Ammann Customer Magazine Gmc-1423-10-En Arx 200916
Ammann Customer Magazine Gmc-1423-10-En Arx 200916
ON THE ROAD
ON-SITE, HIGH-PERFORMANCE PLANT
ELIMINATES 25,000 HAUL TRIPS
0 9. 2 0 2 0
TA B L E O F C O N T E N T S LOOKING FORWARD
TO A BRIGHTER AND
HEALTHIER FUTURE
PG 18 Our promise, going forward, is to remain vigilant in protecting the health of our
AMMANN AROUND THE WORLD employees and customers. We will be quick to recognise and adapt as conditions
An Overview of News and Events change – not only in Switzerland, but in all locations around the world, including
where you live and work, too.
AMMANN.COM
Materials and specification data are subject
to change without notice. Hans-Christian Schneider
GMC-1423-10-EN | © Ammann Group CEO, Ammann Group
As a road and civil engineering contractor, Mini paver starts trial work AFW 150-2 raises and secures
Karsten Stirnberg frequently repaves Anton Kreitz & W.H. Ostermann GmbH efficiency gains
footpaths and bicycle trails in the Sauerland from the neighbouring town of Iserlohn Thanks to the AFW 150-2, the project was
region of Germany. Until recently, the made the AFW 150-2 Mini Paver available completed faster than expected. “After only
owner of the business bearing his name was for testing on the project. The construction four hours, the installation job was done,”
firmly convinced that the use of machines machinery dealer also offered on-site said Stirnberg. “I am thrilled.”
was not worthwhile when paving at such instruction and helped train Stirnberg’s
narrow widths. staff to properly operate the paver on the Paving by hand would have taken at least
jobsite. Kreitz & Ostermann supported the eight hours and required more manpower,
After his latest rehabilitation project, paver from start to finish and also provided he said. The quality of the end product
entrepreneur Karsten Stirnberg changed practical tips achieving the best results with made the mini paver’s performance even
his mind based on the performance of the the AFW 150-2. more impressive. “The asphalt surface is
Ammann AFW 150-2 Mini Paver. flawless,” Stirnberg said.
“The compact dimensions and unique
The paver was put to the test on performance data raised my interest in the The pavement on the Menden site had
a restoration job in Menden – a routine machine,” said Stirnberg. The AFW 150-2 barely cooled before Stirnberg made a
undertaking for the business. A deteriorated from Ammann is one of the most compact decision: He and his staff will never again
pipeline needed urgent replacement, which pavers around. It is only 2.9 metres (9.5 feet) pave an asphalt strip by hand – no matter
was no big deal for the experienced and long, 1.64 metres (5 feet) high and not even how narrow. After the trial run, Stirnberg
well-rehearsed Stirnberg team. The firm 88 cm (35 in) wide. It is the only machine was won over by the advantages of paving
carries out comparable projects several on the market that easily enabled the pave by machine. The fast working speed, high
times a year, many of them in Menden width of just 80 cm (31.5 in) required for the paving quality and seamless process brought
and the surrounding area. project – and did so without any additional significant efficiency gains.
equipment. (The Ammann mini machine can
The dilapidated pipeline, located under even pave at a width as narrow as 25 cm Because of these benefits, Stirnberg chose
pavement that was only 80 cm wide, (10 in) with minor equipment adjustments.) not to return the test machine to dealers
was wedged between the curb and front It is fast, with working speeds up to Kreitz & Ostermann. Instead, he purchased
gardens, and ran through a residential 10 metres (33 feet) per minute. the paver and already has future projects in
street in Menden. mind for the machine.
The AFW 150-2 twice traveled down
“We have always paved such narrow the 300-metre (984 feet) long and 80-cm
strips by hand,” Stirnberg said. Reluctant (31.5 in) wide footpath. During the first
to deviate from usual procedures, he was pass, the machine placed a 6-cm (2 in) thick
initially convinced that using a paver would base course. Next came a 4-cm (1.5 in)
not be advisable given the small paving surface pass. The compact paver is capable
width. “It was simply too expensive – of handling thicknesses up to 10 cm (4 in)
and too complex,” he said. without difficulty.
