19 PM
To: Pipo, Eugenio Jr. R.; Soguilon, Dimas S.
Cc: Tagudando, Reynaldo G.; Faustino, Reynaldo P.
Subject: [Part 1] Status Update on the Approval of Special Items of Work (SPL) Requested by
Implementing Offices in Luzon
Attachments: March 6, 2018 Memo_Luzon.pdf; Annex B_Luzon IOs.pdf; Annex B_Luzon SPLs.pdf;
Annex C.pdf
Good Day!
This refers to the submitted Special Items of Work from various Implementing Offices which are requested to be
approved.
These 10's were advised by the Bureau of Research and Standards, this Office, to submit the required Generic
Technical Specifications and additional relevant references which are
needed to fully facilitate the evaluation, scheduling of deliberation of the Generic Technical Specification and
recommendation for approval of the Undersecretary for Technical Services.
In view hereof, it would be appreciated if said Implementing Offices shall submit the necessary documents the
soonest in order to complete approval of the Generic Technical Specification.
/.
Regards,
Jennifer D. Largueza
Engineer II
Standards Development Division, Bureau of Research and Standards
Department of Public Works and Highways
Tel. # Direct Line (02) 304.2083; Local No. 420831 www.dpwh.gov.ph
Di.~;(:l.aimer·: This f!12ssage is Fc>!' en~ ()rll.y.~l you are r,ot the
vou are notified that di
a.ny ~~.ction i.n reJ.j.,ance on the contents of this i.nformati.on is strictJ.y
1
or \.~.7horeceJ.'\'e an emL1J...1. rnust. their
2
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CENTRAL OFFICE
Manila
March 6, 2018
MEMORANDUM
This has reference to the status of requested Special Items of Work (SPLs) by Implementing
Offices in your area of authority/responsibility.
Be informed that this Office has already issued two (2) Memoranda dated December 7, 2017
and January 16, 2018, copies attached (Annex A), advising the concerned Implementing
Offices in your area of authority/responsibility to provide this Office the requirements as
stipulated in the said memoranda such as the- Generic Technical Specifications of the
previously requested Special Items of Work (SPLs) and references used in the formulation of
these technical specifications. However, to date, we have not received any response from the
Implementing Offices listed in Annex B. This causes the delay in the approval of the SPLs.
Further, it is emphasized that the requested SPLs (listed in Annex A) which already have
assigned pay item numbers in the latest Standard Pay Item Ust (D.O. No. 143! Series of 2017)
can be used in the preparation of Program of Work (POW). However, the concerned
Implementing Offices (See Annex A) are still required to submit the Generic Technical
Specifications and relevant references of SPLsto the Bureau of Researchand Standards (BRS).
Non-compliance shall result to no payment to the Contractor concerned on unapproved pay
item of work.
In this regard! it would be appreciated if said Implementing Offices shall submit the necessary
documents the soonest in order to fully facilitate the evaluation, scheduling of deliberation of
the Generic Technical Specification and recommendation for approval of the Undersecretary
for Technical Services. Attached as Annex C is the template for the Specification.
;:~A~DANDO
Bureau of Research and Standards
Encl.: As stated.
14.1.2 FET/RGT
Implementing Offices Requested with Generic Specification and References
No submitted Generic
Pangasinan Fourth DED Specification and
1 Luzon December 7, 2018 January 16, 2018
(Region I) additional references
as of March 6, 2018
No submitted Generic
I1ocos Norte First DED Specification and
2 Luzon December 7, 2018 January 16, 2018
(Region I) additional references
as of March 6, 2018
No submitted Generic
Specification and
3 Region III Luzon December 7, 2018 January 16, 2018
additional references
as of March 6, 2018
No submitted Generic
Specification and
4 Region V Luzon December 7, 2018 January 16, 2018
additional references
as of March 6, 2018
No submitted Generic
Albay Second DED Specification and
5 Luzon December 7, 2018 January 16, 2018
(Region V) additional references
as of March 6, 2018
No submitted Generic
Albay Third DED Specification anq
6 Luzon December 7, 2018 January 16, 2018
(Region V) additional references
as of March 6, 2018
New Items of Work requested with Generic Specification and References
(for Compliance of Implementing Offices)
Remarks
Implementing Status Reiterating Action to be Taken by the
Special Item of Work Re: Submitted
Office Re: Item No. (after the Reiteration) Implementing Office
Specification
Page 1 of 2
New Items of Work requested with Generic Specification and References
(for Compliance of Implementing Offices)
Remarks
Implementing Status Reiterating Action to be Taken by the
Special Item of Work Re: Submitted
Office Re: Item No. (after the Reiteration) Implementing Office
Specification
* No Pay Item Number yet is assigned on the requested SPLs since the submitted materials are not sufficient enough to identify its proper Pay Item Number/Bluebook Category
Page2of2
DEFINITION OF FIVE (5) MAIN SECTIONS OF THE DPWH STANDARD
SPECIFICATIONS
1. Description - This shall define the objectives, purpose, limitations or constraints of Item
of Work in project implementation.
