Project Quantity Tracking and Reporting
Procedure
اﻋﺪه اﻟﻤﻮاﻓﻘﺔ
اﻹدارة اﻟﻌﺎﻣﺔ ﻟﻠﻤﺸﺎرﻳﻊ اﻟﺒﻠﺪﻳﺔ ﻣﺪﻳﺮ ﻣﺸﺮوع ﻋﻘﺪ ﺗﻘﺪﻳﻢ ﺧﺪﻣﺎت إﺳﺘﺸﺎرﻳﺔ ﻹﻧﺸﺎء
اﻹدارة اﻟﻌﺎﻣﺔ ﻟﻠﻤﺸﺎرﻳﻊ اﻟﺒﻠﺪﻳﺔ
Prepared by
2
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ .ﻳﺮﺟﻰ اﻟﺮﺟﻮع
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ .
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
"اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ.
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
.ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪّﻳﺔ واﻟﻘﺮوّﻳﺔ واﻹﺳ ن
اﻟﻮزارة ﻟﻬﺎ اﻟﺤﻖ ﻓﻲ إﺗﺎﺣﺔ اﻟﻤﻌﻠﻮﻣﺎت اﻟﻮاردة ﻓﻲ ﻫﺬا.ﻣﻞ ﺑﻤﺎ ﻓﻲ ذﻟﻚ أﺣ م ﻫﺬا اﻹﺧﻄﺎر اﻟﻬﺎم وﻳﺠﺐ اﻻﻃﻼع ﻋﻠﻴﻪ ﺑﺸ
.اﻟﻤﺴﺘﻨﺪ أو أي ﻣﺴﺘﺨﺮج ﻣﻨﻪ ﻟﻤﺴﺘﺸﺎرﻳﻬﺎ أو ﻣﻘﺎوﻟﻴﻬﺎ أو ﻴﻬﻤﺎ ﺑﺸﺮط ﺗﻀﻤﻴﻦ ﻫﺬا اﻹﺧﻄﺎر اﻟﻬﺎم ﻓﻲ اﻟﻮﺛﺎﺋﻖ اﻟﻤﺮاد ﻣﺸﺎرﻛﺘﻬﺎ
أو/أو ﻣﺴﺘﺸﺎرﻳﻬﺎ و/ ﺑﻤﺎ ﻓﻲ ذﻟﻚ اﻟﺠﻬﺎت اﻟﻌﺎﻣﺔ و، ﻣﻦ ﻗﺒﻞ أي ﻃﺮف،أي اﺳﺘﺨﺪام أو إﺟﺮاءات ﺗﻨﺒﺜﻖ ﻋﻦ ﻫﺬا اﻟﻤﺴﺘﻨﺪ أو ﺟﺰٍء ﻣﻨﻪ
إﻟﻰ أﻗﺼﻰ ﺣﺪ، وُﺗﺒﺮئ اﻟﻮزارة ذﻣﺘﻬﺎ. ﻳﻜﻮن ﻋﻠﻰ اﻟﻤﺴﺆوﻟﻴﺔ اﻟﺘﺎﻣﺔ ﻟﺬﻟﻚ اﻟﻄﺮف وﻳﺘﺤﻤﻞ اﻟﻤﺨﺎﻃﺮ اﻟﻤﺮﺗﺒﻄﺔ ﺑﻪ،اﻟﻤﺘﻌﺎﻗﺪﻳﻦ ﻣﻌﻬﺎ
ي أﺳﺎسّ اﻟﺨﺴﺎﺋﺮ أو اﻟﺘﻌﻮﻳﻀﺎت أّﻳًﺎ ﻧﺖ ﻃﺒﻴﻌﺘﻬﺎ اﻟﺘﻲ ﻳﺘﻢ ﻣﻄﺎﻟﺒﺘﻬﺎ ﺑﻬﺎ ﻋﻠﻰ أ، ﻣﻦ أي اﻟﺘﺰاﻣﺎت )ﺑﻤﺎ ﻓﻲ ذﻟﻚ،ﻳﺴﻤﺢ ﺑﻪ اﻟﻘﺎﻧﻮن
، ﻣﻬﻤﺎ ﻧﺖ ﻃﺮﻳﻘﺔ ﻧﺸﻮﺋﻬﺎ ﻓﻴﻤﺎ ﻳﺘﻌﻠﻖ أو ﻳﺘﺼﻞ ﺑﺎﺳﺘﺨﺪام ﻫﺬا اﻟﻤﺴﺘﻨﺪ،ي ﻃﺮف آﺧﺮ ّ اﻹﻫﻤﺎل أو ﺧﻼف ذﻟﻚ( ﻷ، ﺑﻤﺎ ﻓﻲ ذﻟﻚ،ن
.ي اﻟﺘﺰام ﻳﻨﺸﺄ ﺑﺴﺒﺐ اﻹﻫﻤﺎل أو اﻟﺘﻘﺼﻴﺮ
ّ أ،ﺑﻤﺎ ﻓﻲ ذﻟﻚ
.ﺗﺴﺮي ﺻﻼﺣﻴﺔ ﻫﺬا اﻟﻤﺴﺘﻨﺪ وﻣﺎ ﺗﻀﻤﻨﻪ ﻣﻦ ﻣﺤﺘﻮﻳﺎت اﺳﺘﻨﺎدًا ﻋﻠﻰ اﻟﺸﺮوط اﻟﻮاردة ﺑﻪ واﻋﺘﺒﺎرًا ﻣﻦ ﺗﺎرﻳﺦ إﺻﺪاره
Important Notice
This notice must accompany every copy of this document
This document, (“Document”) is the exclusive property of the Ministry of Municipal & Rural Affairs &
Housing (“MoMRAH”).
This Document should be read in its entirety including the terms of this Important Notice. The
government entities may disclose this Document or extracts of this Document to their respective
consultants and/or contractors, provided that such disclosure includes this Important Notice.
Any use or reliance on this Document, or extracts thereof, by any party, including government entities
and their respective consultants and/or contractors is at that third party’s sole risk and responsibility.
MoMRAH, to the maximum extent permitted by law, disclaim all liability (including for losses or damages
of whatsoever nature claimed on whatsoever basis including negligence or otherwise) to any third party
howsoever arising with respect to or in connection with the use of this Document including any liability
caused by negligent acts or omissions.
This Document and its contents are valid only for the conditions reported in it and as of the date of this
Document.
3
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
4
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
5
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
6
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
7
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
A/E (Architect/Engineer) - Architect & Engineer اﻟﻤﺆﺳﺴﺔ اﻟﻤﻌﻤﺎرﻳﺔ اﻟﻬﻨﺪﺳﻴﺔ اﻟﺘﻲ:( ﻣﻬﻨﺪس/ )ﻣﻌﻤﺎريA/E
organization that undertakes studies and/or design of .أو ﻣﺸﺎرﻳﻊ اﻟﺘﺼﻤﻴﻢ/ﺗﺠﺮي اﻟﺪراﺳﺎت و
projects.
Amana - The Amana is a government organization . ﺟﻬﺎز ﺣﻜﻮﻣﻲ ﻣﺮﺗﺒﻄﺔ ﺑﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ:اﻷﻣﺎﻧﺔ
related to MOMRA. It is independent of its ﻳﺮأﺳﻬﺎ ﻣﻮﻇﻒ.وﻫﻲ أﺟﻬﺰة ﻣﺴﺘﻘﻠﺔ ﻓﻲ ﺷﺆوﻧﻬﺎ اﻹدارﻳﺔ واﻟﻤﺎﻟﻴﺔ
administrative and financial affairs. It is headed by an ﺣﻜﻮﻣﻲ ﺗﻌﻴﻨﻪ وزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ أو ُﻳﻌﻴﻦ ﺑﺄﻣﺮ ﺳﺎﻣﻲ
official person appointed by the Minister of MOMRA or ﻷداء اﻟﻤﻬﺎم اﻟﻤﺴﻨﺪة إﻟﻴﻪ ﻟﺘﻄﻮﻳﺮ اﻟﺨﺪﻣﺎت "وﻳﺴﻤﻰ "اﻷﻣﻴﻦ
by royal order in the name of “Ameen” to carry out his . اﻟﺒﻠﺪﻳﺔ )اﻟﺘﻨﻈﻴﻢ واﻟﺘﺨﻄﻴﻂ وﻏﻴﺮه( اﻟﻤﻮﺟﻮدة ﻓﻲ اﻟﻤﻨﻄﻘﺔ
authorized missions to promote the municipality
services (organizing, planning, etc.) that exist in its
region.
Baladiyah - The Baladiyah is a government sector that ﺑﻠﺪﻳﺔ ﻗﻄﺎع ﺣﻜﻮﻣﻲ ﻳﺘﺒﻊ ﺗﻨﻈﻴﻤﻴًﺎ ﻟﻸﻣﺎﻧﺎت وﻳﺮأس:اﻟﺒﻠﺪﻳﺔ
is organizationally related to the Amana headed by a ﺗﺘﻤﺜﻞ.ﻣﻮﻇﻒ ﻳﻌﻴﻨﻪ أﻣﻴﻦ أﻣﺎﻧﺔ اﻟﻤﻨﻄﻘﺔ اﻟﺘﻲ ﺗﺘﺒﻊ ﻟﻬﺎ اﻟﺒﻠﺪﻳﺔ
person appointed by the head of Amana in the region ﻣﻬﻤﺔ اﻟﺒﻠﺪﻳﺔ ﻓﻲ ﺗﻨﻔﻴﺬ اﻟﺨﺪﻣﺎت اﻟﺒﻠﺪﻳﺔ اﻟﻤﺤﺪدة ﻣﻦ اﻷﻣﺎﻧﺔ
to which it belongs. Its mission is to carry out the .وﺗﻘﺪﻳﻤﻬﺎ ﻟﻠﻤﻮاﻃﻨﻴﻦ وﻓﻘًﺎ ﻟﻠﺴﻠﻄﺎت اﻟﻤﻤﻨﻮﺣﺔ ﻟﻬﺎ ﻣﻦ اﻷﻣﺎﻧﺔ
municipal services provided by Amana to be
presented to the citizens under his authorities given
by Amanat.
COA (Code of Accounts) - Unique lettering or اﻟﺤﺴﺎﺑﺎت( ﻧﻈﺎم ﺗﻜﻮﻳﺪ ﻓﺮﻳﺪ ﺗﺨﺼﺺ ﻓﻴﻪ ﺣﺮوف أو )ﻫﻴ:COA
numbering system in which letters or numbers are .ﺗﺠﺰﺋﺔ اﻷﻋﻤﺎل ﻋﻨﺼﺮ ﻓﺮﻳﺪ ﻣﻦ ﻫﻴ أرﻗﺎم ﻟ
assigned to each unique component of the work
breakdown structure.
Engineering Tracker - Tool managed by the أداة ﻳﺴﺘﺨﺪﻣﻬﺎ ﻓﺮﻳﻖ اﻟﺘﺼﻤﻴﻢ:أداة ﺗﻌﻘﺐ اﻟﻤﺨﺮﺟﺎت اﻟﻬﻨﺪﺳﻴﺔ
engineering team to collect and status all engineering ﺗﻤﺜﻞ.اﻟﻬﻨﺪﺳﻲ ﻟﺠﻤﻊ اﻟﻤﻌﻠﻮﻣﺎت وﺣﺎﻟﺔ اﻟﻤﺨﺮﺟﺎت اﻟﻬﻨﺪﺳﻴﺔ
deliverables. It is part of the suite of Level 5 Schedules اﻟﻤﺨﺮﺟﺎت ﺟﺰًء ﻣﻦ ﺣﺰﻣﺔ اﻟﺠﺪاول اﻟﺰﻣﻨﻴﺔ ﻟﻠﻤﺴﺘﻮى اﻟﺨﺎﻣﺲ وﺗﻮﻓﺮ
and provides key input for statusing of the Level 3 ﻣﺪﺧﻼت رﺋﻴﺴﻴﺔ ﻟﺘﺤﺪﻳﺪ ﺣﺎﻟﺔ اﻟﺠﺪول اﻟﺰﻣﻨﻲ ﻟﻀﺒﻂ اﻟﻤﺴﺘﻮى
Control Schedule. .اﻟﺜﺎﻟﺚ
8
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
9
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
PMT - Project Management Team, the team deployed اﻟﻮزارة/ ﻣﻦ اﻷﻣﺎﻧﺔ ﻓﺮﻳﻖ إدارة اﻟﻤﺸﺮوع وﻫﻮ اﻟﻔﺮﻳﻖ اﻟﻤﺸ:PMT
by the Amana/ MoMRA to manage the Project. .ﻹدارة اﻟﻤﺸﺮوع
QTS - Quantity Tracking System refers to the set of ﻳﺸﻴﺮ ﻧﻈﺎم ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت إﻟﻰ ﻣﺠﻤﻮﻋﺔ ﻣﻦ ﺗﻄﺒﻴﻘﺎت:QTS
tracking applications as a whole that tracks the اﻟﻤﺘﺎﺑﻌﺔ اﻟﺘﻲ ﺗﺘﺎﺑﻊ اﻟﻜﻤﻴﺎت أﺛﻨﺎء ﺳﻴﺮ أﻋﻤﺎل اﻟﺘﺼﻤﻴﻢ واﻟﻤﺸﺘﺮﻳﺎت
quantities during design, procurement and installation .واﻟﺘﺮﻛﻴﺒﺎت ﻟﻠﺴﻠﻊ اﻟﻤﺤﺪدة
progress of specific commodities.
Quantity Reporting - The quantification, weekly اﻟﻘﻴﺎس اﻟﻜﻤﻲ وﺗﺤﺪﻳﺚ اﻟﺤﺎﻟﺔ اﻷﺳﺒﻮﻋﻴﺔ ﻟﺠﻤﻴﻊ:ﺗﻘﺎرﻳﺮ اﻟﻜﻤﻴﺎت
status updating of all equipment/ materials included in . اﻟﻤﻮاد اﻟﻤﻀﻤﻨﺔ ﻓﻲ ﻧﻄﺎق أﻋﻤﺎل اﻟﻤﺸﺮوع/ اﻟﻤﻌﺪات
the project scope.
Rules of Credit - Various task milestones and ﻣﻌﺎﻟﻢ رﺋﻴﺴﻴﺔ ﻣﺨﺘﻠﻔﺔ ﻟﻠﻤﻬﺎم وﻧﺴﺐ اﻹﻛﻤﺎل:ﻗﻮاﻋﺪ اﻟﻤﺼﺪاﻗﻴﺔ
associated percentage complete established to ﻴﺔ ﻟﻠﺘﺮﻛﻴﺒﺎت أو اﻛﺘﺴﺎب اﻟﺨﺎﺻﺔ ﺑﻬﺎ ﻟﺘﻮﻓﻴﺮ ﻣﺼﺪاﻗﻴﺔ ﺟﺰﺋﻴﺔ أو
provide partial or full installation credit, or to earn the .اﻟﻤﻴﺰاﻧﻴﺔ
budget.
Take-off - A summarization of separate, field-installed ﻣﻠﺨﺺ ﻟﻠﺒﻨﻮد اﻟﻤﻨﻔﺼﻠﺔ اﻟﻤﺮﻛﺒﺔ ﻓﻲ اﻟﻤﻮﻗﻊ أو:ﺣﺼﺮ اﻟﻤﻮاد
items or quantities prepared from Issued for .اﻟﻜﻤﻴﺎت اﻟﻤﻌﺪة ﻣﻦ ﻣﺴﺘﻨﺪات ﺑﻨﻮد اﻟﺘﺼﻤﻴﻢ اﻟﻤﺼﺪرة ﻟﻠﺘﺸﻴﻴﺪ
Construction (IFC) design documents.
Unit Rate (UR) - The hours to achieve a unit of work اﻟﺴﺎﻋﺎت اﻟﻼزﻣﺔ ﻹﻧﺠﺎز وﺣﺪة ﻋﻤﻞ )ﻣﺜﻞ اﻟﺘﺮﻛﻴﺒﺎت:ﺳﻌﺮ اﻟﻮﺣﺪة
(e.g. concrete installation UR = 25mh/m3). .( ﺳﺎﻋﺔ ﻋﻤﻞ ﻟﻠﻤﺘﺮ اﻟﻤﻜﻌﺐ25 = اﻟﺨﺮﺳﺎﻧﻴﺔ؛ ﺳﻌﺮ اﻟﻮﺣﺪة
UoM (Unit of Measure) - The unit used to measure a )وﺣﺪة اﻟﻘﻴﺎس( اﻟﻮﺣﺪة اﻟﻤﺴﺘﺨﺪﻣﺔ ﻟﻘﻴﺎس ﺳﻠﻌﺔ ﻣﻌﻨﻴﺔ:UoM
particular commodity (e.g. linear meters (m) for cable, .( اﻟﻤﺘﺮ اﻟﻤﻜﻌﺐ ﻟﻠﺨﺮﺳﺎﻧﺔ،)ﻣﺜﻞ اﻟﻤﺘﺮ اﻟﻄﻮﻟﻲ ﻟﻠ ﺑﻼت
or cubic meter (m3) for concrete).
WBS - Work Breakdown Structure is a breakdown of ﻋﺒﺎرة ﻋﻦ ﺗﻮزﻳﻊ ﻟﻌﻨﺎﺻﺮ ﻧﻄﺎق اﻷﻋﻤﺎل ﺑﻨﺎًء:ﻫﻴ ﺗﺠﺰﺋﺔ اﻷﻋﻤﺎل
scope elements based on location/sections/discipline ﻋﻠﻰ اﻟﻤﻮﻗﻊ واﻟﻘﺴﻢ واﻟﺘﺨﺼﺺ ﺑﻤﺴﺘﻮى ﻳﺴﻬﻞ إدارﺗﻬﺎ ﻷﻏﺮاض
to a manageable level for control and reporting .اﻟﻀﺒﻂ واﻟﺘﻘﺎرﻳﺮ
purposes.
10
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
11
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Turning over the quantity and UoM information ﺗﺴﻠﻴﻢ ﻣﻌﻠﻮﻣﺎت اﻟﻜﻤﻴﺎت ووﺣﺪات اﻟﻘﻴﺎس إﻟﻰ ﺿﺒﻂ
to Project Controls and Project Engineering in اﻟﻤﺸﺎرﻳﻊ وﻫﻨﺪﺳﺔ اﻟﻤﺸﺎرﻳﻊ ﺑﺼﻮرٍة ﻣﻨﻈﻤﺔ ﻋﻨﺪ ﺗﺮﺳﺔ
an organized manner upon award of the project .اﻟﻤﺸﺮوع ﻟﻠﺘﺸﻴﻴﺪ
for Construction.
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Interfacing closely with Engineering and / اﻟﺘﻮاﺻﻞ اﻟﻤﺴﺘﻤﺮ ﻣﻊ إدارة اﻟﻬﻨﺪﺳﻴﺔ واﻟﻤﺸﺘﺮﻳﺎت
Procurement/ Contracts to establish and اﻟﻌﻘﻮد ﻟﺘﺤﺪﻳﺪ وﺣﻔﻆ اﻻﺗﺼﺎل اﻟﻤﺴﺘﻤﺮ وﻧﻘﻞ اﻟﺒﻴﺎﻧﺎت ﺑﻴﻦ
maintain open communication and transfer of .اﻟﻤﺠﻤﻮﻋﺎت
data between groups.
Reviews and ensures the correctness of the ﻣﺮاﺟﻌﺔ واﻟﺘﺄﻛﺪ ﻣﻦ ﺻﺤﺔ أداة ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت )أﺛﻨﺎء ﻣﺮﺣﻠﺔ
Quantity Tracker (during Construction Phase) .اﻟﺘﺸﻴﻴﺪ( ﻣﻊ إدارة ﺿﺒﻂ اﻟﻤﺸﺎرﻳﻊ
with the Project Controls department.
Ensures the timely submission of the Weekly .ﺿﻤﺎن ﺗﺴﻠﻴﻢ ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت اﻷﺳﺒﻮﻋﻴﺔ ﻓﻲ وﻗﺘﻬﺎ
Quantity Tracker.
Ensures that Site Management has validated اﻟﺘﺄﻛﺪ ﻣﻦ ﺗﺤﻘﻖ إدارة اﻟﻤﻮﻗﻊ ﻣﻦ اﻟﻜﻤﻴﺎت اﻟﻤﺮﻛﺒﺔ ﻓﻲ
the installed quantities in the Quantity Tracker. .أداة ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت
Ensures the timely submission of the status of ﺿﻤﺎن ﺗﺴﻠﻢ ﺣﺎﻟﺔ ﺗﺴﻠﻴﻢ اﻟﻤﻮاد واﻟﻤﻌﺪات ﻓﻲ وﻗﺘﻬﺎ إﻟﻰ
the delivery of materials and equipment to the .إدارة ﺿﺒﻂ اﻟﻤﺸﺎرﻳﻊ
Project Controls department.
