0% found this document useful (0 votes)
73 views19 pages

Intra Company STO With Delivery and W O Billing 1722501322

Uploaded by

Ajinkya Shinde
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
73 views19 pages

Intra Company STO With Delivery and W O Billing 1722501322

Uploaded by

Ajinkya Shinde
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 19

Intra STO Process

Configuration
A. Master Data –

1. Material Master –

a. Create Material Master – MM01


Create Material in Receiving & Supplying Plant with Sales View.

Basic Data 1

pg. 1 By: Omkar Solse +91 8550961819


Intra STO Process

Sales: sales org. 1

Sales: sales org. 2

pg. 2 By: Omkar Solse +91 8550961819


Intra STO Process

Sales: General/Plant

Note: Maintain other views like Plant data Storage 1 & 2, Accounting 1 & 2 as usual.

pg. 3 By: Omkar Solse +91 8550961819


Intra STO Process

2. Supplier Master –

a. Create Supplier Master – BP


Note: Maintain details as per requirement I have highlighted details required for STO.

Maintain Business Partner Role (Maintain details as per requirement)

Maintain FLVN00 Supplier (Fin. Accounting) view (Maintain details as per requirement)

pg. 4 By: Omkar Solse +91 8550961819


Intra STO Process

Maintain Shipping Conditions in Purchasing View (Maintain other details as required)

pg. 5 By: Omkar Solse +91 8550961819


Intra STO Process

3. Customer Master –

a. Create Supplier Master – BP


Note: Maintain details as per requirement I have highlighted details required for STO.

Maintain Business Partner Role (Maintain details as per requirement)

Maintain FLCU00 Customer (Fin. Accounting) Role (Maintain details as per requirement)

pg. 6 By: Omkar Solse +91 8550961819


Intra STO Process

Maintain FLCU01 Customer Role (Maintain details as per requirement)

Note: Create Supplier & Customer Master in same company code for Intra STO.

pg. 7 By: Omkar Solse +91 8550961819


Intra STO Process

B. Sales & Distribution Configuration (SD) –

a. Create Sales Organization –


SPRO – IMG – Enterprise Structure – Definition - Sales & Distribution – Define, Copy,
delete, check sales organization – Define Sales Organization

b. Create Distribution Channel –


SPRO – IMG – Enterprise Structure – Definition – Sales & Distribution - Define, Copy,
delete, check distribution channel – Define Distribution Channel

pg. 8 By: Omkar Solse +91 8550961819


Intra STO Process

c. Create check Division –


SPRO – IMG – Enterprise Structure – Definition – Logistic General – Define, copy, delete,
check division – Define Division

d. Assign Sales Organization to Company Code –


SPRO – IMG – Enterprise Structure – Assignment – Sales & Distribution – Assign sales
organization to company code – New Entries

e. Assign distribution channel to sales organization –


SPRO – IMG – Enterprise Structure – Assignment – Sales & Distribution – Assign
distribution channel to sales organization – New Entries

pg. 9 By: Omkar Solse +91 8550961819


Intra STO Process

f. Assign Division to Sales Organization –


SPRO – IMG – Enterprise Structure – Assignment – Sales & Distribution – Assign division
to sales organization – New Entries

g. SPRO – IMG – Enterprise Structure – Assignment – Sales & Distribution – set up


sales area – New Entries

pg. 10 By: Omkar Solse +91 8550961819


Intra STO Process

h. Assign Sales Organization-Distribution Channel-Plant –


SPRO – IMG – Enterprise Structure – Assignment – Sales & Distribution – Assign Sales
Organization-Distribution Channel-Plant – New Entries

i. Define Shipping Point –


SPRO – IMG – Enterprise Structure – Definition – Logistic Execution – Define Shipping
Point – New Entries

pg. 11 By: Omkar Solse +91 8550961819


Intra STO Process

j. Assign Shipping Point to Plant –


SPRO – IMG – Enterprise Structure – Assignment – Logistic Execution –Assign Shipping
Point to Plant– Select Plant and click on assign – Select shipping point - save

pg. 12 By: Omkar Solse +91 8550961819


Intra STO Process

C. Material Management Configuration (MM) –

a. Shipping Point Determination –


SPRO – IMG – Logistic Execution – Shipping – Basic Shipping Function - Shipping Point
and Goods Receiving Point Determination – Assign Shipping Point – New Entries –
Maintain combination of Shipping Condition, Loading Group, Plant & Proposed shipping
Point.

b. Define Shipping data for Supplying Plant –


SPRO – IMG – Material Management – Purchasing – Purchase Order – Setup Stock
Transport Order – Define Shipping Data for Plants – Select Supplying Plant – Maintain
Sales Org, Distribution Channel, Division - Save

pg. 13 By: Omkar Solse +91 8550961819


Intra STO Process

c. Define Shipping data for Receiving Plant –


SPRO – IMG – Material Management – Purchasing – Purchase Order – Setup Stock
Transport Order – Define Shipping Data for Plants – Select Receiving Plant – Maintain
Sales Org, Distribution Channel, Division & Customer No Plant - Save

d. Assign Delivery Type & Checking Rule –


SPRO – IMG – Material Management – Purchasing – Purchase Order – Setup Stock
Transport Order – Configure Delivery Type & Availability Check Procedure by Plant –
Maintain PO Document type, Supplying Plant, Delivery Type (NL for Intra STO),
Checking Rule - Save

pg. 14 By: Omkar Solse +91 8550961819


Intra STO Process

e. Assign Document Type, One-Step Procedure, Under delivery Tolerance –


SPRO – IMG – Material Management – Purchasing – Purchase Order – Setup Stock
Transport Order – Assign Document Type, One-Step Procedure, Under Delivery
Tolerance – New Entries – Maintain Supplying Plant, Receiving Plant, PO Document
Type – Save (If required checked for One Step & Under Delivery Tolerance)

One Step – you set the indicator for the one-step procedure, the goods receipt is posted
in the receiving plant at the same time as the goods issue is posted in the issuing plant.

Under Delivery Tolerance – Shows whether the under-delivery tolerance for the stock
transfer order is taken into account when the goods issue is posted.

pg. 15 By: Omkar Solse +91 8550961819


Intra STO Process

D. Test Scenario –

a. Create Purchase Order – ME21N

Select Document Type UB, Supplying Plant, Item Category “U”, Receiving Plant,
automatically as per configuration system will determine shipping data for material.

b. Create Outbound Delivery – VL10B

In Purchase Orders tab maintain Purchasing Document, maintain Delivery Creation Date &
Execute

pg. 16 By: Omkar Solse +91 8550961819


Intra STO Process

Select PO & Click on Background

Delivery has been created in background; select line with green light - Select details – find
SD Document – Copy SD Document

pg. 17 By: Omkar Solse +91 8550961819


Intra STO Process

c. Post Goods Issue – VL02N

Issue Goods from Supplying Plant

Input Outbound Delivery (SD Document) – Enter – Input Picked Qty., Plant, Storage
Location, Batch & Select on Post Goods Issue.

Note:

i. If Batch Determination is available select on Batch Split – Batch Determination – Select


Batch & Copy – Save

ii. If Warehouse Management is activated – Select Subsequent function in menu bar & click
on Create Transfer Order.

pg. 18 By: Omkar Solse +91 8550961819


Intra STO Process

d. Goods Receipt – MIGO

Receive the Goods in Receiving Plant – Input T-code MIGO – Select Action Goods Receipt
& Reference Document Purchase Order/Outbound Delivery – Click on Item Okay – Save

pg. 19 By: Omkar Solse +91 8550961819

You might also like