5. Basis of Payment - defines the scope of work in the awarded cC?ntractto be paid for at
the contract unit price. Pay Item numbers, description and unit of measurement are
reflected in this section.
.!!po, Eugenio Jr. R.
From: Largueza, Jennifer D.
Sent: Tuesday, March 06, 2018 5:21 PM
To: Pipo, Eugenio Jr. R.; Soguilon, Dimas S.
Cc: Tagudando, Reynaldo G.; Faustino, Reynaldo P.
Subject: [Part 2] Status Update on the Approval of Special Items of Work (SPL) Requested by
Implementing Offices in Luzon
Attachments: Annex A_Dee. 7, 2018 Memo.pdf; Annex A_Jan. 16,2018 Memo.pdf
Attachment:
Annex A - Memorandum dated January 16, 2018 and December 7,2017 [See E-mail: Part 2]
Regards,
Jennifer D. Largueza
Engineer II
Standards Development Division, Bureau of Research and Standards
Department of Public Works and Highways
Tel. # Direct Line (02) 304.2083; Local No. 420831 www.dpwh.qov.ph
1
REPUBLIC OF THE PHILIPPL.'1ES
DEPARTMENT OF PUBLIC 'VORKS AND HIGH\VAYS
BUREAU OF RESEARCH AND STANDARDS
EDSA, QUEZON CITY
December 7, 2017
MEMORANDUM
This refers to the various proposed Special Items of Work (SPLs) that have been submitted
to this Office for our review/evaluation and their eventual inclusion in the Project and
Contract Management Application (PCMA).
It is emphasized that the use of SPls in DPWH infrastructure project is already prohibited
pursuant to Department Order No. 99, Series of 2017. As such, the BRS has to evaluate
these proposed new items of work/standard pay items strictly in accordance with the
procedures and requirements as stipulated in the memorandum dated October 24, 2017 of
former Undersecretary for Technical Services Raul C. Asis, copy attached.
Indicated in the attached table are the status and remarks on all the proposed items of
work/standard pay items that were submitted to this Bureau for evaluation. In order to
expedite the evaluation of some of these pay items, it is advised that you submit to us the
following: .
For any further inquiries/clarification on this matter, please coordinate with our Standards
Development Division (SDD) through Tel. Nos. (02) 481-0131/481-0062.
Requirements for the Approval of New Standard Pay Items
Page Z of Z
Ene!.: As Stated.
14.1.2. FETjRGT
Subject: Reiteration of on the R(~quirernents for the ApprOVdl of New Standard Pay Items
ANNEX A
RegionI
Region I
SPL 1 - Protective Coatin 9 Underdeck Slab 628 (12) with evaluated specs subject for deliberation
SPL 2 -Patching on Pier Copping 628 (7) with evaluated specs subject for deliberation
Pangasinan Second SPL 1 - Application of Protective Coating System 628 (12) with evaluated specs subject for deliberation
J)EO
SPL 2 - Provision Corbel (Bridge Seat Expansion) 628 (13) with evaluated specs subject for deliberation
SPL 3 - patching on Concrete Girder and Deck Slab 628 (7) with evaluated specs subject for deliberation
Pangasinan FOUlth Gen.specs and additional relevant
Temporary Bridge 13.21 with evaluated specs
DEO ref rences re uired
Page 1 of 10
Subject: Reiteration of Mernom on the Requirements for the Approval of New Standard Pay Items
ANNEX A
Page 2 of 10
Subject: Reiteration of Memora on the Requirements for the Approval of New Standard Pay Items
ANNEX A
Remarks
Region IV-B Sewerage Treatment Plant Newly ~ ed. With submitted tech.