AMMANN.COM 3
SWISS MOTORWAY MAXIMISES
ON-SITE RECYCLING
Renovating a section of the Swiss N2 Traveling between that plant and the In addition, a temporary entrance and
Motorway required an unconventional, jobsite would have created some staggering exit to the motorway and thus to the
creative approach. numbers. For starters, 25,000 truck construction site was constructed to reduce
journeys of 70 km (43 miles) would equal transport routes.
The motorway is the north-south the distance of roughly 50 trips around
connection from Basel to Chiasso. South the centre of the earth. The construction work, including these
of the well-known Gotthard Road tunnel, temporary installations, was put out to
the 10-km (6 mile), four-lane section Distance wasn’t the only challenge. tender with the condition that required
of motorway is currently undergoing The trucks would have to travel to the recycling percentages for the asphalt
a complete renovation that will be jobsite either via the motorway itself pavement would be met. In addition,
completed in 2022. The total cost of the or a cantonal road. Each had problems. the plants may only produce material
project is CHF 250 million (EUR 236 million). The motorway has such high traffic volume, from that specific site for the N2 project.
even without construction, that traffic jams After its completion, the plants must be
The existing road base consists of occur frequently, especially on summer dismantled and the site restored to its
material created during the excavation of days. The passage of the mix trucks would original condition.
the Gotthard tunnel. That aggregate has therefore not be guaranteed and cycles
a fine-grain content of more than 8% and impossible to calculate. Structure for the future load
is therefore not frost-resistant. In addition, The new asphalt pavement structure
the existing asphalt structure required Use of the cantonal road had issues of consists of the following layers and required
reinforcement to handle today’s heavy loads. its own. The road runs through the villages percentages of recycled materials:
in the narrow Leventina valley and the • 3 cm SDA 8-12 (semi-dense rolled asphalt)
The current project includes many nods 25,000 truck journeys would create noise, with 0% recycled asphalt
toward sustainability. The aim of the Federal congestion and safety problems – not to • 8 cm AC B 22 H (binder course) with 50%
Roads Office (Astra), the project’s owner mention damage the road. recycled asphalt
and builder, is to ensure that the existing • 8 cm AC T 22 H (base course) with 50%
materials can be processed on site and On-site solution finishing asphalt
reused in the new mix. For all these reasons, an area next to • 11 cm AC F 22 (bitumen-bound foundation
the motorway was provided for asphalt layer) with 90% finishing asphalt
The use and transport of materials was preparation and production. The space • 11 cm AC F 22 (bitumen-bound foundation
a key consideration during project planning. includes an old military airfield for the layer) with 90% finishing asphalt
installation of an asphalt crushing plant, an • A 5 cm thick seal on
Enormous masses and distances asphalt-mixing plant and a gravel washing a 33 cm (13 in) frost
Planners calculated the following plant with sludge press. protection layer
quantities of materials would be required for
rebuilding the N2 section:
• 55,000 tonnes (61,000 short tons)
of gravel
• 119,000 tonnes (131,000 short
tons) of reclaimed asphalt
from the construction site
• 21,000 tonnes (23,000 short tons)
of reclaimed asphalt from other
construction sites
• 256,000 tonnes (282,000 short tons)
of asphalt for placement
AMMANN.COM 5
INTELLIGENT ARS SINGLE-DRUM
ROLLER FINDS OBSTRUCTIONS
AND POTENTIAL TROUBLE
De Cnodder from Herentals handles soil The company owners Mr. Michel Coveliers, approach. With the ARS 70, we can utilise
compaction for residential, industrial and states: “We also appreciate ACEforce, which multiple frequencies. Doing so in a timely
commercial projects. The company needs helps us to monitor compaction progress. manner reduces the cost of fuel and labor
powerful compaction output – but it has This system supports efforts to determine and increases quality, too.”