Challenging design changes and ﻣﺮاﺟﻌﺔ ﺗﻐﻴﻴﺮات اﻟﺘﺼﻤﻴﻢ واﻟﺘﻮﺻﻴﺔ ﺑﻄﺮق ﺗﺨﻔﻴﻒ اﻵﺛﺎر
recommending ways to optimize cost and ﻋﻠﻰ اﻟﺘ ﻟﻴﻒ واﻟﺠﺪول اﻟﺰﻣﻨﻲ وﻣﻌﺎﻟﺠﺔ اﻟﺰﻳﺎدة ﻏﻴﺮ اﻟﻤﺒﺮرة
schedule impacts and to mitigate unnecessary .ﻓﻲ اﻟﻜﻤﻴﺎت
quantity growth.
Working closely with Procurement/ Contracts, اﻟﻌﻘﻮد واﻟﺘﺸﻴﻴﺪ واﻟﺘﺸﻐﻴﻞ/ اﻟﻌﻤﻞ ﻣﻊ اﻟﻤﺸﺘﺮﻳﺎت
Construction, Commissioning, and other اﻟﺘﺠﺮﻳﺒﻲ وﻏﻴﺮﻫﺎ ﻣﻦ اﻟﺨﺪﻣﺎت اﻟﻤﺴﺎﻧﺪة ﺣﺴﺐ اﻟﻀﺮورة
13
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
support services as necessary to be aware of ﻟﻺﻟﻤﺎم وﺗﺤﻠﻴﻞ وﺗﻘﻴﻴﻢ اﻻﺗﺠﺎﻫﺎت وﺗﻐﻴﻴﺮات ﻧﻄﺎق اﻷﻋﻤﺎل
and have time to analyze and evaluate potential .اﻟﻤﺘﻮﻗﻌﺔ
trends/ scope changes.
Actively attending review meetings regularly to اﻟﻤﺸﺎرﻛﺔ ﺑﻔﻌﺎﻟﻴﺔ ﻓﻲ اﺟﺘﻤﺎﻋﺎت اﻟﻤﺮاﺟﻌﺔ اﻟﻤﻨﺘﻈﻤﺔ
understand changes in the to-go design .ﻟﻔﻬﻢ اﻟﺘﻐﻴﻴﺮات ﻓﻲ ﻛﻤﻴﺎت اﻟﺘﺼﻤﻴﻤﺎت اﻟﻤﺴﺘﻘﺒﻠﻴﺔ
quantities.
In certain instances that smaller scale of projects has ﻓﻲ ﺑﻌﺾ اﻟﺤﺎﻻت اﻟﺨﺎﺻﺔ ﺑﺎﻟﺘﻲ ﻳﺘﻢ ﻓﻴﻬﺎ ﺗﻨﻔﻴﺬ ﻣﺸﺎرﻳﻊ ﺻﻐﻴﺮة دون
to be executed and the position of Trend Engineer is اﻟﺤﺎﺟﺔ إﻟﻰ ﻣﻬﻨﺪس اﺗﺠﺎﻫﺎت ﻳﺘﻮﻟﻰ ﻣﻬﻨﺪس اﻟﺘ ﻟﻴﻒ ﻣﺴﺆوﻟﻴﺔ
not warranted, the Cost Engineer assumes the .ﻣﻬﻨﺪس اﻻﺗﺠﺎﻫﺎت ﻓﻲ ﻫﺬا اﻹﺟﺮاء
responsibility of the Trend Engineer in this procedure.
Providing guidance and direction to the Project ﺗﻘﺪﻳﻢ اﻟﺘﻮﺟﻴﻬﺎت واﻹرﺷﺎدات ﻟﻤﺴﺆوﻟﻲ ﺿﺒﻂ اﻟﻤﺸﺎرﻳﻊ
Controls personnel involved in quantity .اﻟﻤﻌﻨﻴﻴﻦ ﺑﺘﻌﻘﺐ اﻟﻜﻤﻴﺎت
tracking and reporting.
Issuing quantity tracking management إﺻﺪار ﻣﺴﺘﻨﺪات ﺗﻘﺎرﻳﺮ إدارة ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت ﺣﺴﺐ
reporting documents per project .ﻣﺘﻄﻠﺒﺎت اﻟﻤﺸﺮوع
requirements.
Providing periodic audits to confirm the ﺗﻘﺪﻳﻢ ﻣﺮاﺟﻌﺎت دورﻳﺔ ﻟﻀﻤﺎن دﻗﺔ ﺳﻴﺮ اﻟﻌﻤﻞ اﻟﻮارد ﻓﻲ
accuracy of the reported progress and cost .اﻟﺘﻘﺎرﻳﺮ وأﻧﺸﻄﺔ ﺗﺮﻣﻴﺰ اﻟﺘ ﻟﻴﻒ
coding activities.
Ensures that Weekly Quantities are properly ﺿﻤﺎن اﻟﺘﺨﺼﻴﺺ اﻟﺴﻠﻴﻢ ﻟﻠﻜﻤﻴﺎت اﻷﺳﺒﻮﻋﻴﺔ ﻋﻠﻰ ﻫﻴ
assigned to the Code of Accounts. .اﻟﺤﺴﺎﺑﺎت
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Maintaining the Project Controls systems .ﺻﻴﺎﻧﺔ أﻧﻈﻤﺔ ﺿﺒﻂ اﻟﻤﺸﺎرﻳﻊ اﻟﻤﻌﻨﻴﺔ ﺑﺘﻌﻘﺐ اﻟﻜﻤﻴﺎت
involved in tracking quantities;
Coordinating closely with Procurement to اﻟﺘﻨﺴﻴﻖ اﻟﻤﺒﺎﺷﺮ ﻣﻊ اﻟﻤﺸﺘﺮﻳﺎت ﻟﺠﻤﻊ ﺑﻴﺎﻧﺎت اﻟﻜﻤﻴﺎت
collect relevant quantity data on time; .اﻟﻼزﻣﺔ ﻓﻲ اﻟﻮﻗﺖ اﻟﺴﻠﻴﻢ
Being familiar with the responsibilities, اﻹﻟﻤﺎم ﺑﺎﻟﻤﺴﺆوﻟﻴﺎت واﻹﺟﺮاءات واﻟﻤﺠﺎﻻت ذات اﻟﻤﺸﺎ
procedures, and problem areas regarding .( اﻟﺘﻮﻗﻌﺎت واﻟﻀﺒﻂ، اﻟﺘﻘﺎرﻳﺮ،ﻓﻲ اﻟﻜﻤﻴﺎت )ﻣﺜﻞ اﻟﺤﺼﺮ
quantities (i.e., takeoffs, reporting, forecasting,
and control);
Spot checking the takeoffs because this :اﻟﻤﺮاﺟﻌﺔ اﻟﻔﻮرﻳﺔ ﻟﻌﻤﻴﺎت اﻟﺤﺼﺮ ﻷن ذﻟﻚ ﻳﺴﺎﻋﺪ ﻓﻲ
assists in:
o Understanding forecast quantities, .ﻓﻬﻢ اﻟﻜﻤﻴﺎت اﻟﻤﺘﻮﻗﻌﺔ o
o Resolving coding related issues, .ﺣﻞ اﻟﻤﺴﺎﺋﻞ اﻟﻤﺘﻌﻠﻘﺔ ﺑﺎﻟﺘﺮﻣﻴﺰ o
o Updating the cost control tool, .ﺗﺤﺪﻳﺚ أدوات ﺿﺒﻂ اﻟﺘ ﻟﻴﻒ o
o Generating and analyzing the Progress .إﻋﺪاد وﺗﺤﻠﻴﻞ ﻟﻮﺣﺎت ﻣﺮاﻗﺒﺔ ﺳﻴﺮ اﻟﻌﻤﻞ واﻷداء o
and Performance dashboard;
Running periodic spot checks to confirm إﺟﺮاء اﻟﻤﺮاﺟﻌﺔ اﻟﻤﻴﺪاﻧﻴﺔ اﻟﺪورﻳﺔ ﻟﻀﻤﺎن ﺳﻴﺮ اﻟﺘﺮﻛﻴﺒﺎت
installation progress and verify that the واﻟﺘﺤﻘﻖ ﻣﻦ أن رﻣﻮز ﺗ ﻟﻴﻒ ﻣﺘﺎﺑﻌﺔ اﻟﻮﻗﺖ دﻗﻴﻘﺔ
timekeeping cost codes are accurate and .وﻣﺘﺴﻘﺔ
consistent;
Performing visual inspections of installed إﺟﺮاء اﻟﻔﺤﺺ اﻟﻨﻈﺮي ﻟﻠﻜﻤﻴﺎت اﻟﻤﺮّﻛﺒﺔ وﻣﻘﺎرﻧﺔأﺳﻌﺎر
quantities, budget versus actual installation اﻟﻮﺣﺪات ﻓﻲ اﻟﻤﻴﺰاﻳﻨﺔ وﻓﻲ اﻟﺘﺮﻛﻴﺒﺎت اﻟﻔﻌﻠﻴﺔ ﻣﻊ ﺿﺮورة
unit rate comparisons, and takeoff spot checks .اﻟﻤﺮاﺟﻌﺔ اﻟﻔﻮرﻳﺔ ﻟﻠﺤﺼﺮ
are also necessary;
Communicating with the team any deviations ﺗﺒﻠﻴﻎ اﻟﻔﺮﻳﻖ ﺑﺨﺼﻮص أي اﻧﺤﺮاﻓﺎت ﺑﻴﻦ اﻟﻜﻤﻴﺎت اﻟﻤﻜﺘﺴﺒﺔ
between the earned quantities and the actual .واﻟﻜﻤﻴﺎت اﻟﻔﻌﻠﻴﺔ اﻟﻤﺮّﻛﺒﺔ
installed quantities.
Setting up and maintaining the delivery and .إﻋﺪاد وﺣﻔﻆ ﻣﻨﺤﻨﻴﺎت اﻟﺘﺴﻠﻴﻢ واﻟﺘﺮﻛﻴﺐ
installation curves;
Identifying and quantifying schedule impacts. .ﺗﺤﺪي وﻗﻴﺎس اﻟﺘﺄﺛﻴﺮات ﻋﻠﻰ اﻟﺠﺪول اﻟﺰﻣﻨﻲ
15
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Verifies quantity reporting from Architectural/ / اﻟﺘﺤﻘﻖ ﻣﻦ ﺗﻘﺎرﻳﺮ اﻟﻜﻤﻴﺎت ﻣﻦ اﻟﺸﺮ ت اﻟﻤﻌﻤﺎرﻳﺔ
Engineering (A/E) Firms. .اﻟﻬﻨﺪﺳﻴﺔ
Verifies proper quantity reporting from اﻟﺘﺤﻘﻖ ﻣﻦ ﺻﺤﺔ ﺗﻘﺎرﻳﺮ اﻟﻜﻤﻴﺎت اﻟﺼﺎدرة ﻣﻦ اﻟﻤﻘﺎوﻟﻴﻦ
Contractors during the construction phase. .أﺛﻨﺎء ﻣﺮﺣﻠﺔ اﻟﺘﺸﻴﻴﺪ
Creates and maintains the quantity trackers. .إﻧﺸﺎء وﺻﻴﺎﻧﺔ أدوات ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت
6.2.6 PROJECT ENGINEERING MANAGER (DURING ( اﻟﻤﺪﻳﺮ اﻟﻬﻨﺪﺳﻲ ﻟﻠﻤﺸﺮوع )أﺛﻨﺎء اﻹﺷﺮاف اﻟﻤﻴﺪاﻧﻲ6.2.6
SITE SUPERVISION)
The Engineering Manager is responsible for: :ﻳﻜﻮن اﻟﻤﺪﻳﺮ اﻟﻬﻨﺪﺳﻲ ﻣﺴﺆوًﻻ ﻋﻤﺎ ﻳﻠﻲ
Loading installed and certified quantity data ﺗﺤﻤﻴﻞ ﺑﻴﺎﻧﺎت اﻟﻜﻤﻴﺎت اﻟﻤﺮّﻛﺒﺔ واﻟﻜﻤﻴﺎت اﻟﻤﻌﺘﻤﺪة ﻓﻲ
into computerized databases. .ﻗﻮاﻋﺪ اﻟﺒﻴﺎﻧﺎت اﻟﻤﺤﻮﺳﺒﺔ
Working with Construction to optimize اﻟﻌﻤﻞ ﻣﻊ إدارة اﻟﺘﺸﻴﻴﺪ ﻟﺘﺤﺴﻴﻦ اﻟﻜﻤﻴﺎت )ﻋﻠﻰ ﺳﺒﻴﻞ
quantities (for example: recycle and reuse). .(اﻟﻤﺜﺎل إﻋﺎدة اﻟﺘﺪوﻳﺮ وإﻋﺎدة اﻻﺳﺘﺨﺪام
Validates the correctness of the Engineering اﻟﺘﺤﻘﻖ ﻣﻦ ﺻﺤﺔ أدوات اﻟﺘﻌﻘﺐ اﻟﻬﻨﺪﺳﻲ اﻟﺘﻲ ﺳُﺘﺴﻠﻢ
Tracker to be submitted to the Project .إﻟﻰ إدارة ﺿﺒﻂ اﻟﻤﺸﺎرﻳﻊ
Controls department.
Follows-up with A/E’s for timely submission of اﻟﻤﻬﻨﺪس ﻟﻀﻤﺎن ﺗﺴﻠﻴﻢ أدوات/ اﻟﻤﺘﺎﺑﻌﺔ ﻣﻊ اﻟﻤﻌﻤﺎري
the Weekly Engineering Tracker. .ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت اﻷﺳﺒﻮﻋﻴﺔ ﻓﻲ وﻗﺘﻬﺎ
Ensures that the Discipline Leads have ﺿﻤﺎن ﺗﺤﻘﻖ ﻣﺴﺆوﻟﻲ اﻟﺘﺨﺼﺼﺎت ﻣﻦ اﻟﻜﻤﻴﺎت )ﻋﺪد
validated the quantities (number of اﻟﻤﺨﺮﺟﺎت ﺷﺎﻣﻠًﺔ اﻟﺘﻮارﻳﺦ اﻟﻔﻌﻠﻴﺔ( ﻓﻲ أداة اﻟﺘﻌﻘﺐ
deliverables including the actual dates) in the .اﻟﻬﻨﺪﺳﻲ
Engineering Tracker.
Ensures that the reported quantities (number ﺿﻤﺎن أن اﻟﻜﻤﻴﺎت اﻟﻮاردة ﻓﻲ اﻟﺘﻘﺎرﻳﺮ )ﻋﺪد اﻟﻤﺨﺮﺟﺎت( ﻓﻲ
of deliverables) on each Control Point are in ﻧﻘﻄﺔ ﺿﺒﻂ ﻣﺘﻤﺎﺷﻴﺔ ﻣﻊ ﺳﺠﻼت ﺿﺒﻂ اﻟﻮﺛﺎﺋﻖ )ﻣﺜﻞ
line with Document Control records (e.g., IFR, اﻟﺼﺎدرة ﻟﻠﺘﺸﻴﻴﺪ، اﻟﺼﺎدرة ﻟﻼﻋﺘﻤﺎد،اﻟﺼﺎدرة ﻟﻠﻤﺮاﺟﻌﺔ
IFA, IFC, etc.). .(وﻏﻴﺮﻫﺎ
16
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Validating quantity takeoffs issued during Bid .اﻟﺘﺤﻘﻖ ﻣﻦ ﺣﺼﺮ اﻟﻜﻤﻴﺎت اﻟﺼﺎدرة أﺛﻨﺎء ﻣﺮﺣﻠﺔ اﻟﻤﻨﺎﻗﺼﺔ
stage;
Monitoring and coordinating design ﻣﺮاﻗﺒﺔ وﺗﻨﺴﻴﻖ ﻣﺘﻄﻠﺒﺎت اﻟﺘﺼﻤﻴﻢ وﺳﻴﺮ اﻟﻌﻤﻞ ﻓﻲ
requirements and progress in various physical .ﻣﺠﺎﻻت اﻟﻤﺮاﻓﻖ اﻟﻤﺎدﻳﺔ اﻟﻤﺨﺘﻠﻔﺔ واﻟﺘﺨﺼﺼﺎت اﻟﺤﺮﻓﻴﺔ
facility areas and craft disciplines;
Tracking installed quantities and reporting this ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت اﻟﻤﺮﻛﺔ وﺗﺒﻠﻴﻎ ﻫﺬه اﻟﻤﻌﻠﻮﻣﺎت إﻟﻰ ﺿﺒﻂ
information to Project Controls on time; .اﻟﻤﺸﺎرﻳﻊ ﻓﻲ وﻗﺘﻬﺎ
Producing timely takeoffs of non-engineered اﺳﺘﺨﺮاج ﻛﻤﻴﺎت ﺣﺼﺮ ﻟﻠﺴﻠﻊ ﻏﻴﺮ اﻟﻬﻨﺪﺳﻴﺔ ﻓﻲ اﻟﻮﻗﺖ
commodities to ensure delivery in time to .اﻟﺴﻠﻴﻢ ﻟﻀﻤﺎن ﺗﺴﻠﻴﻤﻬﺎ ﻓﻲ وﻗﺘﻬﺎ ﻟﺪﻋﻢ اﻟﺘﺮﻛﻴﺒﺎت
support the installation;
Resolving any questions or problems اﻹﺟﺎﺑﺔ ﻋﻠﻰ أي أﺳﺌﻠﺔ وﺣﻞ أي ﻣﺸ ﺎت ﺗﺘﻌﻠﻖ ﺑﺎﻟﻜﻤﻴﺎت
regarding installed quantities. .اﻟﻤﺮّﻛﺒﺔ
Notifying vendors and contractors of quantity .إﺧﻄﺎر اﻟﺒﺎﺋﻌﻴﻦ واﻟﻤﻘﺎوﻟﻴﻦ ﺑﺘﻐﻴﺮات اﻟﻜﻤﻴﺎت
changes,
Tracking quantities from fabrication to site .ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت ﻣﻦ اﻟﺘﺼﻨﻴﻊ وﺣﺘﻰ اﻟﺘﺴﻠﻴﻢ ﻓﻲ اﻟﻤﻮﻗﻊ
delivery,
Initiating and maintaining a database for .إﻧﺸﺎء وﺻﻴﺎﻧﺔ ﻗﺎﻋﺪة ﺑﻴﺎﻧﺎت ﺑﺎﻟﻜﻤﻴﺎت اﻟﻤﺴﺘﻠﻤﺔ
received quantities,
17
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Reporting this information to Construction .ﺗﺒﻠﻴﻎ ﻫﺬه اﻟﻤﻌﻠﻮﻣﺎت إﻟﻰ ﻣﺪﻳﺮ اﻟﺘﺸﻴﻴﺪ وﺿﺒﻂ اﻟﻤﺸﺎرﻳﻊ
Management and Project Controls.
Submits the Weekly Quantity Tracker on time. .ﺗﺴﻠﻴﻢ ﺗﻘﺮﻳﺮ ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت اﻷﺳﺒﻮﻋﻲ ﻓﻲ وﻗﺘﻪ
Ensures that construction supervision has اﻟﺘﺄﻛﺪ ﻣﻦ ﺗﺤﻘﻖ إدارة اﻟﺘﺸﻴﻴﺪ ﻣﻦ اﻟﻜﻤﻴﺎت اﻟﻤﺮﻛﺒﺔ ﻓﻲ
validated the installed quantities in the .أداة ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت
Quantity Tracker.
Submits the status of the delivery of materials ﺗﻘﺪﻳﻢ ﺣﺎﻟ ﺔ ﺗﺴﻠﻴﻢ اﻟﻤﻮاد واﻟﻤﻌﺪات ﻓﻲ وﻗﺘﻬﺎ إﻟﻰ إدارة
and equipment to the Project Controls .ﺿﺒﻂ اﻟﻤﺸﺎرﻳﻊ
department.
NOTE: In certain instances, for smaller-scale projects, ﻓﻲ ﺑﻌﺾ اﻟﺤﺎﻻت ﻟﻠﻤﺸﺎرﻳﻊ اﻟﺼﻐﻴﺮة ﻓﺈن اﻟﻮﻇﺎﺋﻒ:ﻣﻼﺣﻈﺔ
positions listed in this section do not exist in the وﻋﻠﻰ، ﻫﺬا.اﻟﻤﻮﺿﺤﺔ ﻓﻲ ﻫﺬا اﻟﻘﺴﻢ ﻻ ﺗﻮﺟﺪ ﺿﻤﻦ اﻟﺘﻨﻈﻴﻢ
Organization. The project is required to identify the اﻟﻤﺸﺮوع ﺗﺤﺪﻳﺪ اﻷﺷﺨﺎص اﻟﻤﺴﺆوﻟﻴﻦ اﻟﺬﻳﻦ ﺳﻴﺘﻮﻟﻮن اﻟﻤﻬﺎم
responsible persons who will handle the tasks .اﻟﻤﺤﺪدة ﻓﻲ ﻫﺬا اﻟﻘﺴﻢ
specified in this section.