SPL - Rubberized Playing Field'" Adopt assigned Pay Item No. For
'>i' Previously a/.Jf.JlVI/(KJ SPL 630 (1) with evaluated specs formulation of Generic Specification of BRS'
Cavite First DEO SDD
SPL- Artifidal Grass Turf> Adopt assigned Pay Item No. For
• Previoil.,1y '~fJProv"yf SPL 630 (2) with evaluated specs formulation of Generic Specification of BRS-
SOO
Batangas First DEO SPL 715(1)a • Geotextile Bag 715 (8) with evaluated specs Gen.specs and additional relevant
references re ulred
Patching 628 (7) with evaluated specs Gen.specs and additional relevant
references reeuired
Waterproofing on Deck Slab 628 (1) with evaluated specs Gen.specs and additional relevan t
references re uired
Fast Setting Mortar for Continued Deck Slab No Pay Item Number Yet with evaluated specs Gen.specs and additional relevant
references r ui red
Found in Pay Item 417 (1) - . Gen.specs and additional relevant
Region V Repainting and Repaint of Steel Bearing
Bearing Device (Steel Bearing) WIth evaluated specs
references reqUired
Page 3 of 10
Subject: Reiteration of Memora on the Requirements for the Approval of New Standard Pay Items
ANNEX A
Page 4 of 10
Subject: Reiteration of Memom on the Requirements for the Approval of New Standard Pay Items
ANNEX A
Region VII
Concrete Repair on SpaUing and Honey Combs No Pay Item Number Yet No submitted tech. specs.and references Gell.specs and additional relevant
references required
New Ultra Finger Joint, Type NUF #100
45 k/m)
No Pay Item Number Yet No submitted tech. specs.and references Gen.specs and additional relevant
references re~uired
New Ultra Finger Joint, Type NUF #70 (41 Gen.specs and additional relevant
No Pay ltern Number Yet No submitterJ tech. specs.and references
k/ml references requl red
New Ultra Finger Joint, Type NUF #50 Gen.specs and additional relevant
No Pay Item Number Yet No submitted tech. specs.and references
1(40kJm)
references reouired
Region VlI! SPL 1 - Rubberized Playing Field with submitted tech. specs. but Gen.specs and additional relevant
630 (1)
insufficient references references reaui red
lOOement Levelled Marker/Stud
ype), Type G105
No Pay Item Number Yet No submitted tech. specs.and references Gen.specs and additional relevant
references required
-..-
"mn'~~"
Page 6 of 10
Subject: Reiteration of Memorar on the Requirements for the Approval of New Standard Pay Items
ANNEX A
REGION/DEO Soecial Item of Work Remarks Status
Re Item No. Re Specs
Lowmount 400 Luminaire, Low Bay Enclosed,
Complete with 1-250 Netal Halide lamp, With submitted tech. specs but Gen.specs and additional relevant
624 (3)a
Desinnation: UCl insufficient references references require(1
Lighting Controfpiiiler(Malil:60AT/lOOAf, 2P, -, N~~,W_.
~, ...
relevant
, t references references reouirecl
Conduit Elbow, 32mmy) x 90 deg, (RSC) No Pay Item Number Yet With submitted tech. specs but Gen.specs and additional relevant
insufficient references references re0ui red
PVCjuPVC Elbow, 32mm0 x 90 deg. No Pay Item Number Yet With submitted tech. specs but Gen.specs and additional relevant
insufficient references references reguired
32mm0 RSC Entrance CAP, Weather Proof Complete With submitteci'tech. specs but ..