also placed a priority on the manoeuvrability when the work is complete and whether it’s
necessary to succeed on the varied projects. time to move onto another section of the Wide-opening hood offer exceptional
jobsite. ACEforce also indicates possible weak access to the engine compartment,
The need for both power and spots in the compacted area. including an after-treatment system. All
manoeuvrability has led De Cnodder, based daily maintenance points are easy to reach,
in the town of Herentals in the province of “When working on housing developments, including the engine oil dipstick, fuel filling
Antwerp, Belgium, to utilise the Ammann there are a lot of obstructions underneath point and all filters. No tools are required to
ARS 70 Single-Drum Roller. The compactor the compacted layer – sewage, engineering access service points. All filters and draining
features a shortened wheelbase and an networks, old back-filled trenches, etc.. This points are centralised. Most fluids need only
articulation joint that tightens the inner means we need to compact with a special be replaced every 2,000 hours.
turning radius to 2580 mm (101,6 in).
A lower centre of gravity provides
outstanding stability.
TECHNICAL SPECIFICATIONS:
OPERATING WEIGHT:
6490 kg (14 310 lb)
MAXIMUM WEIGHT:
8400 kg (18 520 lb)
DRUM WIDTH:
1680 mm (66.1 in)
ENGINE:
Kubota V3307-CR-TE5 – 55.4 kW (75 HP)
EU Stage V / U.S. EPA Tier 4f
AMMANN.COM 7
AMMANN ASPHALT-MIXING
PLANT HELPS RUSSIAN
BUSINESS ATTRACT CUSTOMERS
Fuel Options and ‘Green’ Features Minimise Mix Costs
Tiger Mix and its general director, Ilya Nemaltsyn (left), chose the Ammann ABA UniBatch
Asphalt-Mixing Plant in part because of its ability to utilise multiple fuel types, enabling the
company to take advantage of the lowest-cost options as prices fluctuate.
prices fluctuate. The flexibility ultimately will increased use of RAP in the future, so the
The advanced technology of an Ammann help Tiger Mix appeal to new customers and company was sure to acquire a plant that
ABA UniBatch Asphalt-Mixing Plant retain current ones by minimising mix prices. could easily add those capabilities.
is helping a Russian company attract
customers by minimising the cost of Tiger Mix is also benefitting from The Ammann plant began operation in
high-quality mix – and reducing hauling Ammann’s environmentally friendly systems September 2019. It was a quick turnaround
distances, too. that lessen noise and dust levels. A green from deciding to enter the asphalt market to
plant such as the ABA UniBatch can be producing the first batch of mix.
Tiger Mix, based in Vladivostok in located in residential areas and city centres,
southeastern Russia, has been a concrete thereby reducing the customers’ hauling “The idea to expand production and
producer since 2016. It recently began distances. Shortened routes can lower acquire an asphalt-mixing plant first
asphalt production with the purchase of the customer costs significantly in terms of fuel came up less than a year ago,” said Ilya
Ammann ABA UniBatch. consumption, the number of haul trucks Nemaltsyn, the general director of Tiger
required – and the number of drivers, too. Mix. “The construction of the plant was
Tiger Mix chose the Ammann plant in relatively short – about eight months
part because of its ability to utilise multiple The plant can also be fit with components from the moment of the idea to the
fuel types, enabling the company to take that can employ high levels of recycled choice of a supplier and then finally to
advantage of the lowest-cost options as asphalt (RAP). Tiger Mix sees a need for the the commissioning.”