18
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
7.1.1 ESTABLISH QUANTITY TRACKING SYSTEM (QTS) إﻧﺸﺎء ﻧﻈﺎم ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت7.1.1
(QTS)
Quantities drive both cost and schedule, the sooner ﺗﻌﺘﺒﺮ اﻟﻜﻤﻴﺎت ﻫﻲ اﻟﻤﺤﺮك ﻟ ٍ ﻣﻦ اﻟﺘ ﻟﻴﻒ واﻟﺠﺪول اﻟﺰﻣﻨﻲ و ﻤﺎ
cost and schedule impacts are recognized and ﺗﻢ ﺗﺤﺪﻳﺪ اﻟﺘﺄﺛﻴﺮات ﻋﻠﻰ اﻟﺘ ﻟﻴﻒ واﻟﺠﺪول اﻟﺰﻣﻨﻲ ﺳﺮﻳﻌًﺎ ﻤﺎ ن
optimized, the better. During the design phase, a good أﺛﻨﺎء ﻣﺮﺣﻠﺔ، ﻳﺴﺎﻋﺪ ﺑﺮﻧﺎﻣﺞ ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت اﻟﺠﻴﺪ.ذﻟﻚ أﻓﻀﻞ
quantity tracking program allows the project functions ﻣﺴﺆوﻟﻲ اﻟﻤﺸﺮوع ﻓﻲ ﺗﻘﻴﻴﻢ اﻟﺘﺄﺛﻴﺮات واﻻﻧﺤﺮاﻓﺎت،اﻟﺘﺼﻤﻴﻢ
to proactively evaluate impacts and deviations from وﻳﻤﻜﻦ ﻟﻠﻤﺸﺮوع ﺧﻼل ﻣﺮﺣﻠﺔ.اﺳﺘﺒﺎﻗﻴًﺎ ﻣﻦ اﻟﺘﺨﻄﻴﻂ اﻟﻤﺒﺪﺋﻲ
the Initial planning. It is during the design phase that وﻋﻠﻰ.اﻟﺘﺼﻤﻴﻢ اﻟﺘﺄﺛﻴﺮ ﻋﻠﻰ اﻟﺘﺸﻴﻴﺪ ﻟﺘﺤﻘﻴﻖ أﻗﺼﻰ ﻓﺎﺋﺪة ﻣﻤﻜﻨﺔ
the project can affect construction with the greatest ( اﻟﻬﻨﺪﺳﺔ/ ﻣﺴﺆوﻟﻲ اﻟﻬﻨﺪﺳﺔ واﻟﺘﻘﺪﻳﺮات )ﺿﻤﻦ وﻇﻴﻔﺔ اﻟﻤﻌﻤﺎر
benefit. Engineering and Estimating (under A/E’s اﺳﺘﺒﺎﻗﻲ ﻋﻦ ﺳﺒﻞ ﺗﺤﺴﻴﻦ اﻟﺘﺼﻤﻴﻢ اﻟﻌﻤﻞ ﻣﻌًﺎ ﻟﻠﺒﺤﺚ ﺑﺸ
function) need to work together to proactively look for و ﻤﺎ ﺗﻢ ﺗﺤﺪﻳﺪ اﻟﺘﺄﺛﻴﺮات ﻋﻠﻰ اﻟﺘ ﻟﻴﻒ واﻟﺠﺪول اﻟﺰﻣﻨﻲ.واﻟﻜﻤﻴﺎت
ways to optimize the design and optimize the .ﺑﺸ ٍ ﻣﺒﻜﺮ وﻣﻌﺎﻟﺠﺘﻬﺎ ﻤﺎ ﻧﺖ اﻟﻔﻮاﺋﺪ اﻟﻤﺘﺤﻘﻘﺔ أﻛﺒﺮ
quantities. The earlier in the project’s life that impacts
on cost, and schedule are recognized and mitigated,
the greater the benefit that can be achieved.
Quantity Tracking System (QTS) refers to the set of ﻳﻌﻨﻲ ﻧﻈﺎم ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت إﻟﻰ ﻣﺠﻤﻮﻋﺔ ﻣﻦ ﺗﻄﺒﻴﻘﺎت اﻟﻤﺘﺎﺑﻌﺔ
tracking applications as a whole that tracks the اﻟﺘﻲ ﺗﺘﺎﺑﻊ اﻟﻜﻤﻴﺎت أﺛﻨﺎء ﺳﻴﺮ أﻋﻤﺎل اﻟﺘﺼﻤﻴﻢ واﻟﺘﺮﻛﻴﺒﺎت ﻟﻠﺴﻠﻊ
quantities during the Design phase and installation .اﻟﻤﺤﺪدة أﺛﻨﺎء ﻣﺮﺣﻠﺔ اﻟﺘﺸﻴﻴﺪ
progress of specific commodities during the
Construction phase.
The followings are typical items included for quantity :وﻓﻴﻤﺎ ﻳﻠﻲ ﺑﻌﺾ اﻟﻨﻮد اﻟﻤﺸﻤﻮﻟﺔ ﻷﻏﺮاض اﻟﺘﻌﻘﺐ واﻟﺘﻘﺎرﻳﺮ
tracking and reporting purposes:
Quantities should be reported against pre- ﻳﺠﺐ إﻋﺪاد ﺗﻘﺎرﻳﺮ اﻟﻜﻤﻴﺎت ﻣﻘﺎرﻧًﺔ ﺑﺤﺼﺮ اﻟﻜﻤﻴﺎت اﻟﻤﺤﻤﻠﺔ
loaded quantity takeoffs by drawing number, ﻣﺴﺒﻘًﺎ ﺑﺮﻗﻢ اﻟﺮﺳﻮﻣﺎت ودﻳﺒﺎﺟﺔ اﻟﻤﻌﺪات أو أي رﻗﻢ ﺗﺤﻜﻢ
equipment tag number, or any other control .ﻳﻌﺮف اﻟﻌﻤﻞ ﺑﺸ ٍ ﻣﺤﺪد وﻳﻤﻜﻦ ﻣﺮاﺟﻌﺘﻪ ﻓﻲ وﻗٍﺖ ﻻﺣﻖ
number that specifically identifies the work and وﻻ ُﻳﺴﺘﺤﺴﻦ ﺑﺼﻮرٍة ﻋﺎﻣﺔ إﻋﺪاد ﺗﻘﺎرﻳﺮ اﻟﻜﻤﻴﺎت ﻋﻠﻰ
can be audited at a later time. Quantity ﻣﺴﺘﻮى رﻣﻮز اﻟﺘ ﻟﻴﻒ ﻓﻘﻂ ﺑﺴﺒﺐ ﺣﺠﻢ رﻣﻮز اﻟﺘ ﻟﻴﻒ
reporting at only the cost code level is ف
.ٍ ٍ اﻟﻼزم ﻟﻤﺘﺎﺑﻌﺔ ﺳﻴﺮ اﻟﻌﻤﻞ ﺑﺸ
generally not recommended due to the volume
of cost codes required to adequately track
progress.
The quantity tracking and reporting database ﻳﺠﺐ أن ﺗﺘﻀﻤﻦ ﻗﺎﻋﺪة ﺑﻴﺎﻧﺎت ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت واﻟﺘﻘﺎرﻳﺮ ﻣﺎ
should contain: :ﻳﻠﻲ
o Cost Code/ Cost Account ﺣﺴﺎب اﻟﺘ ﻟﻴﻒ/ رﻣﻮز اﻟﺘ ﻟﻴﻒ o
o Item Number رﻗﻢ اﻟﺒﻨﺪ o
o Drawing Number رﻗﻢ اﻟﺮﺳﻢ o
o Description اﻟﻮﺻﻒ o
o Budget Quantity اﻟﻜﻤﻴﺔ ﻓﻲ اﻟﻤﻴﺰاﻧﻴﺔ o
o Unit of Measure (UoM) وﺣﺪة اﻟﻘﻴﺎس o
19
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Input for the total budget quantities and total forecast ﻣﺪﺧﻼت إﺟﻤﺎﻟﻲ ﻛﻤﻴﺎت اﻟﻤﻴﺰاﻧﻴﺔ وإﺟﻤﺎﻟﻲ اﻟﻜﻤﻴﺎت اﻟﻤﺘﻮﻗﻌﺔ ﻓﻲ
quantities in the QTS come primarily from Engineering أﺳﺎﺳﻲ ﻣﻦ اﻟﻘﺴﻢ ﻧﻈﺎم ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت اﻟﺘﻲ ﺗﺄﺗﻲ ﺑﺸ
before the construction phase of the project. Primary ﺗﺘﻀﻢ اﻟﻤﺼﺎدر اﻷوﻟﻴﺔ.اﻟﻬﻨﺪﺳﻲ ﻗﺒﻞ ﻣﺮﺣﻠﺔ اﻟﺘﺸﻴﻴﺪ ﻓﻲ اﻟﻤﺸﺮوع
sources of information from Engineering are bills of .ﻟﻠﻤﻌﻠﻮﻣﺎت ﻣﻦ اﻟﻘﺴﻢ اﻟﻬﻨﺪﺳﻲ ﻓﻮاﺗﻴﺮ اﻟﻤﻮاد وﻗﻮاﺋﻢ اﻟﻤﻌﺪات
materials and equipment lists. Any deviation from the ﻳﺠﺐ ﺗﻀﻤﻴﻦ أي اﻧﺤﺮاف ﻋﻦ ﻣﻴﺰاﻧﻴﺔ ﻣﺮﺣﻠﺔ اﻟﺘﺼﻤﻴﻢ ﻓﻲ اﻻﺗﺠﺎﻫﺎت
design phase budget quantity must be trended and ﻳﻮﻓﺮ ﻧﻈﺎم ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت ﺗﻘﺎرﻳﺮ ﻛﻤﻴﺎت.وإدراﺟﻪ ﻓﻲ اﻟﺘﻘﺎرﻳﺮ
reported. A QTS provides some standard quantity ﻣﻮﺣﺪة ﺑﺨﺼﻮص ﻣﺘﻄﻠﺒﺎت اﻟﻤﺸﺘﺮﻳﺎت واﻟﺘﺸﻴﻴﺪ ﻛﻤﺎ ﻳﻮﻓﺮ أﻳﻀًﺎ
reports geared toward the needs of Procurement and ﺑﻌﺾ اﻟﻤﺮوﻧﺔ ﻟﻠﺘﻘﺎرﻳﺮ اﻟﺘﻲ ﻳﻌﺪﻫﺎ اﻟﻤﺴﺘﺨﺪﻣﻮن ﺑﺎﺳﺘﺨﺪام أدوات
Construction and also provides some flexibility for .ﺗﻘﺎرﻳﺮ ﻣﺨﺼﺼﺔ
user-generated reports through the use of ad-hoc
reporting tools.
It is important that QTS reporting represents the total ﻧﻄﺎق أﻋﻤﺎل وﻣﻦ اﻟﻤﻬﻢ أن ﺗﻤﺜﻞ ﺗﻘﺎرﻳﺮ ﻧﻈﺎم ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت
scope of the project. If separate systems are being ﻓﻲ ﺣﺎل اﺳﺘﺨﺪام أﻧﻈﻤﺔ ﻣﻨﻔﺼﻠﺔ أﺛﻨﺎء ﻣﺮﺣﻠﺘﻲ اﻟﺘﺼﻤﻴﻢ.اﻟﻤﺸﺮوع
used during the Design and Construction phases to ﻳﺘﻢ دﻣﺞ اﻟﻤﻌﻠﻮﻣﺎت اﻟﺼﺤﻴﺤﺔ ﺑﺎﺳﺘﺨﺪام،واﻟﺘﺸﻴﻴﺪ ﻟﺤﻔﻆ اﻟﻜﻤﻴﺎت
maintain quantities, the appropriate information is MMR-CAE-KPC-PR-) ﺗﺮﻣﻴﺰ ﺗ ﻟﻴﻒ اﻟﻤﺸﺮوع إﺟﺮاء ﻫﻴ
integrated using the Project Cost Coding Structure .(000001
Procedure (MMR-CAE-KPC-PR-000001).
Note: Engineering is responsible for the initial quantity ﺗﻌﺘﺒﺮ اﻹدارة اﻟﻬﻨﺪﺳﻴﺔ ﻣﺴﺆوﻟﺔ ﻋﻦ أﺣﻤﺎل اﻟﻜﻤﻴﺎت:ﻣﻼﺣﻈﺔ
loads as the design progresses, but during the اﻟﻤﺒﺪﺋﻴﺔ ﻣﻊ ﺳﻴﺮ اﻟﻌﻤﻞ ﻓﻲ اﻟﺘﺼﻤﻴﻢ ﻓﻲ ﺣﻴﻦ ﻳﻜﻮن اﻟﻤﻘﺎول أﺛﻨﺎء
Construction phase the Contractor with the اﻟﻮزارة أو/ ﺗﺤﺖ إﺷﺮاف إدارة اﻟﻤﺸﺮوع ﻣﻦ اﻷﻣﺎﻧﺔ،ﻣﺮﺣﻠﺔ اﻟﺘﺸﻴﻴﺪ
supervision of Amana/MOMRA Project Management . ﻣﺴﺆوًﻻ ﻋﻦ اﻟﺘﺤﻘﻖ ﻣﻦ اﻟﺒﻴﺎﻧﺎت،ﻓﺮﻳﻖ ﺷﺮﻛﺔ إدارة اﻟﻤﺸﺮوع
Team/ Project Management Company (PMT/PMC) is
responsible for validating the data.
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
equipment, piping, instrumentation, and electrical وﺑﻤﺠﺮد ﺑﺪء اﻟﻤﺸﺮوع ﻳﺼﺒﺢ ﺗﻌﻘﺐ.واﻷﺟﻬﺰة واﻟﺴﻠﻊ اﻟﻜﻬﺮﺑﺎﺋﻴﺔ
commodities. Once the project is initiated, quantity .اﻟﻤﺸﺮوع ﺟﺰًء ﻻ ﻳﺘﺠﺰأ ﻣﻦ أﻧﻈﻤﺔ ﺿﺒﻂ اﻟﻤﺸﺮوع
tracking becomes an integral part of the Project
Controls systems.
Quantity tracking is a fundamental and significant ﻳﻌﺘﺒﺮ ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت ﻋﻨﺼﺮًا أﺳﺎﺳﻴًﺎ وﻫﺎﻣًﺎ ﻟﻀﺒﻂ اﻟﺘ ﻟﻴﻒ واﻟﺠﺪول
element of cost and schedule control because .اﻟﺰﻣﻨﻲ ﻷن اﻟﻜﻤﻴﺎت ﻫﻲ اﻟﺘﻲ ﺗﺆﺛﺮ ﻋﻠﻰ اﻟﺘ ﻟﻴﻒ واﻟﺠﺪول اﻟﺰﻣﻨﻲ
quantities drive cost and schedule. One of the most واﺣﺪة ﻣﻦ أﻫﻢ وﻇﺎﺋﻒ ﺿﺒﻂ اﻟﺘ ﻟﻴﻒ ﻫﻲ ﺟﻤﻊ ﻣﻌﻠﻮﻣﺎت اﻟﻜﻤﻴﺎت
important functions of cost control is the accurate and وإﻋﺪاد ﺗﻘﺎرﻳﺮﻫﺎ ﺑﺸ ٍ ﻓﻮري ﺧﻼل دورة ﺣﻴﺎة اﻟﻤﺸﺮوع ﺑﺪًء ﻣﻦ
timely collection and reporting of quantities over the .اﻟﺘﻘﺪﻳﺮات ووﺿﻊ اﻟﻤﻴﺰاﻧﻴﺔ وإﻟﻰ اﻟﻨﻮاﺣﻲ اﻟﻬﻨﺪﺳﻴﺔ وﺣﺘﻰ اﻟﺘﺸﻴﻴﺪ
life-cycle of a project, from estimating and وﻳﺸﻤﻞ ذﻟﻚ اﻟﻜﻤﻴﺎت اﻟﻤﺮّﻛﺒﺔ ﺣﺘﻰ ﺗﺎرﻳﺨﻪ وإﺟﻤﺎﻟﻲ اﻟﻜﻤﻴﺎت
establishing the budget through Engineering until : وﻓﻴﻤﺎ ﻳﻠﻲ ﺑﻌﺾ أﺳﺒﺎب أﻫﻤﻴﺔ ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت.اﻟﻤﺘﻮﻗﻌﺔ
Construction. This includes quantities that are
installed to-date and total forecast quantities. Below
are some of the reasons why Quantity Tracking is
important:
Quantities are a measure of a project’s scope اﻟﻜﻤﻴﺎت ﻫﻲ ﻗﻴﺎس ﻟﻨﻄﺎق أﻋﻤﺎل اﻟﻤﺸﺮوع وﻣﻦ ﺛﻢ ﺗﻤﺜﻞ
and therefore serve as a guide in determining ﻣﻮﺟﻬًﺎ ﻟﺘﺤﺪﻳﺪ اﻟﺘﻮﻇﻴﻒ وﻣﻌﺪات اﻟﺘﺸﻴﻴﺪ اﻟﻤﻄﻠﻮﺑﺔ
staffing, construction equipment .وأﻧﺸﻄﺔ اﻟﻤﺸﺘﺮﻳﺎت
requirements, and procurement activities.
Cost and job hour information do not reveal ﻻ ﺗﻮﺿﺢ ﻣﻌﻠﻮﻣﺎت اﻟﺘ ﻟﻴﻒ وﺳﺎﻋﺎت اﻟﻌﻤﻞ اﻹﻧﺘﺎﺟﻴﺔ أو
productivity or performance unless it is related اﻷداء ﻣﺎ ﻟﻢ ﺗﻘﺘﺮن ﺑﺎﻟﻜﻤﻴﺎت ﺑﻤﻌﻨﻰ أن ﺗﻘﻴﻴﻢ أداء اﻟﻘﻮى
to quantities, i.e., assessment of labor .اﻟﻌﺎﻣﻠﺔ ﻳﺘﻢ ﺑﺮﺑﻂ ﺳﺎﻋﺎت اﻟﻌﻤﻞ ﺑﺎﻟﻜﻤﻴﺎت
performance is accomplished by relating job
hours and quantities.
Accurate equipment and material cost ٍ ﺗﻌﺘﻤﺪ اﻟﺘﻮﻗﻌﺎت اﻟﺪﻗﻴﻘﺔ ﻟﺘ ﻟﻴﻒ اﻟﻤﻌﺪات واﻟﻤﻮاد ﺑﺸ
forecasts depend directly on accurate total ﻣﺒﺎﺷﺮ ﻋﻠﻰ إﺟﻤﺎﻟﻲ اﻟﺘﻮﻗﻌﺎت اﻟﺪﻗﻴﻘﺔ ﻟﻠﻜﻤﻴﺎت واﻟﻜﻤﻴﺎت
forecast quantities and to-date installed .اﻟﻤﺮّﻛﺒﺔ ﺣﺘﻰ ﺗﺎرﻳﺨﻪ
quantities.
Maintenance of the project schedule and ﺗﻮﻗﻊ ﺳﻴﺮ/ ﺗﻌﺘﻤﺪ ﺻﻴﺎﻧﺔ اﻟﺠﺪول اﻟﺰﻣﻨﻲ ﻟﻠﻤﺸﺮوع وﻗﻴﺎس
measurement/ forecasting of project progress أﻋﻤﺎل اﻟﻤﺸﺮوع ﻋﻠﻰ اﻟﻤﻌﻠﻮﻣﺎت اﻟﺠﻴﺪة ﺑﺨﺼﻮص
depends on good quantity information. .اﻟﻜﻤﻴﺎت
Note: A good quantity tracking program will allow the ﻳﺴﺎﻋﺪ ﺑﺮﻧﺎﻣﺞ ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت اﻟﺠﻴﺪ ﻣﺴﺆوﻟﻲ اﻟﻤﺸﺮوع:ﻣﻼﺣﻈﺔ
project functions to proactively evaluate impacts and ﻓﻲ ﺗﻘﻴﻴﻢ اﻟﺘﺄﺛﻴﺮات واﻻﻧﺤﺮاﻓﺎت ﻋﻦ اﻟﺘﺨﻄﻴﻂ اﻟﻤﺒﺪﺋﻲ أﺛﻨﺎء ﻣﺮﺣﻠﺔ
deviations from the Initial Planning during the Design اﻟﺘﺼﻤﻴﻢ ﻗﺒﻞ ﺗﺮﺳﻴﺔ ﻧﻄﺎق أﻋﻤﺎل اﻟﺘﺸﻴﻴﺪ ﺑﺤﻴﺚ ﻳﻤﻜﻦ ﺗﺤﺴﻴﻦ
phase before award Construction scope so that cost .اﻟﺘ ﻟﻴﻒ واﻟﺠﺪول اﻟﺰﻣﻨﻲ
and schedule can be optimized.
