Estimates
Estimates
ARCHITECTURAL DESIGN
AND SITE PLANNING
ESTIMATES FOR ADSP
ALE Series of 2022
1
28/4/2022
Truckload of Sand/Gravel
2
28/4/2022
Truckload of Sand/Gravel
AMBF
TLA - SETBACK
AMBF
FROM ACQUIRED AMBF
VOLUME OF CONCRETE &
BAGS OF CEMENT IS ASKED
SETBACK
RROW
ESTIMATES
TRUCKLOAD OF SAND KG. OF REBARS
& GRAVEL VOLUME OF BASED FROM COMPUTED VOLUME OF
CONCRETE CONCRETE, FACTOR OF KILOGRAM OF
REBARS IS GIVEN.
BASED FROM AMBF THICKNESS
OF SLAB IS GIVEN Example: 1 CUM OF CONC.= 15 KGS OF REBARS
THICKNESS
OF SLAB IS
GIVEN
AMBF
3
28/4/2022
USA ISA
FRONT SETBACK TLA - USA
ISA
AMBF AMBF
USA
FROM ACQUIRED
FRONT
USA VOLUME OF
CONCRETE & SETBACK
BAGS OF CEMENT IS
RROW RROW
ASKED
Truckload of Sand/Gravel
V (truck)=15 ft x 8ft x 4ft
Example:
Volume = L x W x Thickness
= 10m x 30m x .15 m
= 45 cum
4
28/4/2022
Truckload of Sand/Gravel
HIGHEST ELEVATION DIFFERENCE
SOME GIVEN LOT HAS
IF SLOPE IS GIVEN MODERATE SLOPE. ELEVATION
DIFFERENCE FROM SIDEWALK
A IS ASKED
3%
HIGHEST
AMBF 20M X=? ELEVATION
RROW DIFFERENCE
20M
SECTION A
Truckload of Sand/Gravel
(BACKFILL) BACKFILL
VOLUME
IF SLOPE IS GIVEN
A X=.060 M
RROW
10M
20M
3% SECTION A
AMBF 20M
20 M 10 M
0.60 M
10
5
28/4/2022
11
12
6
28/4/2022
Truckload of Sand/Gravel
AMBF
TLA - SETBACK
AMBF
FROM ACQUIRED
AMBF VOLUME
OF CONCRETE &
BAGS OF CEMENT
IS ASKED
SOMETIMES
CARPORT
SETBACK
RROW RROW
13
Truckload of Sand/Gravel
FLOORING FOR
SAND/GRAVEL
TRUCKLOAD NO. OF
TRUCKLOAN
FROM ACQUIRED AMBF
OR GIVEN AREA D
SIZE IS GIVEN
FROM DESIGN
PROBLEM
RROW
RROW
14
7
28/4/2022
Example:
Volume = L x W x Thickness
= 30m x 60m x .15 m
= 270 cum
15
16
8
28/4/2022
FLOORING
BASED FROM AMBF COMPUTE NUMBER
FLOOR TILES
FLOORING
FOR
INTERIORS NO. OF
FLOORING
FROM ACQUIRED AMBF
OR GIVEN AREA OF AT LIVING
ROOM/SPACE NUMBER SZIE IS GIVEN
PLYWOOD OR FROM DESIGN
PAINTS IS ASKED PROBLEM
RROW
RROW
17
Number of Flooring
(Ceramic, Marble, Granite, Vinyl)
Commercial Sizes
18
9
28/4/2022
19
CEILING
BASED FROM AMBF COMPUTE NUMBER
PLYWOOD OR CEILING TILES
CEILING
CEILING FOR EAVES
FROM ACQUIRED AREA
FOR EAVES NUMBER
INTERIORS PLYWOOD OR
FROM ACQUIRED AMBF PAINTS IS ASKED
OR GIVEN AREA OF
ROOM/SPACE NUMBER
PLYWOOD OR
PAINTS IS ASKED
RROW RROW
SOMETIMES NUMBER
OF CEILING AT GIVEN
ROOM:
- MASTERS BEDROOM
- EMGINEERING OFFICE
- LOBBY ETC
20
10
28/4/2022
CEILING
BASED FROM AMBF COMPUTE NUMBER
PLYWOOD OR CEILING TILES
NO. OF
PLYWOOD FOR
A GIVEN NO. OF
SPACE PLYWOOD
AT LIVING
SZIE IS GIVEN
FROM DESIGN
PROBLEM
RROW RROW
SOMETIMES NUMBER
OF CEILING AT GIVEN
ROOM:
- MASTERS BEDROOM
- EMGINEERING OFFICE
- LOBBY ETC
21
Number of Plywood
Commercial Sizes
Example:
22
11
28/4/2022
Example:
23
24
12
28/4/2022
THICKNESS
OF SLAB IS
GIVEN
AMBF
AMBF
FROM ACQUIRED AMBF OR GIVEN AREA OF
ROOM/SPACE AND THICKNESS OF SLAB
ESTIMATES OF FOLLOWING IS ASKED:
SETBACK
TRUCKLOAD OF SAND OR GRAVEL
RROW
BAGS OF CEMENT
CUBIC METER OF CONCRETE
25
BAGS OF CEMENT
USA ISA
FRONT SETBACK TLA - USA
ISA
AMBF AMBF
USA
FROM ACQUIRED