TECHNICAL SPECIFICATIONS:
CAPACITY: 100 - 340 t/h (111–387 short tons/h)
MIXER SIZE: 1.7 t - 4.3 t (1.9–4.8 short tons)
HOT AGGREGATE SILO: 29 t - 40 t (32–44 short tons)
HOT MIX STORAGE SILO: 40 t or 30 t (44 or 33 short tons)
in 2 compartments
CONTROL SYSTEM: as1
RECYCLING SYSTEM: RAC / RAH50 / RAH60
Nemaltsyn confirmed that fuel flexibility “All the innovations that are available are “The system also allows you
was a key factor in the purchasing process. applied in this plant,” said Oleg Avakin, to connect online to the home
“What’s unique about this plant is that it can Ammann area manager for the Far East. office in Switzerland, which
operate on three types of fuel: natural gas, “All Ammann equipment is distinguished can monitor the operation of all
oil and diesel,” he said. by a high degree of design study, reliability, systems and provide after-sales and
economy in terms of energy efficiency, and online technical support,” Avakin
Having these options provides more than environmental friendliness.” said. “Ammann customers say the
price protection. Some fuels are better at availability of immediate assistance,
creating certain types of mixes, he said. The plant features Ammann’s fully day or night, is one of the benefits they
“These choices provide flexibility in the automated as1 Control System, which value the most.”
production of mixtures and also meet all utilises an intuitive graphic interface to help
environmental standards.” the operator track the production process.
The operator can control both the batch and
The plant can incorporate varied the unloading of asphalt without leaving the
aggregates and bitumens and meets control room.
international quality standards. It produces
about 210 tonnes (232 short tons) of mix
per hour.
AMMANN.COM 9
The APH 65/85 Hydrostatic Vibratory Plate Compactor
fit nicely in the tight trench.
L. Gasser & Co AG Civil Engineering, based A few days later the crew utilised the APH The APH 65/85 provided the power and
in Zurich, specialises in smaller construction to compact a trench for the water supply to consistent coverage that this project needed.
projects and therefore relies greatly on a new building complex. The APH fit nicely The crew, led by foreman Amit Ismaili,
vibratory plates for their compaction in the tight trench, which was 2 metres appreciated the machine’s compaction
tasks. The main jobsite challenge the (6.5 feet) deep and 1 metre (3.3 feet) wide. performance as well as its ease of operation
company faced was maintenance of these The plate first compacted a 1-metre-deep and precise steering, which are essential on
plate compactors, machines that were (3.3 feet) layer of fill material. Another metre tight jobsites. “The compaction power of the
manufactured by a competitor of Ammann. of material was then placed, and the APH plate is exceptional,” said Ismaili. “It helps us
They required a great deal of servicing, compacted that layer, closing the trench. to compact the deep layers in fewer passes.”
which drove up ownership costs and often In addition, the plate is designed to minimise
made them unavailable when needed. The narrow width allowed only a plate the amount of unwanted vibration that
compactor to access the trench – yet reaches the operator, reducing stress and
L. Gasser, a third-generation, family- great force was needed to compact such the risk of injury.
owned business, recently turned to the deep layers. The APH 65/85 is a great
Ammann APH 65/85 Hydrostatic Vibratory match for such jobsites. The plate offers But performance, control and comfort
Plate Compactor to reduce maintenance the best compaction performance in its were only part of the equation. The L.
issues – and of course to provide size class thanks to the unique triple-shaft Gasser management team was concerned
compaction power, too. A roller is often exciter system. The machine performed about maintenance needs and the
too large to be used on the company’s exceptionally well and had abundant power associated costs.
projects. The jobsites can require vibratory to quickly reach the compaction targets.
plates that have good compaction output The compactor has a working width of They quickly learned that Ammann
and cover ground quickly, yet still fit on the 700 mm (27.6 in) with standard extension compactors are engineered to lessen
smaller projects. plates. With the simple and quick removal of downtime. Ammann APH plates feature a
the extension plates, the working width can hydraulic system that drives the machines
L. Gasser put the Ammann compactor be reduced to 700 mm (21.7 in), making it without a V belt, eliminating the wear
to work on a refurbishing project on “Im the ideal fit for the compact spaces L. Gasser and maintenance costs of the component.
Wiesenbeetli” in Zurich to see how it often works in. Other key parts of the Ammann compactor
compared to competitive models. The sub- are maintenance-free. Fluid intervals are
grade layers had been prepared the week Compaction is crucial on any jobsite, extensive, too, reducing costs for the
prior, and the Ammann machine excelled and the project “Im Wiesenbeetli” with acquistion of new fluids and the disposal of
at compacting gravel for the surface layer. its water supply trench was no exception. the old.