Forecasted quantities provide the basis for ﺗﻮﻓﺮ.ﺗﻮﻓﺮ اﻟﻜﻤﻴﺎت اﻟﺘﻘﺪﻳﺮﻳﺔ أﺳﺎس ﺗﺤﺪﻳﺪ اﻷﻋﻤﺎل اﻟﻮاﺟﺐ إﻧﺠﺎزﻫﺎ
determining what work must be done. Installed .اﻟﻜﻤﻴﺎت اﻟﻤﺮّﻛﺒﺔ اﻟﻘﻴﺎس وﺳﻴﺮ اﻷﻋﻤﺎل ﻗﻴﺪ اﻟﺘﻨﻔﻴﺬ أو اﻟﺘﻲ اﻛﺘﻤﻠﺖ
21
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
quantities provide the measure and progress of work وﻓﻲ ﻏﻴﺎب ﻣﺴﺘﻮى اﻟﺪﻗﺔ اﻟ ﻓﻲ ﻟﺘﻘﺎرﻳﺮ اﻟﻜﻤﻴﺎت ﻟﻦ ﻳﻠﻢ ﻓﺮﻳﻖ إدارة
that is in-progress or has been completed. Without اﻟﻤﺸﺮوع ﺑﺤﺎﻟﺔ ﺗﺸﻴﻴﺪ اﻟﻤﺸﺮوع ووﺟﻬﺘﻪ أو اﻟﻤﻌﺪل اﻟﺬي ﻳﺠﺐ أن
reasonable quantity reporting accuracy, the project .ﻳﺴﻴﺮ ﻋﻠﻴﻪ ﻹﻛﻤﺎل اﻷﻋﻤﺎل اﻟﻤﺪرﺟﺔ ﻓﻲ اﻟﺠﺪول اﻟﺰﻣﻨﻲ
management team will not know the construction
status of a project, where it is going, or the rate at
which it must proceed to complete the work on
schedule.
Before the initialization of a QTS, develop a general وﻗﺒﻞ ﺑﺪء ﻧﻈﺎم ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت ﻳﺠﺐ وﺿﻊ ﺧﻄﺔ ﻋﺎﻣﺔ ﻟﺘﺤﺪﻳﺪ اﻟﺴﻠﻊ
plan for identifying the commodities that will be ﻳﺠﺐ ﺗﺤﺪﻳﺪ ﻧﻮع ﻧﻈﺎم.اﻟﺘﻲ ﺳﻴﺠﺮي ﺗﻌﻘﺒﻬﺎ وﻛﻴﻔﻴﺔ ﺗﻄﺒﻴﻖ اﻟﻨﻈﺎم
tracked, and how the system will be implemented. ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت اﻟﺬي ﺳُﻴﺴﺘﺨﺪم وﺗﻮزﻳﻊ اﻟﻤﺴﺆوﻟﻴﺎت اﻟﺘﻨﻈﻴﻤﻴﺔ
Determine the type of QTS that will be used and assign .ﻟﻠﻤﺪﺧﻼت وﺣﻔﻆ اﻟﺒﻴﺎﻧﺎت
organizational responsibilities for the input and
maintenance of data.
Generally, the number of commodities that are tracked وﺑﺼﻮرٍة ﻋﺎﻣﺔ ﻓﺈن ﻋﺪد اﻟﺴﻠﻊ اﻟﺘﻲ ﻳﺠﺮي ﺗﻌﻘﺒﻬﺎ ﻣﻨﻔﺮدًة ﻟﺘﺤﺪﻳﺪ
individually to identify the project scope is in the range ﻓﺈن، ٍ وﻋﻠﻰ، ﺳﻠﻌﺔ15 إﻟﻰ6 ﻧﻄﺎق أﻋﻤﺎل اﻟﻤﺸﺮوع ﻳﻜﻮن ﺑﻴﻦ
of 6 to 15; however, the number and type of ﻳﺤﺪد.ﻋﺪد وﻧﻮع اﻟﺴﻠﻊ اﻟﺘﻲ ﻳﺠﺮي ﺗﻌﻘﺒﻬﺎ ﻳﺨﺘﻠﻒ ﻣﻦ ﻣﺸﺮوع ﻵﺧﺮ
commodities tracked varies by project. Each project ﻣﺸﺮوع اﻟﺴﻠﻊ اﻟﺘﻲ ﺳﻴﺠﺮي ﺗﻌﻘﺒﻬﺎ وﻋﺪدﻫﺎ ﻟﺘﺤﻘﻴﻖ أﻫﺪاف
identifies which and how many commodities will be وﻛﻤﺜﺎل ﻋﻠﻰ ذﻟﻚ ﻓﺈن اﻟﺴﻠﻊ ووﺣﺪات.وﻣﺘﻄﻠﺒﺎت اﻟﻤﺸﺮوع
tracked to meet project goals and requirements. :اﻟﻘﻴﺎس ﻳﻤﻜﻦ أن ﺗﻜﻮن ﻛﻤﺎ ﻳﻠﻲ
Example commodities and the typical Unit of Measure
(UoM) are as follows:
Discipline Commodity Metric اﻟﻤﻘﻴﺎس اﻟﺴﻠﻌﺔ اﻟﺘﺨﺼﺺ
Structural
Cubic meters ﻣﺘﺮ ﻣﻜﻌﺐ ﺣﻔﺮﻳﺎت اﻟﺘﺸﻴﻴﺪ
excavation
Earth walls Cubic meters ﻣﺘﺮ ﻣﻜﻌﺐ اﻟﺠﺪران اﻟﺘﺮاﺑﻴﺔ
Concrete piles
- اﻟﺮ ﺋﺰ اﻟﺨﺮﺳﺎﻧﻴﺔ
- preparation, Each ﻋﺪد
اﻟﺘﺠﻬﻴﺰ واﻟﻤﻨﺎوﻟﺔ
handling
ﻏﺮس اﻟﺮ ﺋﺰ
Civil works & Driving of piles Linear meters ﻣﺘﺮ ﻃﻮﻟﻲ اﻷﻋﻤﺎل اﻟﻤﺪﻧﻴﺔ
اﻟﺨﺮﺳﺎﻧﻴﺔ
major واﻟﻤﻨﺸﺂت
Bored piles -
structures - اﻟﺮ ﺋﺰ اﻟﻤﺜﻘﺒﺔ اﻟﺮﺋﻴﺴﻴﺔ
excavation in
Cubic meters ﻣﺘﺮ ﻣﻜﻌﺐ اﻟﺤﻔﺮ ﻓﻲ أﻏﻠﻔﺔ
steel pile
اﻟﺮ ﺋﺰ اﻟﺤﺪﻳﺪﻳﺔ
casing
Bored piles - - اﻟﺮ ﺋﺰ اﻟﻤﺜﻘﺒﺔ
Cubic meters ﻣﺘﺮ ﻣﻜﻌﺐ
concreting وﺿﻊ اﻟﺨﺮﺳﺎﻧﺔ
Formworks Square meters ﻣﺘﺮ ﻣﺮﺑﻊ اﻟﻘﻮاﻟﺐ اﻟﻤﺆﻗﺘﺔ
Steel Metric tons ﻃﻦ ﻣﺘﺮي اﻟﺘﺴﻠﻴﺢ اﻟﺤﺪﻳﺪي
22
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
23
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
actual delivery of quantities at the construction ﻳﻮﺿﺢ ﻫﺬا:اﻟﺨﻄﺔ ﻣﻘﺎﺑﻞ ﻛﻤﻴﺎت اﻟﺘﺴﻠﻴﻢ اﻟﻔﻌﻠﻴﺔ
job site. Slippage in delivery dates indicates اﻟﻤﻨﺤﻨﻰ اﻟﻜﻤﻴﺎت اﻟﻤﺨﻄﻄﺔ واﻟﻜﻤﻴﺎت اﻟ ﻔﻌﻠﻴﺔ اﻟﺘﺮاﻛﻤﻴﺔ
Construction may have to implement work- ﻳﺸﻴﺮ ﺗﺄﺧﻴﺮ ﺗﻮارﻳﺦ اﻟﺘﺴﻠﻴﻢ إﻟﻰ.ﻓﻲ ﻣﻮﻗﻊ أﻋﻤﺎل اﻟﺘﺸﻴﻴﺪ
around activities to maintain progress. أن ﻋﻠﻰ إدارة اﻟﺘﺸﻴﻴﺪ ﺗﻨﻔﻴﺬ أﻧﺸﻄﺔ أﺧﺮى ﻟﻠﺤﻔﺎظ ﻋﻠﻰ ﺳﻴﺮ
.اﻟﻌﻤﻞ
Plan vs. Actual Installation of Quantities - this
curve shows the cumulative planned
installation of quantities (work to be completed ﻳﻮﺿﺢ ﻫﺬا:اﻟﺨﻄﺔ ﻣﻘﺎﺑﻞ اﻟﺘﺮﻛﻴﺐ اﻟﻔﻌﻠﻲ ﻟﻠﻜﻤﻴﺎت
by Construction) vs. the cumulative actual اﻟﻤﻨﺤﻨﻰ اﻟﺘﺮﻛﻴﺒﺎت اﻟﺘﺮاﻛﻤﻴﺔ اﻟﻤﺨﻄﻄﺔ ﻟﻠﻜﻤﻴﺎت )اﻟﻌﻤﻞ
installation of quantities. اﻟﺬي ﻳﺠﺐ أن ﺗﻨﺠﺰه إدارة اﻟﺘﺸﻴﻴﺪ( ﻣﻘﺎﺑﻞ اﻟﺘﺮﻛﻴﺒﺎت
.اﻟﺘﺮاﻛﻤﻴﺔ اﻟﻔﻌﻠﻴﺔ ﻟﻠﻜﻤﻴﺎت
These curves are included on one graph for all
commodities as well as individual commodities.
Typical commodities to be tracked include but are not ﻳﺪﻣﺞ ﻫﺬان اﻟﻤﻨﺤﻨﻴﺎن ﻓﻲ رﺳﻢ ﺑﻴﺎﻧﻲ واﺣﺪ ﻟﺠﻤﻴﻊ اﻟﺴﻠﻊ ﻣﺠﺘﻤﻌًﺔ
limited to the following. ﻋﻠﻰ ﺳﺒﻴﻞ، ﺗﺘﻀﻤﻦ اﻟﺴﻠﻊ اﻟﺘﻲ ﻳﺠﺐ ﺗﻌﻘﺒﻬﺎ.ﺑﺠﺎﻧﺐ اﻟﺴﻠﻊ اﻟﻤﻔﺮدة
Structural concrete - formworks, rebars, : ﻣﺎ ﻳﻠﻲ،اﻟﻤﺜﺎل ﻻ اﻟﺤﺼﺮ
embeds, pouring;
Structural steel - supplied, erected, aligned, اﻷﺟﺰاء، اﻟﺘﺴﻠﻴﺢ، اﻟﻘﻮاﻟﺐ اﻟﻤﺆﻗﺘﺔ:اﻟﺨﺮﺳﺎﻧﺔ اﻹﻧﺸﺎﺋﻴﺔ
bolted, inspected; . ﺻﺐ اﻟﺨﺮﺳﺎﻧﺔ،اﻟﻤﺪﻣﺠﺔ
Pilings - preparation, handling, driving; اﻟﻤﺮﺑﻮط، اﻟﻤﻨﻈﻢ، اﻟﻤﻨﺼﻮب، اﻟﻤﻮرد:اﻟﻔﻮﻻذ اﻹﻧﺸﺎﺋﻲ
Pavement and surfacing - subbase course, .واﻟﻤﻔﺤﻮص
base course, coating & asphalt paving; . اﻟﻤﻨﺎوﻟﺔ اﻟﺘﺮﻛﻴﺐ، اﻟﺘﺠﻬﻴﺰ:اﻟﺮ ﺋﺰ
Cable installation - excavation, cable pulling, اﻟﻤﺴﺎر، اﻟﻤﺴﺎر ﺗﺤﺖ اﻷﺳﺎﺳﻲ:اﻟﺮﺻﻒ واﻟﺘﺴﻮﻳﺔ
backfilling; . اﻟﻄﺒﻘﺎت واﻟﺮﺻﻒ ﺑﺎﻷﺳﻔﻠﺖ،اﻷﺳﺎﺳﻲ
Piping erection - staging, alignment, tacking & . ﺳﺤﺐ اﻟ ﺑﻼت واﻟﺮدم، اﻟﺤﻔﺮﻳﺎت:ﺗﺮﻛﻴﺐ اﻟ ﺑﻼت
welding, testing, restoration;
Railway track - track drainage, subgrade, laying ، اﻻﺧﺘﺒﺎر، اﻟﻠﺼﻖ واﻟﻠﺤﺎم، اﻟﻤﺤﺎذاة، اﻟﺘﻨﺼﻴﺐ:ﺗﺮﻛﻴﺐ اﻷﻧﺎﺑﻴﺐ
bottom ballast, anchorage, laying steel rail, top .اﻟﺘﺮﻣﻴﻢ
ballast, rail anchor, rail brace. اﻟﻄﺒﻘﺔ، ﺗﺼﺮﻳﻒ اﻟﻤﺴﺎرات:ﻣﺴﺎرات اﻟﺴﻜﻚ اﻟﺤﺪﻳﺪﻳﺔ
وﺿﻊ اﻟﻘﻀﺒﺎن، وﺿﻊ ﻃﺒﻘﺔ اﻟﺤﺼﻰ اﻟﺴﻔﻠﻴﺔ،اﻟﻘﺎﻋﺪﻳﺔ
ﺗﺮﺑﻴﻂ، ﺗﺜﺒﻴﺖ اﻟﻘﻀﺒﺎن، ﻃﺒﻘﺔ اﻟﺤﺼﻰ اﻟﻌﻠﻮﻳﺔ،اﻟﻔﻮﻻذﻳﺔ
Refer to .اﻟﻘﻀﺒﺎن ﺑﺒﻌﻀﻬﺎ
راﺟﻊ
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
(Amana/ MOMRA PMT, PMC and A/E) must proactively ﻋﻠﻰ ﻓﺮﻳﻖ اﻟﻤﺸﺮوع )ﻓﺮﻳﻖ إدارة اﻟﻤﺸﺎرﻳﻊ،وﻃﻮال ﻓﺘﺮة اﻟﺘﺼﻤﻴﻢ
work together to optimize the design, mitigate cost (اﻟﻤﻬﻨﺪس/ اﺳﺘﺸﺎري إدارة اﻟﻤﺸﺮوع واﻟﻤﻌﻤﺎري، اﻟﻮزارة/ ﻣﻦ اﻷﻣﺎﻧﺔ
and schedule impacts, and minimize quantities as اﺳﺘﺒﻴﺎﻗﻲ ﻟﺘﺤﺴﻴﻦ اﻟﺘﺼﻤﻴﻢ وﻣﻌﺎﻟﺠﺔ اﻟﺘﺄﺛﻴﺮات اﻟﻌﻤﻞ ﻣﻌًﺎ ﺑﺸ
much as reasonably possible. The earlier this is ﻋﻠﻰ اﻟﺘ ﻟﻴﻒ واﻟﺠﺪول اﻟﺰﻣﻨﻲ وﺗﺨﻔﻴﺾ اﻟﻜﻤﻴﺎت إﻟﻰ اﻟﺤﺪ اﻷدﻧﻰ
implemented on the project, the greater the benefit ﻃﺒ ﻖ ذﻟﻚ ﻓﻲ وﻗٍﺖ ﻣﺒﻜﺮ ﻋﻠﻰ اﻟﻤﺸﺮوع ﻤﺎ ﻧﺖ
ُ و ﻤﺎ.اﻟﻤﻌﻘﻮل
that will be realized by the project. .اﻟﻔﻮاﺋﺪ اﻟﺘﻲ ﻳﺤﻘﻘﻬﺎ اﻟﻤﺸﺮوع أﻛﺒﺮ
The level of detail available for each commodity .ﺳﻠﻌﺔ ﻣﻊ ﺗﻘﺪم أﻋﻤﺎل اﻟﺘﺼﻤﻴﻢ ﻳﺰﻳﺪ ﻣﺴﺘﻮى اﻟﺘﻔﺎﺻﻴﻞ اﻟﻤﺘﺎﺣﺔ ﻟ
increases as the design evolves. During the design of ﻫﻨﺎﻟﻚ ﻣﺮاﺣﻞ ﻣﻤﻴﺰة ﻣﻦ إﻋﺪاد وﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت أﺛﻨﺎء ﺗﺼﻤﻴﻢ
the project, there are distinct phases of quantity .اﻟﻤﺸﺮوع؛ اﻷوﻟﻰ اﻟﺘﺨﻄﻴﻂ اﻟﻤﺒﺪﺋﻲ واﻟﺜﺎﻧﻴﺔ اﻟﺘﺼﻤﻴﻢ اﻟﺘﻔﺼﻴﻠﻲ
development and tracking - 1st initial planning and 2nd وﻳﺨﺘﻠﻒ ﻣﺴﺘﻮى اﻟﺘﻔﺎﺻﻴﻞ واﻟﻄﺮق اﻟﻤﺴﺘﺨﺪﻣﺔ ﻟﺘﺤﺪﻳﺪ وﻗﻴﺎس
detailed design. The level of detail and techniques for وﻳﻤﻜﻦ ﺣﻴﻨﻬﺎ رﺑﻂ ﺗﻠﻚ.ﻣﺮﺣﻠٍﺔ ﻣﻦ ﻣﺮاﺣﻞ اﻟﺘﺼﻤﻴﻢ اﻟﺴﻠﻊ ﻣﻊ
identifying and quantifying commodities varies with اﻟﻜﻤﻴﺎت ﺑﻤﻮاﺻﻔﺎت أو ﻃﻠﺒﺎت اﻟﻤﻮاد واﻟﺠﻮاﻧﺐ اﻟﻬﻨﺪﺳﻴﺔ واﻟﺠﺪاول
each stage of design. These quantities can then be اﻟﺰﻣﻨﻴﺔ اﻟﻮﺳﻴﻄﺔ ﻟﻠﺘﺸﻴﻴﺪ واﻷﻧﻈﻤﺔ اﻟﻬﻨﺪﺳﻴﺔ وﺣﺴﺎﺑﺎت
associated with specifications or material requisitions, .رﻣﻮز اﻟﺘ ﻟﻴﻒ/اﻟﺘ ﻟﻴﻒ
engineering and construction intermediate schedules,
engineering systems, and cost accounts/ cost codes.
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
team and the requirements of the QTS. Error! ﻗﺎﺋﻤﺔ ﺑﺎﻟﻜﻤﻴﺎت اﻷﺳﺎﺳﻴﺔ ﻣﻊ،اﻟﻤﻌّﺮﻓﺎت اﻟﻤﻮﺣﺪة ﻟﺘﻌﻘﺐ اﻟﻜﻤﻴﺎت
Reference source not found. - Quantity Tracking وﺣﺪات ﻗﻴﺎﺳﻬﺎ واﻟﺘﻲ ﺗﺘﻢ ﻣﺘﺘﺎﺑﻌﺘﻬﺎ ﺣﺴﺐ اﻟﺴﻠﻌﺔ وﺗﻌﻜﺲ اﻟﺤﺪ
Standard Identifiers, provides a listing of typical key ﻳﻤﻜﻦ أن ﺗﺨﺘﻠﻒ اﻟﻤﻌّﺮﻓﺎت اﻟﻤﻮﺣﺪة.اﻷدﻧﻰ اﻟﻌﺎدي ﻣﻦ اﻟﺘﻔﺎﺻﻴﻞ
quantities, along with their typical UoMs that are .اﻟﻮزارة وﺣﺴﺐ اﻟﻤﺸﺮوع/ﺣﺴﺐ اﻷﻣﺎﻧﺔ
tracked by commodity and that reflect a normal lowest
level of detail. Standard identifiers can vary from
Amana/MOMRA to Amana/MOMRA, and from project
to project.