No Pay Item Number Yet Gen.specs and additional relevant
Brackets and damns insufficient references reference!' renuired
Squ<lre Box (Metal) No Pay Item Number Yet With submitted tech. specs but Gen.specs and additional relevant
insufficient references references renuired
Square Box (PVC/uPVC) No Pay Item Number Yet With submitted tech. specs but Gen.specs and additiOnal relevant
nsufficient references
Concrete Service Pedestal for LPGCl & l,PGC2 {as With submitted tech. specs but ~'~"i~d
No Pay Item Nllmber Yet and additional relevant
Iner detailed drawino\ in<;,.fficient references reouired
Ground Rod, 20rnm0 x 3048mmmi complete with With submitted tech. specs but
No Pay Item Number Yet and additional relevant
Clarno Connectors etc. insufficient references references rel1ui rcd
Page 7 of to
Subject: Reiteration of Memora, on the Requirements for the Approval of New Standard Pay Items
ANNEX A
-~,,-
With submitted tech. specs but Gen.specs and additional relevant
Electrical Wire, 8.0mm2 TW/THHN/THW color: Black No Pay Item Number Yet
insufficient references references required
With submitted tech. specs but Gen.specs and additional relevant
Electrical Wire, 14mm11WfTHHN/THW color: Black No Pay Item Number Yet
-~-,- ••...__ ..._~ insufficient references e, ref~e(~~~?"required "_
With subrnitted tech. specs but Gen.specs and additional relevant
Bureau of Design Electrical Wire, 22mrn2 TW{rHHN/THW color: Black No Pay Itern Number Yet
insufficient references references required
With submitted tech. specs but Gen.specs and additional rdevarlt
Electrical Wire, 3C x 4.0mm (XLPEj No Pay Item Number Yel
' insufficient references references r0Quired
With submitted tech. specs but Gen.specs and additional relevant
Bare Copper Wire, 8.0mm' No Pay Item Number Yet
insufficient reterences references reauired
Kilowatt Meter with Base submitted tech. specs but Gen.specs and additional relevant
No Pay Item Number Yet
IGUZZINI Lavinia B420 lVlodern Streetlights for
references required ...
Viaduct, Philips 140W CPO·T White Cosmopolis, With submitted tech. specs but Gen.specs and additional relevant
No Pay Item Number Yet
4000K,Desionatinn:.SLl insufficient references references required
Page 8 of 10
Subject: Reiteration of Memora, on the Requirements for the Approval of New Standard Pay Items
ANNEX A
Page 9 of 10
Subject: Reiteration of Memorai on the Requirements for the Approval of New Standard Pay Items
ANNEX A
Page 10 of 10
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BUREAU OF RESEARCH AND STANDARDS
EDSA, QUEZON CITY
MEMORANDUM
This is to reiterate Memorandum dated December 7, 2017, copy attached (Annex B),
advising the concerned Implementing Offices to comply with the requirements as stipulated
in the said memorandum and to provide us the Generic Technical Specifications and
additional relevant references required in the attached tabulation (Annex B) of the
previously submitted Special Items of Work (SPLs).
To date, we have not yet received any response from your office. It will be appreciated if
said requirements can be submitted to this office on/or before January 30, 2018.
Please be reminded that the required documents are needed in order to fully facilitate the
evaluation, scheduling of deliberation of the submitted Generic Technical Specification and
eventual approval of formulated Standard Specification. The concerned Implementing Office
may refer to table in Annex A for guidance.
For any further inquiries/clarification on this matter, please coordinate with our Standards
Development Division (SDD) through Tel. Nos. (02) 481-0131/481-0062.
Encl.: As Stated.
14.1.2 FET/RGT
Subject: Reiteration of Memorandum on the Requirements for the Approval of New Standard Pay Items
ANNEX A
7. Region V
i
I
I
I 8. Thru Region V Albay 2nd DEO
: 10. Region VI
1-------------+----------------<
st
I 11. Thru Region VI Capiz 1 DEO
-~-----------
12. Region VII
I 17. BOD
SPL 1 - Protective Coating Underdeck Slab 628 (12) with evaluated specs subject for deliberation
-Patching on Pier Copping 628 (7) with evaluated specs subject for deliberation
Pangaslnan Second SPL 1 - Application of Protective Coating System 628 (12) with evaluated specs subject for deliberation
DEO
SPL 2 - Provision Corbel (Bridge Seat Expansion) 628 (13) with evaluated specs subject for deliberation
SPl 3 - patching on Concrete Girder and Deck Slab 628 (7) with evaluated specs subject for deliberation
Pangaslnan Fourth Gen.specs and additional relevant references
Temporary Bridge B.21 with evaluated specs
DEO reauired
Gen.specs and additional relevant references
SPL-l Boulder Fill 104 (5) with evaluated specs
Hoeos Norte First reauired
DEO Not considered as new pay item of work.