TECHNICAL SPECIFICATIONS:
APH 65/85
MACHINE WEIGHT:
471 kg (1038 lb)
MAX. VIBRATION FREQUENCY:
55 Hz (3300)
MAX. CENTRIFUGAL FORCE:
65 kN (14 612 lbf)
The patented triple-shaft exciter system makes the plate compactor easy to control.
AMMANN.COM 11
AMMANN MACHINES: HELPING
OPERATORS SUCCEED
Operators are essential to the success of construction businesses. In the end,
they deliver quality, productivity, efficiency, cost savings and more. Yet they
also need the right equipment to achieve the desired outcomes.
AMMANN.COM 13
SIGN UP
FOR THE
OPERATOR
CLUB!!
The Operator Club is open to the individuals who run the Ammann plants.
The goal is to make the plant easy to run, Operator Club world and have seen firsthand the obstacles
which in turn helps the operator access The Operator Club is open to the encountered by those who run the plants.
efficiencies that reduce material usage, fuel individuals who run the Ammann plants.
burn and other costs. Additional support The club provides members with training The insight they share can enhance
programs ensure operators maximise uptime discounts, free admission to VIP events the operation of any model of
and ensure quality, too. at trade shows and a subscription to the asphalt-mixing plant.
Ammann Customer Magazine – among
Here are some of the ways other benefits. There is no cost to join
Ammann assists operators of asphalt- the club.
mixing plants:
Perhaps the key component of the
The as1 Control System group is the Operator Club Blog,
This advanced control system is the a valuable communication tool
brains of the plant. It is technologically that helps those who control the
advanced, yet it also enables easy, intuitive plants overcome challenges big
operation. The proprietary system improves and small. Ammann trainers –
quality while reducing material waste and who author the posts – are
energy consumption. A variety of different current on the latest trends
modules concentrates on specific areas of and issues facing plant
the production process, helping operators operators. These trainers
achieve key goals. have visited countless
plant sites around the
Way Kambas National Park in the ABA UniBatch is cleaner, and the quality The ABA UniBatch is the highest capacity
Lampung province of Indonesia is home to is better. The mix even looks different – it plant operating in Indonesia. It is the first
Sumatran tigers, elephants, rhinoceroses looks more shiny.” plant with a 3.3-tonne (3.5 short ton) mixer.
and rare birds. The plant is productive, too, with output
Among the environmental benefits of the of 170 tonnes (187 short tons) per hour –
The park also attracts many visitors, plant that were noted by PT. Usaha Remaja essential as the mix had to cover 50 hectares
who provide the funds needed to preserve Mandiri staff are: (500,000 m2 /60,000 yd2).
the rare wildlife. The roads that support • The plant was equipped with sensors that
the tourism – which in turn enables the alerted operators to potential issues early, One of the operators also praised the
retention of the sensitive habitat – was in improving efficiency and safety. ease of control. “The plant is very user
need of replacement and expansion. • Only white steam was visible from friendly, and the automatic settings are very
the chimney. “There was no dust,” accurate,” he said.
Ammann customer PT. Usaha Remaja an operator said, echoing Widodo’s
Mandiri used an Ammann ABA 240 UniBatch observation. Way Kambas is one of about 50 ASEAN
Asphalt-Mixing Plant to produce mix for • Fuel efficiency was exceptional. Heritage Parks worldwide. The goal of such
the project. • The mix retained heat for long periods. designated parks is to preserve particularly
Only about 5º C (41º F) was lost during sensitive areas of biodiversity. The park is
“The use of the ABA UniBatch and 2 to 3 hours of transport. This heat focused on saving the critically endangered
its baghouse filter enabled the plant to retention enabled mix to be produced at birds and animals that reside there.
work without dust,” said Hengki Widodo, lower temperatures, reducing fuel burn
President Director at PT. Usaha Remaja and emissions.
Mandiri. “The hot-mix product from the The Ammann ABA UniBatch is the highest-capacity
asphalt-mixing plant operating in Indonesia.