7.2.3 REPORT DESIGN PHASE QUANTITY إﻋﺪاد ﺗﻘﺎرﻳﺮ ﻛﻤﻴﺎت ﻣﺮﺣﻠﺔ اﻟﺘﺼﻤﻴﻢ7.2.3
A/E firms are required to create and maintain a اﻟﻬﻨﺪﺳﻴﺔ إﻧﺸﺎء وﺣﻔﻆ ﻗﺎﻋﺪة ﺑﻴﺎﻧﺎت/ﻋﻠﻰ اﻟﺸﺮ ت اﻟﻤﻌﻤﺎرﻳﺔ
quantity tracker database with details of different ﻟﺘﻌﻘﺐ اﻟﻜﻤﻴﺎت ﺗﺘﻀﻤﻦ ﺗﻔﺎﺻﻴﻞ ﻣﺨﺘﻠﻒ اﻟﺴﻠﻊ اﻟﻤﺴﺘﺨﻠﺼﺔ ﻣﻦ
commodities that are being derived from Design ﻣﺨﺮﺟﺎت ﻣﺮﺣﻠﺔ اﻟﺘﺼﻤﻲ ﻣﺜﻞ اﻟﺮﺳﻮﻣﺎت واﻟﻤﻮاﺻﻔﺎت ﻣﻊ ﺗﻮﺿﻴﺢ
phase deliverables like drawings and specifications Attachment 13 ﻳﺘﻀﻤﻦ.اﻟﻨﻘﻄﺔ اﻟﺘﻲ ﺗﺠﺮي ﻓﻴﻬﺎ ﻋﻤﻠﻴﺔ اﻟﺤﺼﺮ
and lists where the take-off process can be اﻟﻌﺪﻳﺪ ﻣﻦ اﻷﻣﺜﻠﺔ ﻷداة ﺗﻌﻘﺐMMR-CAE-KPC-TP-000038
performed. Attachment 13 MMR-CAE-KPC-TP- Error! Reference ﻳﻮﺿﺢ.اﻟﻬﻨﺪﺳﻴﺔ/اﻟﻜﻤﻴﺎت اﻟﺘﺼﻤﻴﻤﻴﺔ
000038 provides several examples of typical Design/ . ﻋﻤﻠﻴﺔ ﺗﻌﻘﺐ وإﻋﺪاد اﻟﻜﻤﻴﺎت اﻟﻬﻨﺪﺳﻴﺔsource not found.
Engineering Quantity Tracker. Error! Reference
source not found. illustrates the Engineering Quantity
tracking and Reporting process. اﻟﻬﻨﺪﺳﻴﺔ أن/ ﻋﻠﻰ اﻟﺸﺮ ت اﻟﻤﻌﻤﺎرﻳﺔ،وﻛﺠﺰء ﻣﻦ ﺗﻘﺮﻳﺮ اﻟﻜﻤﻴﺎت
As part of Quantities Report, A/E firms are required to ﺗﻘﺪم ﻟﻠﻤﺸﺮوع ﺗﻘﺮﻳﺮ ﺑﺄﻋﺪاد اﻟﺘﻮﻇﻴﻒ اﻟﻔﻌﻠﻴﺔ ﻣﻘﺎرﻧًﺔ ﺑﺎﻟﻜﻤﻴﺎت
report to the Projects the actual staffing numbers ﻳﻜﻦ ﺗﺤﺪﻳﺪ ﻗﻮى ﻋﺎﻣﻠﺔ إﺿﺎﻓﻴﺔ ﺑﻤﺮاﺟﻌﺔ إﻧﺘﺎﺟﻴﺔ اﻟﻘﻮى.اﻟﻤﺨﻄﻄﺔ
compared with the planned Quantities. Additional staff .اﻟﺤﺎﻟﻴﺔ واﻟﻤﺨﺮﺟﺎت اﻟﻤﺘﺒﻘﻴﺔ اﻟﻮاﺟﺐ إﻧﺘﺎﺟﻬﺎ
can be determined by checking the productivity of :ﻓﻴﻤﺎ ﻳﻠﻲ ﻣﻨﺤﻨﻴﺎت اﻟﻜﻤﻴﺎت اﻟﻼزﻣﺔ ﻟﻠﺘﻘﺎرﻳﺮ
existing staff and the balance deliverables to produce.
The following are typical Quantity Curves required for
reporting:
اﻟﻤﺨﻄﻂ- (اﻟﻬﻨﺪﺳﻴﺔ/ﻋﺪد اﻟﻤﺨﺮﺟﺎت )اﻟﺸﺮ ت اﻟﻤﻌﻤﺎرﻳﺔ
Deliverables Count (A/E firms) - plan vs actual اﻟﺼﺎدرة،ﻣﻘﺎﺑﻞ اﻟﻔﻌﻠﻲ ﻟﻠﻜﻤﻴﺎت اﻟﺼﺎدرة ﻟﻠﻤﺮاﺟﻌﺔ
numbers are required for IFR, IFA & IFC/IFP. وﻳﺠﺐ، ﻫﺬا.اﻟﺼﺎدرة ﻟﻠﺸﺮاء/ﻟﻼﻋﺘﻤﺎد واﻟﺼﺎدرة ﻟﻠﺘﺸﻴﻴﺪ
Family of Curves report is needed for this .إﻋﺪاد ﻣﺠﻤﻮﻋﺔ ﺗﻘﺎرﻳﺮ ﻻﺳﺘﻴﻔﺎء ﻫﺬه اﻟﻨﻘﻄﺔ
requirement.
( اﻟﻬﻨﺪﺳﻴﺔ/ﺗﻮﻇﻴﻒ اﻟﻤﻮارد اﻟﻬﻨﺪﺳﻴﺔ )اﻟﺸﺮ ت اﻟﻤﻌﻤﺎرﻳﺔ
Engineering Resource Staffing (A/E firms) - وﻳﻤﻜﻦ أن ﺗﻜﻮن. ﺗﻘﺪﻳﻢ اﻷﻋﺪاد اﻟﻤﺨﻄﻄﺔ ﻣﻘﺎﺑﻞ اﻟﻔﻌﻠﻴﺔ-
plan vs actual numbers are required. This can .ﻣﺪّرج ﺗﻜﺮاري ﺗﻠﻚ اﻟﻤﻌﻠﻮﻣﺎت ﻓﻲ ﺷ
be in histogram format.
27
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Figure Error! No text of specified style in 2-Error! No text of specified style in document. اﻟﺸ
document.-1 Engineering Quantity Tracking / . اﻟﻤﺨﻄﻂ اﻻﻧﺴﻴﺎﺑﻲ ﻟﻠﺘﻘﺎرﻳﺮ/ ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت اﻟﻬﻨﺪﺳﻴﺔ
Reporting Flowchart
ﺗﻌﻘﺐ وإﻋﺪاد ﺗﻘﺎرﻳﺮ ﻛﻤﻴﺎت اﻟﻤﺸﺘﺮﻳﺎت7.3
7.3 TRACK AND REPORT PROCUREMENT
QUANTITIES ﺗﻌﻘﺐ وإﻋﺪاد ﺗﻘﺎرﻳﺮ اﻟﻜﻤﻴﺎت اﻟﻤﺸﺘﺮاة7.3.1
7.3.1 TRACK AND REPORT PURCHASED ITEMS اﻟﻬﻨﺪﺳﻴﺔ ﺟﻤﻴﻊ ﺑﻨﻮد اﻟﻤﻮاد واﻟﻤﻌﺪات/ﺗﺮاﺟُﻊ اﻟﺸﺮﻛﺔ اﻟﻤﻌﻤﺎرﻳﺔ
All material and equipment items for which the detailed ﻳﻤﻜﻦ.اﻟﺘﻲ اﻛﺘﻤﻞ ﺗﺼﻤﻴﻤﻬﺎ اﻟﺘﻔﺼﻴﻠﻲ وﻓﻘًﺎ ﻟﻠﻤﻮاﺻﻔﺎت اﻟﻬﻨﺪﺳﻴﺔ
28
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
design is complete are cross-referenced by A/E to ﺑﻌﺪﻫﺎ ﺗﻠﺨﻴﺺ ﻫﺬه اﻟﺒﻨﻮد ﺣﺴﺐ اﻟﻤﻮاﺻﻔﺎت ﻟﻠﺤﺼﻮل ﻋﻠﻰ ﻛﻤﻴﺎت
Engineering specification. These items can then be وﺑﻤﺠﺮد اﻋﺘﻤﺎد ﻫﺬه اﻟﺒﻨﻮد ﺗﺼﺪرﻫﺎ اﻹدارة.اﻟﺸﺮاء اﻟ ﻴﺔ اﻟﻼزﻣﺔ
summarized by specification to provide the total .اﻟﻬﻨﺪﺳﻴﺔ وﺗﺼﺮح ﺑﺒﺪء ﻋﻤﻠﻴﺔ اﻟﻤﺸﺘﺮﻳﺎت ﻟﻬﺬه اﻟﺒﻨﻮد
required purchase quantities. Once Approved,
Engineering will release these items and trigger the
Procurement process for these items.
ﻳﺠﺐ ﺗﺤﺪﻳﺪ اﻟﻜﻤﻴﺎت واﻟﺮﺳﻮﻣﺎت واﻟﺮﻣﻮز وﻏﻴﺮﻫﺎ ﻣﻦ اﻟﺒﻴﺎﻧﺎت
Detailed quantities, drawings, codes, and other data ﺑﻨﺎًء ﻋﻠﻰ.(Attachment 13) اﻟﺘﻔﺼﻴﻠﻴﺔ ﻓﻲ أداة ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت
should be identified in the Design Quantity Tracker أداة ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت اﻟﺘﺼﻤﻴﻤﻴﺔ وﺑﺪﻋﻢ اﻹدارة اﻟﻬﻨﺪﺳﻴﺔ وإدارة
(Attachment 13). Based on Design Quantity Tracker ﺿﺒﻂ اﻟﻤﺸﺎرﻳﻊ ﻳُﻌﺪ اﻟﻤﺸﺘﺮي وإداري اﻟﻌﻘﻮد ﺟﺪول ﺗﺨﺼﻴﺺ اﻟﻤﻮاد
and with the support from engineering and project ﻳﺮﺟﻰ ﻣﺮاﺟﻌﺔ إﺟﺮاء ﺗ ﻟﻴﻒ وارﺗﺒﺎﻃﺎت.وﺟﺪول إﺣﺎﻟﺔ اﻟﻌﻘﻮد
controls, Buyers and Contract administrators prepare ( ﻟﻤﺰﻳﺪ ﻣﻦ اﻟﻤﻌﻠﻮﻣﺎتMMR-CAE-KPC-PR-000003) اﻟﻤﺸﺎرﻳﻊ
Material Assignment Schedule (MAS), and Contract ﻋﻠﻰ اﻟﻤﺸﺘﺮي.ﻋﻦ ﺟﺪول ﺗﺨﺼﻴﺺ اﻟﻤﻮاد وﺟﺪول إﺣﺎﻟﺔ اﻟﻌﻘﻮد
Assignment Schedule (CAS). Refer to Project Cost and وإداري اﻟﻌﻘﻮد إﺟﺮاء ﺗﺤﺪﻳﺜﺎت أﺳﺒﻮﻋﻴﺔ أو ﻧﺼﻒ ﺷﻬﺮﻳﺔ أو ﺷﻬﺮﻳﺔ
Commitment Procedure (MMR-CAE-KPC-PR-000003) ﻋﻠﻰ ﺣﺎﻟﺔ اﻟﻤﺸﺘﺮﻳﺎت واﻟﺘﻌﺎﻗﺪ ﻣﻦ ﺧﻼل ﺟﺪول ﺗﺨﺼﻴﺺ اﻟﻤﻮاد
for MAS and CAS. Buyer and Contract Administrator ،ﻣﺴﺆول ﺗﺨﻄﻴﻂ اﻟﻤﺸﺮوع/ ﻋﻠﻰ ﻣﻬﻨﺪس.وﺟﺪول إﺣﺎﻟﺔ اﻟﻌﻘﻮد
are required to perform weekly or biweekly or Monthly ﻣﻘﺎرﻧﺔ ﻛﻤﻴﺎت اﻟﻤﻴﺰاﻧﻴﺔ واﻟﻜﻤﻴﺎت،اﻋﺘﻤﺎدًا ﻋﻠﻰ ﻫﺬه اﻟﻤﻌﻠﻮﻣﺎت
updates on purchasing and contracting status اﻟُﻤﺼﺪرة واﻟﻜﻤﻴﺎت اﻟﻤﺸﺘﺮاة ﺑﺎﺳﺘﻤﺮار وﻣﺮاﻗﺒﺔ ﺣﺎﻟﺔ اﻟﻤﻮاد
through MAS and CAS. Using this information, Project .واﻟﻤﻌﺪات اﻟﻤﺸﺘﺮاة ﻟﻠﻤﺸﺮوع
Engineer/ Planner is required to continuously compare
quantity budgeted, quantity released and quantities
procured, and monitor the status of purchased
materials and equipment for the project. :ﻳﺠﺐ أن ﺗﺸﺘﻤﻞ ﺗﻘﺎرﻳﺮ ﺗﻌﻘﺐ ﻛﻤﻴﺎت اﻟﻤﺸﺘﺮﻳﺎت ﻋﻠﻰ اﻵﺗﻲ
The Procurement quantity tracking reporting should
include the following: اﻷﻧﺸﻄﺔ اﻟﻼزﻣﺔ- اﻟﺘﺮﺳﻴﺔ، اﻟﺘﻘﻴﻴﻢ،ﺗﻘﺪﻳﻢ اﻟﻤﻨﺎﻗﺼﺎت
Bid, Evaluate, Award - activities for purchase اﻟﺘﻘﻴﻴﻢ واﻟﺘﺮﺳﻴﺔ وﺣﺎﻟﺔ اﻹﻛﻤﺎل،ﻟﻤﻨﺎﻗﺼﺎت أﻣﺮ اﻟﺸﺮاء
order bid, evaluate, and award and the .واﻻﻋﺘﻤﺎد
completion and approval status.
ﻣﻬﺎم إﻋﺪاد- رﺳﻮﻣﺎت اﻟﺘﺼﻨﻴﻊ/ ﺗﺴﻠﻴﻢ ﺑﻴﺎﻧﺎت اﻟﺒﺎﺋﻊ
Vendor Data/fabrication drawings Submittals - وﺗﺴﻠﻴﻢ ﺑﻴﺎﻧﺎت ورﺳﻮﻣﺎت اﻟﺒﺎﺋﻊ اﻟﻬﺎﻣﺔ وﺣﺎﻟﺔ اﻹﻛﻤﺎل
activities for development and submittal of .واﻻﻋﺘﻤﺎد
significant vendor data and drawings, and the
completion and approval status. ﻣﻬﺎم ﺗﺼﻨﻴﻊ اﻟﻤﻮاد أو اﻟﻤﻌﺪات- اﻟﺘﺼﻨﻴﻊ واﻟﺘﺴﻠﻴﻢ
Fabricate and Deliver - activities for material or ﻳﻤﻜﻦ ﺗﺤﺪﻳﺪ اﻟﺘﺴﻠﻴﻤﺎت.واﻟﺘﺴﻠﻴﻢ اﻷول ﻓﻲ ﻣﻮﻗﻊ اﻟﻌﻤﻞ
equipment fabrication and first delivery to the .اﻟﻼﺣﻘﺔ ﺣﺴﺐ اﻟﻤﻌﺎﻟﻢ اﻟﺮﺋﻴﺴﻴﺔ ﻋﻨﺪ اﻟﻀﺮورة
job site. Subsequent deliveries can be
identified by milestones as necessary. اﻟﻜﻤﻴﺎت،ﻣﻨﺤﻨﻴﺎت اﻟﻜﻤﻴﺎت اﻟﻬﻨﺪﺳﻴﺔ ﻓﻲ اﻟﻤﻴﺰاﻧﻴﺔ
Quantity curves for engineering budgeted اﻟﻤﺼﺪرة وﺧﻄﻂ اﻟﻤﺸﺘﺮﻳﺎت ﻣﻘﺎﺑﻞ اﻟﻜﻤﻴﺎت اﻟﺘﻲ ﺗﻢ
quantities, released quantities, plan to ﺧﻄﺔ اﻟﺘﺼﻨﻴﻊ ﻣﻘﺎﺑﻞ اﻟﻜﻤﻴﺎت اﻟﺘﻲ ﺗﻢ،ﺷﺮاؤﻫﺎ ﺑﺎﻟﻔﻌﻞ
purchase versus actually purchased ﺗﺼﻨﻴﻌﻬﺎ ﺑﺎﻟﻔﻌﻞ وﺧﻄﺔ اﻟﺘﺴﻠﻴﻢ ﻣﻘﺎﺑﻞ ﻣﺎ ﺗﻢ ﺗﺴﻠﻴﻤﻪ
quantities, plan to fabricate versus actually ﻳﻤﻜﻦ إﻋﺪاد ﻫﺬه اﻟﻤﻨﺤﻨﻴﺎت ﺑﺸ ٍ اﻧﺘﻘﺎﺋﻲ.ﺑﺎﻟﻔﻌﻞ
29
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
fabricated quantity, and planned delivery )راﺟﻊ إﺟﺮاء.وإﻋﺪاد ﺗﻘﺎرﻳﺮﻫﺎ وﻓﻘًﺎ ﻟﻤﺘﻄﻠﺒﺎت اﻟﻤﺸﺮوع
versus actual delivery. These curves can be MMR-CAE-KPP- - ﻣﻨﺤﻨﻴﺎت اﻟﺠﺪول اﻟﺰﻣﻨﻲ ﻟﻠﻤﺸﺎرﻳﻊ
selectively produced and reported bases on (PR-000007
project-specific requirements. (Refer to
Project Schedule Curves Procedure MMR-
CAE-KPP-PR-000007).
ﺗﻌﻘﺐ ﺗﺴﻠﻴﻢ اﻟﻤﻮاد واﻟﻤﻌﺪات7.3.2
7.3.2 TRACK MATERIALS AND EQUIPMENT ﺑﺎﻟﺘﻨﺴﻴﻖ اﻟﻤﺒﺎﺷﺮ ﻣﻊ إدارة اﻟﺘﺸﻴﻴﺪ وإدارة،ﺗﺴﺮع إدارة اﻟﻤﺸﺘﺮﻳﺎت
DELIVERY ﻣﻦ اﻟﻤﻬﻢ أن ﻳﻘﻮم. ﺣﺎﻟﺔ ﺗﺴﻠﻴﻢ اﻟﻤﻮاد واﻟﻤﻌﺪات،ﺿﺒﻂ اﻟﻤﺸﺎرﻳﻊ
Procurement, with the close collaboration of اﻟﻤﻌﻘﺐ ﺑﺎﻟﺘﺄﻛﺪ ﻣﻦ ﺷﺮاء اﻟﻜﻤﻴﺎت وﺗﺴﻠﻴﻤﻬﺎ وﻓﻘًﺎ ﻟﻠﺠﺪول اﻟﺰﻣﻨﻲ
Construction and Project Controls, expediates the اﻟﻤﺤﺪد ﻟﻠﺘﺸﻴﻴﺪ
materials and equipment delivery status. It is critical
expeditor makes sure that the quantities are procured,
and delivered per Construction’s established
installation schedule. :ﻓﻴﻤﺎ ﻳﻠﻲ ﻣﻨﺤﻨﻴﺎت اﻟﻜﻤﻴﺎت اﻟﻼزﻣﺔ ﻟﻠﺘﻘﺎرﻳﺮ
The following is typical Quantity Curves required for
reporting: اﻷﻋﺪاد اﻟﻤﺨﻄﻄﺔ ﻣﻘﺎﺑﻞ اﻟﻔﻌﻠﻴﺔ- ﻣﺨﺮﺟﺎت اﻟﻤﺸﺘﺮﻳﺎت
Procurement Delivery - plan vs actual numbers .ﻣﻄﻠﻮﺑﺔ ﻟﻠﺘﺼﻨﻴﻊ )ﻓﻲ ﺣﺎل اﻧﻄﺒﺎق ذﻟﻚ( وﻛﻤﻴﺎت اﻟﺘﺴﻠﻴﻢ
are required for manufacturing (if applicable) ﻣﻨﺤﻨﻴﺎت اﻟﺘﺴﻠﻴﻢ اﻟﻤﺨﻄﻂ ﻣﻘﺎﺑﻞ اﻟﺘﺴﻠﻴﻢ اﻟﻔﻌﻠﻲ ﺿﺮورﻳﺔ
and delivery quantities. Planned delivery vs .ﻟﺤﺎﻟﺔ ﺗﺴﻠﻴﻢ اﻟﻜﻤﻴﺎت
actual delivery Curves is required for the
quantity delivery status.
إﺟﺮاء ﻣﻨﺤﻨﻴﺎت اﻟﺠﺪول- MMR-CAE--KPP-PR-000003 )راﺟﻊ
Refer to MMR-CAE--KPP-PR-000003 Project (اﻟﺰﻣﻨﻲ ﻟﻠﻤﺸﺎرﻳﻊ ﻓﻲ اﺳﺘﺨﺮاج ﻣﻨﺤﻨﻴﺎت اﻟﻜﻤﻴﺎت
Schedule Curves Procedure in generating Quantity
Curves.