FRONT
USA VOLUME OF
CONCRETE & SETBACK
BAGS OF CEMENT IS
RROW RROW
ASKED
26
13
28/4/2022
BAGS OF CEMENT
BASED FROM AMBF AND CONSIDERING THE
GIVEN SIZE OF RC BEAM COMPUTER NUMBER
BAGS OF CEMENT (GIVEN SIZE OF BEAM)
BEAM AT
WALL
B AMBF D
PERIMETER
A
VOLUME = A + B + C + D (SIZE OF BEAM)
RROW
27
C
STEEL BEAM/
REINF. CONCRETE
BEAM
B AMBF D
LINEAR METER = A + B + C + D
FROM ACQUIRED AMBF OR GIVEN
A DIMENSION OF SPACE LINEAR
METER OF STEEL BEAM IS ASKED
RROW
CUBIC METER= A + B + C + D (AREA OF BEAM)
FROM ACQUIRED AMBF OR GIVEN
DIMENSION OF SPACE LINEAR
METER OF STEEL BEAM IS ASKED
28
14
28/4/2022
BAGS OF CEMENT
HIGHEST ELEVATION DIFFERENCE
SOME GIVEN LOT HAS
IF SLOPE IS GIVEN MODERATE SLOPE. ELEVATION
DIFFERENCE FROM SIDEWALK
A IS ASKED
3%
HIGHEST
AMBF 20M X=? ELEVATION
RROW DIFFERENCE
20M
SECTION A
29
Volume of Slab
BACKFILL
VOLUME
IF SLOPE IS GIVEN
A X=.060 M
RROW
10M
20M
3% SECTION A
AMBF 20M
20 M 10 M
0.60 M
30
15
28/4/2022
31
32
16
28/4/2022
33
34
17
28/4/2022
35
PAINTS
BASED FROM AMBF COMPUTE NUMBER
GALLONS OF PAINTS
CEILINGPAINS FOR
PAINTS FOR EAVES
CEILING
INTERIORS
FROM ACQUIRED AMBF
OR GIVEN AREA OF
ROOM/SPACE NUMBER
PAINTS IS ASKED
RROW RROW
SOMETIMES NUMBER
OF CEILING AT GIVEN
ROOM:
- MASTERS BEDROOM
- EMGINEERING OFFICE
- LOBBY ETC
36
18
28/4/2022
CEILING
BASED FROM AMBF COMPUTE NUMBER
PLYWOOD OR CEILING TILES
NO. OF
GALLONS OR
LITERS NO. OF
OF PAINTS GALLONS
OF PAINTS
SZIE IS GIVEN
FROM DESIGN
PROBLEM
RROW RROW
SOMETIMES NUMBER
OF CEILING AT GIVEN
ROOM:
- MASTERS BEDROOM
- EMGINEERING OFFICE
- LOBBY ETC
37
Commercial Sizes
Factor:
Area of surface= L x W
= 6mx 12m = 72sqm
38
19
28/4/2022
CONVERSION FACTOR
39
40
20
28/4/2022
ESTIMATES
PERIMETER OF EXTERIOR WALLS & CHB
BASED FROM AMBF AND CONSIDERING THE
GIVEN SIZE COMPUTE THE PERIMETER OF
EXTERIOR WALLS
PERIMETER
OF EXTERIOR
B AMBF D
WALL
PERIMETER= A + B + C + D
A
WITH THE AREA OF WALLS,
NUMBER OF CHB OR LINEAR METER
RROW OF WALLS IS ASKED
41
ESTIMATES
LINEAR METER OF FENCE & CHB
BASED FROM GIVEN LOT SIZE COMPUTE THE PERIMETER OF FENCE
AND CONSIDERING GIVEN SIZE OF GATE.
PERIMETER
OF FENCE
B AMBF D
A + B + C + D) – E
WITH THE AREA OF WALLS FOR FENCE,
E NUMBER OF CHB OR LINEAR METER OF
GATE
WALLS IS ASKED
A RROW
IMORTANT: DONT
FORGET TO SUBTRACT
AREA OF GATE
42
21
28/4/2022
43
Example: Important:
• Subtract area of opening (doors,
Area of wall = L x W windows)
= 6mx 12m = 72sqm • For ground floor, the chb below
natural
No. of CHB = Area of surface x 12.5 grade line for wall footing
No. of CHB = 72 x 12.5
No. of CHB = 900 + add 10% contingency
44
22
28/4/2022
WALL FOOTING
45
46
23
28/4/2022
PERIMETER OF GUTTER
BASED FROM AMBF AND GIVEN EAVE
DIMENSIONS
B AMBF D
GUTTER AT
PERIMETER
A
LINEAR METER = A + B + C + D
RROW FROM ACQUIRED AMBF AND GIVEN
WIDTH OF EAVES LINEAR METER
OF GUTTER IS ASKED
47
LINEAR OF
BASEBOARD BASEBOARD
C C
WALL
WALL OF A GIVEN
B D
SPAE
B AMBF D A
RROW RROW
48
24
28/4/2022
49
50
25
28/4/2022
8 METERS
51
END
52
26