Post - Tensioned I Girder for 45.73 meters Span 406 (1) h13
Adopt existing relative subscript
Structural Steel, furnished and fabricated (Grade 36 Not considered as new pay item of work.
403 (4) al-a2
&50' Mont Item 403.
Not considered as new pay Item of work.
Structural Steel, erected (Grade 36 & 50) 403 (3) a1-a2
Mont Item 403.
Requirements for the Approval of New Standard Pay Item, Page2 of 9
(a, of January 11, 2018)
SPl 5 - Concrete Epoxy Painting 628 (2) with evaluated specs ~ uired
,,'" ,,"""00•..• ""'ant """"'''''
Gen.specs and additional relevant references
SPl 6 - Anti-Corrosion Paint 628 (9) with evaluated specs
recuired
Gen.specs and additional relevant references
SPl 7 - Repainting (Weathering Steel) No Pay Item Number Yet with evaluated specs
required
Region III
Gen.specs and additional relevant references
SPl 8 • Cleaning No Pay ]tem Number Yet with evaluated specs
recuired
Gen.specs and additional relevant references
~ 9 - Scaffolding B.24 with evaluated specs
Il'PIluired
Gen.specs and additional relevant references
SPl-1 Waterproofing on Deck Slab 628 (1) with evaluated specs
renulred
Gen.specs and additional relevant references
SPlll- Special Anti Corrosion Plant 628 (9) with evaluated specs
rcouired
Scheduled for Deliberation Meeting on
Steel finger Type Expansion Joint 413 (4)b with evaluated specs
January 11, 2018
Waterproofing - Rubber Compound Membrane Scheduled for Deliberation Meeting on
628 (l)b with evaluated specs
Type January 11, 2018
Region III
Scheduled for Deliberation Meeting on
Restrainers 415 with evaluated specs
January 11, 2018
1st Deliberation: Nov.21, 2017 Deliberation completed.
1052(30) Rammed
Bulacan first DEO Rammed Pier foundation Systems 2nd Deliberation: Nov.27, 2017 For finalization of Generic Specification
Aggregate Piers
3rd Deliberation: Dec.7, 2017 of 10
Requirements for the Approval of New Standard PayItems Page 3019
(a. of January 11, 2018)
Proposed Specialltems of Work (SPL) for the i ~~~~ded in the on-going formulation of Item
Region IV-A 1407(5-6) with evaluated specs
Placement and Installation of Tria Blocks 07 - Precast Breakwater Structure
SPL - Rubberized Playing Field* Adopt assigned Pay Item No. For formulation
630 (1) with evaluated specs
• Previously approved SPL of Generic Specification of BRS-SOD
Cavite First DEO
SPL - Artificial Grass Turf* Adopt assigned Pay Item No. For formulation
630 (2) with evaluated specs
" Previously approved SPL of Generic Specification of BRS-SDD
Gen.specs and additional relevant references
Batangas First DEO SPL 715(1)a - Geotextile Bag 715 (8) with evaluated specs
rPlluired
Gen.specs and additional relevant references
Patching 628 (7) with evaluated specs
l"f'(Iuired
Gen.specs and additional relevant references
Waterproofing on Deck Slab 628 (1) with evaluated specs
fPlluired
Region V Gen.specs and additional relevant references
Fast Setting Mortar for Continued Deck Slab No Pay Item Number Yet with evaluated specs
fPlluired
Found in Pay Item 417 (1) - Gen.specs and additional relevant references
Repainting and Repaint of Steel Bearing with evaluated specs
I Bearing Device (Steell3earing) required
Gen.specs and additional relevant references
SPL 1 - Filter Fabric with Aluminum Frame 1715 (2) evaluated specs
reauired
Albay Second DEO Gen.specs and additional relevant references
SPL 2 - Provision of Hole Drilled on Existing PeCP for
631 (1) with evaluated specs
Tie Bar and Dowel Bar reauired
Gen.specs and additional relevant references
SPL-1 Caulking 628 (6) with evaluated specs
rPllulred
Albay Third DEO Gen.specs and additional relevant references
SPL 2 Waterproofing on Deck Slab 628 (1) with evaluated specs
rPOuired
No submitted tech. specs. and insufficient Gen.specs and additional relevant references