ABA UNIBATCH
TECHNICAL SPECIFICATIONS:
CAPACITY: 100 - 340 t/h (111–387 short tons/h)
MIXER SIZE: 1.7 t - 4.3 t (1.9–4.8 short tons)
HOT AGGREGATE SILO: 29 t - 40 t (32–44 short tons)
HOT MIX STORAGE SILO: 40 t or 30 t
(44 or 33 short tons) in 2 compartments
CONTROL SYSTEM: as1
RECYCLING SYSTEM: RAC / RAH50 / RAH60
AMMANN.COM 15
AS1 CONTROL
SYSTEM MODULES
ADDRESS
Please click here to view an
accompanying video.
Dynamic Recycling
Excel AddIn
Ammann offers this module for comprehensive data evaluation.
It is an extension of the broad menu of standard as1 reports. This
ingenious tool makes your Excel spreadsheet program as1-capable. It
Messaging enables defined data sets to be imported into Excel over the network,
where they can be processed as you wish. Create your own plant
Messaging dashboard or dig in deep for detailed evaluations and optimisation
The newly released as1 Messaging module enables emails to be sent of your processes. Among the defined sets this module makes
automatically from the as1 Control System. Three types of messages available are statistics for production, component usage and RAP; mix
are possible: alarms, counter-events and PDF documents. Simply create temperature reports; bitumen deliveries; data for as1 EcoView and
a list of recipients and combine them in groups. The user selects which Peak Load; counter-events; alarms report; storage content; sample lists;
information is to be sent automatically – and to which group. For maintenance costs (planned and actual); batch data; and loading lists.
example, the plant manager will automatically receive the day report,
the material manager will be sent the component usage statistics and HIGHLIGHTS
the laboratory personnel will be emailed detailed batch protocols. Your • Selects data from the as1 database and imports it into
maintenance team may want to be notified when certain operating Excel for evaluation
hours have been reached so they can plan accordingly. The on-call • Seamlessly integrates newly generated data with a click
service team may want to receive nightly alarms. of the mouse
• Combines all individual evaluations in a single, trusted tool
HIGHLIGHTS
• Automatically sends standard PDF reports by email
• Defines recipient groups directly in the as1
• Simply requires that the as1 is connected to the internet
• as1 Order Management System – enables you to work GRAPHICAL QUALITY REPORT √
with additional master data for orders, such as customers, EXCEL ADDIN √ √ √ √
construction sites and vehicles MAINTENANCE MANAGEMENT √ √
• as1 Peak Load Management electric (PLMe) – prevents PRODUCTION SAMPLE SCHEDULING √ √
expensive spikes in electrical consumption ECOVIEW √
• as1 Peak Load Management gas (PLMg) – indicates
PEAK LOAD MANAGEMENT √
actual gas consumption
MESSAGING √ √ √
• as1 Qualiview (GQR) – documents mix quality
Q PLANT AGENT √ √
• as1 Sample Planning (PSS) – reminds you of
sampling requirements PLANTX DATA INTERFACE FOR ERP √
Porter Equipment is distributing Ammann rammers, vibratory plate compactors – and heavier machines, too.
Porter Equipment to Distribute
Ammann Compactors
Porter Equipment Australia is now the
exclusive Australian distributor of Ammann
light and heavy compaction equipment.
AMMANN.COM 19
OBSTRUCTIONS?
NO PROBLEM
AMMANN ARX 4-2 LIGHT TANDEM ROLLERS
Ammann ARX Light Tandem Rollers excel in the open, where
covering ground quickly is the goal. But other jobsites call for a compactor
that can work tight against obstructions, such as curbs, without losing productivity.
Ammann ARX series of light tandem rollers deliver in both worlds. They feature industry-leading compaction
output to quickly reach targets when working in open spaces. When obstructions are a factor, the rollers can
quickly switch from in-line to offset compaction, providing operators with improved vision and precision.
Looking for even more productivity? When the workday is done, maintenance points
can be easily accessed from the ground to ensure quick completion of service work.