0% found this document useful (0 votes)
38 views11 pages

2nd Floor - Additional-2 - 1

Uploaded by

bcc.fairman.mub
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views11 pages

2nd Floor - Additional-2 - 1

Uploaded by

bcc.fairman.mub
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

FAIRMAN MIXED-USE BUILDING

MAURO ST., SAMPALOC, MANILA


LHK Square, 288 N. Domingo Street, San Juan City, Philippines
Tels.: (632) 724-9214; (632)725-0385 Telef ax:(632)705-7175 FAIRMAN MARKETING, INC.
E-mail: [email protected] Website:www.jslaarchitects.com
Unit 305 Toyama Group Center, 22 Timog Avenue, Quezon City, Philippines
Tel. Nos. (632)412-1792/96/(632)374-8629 (632)374-8779 Mobile No. (63917)324-1573
Project : Fairman Mixed-used Building
Location : Mauro St.,Brgy 581, Sampaloc Manila
Owner : Fairman Marketing Inc.
Architect : Jose Siao Ling and Associates
Date : As of May 5, 2023
Subject : Cost Comparison for 2nd Floor Partition

AS PER SITE ESTIMATE AS PER JJB CONSTRUCTION SERV. AS PER CALUPITAN ENGR'NG SERV. AS PER ROOFTECH SERVICES
Items Particular/Description (per_original_Design) U/Cost U/Cost U/Cost U/Cost
Qty unit Total Cost Qty unit Total Cost Qty unit Total Cost Qty unit Total Cost
Material Material Material Material
DRY WALL PARTITION

SUPPLY AND INSTALLATION OF DRYWALL PARTITION 36.45 sq.m 2,400.00 87,480.00 37.85 sq.m 2,370.00 89,704.50 36.45 sq.m 1,950.00 71,077.50 36.45 sq.m 2,175.00 79,278.75
GYPSUM BOARD 12mm 4ft x 8ft - - - -
METAL STUD 100mm X 50mm X 0.60mm - - - -
METAL TRACKS 100mm X 50mm X 0.60mm - - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

SUB TOTAL 87,480.00 89,704.50 71,077.50 79,278.75

AMOUNT ₱ 87,480.00 ₱ 89,704.50 ₱ 71,077.50 ₱ 79,278.75

GENERAL REQUIREMENT 15% ₱ 13,455.68


DISCOUNT ₱ -
GRAND TOTAL ₱ 87,480.00 ₱ 103,160.18 ₱ 71,077.50 ₱ 79,278.75
VARIANCE -₱ 15,680.18 ₱ 16,402.50 ₱ 8,201.25

Prepared by:

Roedhel Araos Engr. Denis Cezar Engr. Michael Mangulabnan


Project Engineer Project - in - charge Senior Supervisor
TO: FAIRMAN MARKETING INC.
OWNER

THRU: ARCH. MARCELO EDISON ROGUEL


JSLA SENIOR ARCHITECT

ENGR. DENVER NARIO


ELS Consultancy & Management Inc.
Project Manager

PROJECT FAIRMAN MIXED-USE BUILDING


LOCATION Mauro St. Sampaloc, Manila
OWNER Fairman Marketing Inc.
SUBJECT VO #2 - Additional Architectural Finish at 2nd Floor

AS PER BOQ

ITEM SCOPE OF WORK QTY UNIT MATERIAL COST LABOR COST AMOUNT

I. ADDITIVE WORKS

A MASONRY WORKS
CHB 4.62 m2 792.00 178.00 4,481.40
STIFFINER COLUMN 2.31 lm 463.00 178.00 1,480.71
LINTEL BEAM 0.54 lm 463.00 178.00 346.14
LINEAR PLASTERING 9.24 m2 36.00 178.00 1,977.36
REBAR FOR CHB 32.90 kgs 51.75 1,702.58
REBAR FOR SC/LB 10.65 kgs 51.75 - 551.14
GI WIRE 0.25 rolls 2,902.00 725.50

B. DRY WALL
SUPPLY AND INSTALLATION OF DRY WALL PARTITION 36.45 sq.m 2,400.00 87,480.00
GYPSUM BOARD 12mm 4FT X 8FT
METAL STUDS 100mm X 50mm X 0.60mm
METAL TRACKS 100mm X 50mm X 0.60mm