ﺗﻌﻘﺐ وإﻋﺪاد ﺗﻘﺎرﻳﺮ ﻛﻤﻴﺎت ﻣﺮﺣﻠﺔ اﻟﺘﺸﻴﻴﺪ7.4
7.4 TRACK AND REPORT CONSTRUCTION PHASE
QUANTITY إﻋﺪاد ﺧﻄﺔ ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت7.4.1
7.4.1 ESTABLISH QUANTITY TRACKING PLAN ﻋﻨﺪ إﻛﻤﺎل اﻟﺘﺼﻤﻴﻢ اﻟﺘﻔﺼﻴﻠﻲ اﻟﻤﺤّﺴﻦ ﻳﻜﻮن ﻗﻴﺎس ﻧﻄﺎق أﻋﻤﺎل
Upon completion of the optimized detailed design, the ﻳﺼﺒﺢ ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت ﻋﻨﺪ.اﻟﻤﺸﺮوع ﻗﺪ اﻛﺘﻤﻞ ﺑﺼﻮرٍة أﺳﺎﺳﻴﺔ
quantification of the project scope is essentially ﻫﺬه اﻟﻨﻘﻄﺔ وﺳﻴﻠًﺔ ﻟﻠﻤﻘﺎول ﻟﺘﻮﻓﻴﺮ رؤﻳﺔ واﺿﺤﺔ ﻟﻠﻤﺸﺘﺮﻳﺎت
complete. Quantity tracking at this point becomes a وﻳﺘﺤﻘﻖ ذﻟﻚ.ﻋﻨﺼﺮ وﺳﻠﻌﺔ واﻟﺘﺸﻴﻴﺪ واﻟﺘﺸﻐﻴﻞ اﻟﺘﺠﺮﻳﺒﻲ ﻟﺤﺎﻟﺔ
mean for the Contractor to provide visibility to .ﻣﻦ ﺧﻼل إﻋﺪاد ﺧﻄﺔ ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت
Procurement, Construction, and Commissioning of :ﻳﺠﺐ أن ﺗﺘﻀﻤﻦ اﻟﺨﻄﺔ ﻣﺎ ﻳﻠﻲ
the status of each component and commodity. This is
achieved through the development and establishment
of the Quantity Tracking Plan.
The plan should include the:
.ﺳﻠﻌﺔ رﺋﻴﺴﻴﺔ ﻃﺮﻳﻘﺔ اﻟﺤﺼﺮ اﻟﻤﺒﺪﺋﻴﺔ ﻟ
Primary take off method for each major
30
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Quantity Reporting Plan. اﻟﻤﻴﺪاﻧﻲ ﻟﺪى اﻟﻤﻘﺎول ﻓﻴﺘﺤﻘﻖ ﻣﻦ اﻟﺰﻳﺎدات/أﻣﺎ ﻣﻬﻨﺪس اﻟﺘﺨﺼﺺ
The Contractor’s discipline/ field engineer verifies واﻟﻜﻤﻴﺎت اﻟﺘﺮاﻛﻤﻴﺔ ﻣﻘﺎﺑﻞ ﺣﺴﺎﺑﺎت ورﻣﻮز ﺗ ﻟﻴﻒ اﻟﻤﺸﺮوع
incremental and cumulative quantities against the .ووﺣﺪات اﻟﻘﻴﺎس اﻟﺼﺤﻴﺤﺔ
appropriate project cost accounts/ cost codes and
UoM.
ﻳﻘﺪم ﻣﻬﻨﺪس اﻟﻤﻘﺎول اﻟﻤﻴﺪاﻧﻲ ﺗﻘﺎرﻳﺮ اﻟﻜﻤﻴﺎت إﻟﻰ ﻣﻬﻨﺪس
The Contractor’s field engineer reports the quantities Error! No text اﻹﺷﺮاف اﻟﻤﻴﺪاﻧﻲ ﻋﻠﻰ أﺳﺎس أﺳﺒﻮﻋﻲ )اﻟﺸ
to the Site Supervision Engineer on a weekly basis .(4-of specified style in document.
( اﻟﺸError! No text of specified style in document.-
4).
32
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Figure Error! No text of specified style in -Error! No text of specified style in document. اﻟﺸ
document.-3 Quantity Tracking Work Process ﻣﺨﻄﻂ ﺳﻴﺮ أﻋﻤﺎل ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت4
Diagram
The Site Supervision Engineer verifies earned ﻳﺘﺤﻘﻖ ﻣﻬﻨﺪس إﺷﺮاف اﻟﻤﻮﻗﻊ ﻣﻦ اﻟﻜﻤﻴﺎت اﻟﻤﻜﺘﺴﺒﺔ )ﻋﻠﻰ ﺳﺒﻴﻞ
quantities (for example, equipment) using the اﻟﻤﺜﺎل اﻟﻤﻌﺪات( ﺑﺎﺳﺘﺨﺪام ﻗﻮاﻋﺪ اﻟﻤﺼﺪاﻗﻴﺔ اﻟﻤﺤﺪدة ﻟﺘﺴﻬﻴﻞ
established rules of credit to allow performance ﻣﺮاﻗﺒﺔ اﻷداء أﺛﻨﺎء ﻋﻤﻠﻴﺔ اﻟﺘﺮﻛﻴﺐ وﻗﺒﻞ إﻛﻤﺎل ﺟﻤﻴﻊ اﻷﻋﻤﺎل ذات
monitoring during the installation process and before .اﻟﺼﻠﺔ ﻟﺴﻠﻌﺔ ﻣﻌﻴﻨﺔ
completing all related work for a given commodity.
The Site Supervision Engineer periodically performs ﻳﺠﺮي ﻣﻬﻨﺪس اﻹﺷﺮاف ﻋﻠﻰ اﻟﻤﻮﻗﻊ ﻣﺮاﺟﻌﺎت ﻓﻮرﻳﺔ دورﻳﺔ ﻋﻠﻰ
spot checks on actual installed quantities to validate اﻟﻜﻤﻴﺎت اﻟﻤﺮّﻛﺒﺔ ﻓﻌﻠﻴًﺎ ﻟﻠﺘﺤﻘﻖ ﻣﻦ أن اﻟﻜﻤﻴﺎت اﻟﻤﻜﺘﺴﺒﺔ ﻣﻦ ﺧﻼل
that quantities earned via the Rules of Credit are ﺑﻤﺠﺮد اﺳﺘﺨﺮاج اﻟﺘﻘﺎرﻳﺮ ﻳﻘﺎرن ﻣﺴﺆول.ﻗﻮاﻋﺪ اﻟﻤﺼﺪاﻗﻴﺔ ﻣﻌﻘﻮﻟﺔ
reasonable. Once the reports are generated, ﺿﺒﻂ اﻟﻤﺸﺎرﻳﻊ ﻟﺪى اﻟﻤﻘﺎول إﺟﻤﺎﻟﻲ اﻟﻜﻤﻴﺎت اﻟﻤﺮّﻛﺒﺔ ﻣﻊ ﻛﻤﻴﺎت
Contractor Project Controls compares the installed .اﻟﻤﻴﺰاﻧﻴﺔ واﻟﻜﻤﻴﺎت اﻟﻤﺘﻮﻗﻌﺔ
quantity totals to the budget and forecast.
The Contractor’s discipline/ field engineer reviews اﻟﻤﻴﺪاﻧﻲ ﻟﺪى اﻟﻤﻘﺎول ﺣﺎﻟﺔ اﻟﺘﺸﻴﻴﺪ/ﻳﺮاﺟﻊ ﻣﻬﻨﺪس اﻟﺘﺨﺼﺺ
construction status and quantity tracking during .وﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت أﺛﻨﺎء اﻟﺘﺮﻛﻴﺐ
installation.
The quantity tracking process must ensure quantities ﻳﺠﺐ أن ﺗﺆﻛﺪ ﻋﻤﻠﻴﺔ ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت ﺗﺼﻤﻴﻢ وﺷﺮاء وﺗﺴﻠﻴﻢ اﻟﻜﻤﻴﺎت
are designed, procured, and delivered per .وﻓﻘًﺎ ﻟﻠﺠﺪول اﻟﺰﻣﻨﻲ اﻟﻤﺤﺪد ﻟﻠﺘﺸﻴﻴﺪ
Construction’s established installation schedule.
Note: Only quantities that are included in the takeoff ﻳﺠﺐ أن ﺗﺘﻀﻤﻦ ﺗﻘﺎرﻳﺮ اﻟﻜﻤﻴﺎت اﻟﻤﺮّﻛﺒﺔ اﻟﻤﻮاد اﻟﻮاردة ﻓﻲ:ﻣﻼﺣﻈﺔ
quantities should be reported as installed. Additional أو/ ﺗﺪرج اﻟﻜﻤﻴﺎت اﻹﺿﺎﻓﻴﺔ ﺗﺠﺎﻫﺎت ﻣﺤﺘﻤﻠﺔ و.ﻛﻤﻴﺎت اﻟﺤﺼﺮ ﻓﻘﻂ
quantities should be reported as a potential trend .زﻳﺎدة ﻓﻲ ﻧﻄﺎق اﻷﻋﻤﺎل
33
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Contractor’s discipline/ field engineer not اﻟﻤﻴﺪاﻧﻲ ﻟﺪى اﻟﻤﻘﺎول/ﻋﺪم اﻫﺘﻤﺎم ﻣﻬﻨﺪس اﻟﺘﺨﺼﺺ
keeping accurate, current, or complete .ﺑﺪﻗﺔ وﺗﺤﺪﻳﺚ أو إﻛﻤﺎل ﺳﺠﻼت اﻟﻜﻤﻴﺎت
quantity ledgers;
Lack of awareness of budget or forecast .ﻋﺪم اﻹﻟﻤﺎم ﺑﻜﻤﻴﺎت اﻟﻤﻴﺰاﻧﻴﺔ أو اﻟﻜﻤﻴﺎت اﻟﻤﺘﻮﻗﻌﺔ
quantities;
Reporting weekly quantities without checking إﻋﺪاد ﺗﻘﺎرﻳﺮ اﻟﻜﻤﻴﺎت اﻷﺳﺒﻮﻋﻴﺔ دون ﻣﺮاﺟﻌﺔ اﻟﻘﻴﻢ ﺣﺘﻰ
to-date values; .ﺗﺎرﻳﺨﻪ
Not reporting at a detail level compatible with ﻋﺪم إﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﺑﻤﺴﺘﻮى اﻟﺘﻔﺎﺻﻴﻞ اﻟﻤﺘﻮاﻓﻖ ﻣﻊ
Project Controls requirements; .ﻣﺘﻄﻠﺒﺎت ﺿﺒﻂ اﻟﻤﺸﺎرﻳﻊ
Using the wrong Quantity Reporting UoM; .اﺳﺘﺨﺪم وﺣﺪات اﻟﻘﻴﺎس اﻟﺨﻄﺄ ﻓﻲ ﺗﻘﺎرﻳﺮ اﻟﻜﻤﻴﺎت
Reporting quantity at the wrong installation إﻋﺪاد ﺗﻘﺎرﻳﺮ اﻟﻜﻤّﻴﺎت ﻓﻲ اﻟﻤﺮﺣﻠﺔ اﻟﺨﻄﺄ ﻣﻦ اﻟﺘﺮﻛﻴﺐ
stage (too early or too late); .)ﻣﺒﻜﺮة ﺟﺪًا أو ﻣﺘﺄﺧﺮة ﺟﺪ(ًا
Reporting rework quantities (double counting); .(ﺗﻀﻤﻴﻦ ﻛﻤﻴﺎت إﻋﺎدة اﻷﻋﻤﺎل ﻓﻲ اﻟﺘﻘﺎرﻳﺮ )اﻟﺤﺴﺎب اﻟﻤﻜﺮر
Reporting quantities submitted previously or .ﺗﻀﻤﻴﻦ ﻛﻤﻴﺎت ُﺳﻠﻤﺖ ﻣﺴﺒﻘًﺎ أو ﺑﻮاﺳﻄﺔ ﻣﻬﻨﺪس آﺧﺮ
by another engineer;
Not reporting contract quantities. .ﻋﺪم ﺗﻀﻤﻴﻦ ﻛﻤﻴﺎت اﻟﻌﻘﺪ ﻓﻲ اﻟﺘﻘﺎرﻳﺮ
It is critical that teams responsible for the quantities ﻣﻦ اﻟﻤﻬﻢ ﺟﺪًا ﺑﺎﻟﻨﺴﺒﺔ ﻟﻠﻔﺮق اﻟﻤﺴﺆوﻟﺔ ﻋﻦ اﻟﻜﻤﻴﺎت أﺛﻨﺎء ﻣﺮﺣﻠﺔ
during the installation process review progress, check اﻟﺘﺮﻛﻴﺐ أن ﺗﺮاﺟﻊ ﺳﻴﺮ اﻷﻋﻤﺎل وأن ﺗﺪﻗﻖ ﻓﻲ اﻷﺧﻄﺎء أﻋﻼه وﺗﺼﺤﺢ
for the above errors, correct and provide on-going (اﻟﺘﻮﻗﻌﺎت اﻟﺠﺎرﻳﺔ وﺗﻘﺪﻣﻬﺎ )ﺑﻤﺎ ﻓﻲ ذﻟﻚ اﻟﻘﻮى اﻟﻌﺎﻣﻠﺔ واﻟﻤﻮاد
forecasts (including labor and materials) and schedule .واﻟﺘﺄﺛﻴﺮات ﻋﻠﻰ اﻟﺠﺪول اﻟﺰﻣﻨﻲ ﻟﺘﻠﻚ اﻟﺴﻠﻌﺔ
impact for that commodity.
Note: Never make adjustments in prior periods in the ﻋﺪم إﺟﺮاء أي ﺗﻌﺪﻳﻼت ﻓﻲ اﻟﻔﺘﺮات اﻟﺴﺎﺑﻘﺔ ﻟﺘﻄﺒﻴﻖ أداة:ﻣﻼﺣﻈﺔ
cost control tool. .ﺿﺒﻂ اﻟﺘ ﻟﻴﻒ
7.4.2 MONITOR AND UPDATE QUANTITY STATUS ﻣﺘﺎﺑﻌﺔ وﺗﺤﺪﻳﺚ ﺳﻴﺮ أﻋﻤﺎل اﻟﻜﻤّﻴﺎت7.4.2
During the construction phase, Quantities, which are :ﺗﺸﻤﻞ اﻟﻜﻤﻴﺎت اﻟﻤﻄﻠﻮب ﺗﺤﺪﻳﺚ ﺣﺎﻟﺘﻬﺎ أﺛﻨﺎء ﻣﺮﺣﻠﺔ اﻟﺘﺸﻴﻴﺪ ﻣﺎ ﻳﻠﻲ
required to update status including: ﻛﻤﻴﺎت اﻟﻤﻴﺰاﻧﻴ ﺔ
34
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
All material items for which the detailed design is اﻟﻬﻨﺪﺳﻴﺔ ﺟﻤﻴﻊ ﺑﻨﻮد اﻟﻤﻮاد اﻟﺘﻲ اﻛﺘﻤﻞ/ﺗﺮاﺟُﻊ اﻟﺸﺮﻛﺔ اﻟﻤﻌﻤﺎرﻳﺔ
complete are cross-referenced by A/E to an ﻳﻤﻜﻦ ﺑﻌﺪﻫﺎ.ﺗﺼﻤﻴﻤﻬﺎ اﻟﺘﻔﺼﻴﻠﻲ وﻓﻘًﺎ ﻟﻠﻤﻮاﺻﻔﺎت اﻟﻬﻨﺪﺳﻴﺔ
Engineering specification. These items can then be ﺗﻠﺨﻴﺺ ﻫﺬه اﻟﺒﻨﻮد ﺣﺴﺐ اﻟﻤﻮاﺻﻔﺎت ﻟﻠﺤﺼﻮل ﻋﻠﻰ ﻛﻤﻴﺎت اﻟﺸﺮاء
summarized by specification to provide the total .اﻟ ﻴﺔ اﻟﻼزﻣﺔ
required purchase quantities.
Detailed quantities, drawings, codes, and other data ﻳﺠﺐ ﺗﺤﺪﻳﺪ اﻟﻜﻤﻴﺎت واﻟﺮﺳﻮﻣﺎت واﻟﺮﻣﻮز وﻏﻴﺮﻫﺎ ﻣﻦ اﻟﺒﻴﺎﻧﺎت
should be identified in the QTS. Using this system, وﺑﺎﺳﺘﺨﺪام ﻫﺬا اﻟﻨﻈﺎم ﻳﻤﻜﻦ.اﻟﺘﻔﺼﻴﻠﻴﺔ ﻓﻲ ﻧﻈﺎم ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت
Construction contractors can continuously compare ﻟﻤﻘﺎوﻟﻲ اﻟﺘﺸﻴﻴﺪ ﻣﻘﺎرﻧﺔ ﻛﻤﻴﺎت اﻟﺘﺼﻤﻴﻢ واﻟﻜﻤﻴﺎت اﻟﻤﺸﺘﺮاة
designed and procured quantities, and the ﺑﺎﺳﺘﻤﺮار وﻳﻤﻜﻦ ﻟﻔﺮﻳﻖ ﻣﺸﺘﺮﻳﺎت اﻟﻤﻘﺎول ﻣﺘﺎﺑﻌﺔ ﺣﺎﻟﺔ اﻟﻤﻮاد
Contractor’s Procurement team can monitor the .اﻟﻤﺸﺘﺮاة ﻟﻠﻤﺸﺮوع
status of purchased materials for the project.
Upon receipt of equipment and material at the site, ﻋﻨﺪ اﺳﺘﻼم اﻟﻤﻌﺪات واﻟﻤﻮاد ﻓﻲ اﻟﻤﻮﻗﻊ ﺗﺒﺪأ ﻋﻤﻠﻴﺔ ﺗﻌﻘﺐ
quantity tracking by status updating is initiated in the ﺣﺎﻟﺔ ﻣﻦ ﻳﻤﻜﻦ أن ﺗﻜﻮن ﻟ.اﻟﻜﻤﻴﺎت ﺑﺘﺤﺪﻳﺚ اﻟﺤﺎﻟﺔ ﻓﻲ اﻟﻤﻮﻗﻊ
field. Each of the field status levels (received, installed, ﻣﺼﺪرة( ﻣﺴﺘﻮﻳﺎت ﺣﺎﻻت، ﻣﺮّﻛﺒﺔ،اﻟﺤﺎﻻت اﻟﻤﻴﺪاﻧﻴﺔ )ﻣﺴﺘﻠﻤﺔ
released) may have additional levels of status required ﻋﻠﻰ ﺳﺒﻴﻞ اﻟﻤﺜﺎل ﻳﻤﻜﻦ وﺿﻊ ﺣﺎﻟﺔ ِﻣﻀﺨّ ﺔ.إﺿﺎﻓﻴﺔ ﻻزﻣﺔ ﻟﻠﺘﺸﻴﻴﺪ
by Construction. For example, a pump may be ُأﺿﻴﻒ اﻟﻤﻼط أو ﺗﻢ، ُوﺿﻌﺖ ﺑﺎﻟﺸ اﻟﺼﺤﻴﺢ،ﻋﻠﻰ أﻧﻬﺎ ﻓﻲ ﻣ ﻧﻬﺎ
statused as set-in-place, aligned, grouted, and tested. ﻳﺠﺐ أن ﻳﻜﻮن ﻧﻈﺎم ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت ﻣﺮﻧًﺎ ﻓﻲ ﺗﻨﺴﻴﻘﻪ.اﺧﺘﺒﺎرﻫﺎ
The QTS should be flexible enough in format to .ﻻﺳﺘﻴﻌﺎب ﻣﺘﻄﻠﺒﺎت ﺣﺎﻟﺔ اﻟﺘﺸﻴﻴﺪ
accommodate the construction status requirements.
7.4.3 REPORT CONSTRUCTION QUANTITIES AND إﻋﺪاد ﺗﻘﺎرﻳﺮ ﻛﻤﻴﺎت وﺳﻴﺮ أﻋﻤﺎل اﻟﺘﺸﻴﻴﺪ7.4.3
PROGRESS
Quantity reporting has to be consistent with the Work ﺗﺠﺰﺋﺔ اﻷﻋﻤﺎل وﻣﻊ ﻳﺠﺐ أن ﺗﻜﻮن ﺗﻘﺎرﻳﺮ اﻟﻜﻤّﻴﺎت ﻣﺘﺴﻘﺔ ﻣﻊ ﻫﻴ
Breakdown Structure (WBS) and with the unit of ﻳﺤﺪد ﻫﺬا اﻟﻘﺴﻢ أﻳﻀًﺎ ﻋﻤﻠﻴﺔ.وﺣﺪات اﻟﻘﻴﺎس ﻓﻲ أﺳﻌﺎر اﻟﻮﺣﺪات
measure (UoM) in unit rates. This section also defines اﻟﻤﻬﺎم ﻟﺤﺼﺮ ﻛﻤﻴﺎت اﻟﺘﺸﻴﻴﺪ وﺗﻘﺎرﻳﺮ اﻟﻜﻤﻴﺎت اﻟﻤﺮﻛﺒﺔ اﻟﻤﺴﺘﺨﺪﻣﺔ
the work process for the take-off of construction .ﻓﻲ ﺗﺤﺪﻳﺪ ﺳﻴﺮ أﻋﻤﺎل اﻟﺘﺸﻴﻴﺪ وأداﺋﻪ
quantities and the reporting of installed quantities
used in determining construction progress and
performance.