High Skid Resistance Pavement Markings No Pay Item Number Yet
references required
No submitted tech. specs. and insufficient Gen.specs and additional relevant references
Region VI pve Roofing (Corrugated/RIb-Type) No Pay Item Number Yet
references required
with submitted tech. specs. but no Gen.specs and additional relevant references
Precast Pre-stressed Concrete Floor Joist No Pay Item Number Yet
references required
Requirements for the Approval 01New Standard Pay Items Page 4 019
(as of January 11, 2018)
628 (7)
Re SDecs
Supply & Install Meter Base, Service Entrance & Main With submitted tech. specs but Gen.specs and additional relevant references
No Pay Item Number Yet
Circuit Breaker, TSI16 insufficient references required
With submitted tech. specs but Gen.specs and additional relevant references
Single arm Post, with Brackets & Accessories 624 (1)a2
insufficient references required
With submitted tech. specs but Gen.specs and additional relevant references
Double Arm Post, with Brackets & Accessories 624 (2)a2
Bureau of Design insufficient references required
Lowmount 400 Luminalre, Low Bay Enclosed, Gen.specs and additional relevant references
With submitted tech. specs but
Complete with 1-250 Metal Halide Lamp, 624 (3)a
insufficient references required
DeslQnation:UC1
Lighting Control Panel (Main: 60AT/I00AF, 2P, 240V,
60HZ, MCCB, 18 KAIC BRS: 6-30AT/50AF, 2P, 240V, With submitted tech. specs but Gen.specs and additional relevant references
624 (5)
60HZ, 10KAIC Complete with Magnetic Contactor & Insufficient references required
Controls and Photocell in NEMA 3R Enclosure)
With submitted tech. specs but Gen.specs and additional relevant references
Main Feeder Distribution System 624 (6)
Insufficient references rf'{]uired
Hequirements for the Approval of New Standard Pay Items Page 7 of9
(as of January 11, 2018)
Chipping of Roadway longitudinal Edge Patching with Newly received. Returned SPL, Gen.specs and additional relevant references
No Pay Item Number Yet
Asphalt Concrete Incomplete requirements/content required
Elastomeric, Hot-Applied Expansion Joint Sealant Adopt amended Item 413 - Expansion Joint
UPMO - Road 413 (5) No submitted tech. specs. and references
(with single sized Aggregates) System.
Management Cluster
II Epoxy coated Anchor Bar {Permanent Ground Anchor 513 No submitted tech. specs. and references Adopt Item 513 - Permanent Ground Anchor
SPL-6: Precast Concrete Panel 604 (6) approved SPl On-going drafting of Gen.Specs
SPL-7: Installation of Precast Panel 604 (6) approved SPL On-going drafting of Gen.Specs
: Bamboo Cribbing 629 (1) with draft specs Routed to different Bureaus for comments
Gen.specs and additional relevant references
of Dredge Material 805 (1-2) No submitted tech. specs. and references
reQuired
Gen.specs and additional relevant references
Excavated Soil from Surplus Materials 1706 (1) No submitted tech. specs. and references
reQuired
Gen.specs and additional relevant references
Disposal of Unsuitable Soli 1706 (1) No submitted tech. specs.and references
reQuired
Gen.specs and additional relevant references
Precast Concrete Block Retaining Wail 405 (9) a-c No submitted tech. specs.and references
recuired
Gen.specs and additional relevant references
Gravel Bedding for Wet Stone Masonry 103 (3) No submitted tech. specs. and references
reculred
UPMO Flood Control Gen.specs and additional relevant references
Galvanized Steel Fencing 1722 (i) d No submitted tech. specs. and references
Management Cluster recuired
Gen.specs and additional relevant references
Removal of Utilities and Services B.12 No submitted tech. specs.and references
reQuired
Requirements for the Approv.1 of New Standard Pay Items Page90f9
(as of Januaty 11, 2018)