C. STEEL DOOR
MFD - 9 1.00 set 26,000.00 1,380.00 27,380.00
GA. #18 GALVALUME 2HRS FIRE RATED METAL FLUSH DOOR
W/ VISION PANEL ON A GA # 16 DOUBLE RABBET METAL DOOR JAMB
W/ EXTENDED GROOVE IN AUTOMOTIVE LACQUER SPRAY PAINT
-
-
D. HARDWARES - -
4" X 4" S/S FLAG HINGES WITH BALL BEARING 4.00 pcs 851.00 115.00 3,864.00
FOOTBOLT ON ONE DOOR SIDE W/ DUMMY DOOR LEVER TRIM 1.00 set 575.00 230.00 805.00
PANIC DEVICE W/ LEVER TRIM @ OPPOSITE SIDE 1.00 set 8,038.00 575.00 8,613.00
SURFACE MOUNTED DOOR CLOSER DOORMAKABA TS90 1.00 set 2,074.00 576.00 2,650.00
-
E. WINDOW -
SLW - 1 1.00 set 148,680.00 148,680.00
ALUMINUM LOUVER WINDOW ON 50mm X 100mm ALUMINUM
TUBULAR FRAME IN POWDER COATED FINISH -
-
-
F. PAINTING WORKS -
Dry Wall Partition 93.78 sq.m 280.00 26,258.40
Misc 5% 1,312.92 - 1,312.92
- -

-
Sub-total ADDITIVE WORKS 318,308.14
-
-

TOTAL DEDUCTIVE -

ADDITIVE COSTS 318,308.14


(plus 12% overhead and supervision) 38,196.98
TOTAL ADDITIVE COST 356,505.12

AMOUNT IN WORDS:

Subnitted by: Approved by:

ENGR. RODERICK S. WEE ARCH. MARCELO EDISON ROGUEL


Baseline Construction Corp. JSLA SENIOR ARCHITECT
President

Evaluated by: Conformed by:

ENGR. DENVER NARIO FAIRMAN MARKETING INC.


ELS Consultancy & Management Inc. Owner
Project Manager
JJB CONSTRUCTION SERVICES
BLOCK 1, LOT 2, GREENMARK 2,MALAGASANG II-B , CITY OF IMUS

CONTACT NO. 09297877103

April 13, 2023

TO: Baseline Construction Corporation

ATTENTION: Engr. Roedhel Araos

SUBJECT: Quotation for the Installation and Materials for Drywall Partition

Dear Sir,

We are pleased to submit herewith our price proposal for the Installation and Materials for Drywall
Partition along 2nd to 4th Floor area.

Our Offer:

DESCRIPTION AREA QUANTITY UNIT MATERIAL LABOR AMOUNT

COST COST

SUPPLY AND INSTALLATION OF 2F 37.85 SQM 1470 900 89,704.5


DRYWALL PARTITION 12mm
3F 177.879 SQM 1470 900 421,573.23
Gypsum Board and 2x3 Metal
Stud 4F 100.13 SQM 1470 900 237,308.1

SUB-TOTAL Php 748,585.83

GENERAL REQUIREMENT FOR PRELIMS X 15%

TOTAL Php 860,873.70

NOTE: Any additional materials or labor scope the client wish to add which is not included on the above
list will be quoted and charge separately.

REMINDERS:

Payment Terms- 50% downpayment, balance weekly progress billing

We thank you for giving us the opportunity to quote on your requirement and shall be looking forward
to be of further service to you soon.

Prepared by: Conforme:

Engr. Arnulfo Ferrer


Contractor Signature over printed name
Attention Baseline Construction Corporation April 12,2023
Thru Engr. Roedhel Araos
Project Fairman Mixed used Building
Location 2063 Mauro st. Sampaloc Manila
Subject Quotation ( Drywall Partittion )

Location Particular Description Quantity Unit Unit Price Amount


2nd floor Supply and installation of Gypsum Board 12mm x 4' x 8' 36.45 sq.m 1,950.00 71,077.50
Drywall Partition Track .6mm x 50mm x 100mm
Double face Studs .6mm x 50mm x 100mm

3rd floor Supply and installation of Gypsum Board 12mm x 4' x 8' 177.88 sq.m 1,950.00 346,866.00
Drywall Partition Track .6mm x 50mm x 100mm
Double face Studs .6mm x 50mm x 100mm

4th floor Supply and installation of Gypsum Board 12mm x 4' x 8' 100.13 sq.m 1,950.00 195,253.50
Drywall Partition Track .6mm x 50mm x 100mm
Double face Studs .6mm x 50mm x 100mm

Contract Amount 613,197.00

Terms of Payment
50% Downpayment, Balance Weekly Progress Billing
Note
area subject for actual measurements
Not included
Skimcoating, sanding and painting
Temporary Facilities
Water and Power Supply
Permits
Covid 19 test & Disinfectants

Prepared by Conforme

Calupitan Engineering Services Print and sign name

Robbie. M. Calupitan Date


ROOFTECH SERVICES
No. 27 Napindan St., Sta Ana, Taguig City

Date: April 21, 2022

Thru: Engr. Roedhel Araos

Project: Fairman Mixed Use Bldg.

Location: Mauro St., Sampaloc, Manila

Subject: Dry Wall Partition

LOCATION DESCRIPTION DESCRIPTION AREA UNIT UNIT AMOUNT


PRICE
2F Supply and Gypsum Board 36.45 sq.m 2175 79,278.75
Installation 12mm 8’x 4’
Dry Wall Partition Metal Studs 100mm
x 50mm x 0.60mm

CONTRACT 79,200.00
AMOUNT

NOTE:
Any additional labor or supplies requested by the client that are not on the list above will be
quoted and charged individually.