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Site Supervision Engineer reviews design ﻳﺮاﺟﻊ ﻣﻬﻨﺪس اﻹﺷﺮاف ﻋﻠﻰ اﻟﻤﻮﻗﻊ ﻣﺮاﺟﻌﺎت ﻣﺴﺘﻨﺪات
document revisions for quantity changes and اﻟﺘﺼﻤﻴﻢ ﻟﺘﻐﻴﺮات اﻟﻜﻤﻴﺎت وﻳﺤّﺪث ﻣﻌﻠﻮﻣﺎت اﻟﺤﺼﺮ ﺑﺈدﺧﺎل
updates take-off information accordingly ﺗﻐﻴﻴﺮات اﻟﻜﻤﻴﺎت ﻓﻲ ﻧﻈﺎم ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت اﻟﻤﺴﺘﺨﺪم
enters quantity changes into the applicable وﻳﺨﻄﺮ ﺿﻮاﺑﻂ اﻟﻤﺸﺎرﻳﻊ ﻓﻲ ﺣﺎل ﺗﺄﺛﻴﺮ ﻛﻤﻴﺎت اﻟﺤﺼﺮ
quantity tracking system notifies Project .أو اﻟﻤﺮاﺟﻌﺔ ﻋﻠﻰ أرﻗﺎم اﻟﺘﻮﻗﻌﺎت اﻟﺤﺎﻟﻴﺔ/اﻟﻤﻜﺘﻤﻠﺔ و
Controls when completed and/or revised take-
offs affect current forecast numbers.
The contractor reports the progress for the ﻳﺴﻠﻢ اﻟﻤﻘﺎول ﺗﻘﺎرﻳﺮ ﺳﻴﺮ أﻋﻤﺎﻟﻪ ﻟﻸﺳﺒﻮع اﻟﻤﻨﺼﺮم إﻟﻰ
previous week to Site Supervision Engineer ﻣﻬﻨﺪس اﻹﺷﺮاف ﻋﻠﻰ اﻟﻤﻮﻗﻊ اﻟﺬي ﻳﺘﺤﻘﻖ ﻣﻦ ﺻﺤﺔ
who verifies the quantities installed are correct اﻟﻜﻤﻴﺎت اﻟﻤﺮّﻛﺒﺔ وﻣﻄﺎﺑﻘﺘﻬﺎ ﻟﻠﻤﻮاﺻﻔﺎت وﻳﺤﺪد زﻳﺎدة
and to spec. and reports the incremental and اﻟﻜﻤﻴﺎت واﻟﻜﻤﻴﺎت اﻟﺘﺮاﻛﻤﻴﺔ وﻓﻘًﺎ ﻟﺮﻣﻮز ﺗ ﻟﻴﻒ اﻟﻤﺸﺮوع
cumulative quantities against the appropriate .اﻟﺴﻠﻴﻤﺔ
project cost codes.
The contractor ensures that the Field Engineer وﻋﻠﻰ اﻟﻤﻘﺎول اﻟﺘﺄﻛﻴﺪ ﻣﻦ اﺳﺘﻼم اﻟﻤﻬﻨﺪس اﻟﻤﻴﺪاﻧﻲ
receives installation input for all quantities or ﻣﺪﺧﻼت اﻟﺘﺮﻛﻴﺐ ﻟﺠﻤﻴﻊ ﺗﻘﺎرﻳﺮ اﻟﻜﻤﻴﺎت أو ﺗﻘﺎرب اﻟﻜﻤﻴﺎت
marked up quantity reports on a weekly basis. ﺗﺼﺒﺢ ﻫﺬه اﻟﻜﻤﻴﺎت أﺳﺎس.اﻟﺰاﺋﺪة ﻋﻠﻰ أﺳﺎس أﺳﺒﻮﻋﻲ
These quantities should be the basis for اﻟﺘﺤﻘﻖ وﻳﺠﺐ ﺗﻘﺪﻳﻤﻬﺎ وﻓﻘًﺎ ﻟﺘﻮارﻳﺦ ﺗﺴﻠﻴﻢ ﺗﻘﺎرﻳﺮ ﻛﻤﻴﺎت
verification and should be submitted per the .اﻟﻤﺸﺮوع
project quantity reporting deadlines.
The contractor and Site Supervision Engineer
review the quantity reports to ensure that the
36
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
correct quantities have been entered in the ﻳﺮاﺟﻊ اﻟﻤﻘﺎول وﻣﻬﻨﺪس اﻹﺷﺮاف ﻋﻠﻰ اﻟﻤﻮﻗﻊ ﺗﻘﺎرﻳﺮ
system for work performed in the preceding اﻟﻜﻤﻴﺎت ﻟﻠﺘﺄﻛﺪ ﻣﻦ ادﺧﺎل اﻟﻜﻤﻴﺎت اﻟﺼﺤﻴﺤﺔ ﻓﻲ اﻟﻨﻈﺎم
week. .ﻟﻌﻦ أداء اﻷﻋﻤﺎل ﻓﻲ اﻷﺳﺒﻮع اﻟﻤﻨﺼﺮم
37
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
38
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ .ﻳﺮﺟﻰ اﻟﺮﺟﻮع
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ .
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
"اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ.
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
The contractor is required to submit the Procurement ﻋﻠﻰ اﻟﻤﻘﺎول ﺗﻘﺪﻳﻢ ﺗﺤﺪﻳﺜﺎت اﻟﺠﺪول اﻟﺰﻣﻨﻲ ﻟﻠﻤﺸﺘﺮﻳﺎت ﻣﻮﺿﺤًﺎ
Schedule updates showing a list of Purchase Orders/ اﻟﻌﻘﻮد ﻣﻦ اﻟﺒﺎﻃﻦ ﻣﻊ ﺗﻔﺎﺻﻴﻞ أﺳﻤﺎء/ ﻗﺎﺋﻤﺔ ﻣﻦ أواﻣﺮ اﻟﺸﺮاء
Subcontract with the name of the Suppliers, materials/ . اﻟﻤﻌﺪات واﻟﻜﻤﻴﺎت اﻟﻤﺴﻠﻤﺔ/ اﻟﻤﻮاد،اﻟﻤﻮردﻳﻦ
equipment details and delivered quantities. Refer to
Attachment 12 MMR-CAE-KPC-TP-000027 ﻗﺎﻟﺐ- MMR-CAE-KPC-TP-000027 Attachment 12 راﺟﻊ
Procurement Schedule template. .اﻟﺠﺪول اﻟﺰﻣﻨﻲ ﻟﻠﻤﺸﺘﺮﻳﺎت
As part of Quantities Report, the Contractor is :وﻛﺠﺰء ﻣﻦ ﺗﻘﺮﻳﺮ اﻟﻜﻤﻴﺎت ﻋﻠﻰ اﻟﻤﻘﺎول ﺗﺴﻠﻴﻢ ﻣﺎ ﻳﻠﻲ إﻟﻰ اﻟﻤﺸﺎرﻳﻊ
required to submit the following to Projects:
Construction Manpower - Contractors are ﻋﻠﻰ اﻟﻤﻘﺎوﻟﻴﻦ ﺗﻘﺪﻳﻢ ﺗﻘﺮﻳﺮ- اﻟﻘﻮى اﻟﻌﺎﻣﻠﺔ ﻟﻠﺘﺸﻴﻴﺪ
required to report the actual manpower .ﺑﺄﻋﺪاد اﻟﻘﻮى اﻟﻌﺎﻣﻠﺔ اﻟﻔﻌﻠﻴﺔ ﻣﻘﺎرﻧًﺔ ﺑﺎﻷﻋﺪاد اﻟﻤﺨﻄﻄﺔ
numbers comparing with the planned numbers. ﻳﻜﻦ ﺗﺤﺪﻳﺪ ﻗﻮى ﻋﺎﻣﻠﺔ إﺿﺎﻓﻴﺔ ﺑﻤﺮاﺟﻌﺔ إﻧﺘﺎﺟﻴﺔ اﻟﻘﻮى
Additional manpower can be determined by .اﻟﺤﺎﻟﻴﺔ واﻷﻋﻤﺎل اﻟﻤﺘﺒﻘﻴﺔ اﻟﻮاﺟﺐ أداؤﻫﺎ
checking the Productivity of the existing
manpower and the remaining work to be done.
Quantity Tracker (Contractors) - plan vs actual اﻷﻋﺪاد اﻟﻤﺨﻄﻄﺔ- (أداة ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت )اﻟﻤﻘﺎوﻟﻮن
numbers are required for major Commodity .ﻣﻘﺎﺑﻞ اﻟﻔﻌﻠﻴﺔ ﺿﺮورﻳﺔ ﻟﺘﺮﻛﻴﺒﺎت ﻛﻤﻴﺎت اﻟﺴﻠﻊ اﻟﺮﺋﻴﺴﻴﺔ
quantities installation. Planned to install and
39
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
actually installed of Curves report is needed for ﻛﻤﺎ ﻳﺠﺐ ﺗﻘﺪﻳﻢ ﺗﻘﺮﻳﺮ ﻣﻨﺤﻨﻴﺎت اﻟﻜﻤﻴﺎت اﻟﻤﺨﻄﻄﺔ
this requirement. .ﻟﻠﺘﺮﻛﻴﺐ واﻟﻜﻤﻴﺎت اﻟﻤﺮّﻛﺒﺔ ﻓﻌﻠﻴًﺎ ﻟﻬﺬا اﻟﻤﺘﻄﻠﺐ
Construction Manpower (Contractors) - plan vs ﻳﺠﺐ ﺗﻘﺪﻳﻢ اﻷﻋﺪاد- (اﻟﻘﻮى اﻟﻌﺎﻣﻠﺔ ﻟﻠﺘﺸﻴﻴﺪ )اﻟﻤﻘﺎوﻟﻮن
actual numbers are required. This can be in وﻳﻤﻜﻦ أن ﺗﻜﻮن ﺗﻠﻚ.اﻟﻤﺨﻄﻄﺔ ﻣﻘﺎﺑﻞ اﻷرﻗﺎم اﻟﻔﻌﻠﻴﺔ
histogram format. .ﻣﺪّرج ﺗﻜﺮاري اﻟﻤﻌﻠﻮﻣﺎت ﻓﻲ ﺷ
Procurement Delivery (Contractors) - plan vs اﻷﻋﺪاد اﻟﻤﺨﻄﻄﺔ ﻣﻘﺎﺑﻞ- (ﺗﺴﻠﻴﻢ اﻟﻤﺸﺘﺮﻳﺎت )اﻟﻤﻘﺎوﻟﻮن
actual numbers are required for manufacturing اﻟﻔﻌﻠﻴﺔ ﻣﻄﻠﻮﺑﺔ ﻟﻠﺘﺼﻨﻴﻊ )ﻓﻲ ﺣﺎل اﻧﻄﺒﺎق ذﻟﻚ( وﻛﻤﻴﺎت
(if applicable) and delivery quantities. Planned ﻣﻨﺤﻨﻴﺎت اﻟﺘﺴﻠﻴﻢ اﻟﻤﺨﻄﻂ ﻣﻘﺎﺑﻞ اﻟﺘﺴﻠﻴﻢ.اﻟﺘﺴﻠﻴﻢ
delivery vs actual delivery Curves is required .اﻟﻔﻌﻠﻲ ﺿﺮورﻳﺔ ﻟﺤﺎﻟﺔ ﺗﺴﻠﻴﻢ اﻟﻜﻤﻴﺎت
for the quantity delivery status.
40
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
o Backfill is not a measure of loose-fill وﻻ ﻳﻌﺘﺒﺮ اﻟﺮدم ﻣﻘﻴﺎﺳًﺎ ﻟﻤﻮاد اﻟﺮدم اﻟﺴﺎﺋﺒﺔ اﻟﺘﻲ o
material placed to achieve compaction .ﺗﻮﺿﻊ ﻟﺘﺤﻘﻴﻖ ﻣﺘﻄﻠﺒﺎت اﻟﺘﺪﻣﻴﻚ
requirements.
o Excavation and backfill take-offs are ﺗﺘﻢ ﻋﻤﻠﻴﺎت اﻟﺤﺼﺮ ﻟﻠﺤﻔﺮﻳﺎت واﻟﺮدم ﺑﺎﻟﺘﺰاﻣﻦ ﻣﻊ o
performed in conjunction with the ﺑﺎﻟﻨﺴﺒﺔ ﻟﻠﺤﻔﺮﻳﺎت.ﺣﺼﺮ ﺧﺮﺳﺎﻧﺔ اﻷﺳﺎﺳﺎت
foundation concrete take-offs. For واﻟﺮدم ﻏﻴﺮ اﻟﻤﺮﺗﺒﻄﻴﻦ ﺑﺎﻷﺳﺎﺳﺎت ُﺗﺤﻔﻆ ﺳﺠﻼت
excavation and backfill take-offs not .ﻣﻤﺎﺛﻠﺔ ﻟﺘﺴﺠﻴﻞ اﻟﻜﻤﻴﺎت اﻟﻤﺤﺼﻮرة
associated with foundations, separate
ledgers are typically maintained for
recording take-off quantities.
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
o Where foundations are repetitive and وﻋﻨﺪﻣﺎ ﺗﻜﻮن اﻷﺳﺎﺳﺎت ﻣﺘﻜﺮرة وﻣﻦ اﻟﻤﺤﺘﻤﻞ o
likely to be worked simultaneously, ﻣﺜﻞ أﺳﺎﺳﺎت دﻋﺎﻣﺎت،اﻟﻌﻤﻞ ﻋﻠﻴﻬﺎ ﺑﺎﻟﺘﺰاﻣﻦ
such as pipe rack foundations, the ﻓﻴﺠﺐ ﺗﺼﻨﻴﻒ ﺣﺼﺮ اﻟﻤﻮاد اﻷﺳﺎﺳﺎت،اﻷﻧﺎﺑﻴﺐ
foundation take-offs should be .ﻋﻠﻰ ﺧﻂ ﺣﺼﺮ واﺣﺪ ﺣﺴﺐ رﻗﻢ اﻟﺮﺳﻢ
grouped in a single take-off line by
drawing number.
o Take-offs are typically recorded by ﺗﺴﺠﻞ ﻛﻤﻴﺎت اﻟﺤﺼﺮ ﺑﺄرﻗﺎم اﻟﺮﺳﻮﻣﺎت وأرﻗﺎم o
drawing numbers and foundation ﻓﻲ ﺣﺎل ﻋﺪم وﺟﻮد أرﻗﺎم أﺳﺎﺳﺎت.اﻷﺳﺎﺳﺎت
numbers. If no foundation number ﺗﺸﻤﻞ.ﻳﻤﻜﻦ ﺗﻀﻤﻴﻦ وﺻﻒ ﻟﻠﺒﻨﺪ ﺷﺎﻣًﻼ اﻟﻤﻮﻗﻊ
applies, a description of the item دﻋﺎﻣﺎت إﺳﻨﺎد،اﻷﻣﺜﻠﺔ ﺣﺰم اﻟﻘﻨﻮات ﺗﺤﺖ اﻷرض
including location should be provided. وﻏﻴﺮﻫﺎ ﻣﻦ اﻟﺨﺮﺳﺎﻧﺔ اﻟﺘﻲ ُﺗﺼﺐ ﻓﻲ،اﻷﻧﺎﺑﻴﺐ
Examples would include an .اﻟﻤﻮﻗﻊ
underground duct bank, piping thrust
blocks, and other miscellaneous cast-
in-place concrete.
o The type of quantity tracking system ﺳﻴﺆﺛﺮ ﻧﻮع ﻧﻈﺎم ﻣﺘﺎﺑﻌﺔ اﻟﻜﻤﻴﺎت اﻟﻤﺴﺘﺨﺪم o
adopted for the project will influence .ﻟﻠﻤﺸﺮوع ﻋﻠﻰ ﻃﺮق اﻟﺤﺼﺮ
take-off methods.
43
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
estimated by the weight of rebar per اﻟﻤﻜﻌﺐ ﻣﻦ اﻟﺨﺮﺳﺎﻧﺔ اﻟﻤﺴﻠﺤﺔ )ﻓﻲ ﺣﺎل ﻋﺪم
cubic meter of reinforced concrete .(ﺗﻮﻓﺮ ﻣﻌﻠﻮﻣﺎت ﻣﻦ اﻟﺒﺎﺋﻊ
basis (if no vendor information is
available).
o Note: If rebar is estimated by weight ﻓﻲ ﺣﺎل ﺗﻘﺪﻳﺮ ﻗﻀﺒﺎن اﻟﺘﺴﻠﻴﺢ ﺑﺎﻟﻮزن:ﻣﻼﺣﻈﺔ o
per cubic meter of concrete when no ﻟﻠﻤﺘﺮ اﻟﻤﻜﻌﺐ أو اﻟﻤﺘﺮ اﻟﻤﻜﻌﺐ ﻣﻦ اﻟﺨﺮﺳﺎﻧﺔ ﻓﻲ
vendor information is available, checks ﺣﺎل ﻋﺪم ﺗﻮﻓﺮ ﻣﻌﻠﻮﻣﺎت ﻣﻦ اﻟﺒﺎﺋﻊ وﻳﺠﺐ اﻟﻔﺤﺺ
shall be made to verify that the rate ن اﻟﻤﻌﺪل اﻟﻤﺴﺘﺨﺪم ﻣﺘﺴﻘًﺎ ﻟﻠﺘﺤﻘﻖ ﻣﻤﺎ إذا
used is consistent with the evolving .ﻣﻊ اﻟﺘﺼﻤﻴﻢ اﻟﺠﺎري
design.
o Rebar quantities are normally rounded ﺗﻘﺮب ﻛﻤﻴﺎت ﻗﻀﺒﺎن اﻟﺘﺴﻠﻴﺢ ﻓﻲ اﻟﻌﺎدة إﻟﻰ o
to the nearest 100 kilograms. . ﻛﻴﻠﻮﺟﺮام100 أﻗﺮب
o Projects shall separately track rebar ﻳﺠﺐ أن ﺗﺘﺎﺑﻊ اﻟﻤﺸﺎرﻳﻊ ﻗﻀﺒﺎن ﺣﺪﻳﺪ اﻟﺘﺴﻠﻴﺢ o
required for planned prefabrication اﻟﻼزﻣﺔ ﺑﺸ ٍ ﻣﻨﻔﺼﻞ ﻣﻦ ﺧﻼل ﺗﻄﺒﻴﻖ ﻧﻈﺎم
modularization efforts. .اﻟﻮﺣﺪات ﻗﺒﻞ اﻟﺘﺼﻨﻴﻊ
o Depending on the project, embeds وﺣﺴﺐ ﺣﺎﻟﺔ اﻟﻤﺸﺮوع ﻳﻤﻜﻦ إﻳﺮاد اﻟﻤﻌﺎدن o
may be reported as part of the اﻟﻤﺪﻣﺠﺔ ﻛﺠﺰء ﻣﻦ ﻋﻤﻠﻴﺔ اﻟ ﻘﻮاﻟﺐ اﻟﻤﺆﻗﺘﺔ
formwork operation when the ﻋﻨﺪﻣﺎ ﺗﻜﻮن ﺳﺎﻋﺎت أﻋﻤﺎل اﻟﺘﺮﻛﻴﺐ ﻣﺤﻤﻠﺔ ﻋﻠﻰ
installation job hours are charged to ﻳﺠﺐ اﻟﺘﺤﻘﻖ ﻣﻦ.ﺣﺎﺳﺐ اﻟﻘﻮاﻟﺐ اﻟﻤﺆﻗﺘﺔ
the formwork account. Reporting .ﻣﺘﻄﻠﺒﺎت اﻟﺘﻘﺎرﻳﺮ ﻣﻊ ﻣﺴﺆول ﺿﺒﻂ اﻟﻤﺸﺎرﻳﻊ
requirements should be verified with
Project Controls.
Concrete Paving and Slabs (Cubic Meters) (اﻟﺮﺻﻒ واﻟﺒﻼط اﻟﺨﺮﺳﺎﻧﻴﺔ )ﻣﺘﺮ ﻣﻜﻌﺐ
o All work associated with concrete اﻷﻋﻤﺎل اﻟﻤﺘﻌﻠﻘﺔ ﺑﺎﻷرﺻﻔﺔ واﻟﻤﻤﺮات o
paving and sidewalks, including forms, اﻟﺨﺮﺳﺎﻧﻴﺔ ﺑﻤﺎ ﻓﻲ ذﻟﻚ اﻟﻘﻮاﻟﺐ وﻗﻀﺒﺎن اﻟﺘﺴﻠﻴﺢ
rebar, wire mesh, and expansion joints, واﻟﺸﺒ ت اﻟﺴﻠﻜﻴﺔ وﻣﻔﺎﺻﻞ اﻟﺘﻤﺪد ﺗﺘﻢ
are normally tracked under one ﻣﺘﺎﺑﻌﺘﻬﺎ ﻓﻲ اﻟﻌﺎدة ﺿﻤﻦ ﺣﺴﺎب واﺣﺪ وﺗﻘﺎس
account and reported as concrete .ﺑﺎﻟﻴﺎردة اﻟﻤﻜﻌﺒﺔ ﻣﻦ اﻟﺨﺮﺳﺎﻧﺔ اﻟﻤﺮّﻛﺒﺔ
cubic meters installed.