Payment terms:
50% Downpayment Weekly Progress Billing

We appreciate the chance to provide a quote for your needs and look forward to continuing to serve you
in the near future.

Prepared By: Conforme:


________________ ___________________
Engr. Jose Juadinez
Q U O T A T IO N
B A S E L IN E C O N S T . C O R P . D a te : A p r il 2 8 , 2 0 2 3
U n it # 3 0 5 T o y a m a G r o u p C e n te r P R O JE C T: F a ir m a n M ix e d - U s e B ld g .
T im o g A v e , Q u e z o n C ity L O C A T IO N : M a u r a s t., S a m p a lo c , M a n ila
E m a il A d d : b c c .r e c e p tio n 2 0 2 0 @ g m a il.c o m OW NER: F a ir m a n M a r k e tin g In c .
M o b ile N o .: 0 9 1 7 - 7 1 4 0 7 6 5 A R C H IT E C T J S L A A r c h ite c ts
A tte n tio n : E n g r . D e n is C e z a r
In c o m p lia n c e w ith y o u r r e q u e s t, w e a r e p le a s e d to q u o te o u r b e s t p r ic e fo r th e fo llo w in g , s u b je c t to th e te r m s a n d c o n d itio n s
o n th e fa c e a n d b a c k h e r e o f.
IT E M Q TY. U N IT # of U N IT TO TAL
CODE PNL D E S C R IP T IO N O F A R T IC L E S / M E A S U R E M E N T COST COST

A D D I T I O N A L O R D E R
4 4 m m T h k . G A L V A N IZ E D S T E E L F L U S H D O O R , w ith H o n e y c o m b In s u la tio n
G a # 1 8 D o o r P a n e l, o n G a # 1 6 S td . D o u b le R a b b e t J a m b w ith G r o o v e , S u S F la g H in g e s
P r o v i s i o n o f H o l e f o r c l i e n t 's L o c k s e t E p o x y P r i m e r P a i n t e d O n l y .

M F D -9 01 set 0 2 p n ls 2 .1 0 0 m H x 1 .8 0 0 m W - w / N a r r o w lite O p e n in g 2 6 ,0 0 0 .0 0 2 6 ,0 0 0 .0 0

M F D -10 01 set 01 pnl 2 .1 0 0 m H x 0 .9 0 0 m W - P la in T y p e 1 2 ,7 5 0 .0 0 1 2 ,7 5 0 .0 0

3 8 ,7 5 0 .0 0

L e s s : D is c o u n t 7 5 0 .0 0

N E T A m o u n t ( in P e s o s ) 3 8 ,0 0 0 .0 0

T E R M S O F P A Y M E N T : 5 0 % U p o n A c c e p ta n c e ; 5 0 % U p o n D e liv e r y ( N o t S u b je c t to R e te n tio n )
V A L ID IT Y : F ifte e n ( 1 5 ) d a y s . P r ic e is s u b je c t to c h a n g e w ith o u t p r io r n o tic e .
IN C L U S IO N S : D e liv e r y to a b o v e in d ic a te d s ite , g r o u n d flo o r le v e l o n ly .
E X C L U S IO N S : 1 . S u p p ly o f la b o r fo r h a u lin g a n d in s ta lla tio n .
2 . S u p p ly o f h a r d w a r e s s u c h a s p a n ic d e v ic e w ith le v e r tr im , lo c k s e ts , d o o r c lo s e r , s /s p u s h p la
p u ll h a n d le , c le a r / w ir e d / te m p e r e d g la s s , e tc . ( b y o th e r s )
: 3 . A l l l o c a l g o v 't . f e e s , V a l u e A d d e d T a x ; a n d p e r m i t s .
C O N D I T I O N S : F a b r i c a t i o n o f o r d e r s t a r t s o n l y a f t e r r e c e i p t o f C l i e n t 's a p p r o v e d s h o p d r a w i n g a n d
c o r r e s p o n d in g p a y m e n t s h a ll h a v e b e e n m a d e .
***** n o th in g fo llo w s *****

It is u n d e r s to o d th a t, u p o n y o u r a c c e p ta n c e , th is Q u o ta tio n s h a ll c o n s titu te a n O r d e r / C o n tr a c t s u b je c t to a ll th e T e r m s a n d
C o n d itio n s c o n ta in e d h e r e in . T h a n k y o u fo r th e o p p o r tu n ity to q u o te a n d w e h o p e th e a b o v e w ill m e e t y o u r a p p r o v a l.

R O B I N T E C H L E A D E R S I N T 'L . , I N C . CO NFO RM E:

R u b e n T . L im ____________________________
A u th o r iz e d S ig n a tu r e S ig n a tu r e O v e r P r in te d N a m e /D a t

You might also like