45
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Manholes, Catch-basins (Precast or partially ﻏﺮف اﻟﺘﻔﺘﻴﺶ وأﺣﻮاض اﻟﺘﺠﻤﻴﻊ )ﻣﺴﺒﻘﺔ اﻟﺼﺐ أو ﻣﺴﺒﻘﺔ
precast, or built with block) (Each) (ﻣﻜﻌﺒﺎت( )ﻋﺪد اﻟﺼﺐ ﺟﺰﺋﻴًﺎ أو اﻟﻤﺒﻨﻴﺔ ﻓﻲ ﺷ
o Site work drawings, underground pipe ﺗﺠﺮي ﻣﺮاﺟﻌﺔ رﺳﻮﻣﺎت أﻋﻤﺎل اﻟﻤﻮﻗﻊ واﻷﻧﺎﺑﻴﺐ o
drawings, and electrical drawings are اﻟﻤﺪﻓﻮﻧﺔ واﻟﺮﺳﻮﻣﺎت اﻟﻜﻬﺮﺑﺎﺋﻴﺔ ﻟﻐﺮف اﻟﺘﻔﺘﻴﺶ
reviewed for manholes, catch basins, )اﻟﻤﻨﺎﻫﻞ( وأﺣﻮاض اﻟﺘﺠﻤﻴﻊ وﻣﺤﻄﺎت اﻟﻤﺼﺎﻋﺪ
and lift stations, which may be entirely اﻟﺘﻲ ﻳﻤﻜﻦ أن ﺗﻜﻮن ﻣﺴﺒﻘًﺔ اﻟﺼﺐ ﺑﺎﻟ ﻣﻞ أو
precast or assembled from precast ﻣﺠﻤﻌﺔ ﻣﻦ أﺟﺰاء ﻣﺴﺒﻘﺔ اﻟﺼﺐ أو ﻣﺼﺒﻮﺑﺔ ﻓﻲ
sections or cast in place. .اﻟﻤﻮﻗﻊ
o These are taken off and reported as a ﺗﻔﺼﻞ ﻫﺬه اﻟﺒﻨﻮد وﺗﻮرد ﻛﺒﻨﺪ ﻣﻨﻔﺼﻞ ﺑﺤﻴﺚ o
single item with one manhole equaling .ﻣﺎﻧﻬﻮل وﺣﺪة واﺣﺪة ﻳﺴﺎوي
one each.
46
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
quantities selected for quantity reporting by اﻟﻤﺨﺘﺎرة ﻟﺘﻘﺎرﻳﺮ اﻟﻜﻤﻴﺎت ﺣﺴﺐ رﻣﺰ اﻟﺘ ﻔﺔ ﻓﻲ ﻧﻈﺎم
cost code into the quantity tracking system. .ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت
47
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
48
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
In some cases, take-off quantities can be ﻳﻤﻜﻦ إﻋﺪاد ﻛﻤﻴﺎت اﻟﺤﺼﺮ إﻟﻜﺘﺮوﻧﻴًﺎ،وﻓﻲ ﺑﻌﺾ اﻟﺤﺎﻻت
electronically developed by the steel وﻓﻲ ﻫﺬه اﻟﺤﺎﻟﺔ.ﺑﻮاﺳﻄﺔ اﻟﺠﻬﺔ اﻟﺼﺎﻧﻌﺔ ﻟﺤﺪﻳﺪ اﻟﺘﺴﻠﻴﺢ
fabricator. When this occurs, the Site ﻋﻠﻰ ﻣﻬﻨﺪس اﻹﺷﺮاف ﻋﻠﻰ اﻟﻤﻮﻗﻊ اﻟﺘﺄﻛﺪ ﻣﻦ دﻗﺔ
Supervision Engineer should make sure ﻳﺠﺐ أن ﺗﻜﻮن.اﻟﻤﻌﻠﻮﻣﺎت وﻣﻦ ﺗﻀﻴﻤﻦ أي ﺗﻐﻴﻴﺮات ﺗﻄﺮأ
quantities are accurate and updated with any .اﻟﻜﻤﻴﺎت ﻣﺘﻮﻓﺮة ﻗﺒﻞ اﺳﺘﻼم اﻟﺤﺪﻳﺪ ﻓﻲ اﻟﻤﻮﻗﻊ
changes that occur. Quantities should be
available before the steel is received on site.
Vendor documents are often available that list
the piece marks with weights for all fabricated ﺗﺘﻮﻓﺮ ﻓﻲ اﻟﻐﺎﻟﺐ ﻣﺴﺘﻨﺪات ﻣﻦ اﻟﺠﻬﺔ اﻟﺼﺎﻧﻌﺔ ﺗﻮﺿﺢ
steel by drawing numbers. ﻋﻼﻣﺎت اﻟﻘﻄﻊ ﻣﻊ أوزان ﺟﻤﻴﻊ اﻟﺤﺪﻳﺪ اﻟﻤﺼﻨﻌﺔ ﻣﻊ أرﻗﺎم
.اﻟﺮﺳﻮﻣﺎت
8.4.2 REPORTING
The Site Supervision Engineer normally verifies اﻟﺘﻘﺎرﻳﺮ8.4.2
installed quantities by visual inspection of the ﻳﺘﺤﻘﻖ ﻣﻬﻨﺪس اﻹﺷﺮاف ﻋﻠﻰ اﻟﻤﻮﻗﻊ ﻓﻲ اﻟﻌﺎدة ﻣﻦ
completed work. Installation credit shall be ﻳﻤﻜﻦ.اﻟﻜﻤﻴﺎت اﻟﻤﺮﻛﺒﺔ ﺑﺎﻟﻔﺤﺺ اﻟﻨﻈﺮي ﻟﻸﻋﻤﺎل اﻟﻤﻜﺘﻤﻠﺔ
reported as shown in Table Error! No text of إﻋﺪاد ﺗﻘﺎرﻳﺮ زﻳﺎدة اﻟﺘﺮﻛﻴﺒﺎت وﻓﻘًﺎ ﻟﻤﺎ ﻣﻮﺿﺢ ﻓﻲ اﻟﺠﺪول
specified style in document.-6. Table Error! No text of specified style in
The Site Supervision Engineer should maintain .document.-6
a marked-up set of drawings showing installed ﻋﻠﻰ ﻣﻬﻨﺪس اﻹﺷﺮاف ﻋﻠﻰ اﻟﻤﻮﻗﻊ ﺣﻔﻆ ﻧﺴﺨﺔ ﻣﻦ
quantities and a log of weekly installed اﻟﺮﺳﻮﻣﺎت اﻟﺘﻲ ﻋﻠﻴﻬﺎ اﻟﻌﻼﻣﺎت ﺗﻮﺿﺢ اﻟﻜﻤﻴﺎت اﻟﻤﺮﻛﺒﺔ
quantities that have been reported. .وﺳﺠﻞ ﺑﻜﻤﻴﺎت اﻟﺘﺮﻛﻴﺒﺎت اﻷﺳﺒﻮﻋﻴﺔ اﻟﻮاردة ﻓﻲ اﻟﺘﻘﺎرﻳﺮ
Grouting of associated base plates is normally
included in the steel account and should be ﻳﺘﻢ ﻓﻲ اﻟﻌﺎدة ﺗﻀﻤﻴﻦ وﺿﻊ اﻟﻤﻼط ﻟﻸﻟﻮاح اﻟﻘﺎﻋﺪﻳﺔ ﻓﻲ
considered as part of the installation (welded ﺣﺴﺎﺑﺎت ﺣﺪﻳﺪ اﻟﺘﺴﻠﻴﺢ وﻳﺠﺐ اﻋﺘﺒﺎره ﺟﺰًء ﻣﻦ اﻟﻤﻌﺎﻟﻢ
or bolted) milestone. .(اﻟﺮﺋﻴﺴﻴﺔ ﻟﻠﺘﺮﻛﻴﺒﺎت )اﻟﻤﻠﺤﻮﻣﺔ أو اﻟﻤﺮﺑﻮﻃﺔ ﺑﻤﺴﺎﻣﻴﺮ
Table Error! No text of specified style in document.-6 − 7-Error! No text of specified style in document. اﻟﺠﺪول
Structural Steel Reporting Matrix ﻣﺼﻔﻮﻓﺔ ﺗﻘﺎرﻳﺮ اﻟﻔﻮﻻذ اﻹﻧﺸﺎﺋﻲ
Field
engineerin
اﻻﻛﺘﻤﺎل
g اﻟﻤﻠﺤﻮﻣﺔ
Offload & Erected & Welded or واﻟﻘﺒﻮل اﻟﻤﻨﺼﻮﺑﺔ
inspection واﻟﻤﺮﺑﻮﻃﺔ اﻟﺘﻔﺮﻳﻎ واﻟﻨﻘﻞ
haul tacked bolted اﻟﻬﻨﺪﺳﻲ واﻟﻤﻠﺼﻘﺔ
complete ﺑﻤﺴﺎﻣﻴﺮ
اﻟﻤﻴﺪاﻧﻲ
and
acceptable
Platform, ،اﻟﻤﻨﺼﺎت
stairs, 5% 45% 35% 15% %15 %35 %45 %5 اﻟﺪرج
ladders واﻟﺴﻼﻟﻢ
Grating, ﻓﺘﺤﺎت
checker اﻟﺘﺼﺮﻳﻒ
5% 45% 35% 15% %15 %35 %45 %5
plate واﻷﻟﻮاح
اﻟﻤﻀﻠﻌﺔ
Pipe دﻋﺎﻣﺎت
5% 65% 15% 15% %15 %15 %65 %5
stanchions اﻷﻧﺎﺑﻴﺐ
Steel 5% 50% 25% 20% %20 %25 %50 %5 اﻟﺼﻠﺐ ﻫ ﻴﺎ
49
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
structures
Handrail أﻧﻈﻤﺔ
5% 50% 35% 10% %10 %35 %50 %5
systems اﻟﺪراﺑﺰﻳﻨﺎت
8.5 BUILDINGS اﻟﻤﺒﺎﻧﻲ8.5
8.5.1 TAKE-OFF اﻟﺤﺼﺮ8.5.1
The take-off for buildings should be performed ﻣﺒﻨﻰ ﻟﺒﻨﻮد اﻷﻋﻤﺎل اﻟﺮﺋﻴﺴﻴﺔ ﻣﺜﻞ ُﻳﻌﺪ ﺣﺼُﺮ اﻟﻤﺒﺎﻧﻲ ﻟ
for each building for major work items such as اﻟﺠﻮاﻧﺐ،اﻟﻄﻮب واﻟﺒﻠﻮك واﻟﻔﻮﻻذ اﻹﻧﺸﺎﺋﻲ ﻟﻠﻤﺒﺎﻧﻲ
brick/block, building structural steel, siding and ،اﻟﻜﻬﺮﺑﺎء ،اﻟﺴﺒﺎﻛﺔ ،واﻟﻨﻮاﻓﺬ اﻷﺑﻮاب ،واﻷﺳﻘﻒ
roofing, doors and windows, plumbing, وﻳﺠﺐ.اﻟﺘﺪﻓﺌﺔواﻟﺘﻬﻮﻳﺔ واﻟﺘﻜﻴﻴﻒ واﻟﺘﺸﻄﻴﺒﺎت اﻟﻤﻌﻤﺎرﻳﺔ
electrical, HVAC, and architectural finishes. .ﺗﻀﻤﻴﻦ أﺳﺎﺳﺎت اﻟﻤﺒﺎﻧﻲ ﻣﻊ ﺣﺴﺎﺑﺎت اﻟﺨﺮﺳﺎﻧﺔ
Building foundations should be included with
the concrete accounts.
It is important to clearly identify the boundaries ﻣﻦ اﻟﻤﻬﻢ ﺗﻮﺿﻴﺢ ﺣﺪود ﻣﺴﺆوﻟﻴﺎت اﻟﺤﺼﺮ ﺑﻴﻦ اﻟﻤﺒﺎﻧﻲ
of take-off responsibility between buildings ﺧﺼﻮﺻًﺎ أﻋﻤﺎل اﻷﻧﺎﺑﻴﺐ واﻷﻋﻤﺎل،وﻏﻴﺮﻫﺎ ﻣﻦ اﻟﺘﺨﺼﺼﺎت
and other disciplines, especially piping and ﻣﺘﺮ1.5 وﺗﻌﺘﺒﺮ اﻟﺤﺪود اﻟﻌﺎدﻳﺔ ﻟﻬﺬه اﻟﺤﺪود.اﻟﻜﻬﺮﺑﺎﺋﻴﺔ
electrical. The normal limit for this boundary is .ﺧﺎرج اﻟﻤﺤﻴﻂ اﻟﺨﺎرﺟﻲ ﻟﻠﻤﺒﻨﻰ
1.5 meters outside the building outline.
50
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
In developing the plan for reporting installed وﻋﻠﻰ ٍ ﻋﻨﺪ وﺿﻊ ﺧﻄﺔ ﺗﻘﺎرﻳﺮ ﻛﻤﻴﺎت اﻟﻤﻌﺪات
mechanical equipment quantities, the ﻣﻬﻨﺪس اﻹﺷﺮاف ﻋﻠﻰ،اﻟﻤﻴ ﻧﻴﻜﻴﺔ اﻟﻤﺮّﻛﺒﺔ ﻋﻠﻰ اﻟﻤﻘﺎول
Contractor, Site Supervision Engineer and اﻟﻤﻮﻗﻊ وﻣﺴﺆول ﺿﺒﻂ اﻟﻤﺸﺎرﻳﻊ ﺗﻨﻔﻴﺬ ﻣﺮاﺟﻌﺔ دﻗﻴﻘﺔ
Project Controls shall review the equipment ﻹﺟﺮاء ﺗﺮﻛﻴﺐ اﻟﻤﻌﺪات ﻟﺘﺤﺪﻳﺪ اﻟﻤﻌﺎﻟﻢ اﻟﺮﺋﻴﺴﻴﺔ ﻟﻠﺘﺮﻛﻴﺒﺎت
installation procedure and schedule to ﻳﺠﺐ أن.اﻟﺘﻲ ﻳﻤﻜﻦ اﺳﺘﺨﺪاﻣﻬﺎ ﻟﻤﺮاﻗﺒﺔ ﻋﻤﻠﻴﺔ اﻟﺘﺮﻛﻴﺐ
determine installation milestones that can be ﻳﺄﺧﺬ ﻫﺬا اﻟﺘﺮﺟﻴﺢ ﻓﻲ اﻻﻋﺘﺒﺎر ﺳﺎﻋﺎت اﻟﻌﻤﻞ واﻟﻨﺴﺒﺔ
used to monitor the installation process. This وﺑﻨﺎًء ﻋﻠﻰ.اﻟﻤﺌﻮﻳﺔ ﻣﻦ اﻟﻤﻴﺰاﻧﻴﺔ اﻟﻼزﻣﺔ ﻹﻧﺠﺎز ذﻟﻚ اﻟﻤﻌﻠﻢ
weighting should take into consideration the ﻳﺘﻢ إﻋﺪاد ﺗﻘﺎرﻳﺮ اﻟﺘﺮﻛﻴﺐ ﻛﻨﺴﺒﺔ،ﻋﻮاﻣﻞ اﻟﺘﺮﺟﻴﺢ ﻫﺬه
job hours and percentage of the budget .ﻣﺌﻮﻳﺔ ﻟﻺﻛﻤﺎل ﻟﻠﺘﺮﻛﻴﺒﺎت اﻟ ﻴﺔ
required to achieve the milestone. Based on
these weighting factors, the installation is
reported as a percent complete for the overall
installation. وﻋﻨﺪ وﺿﻊ ﻋﻮاﻣﻞ اﻟﺘﺮﺟﻴﺢ ﻓﺈن ﺗﺮﻛﻴﺐ ﺗﻠﻚ اﻟﺴﻠﻊ وﻋﻤﻠﻴﺎت
When the weighting factors are developed, the اﻷﻋﻤﺎل اﻟﺨﺎﺻﺔ ﻣﺜﻞ اﻟﻤﻮاءﻣﺔ ﻳﺠﺐ وﺿﻌﻬﺎ ﻓﻲ اﻻﻋﺘﺒﺎر
installation of loose commodities and special ﻛﻮاﺣﺪة ﻣﻦ أﻫﻢ اﻟﻤﻌﺎﻟﻢ اﻟﺮﺋﻴﺴﻴﺔ ﻹﻛﻤﺎل اﻟﺘﺮﻛﻴﺒﺎت اﻟ ﻴﺔ
work processes, such as alignment, must be ﻃﺎﻟﻤﺎ أن ﻫﺬه اﻟﺠﻬﺪ ﻳﻤﻜﻦ أن ﻳﻤﺜﻞ ﺟﺰًء ﻛﺒﻴﺮًا ﻣﻦ ﺳﺎﻋﺎت
taken into account as one of the basic .اﻟﻌﻤﻞ اﻟﻤﺤﺪدة ﻓﻲ اﻟﻤﻴﺰاﻧﻴﺔ
milestones in completing the overall
installation since this effort can represent a
significant portion of the budgeted job hours.
اﻟﺘﻘﺎرﻳﺮ8.6.2
8.6.2 REPORTING ﻳﺘﺤﻘﻖ ﻣﻬﻨﺪس اﻹﺷﺮاف ﻋﻠﻰ اﻟﻤﻮﻗﻊ ﻓﻲ اﻟﻌﺎدة ﻣﻦ
The Site Supervision Engineer normally verifies ﻳﺠﺐ.اﻟﻜﻤﻴﺎت اﻟﻤﺮﻛﺒﺔ ﺑﺎﻟﻔﺤﺺ اﻟﻨﻈﺮي ﻟﻸﻋﻤﺎل اﻟﻤﻜﺘﻤﻠﺔ
installed quantities by visual inspection of the أن ﻳﺘﻀﻤﻦ اﻟﺘﺮﻛﻴﺐ اﻟ ﻣﻞ ﻟﻠﻤﻌﺪات اﻟﻤﻴ ﻧﻴﻜﻴﺔ ﺗﺮﺗﻴﺒﻬﺎ
completed work. The complete installation of .ﺑﺎﻟﺼﻮرة اﻟﻨﻬﺎﺋﻴﺔ
mechanical equipment should include final
alignment. ( أﻣﺜﻠﺔ ﻟﺘﻘﺎرﻳﺮ ﻋﻤﻠﻴﺎت اﻷﻋﻤﺎل6-8) ﻳﻮﺿﺢ اﻟﺠﺪول
Typical examples of Major Equipment Detailed .اﻟﺘﻔﺼﻴﻠﻴﺔ ﻟﻠﻤﻌﺪات اﻟﺮﺋﻴﺴﻴﺔ
Work Operations reporting percentages are
shown in Table 8 6.
ﺑﺎﻟﻨﺴﺒﺔ ﻟﻠﻤﻌﺪات اﻟﺮﺋﻴﺴﻴﺔ ﻏﻴﺮ اﻟﻤﺪرﺟﺔ ﻓﻲ اﻟﺠﺪول ﻳﺘﻔﻖ:ﻣﻼﺣﻈﺔ
Note: For Major Equipment not listed in the table, اﻟﻤﻘﺎول ﻣﻊ اﻻﺳﺘﺸﺎري ﻋﻠﻰ أﻧﺸﻄﺔ اﻟﻤﻌﺪات واﻟﻨﺴﺐ اﻟﻤﺌﻮﻳﺔ
Contractor to agree with Consultant on the equipment .ﻟﻠﺘﺮﺟﻴﺢ
activities and percentage weightings.
ﻋﻤﻠﻴﺎت اﻷﻋﻤﺎل اﻟﺘﻔﺼﻴﻠﻴﺔ ﻟﻠﻤﻌﺪات اﻟﺮﺋﻴﺴﻴﺔ:(6-8) اﻟﺠﺪول
Table 8 6 - Major Equipment Detailed Work Operations
Description Percent complete اﻟﻨﺴﺒﺔ اﻟﻤﺌﻮﻳﺔ ﻟﻼﻛﻤﺎل ﺑﻴﺎن
Tanks (shop اﻟﺨﺰاﻧﺎت )اﻟﺘﺼﻨﻴﻊ ﻓﻲ
fabrication - ﺑﺪون اﻷﺟﺰاء- اﻟﻮرﺷﺔ
containing no (اﻟﺪاﺧﻠﻴﺔ
51
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
52
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ .ﻳﺮﺟﻰ اﻟﺮﺟﻮع
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ .
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
"اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ.
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
55
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ .ﻳﺮﺟﻰ اﻟﺮﺟﻮع
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ .
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
"اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ.
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
take-off accuracy and completeness. It should اﻟﺤﺼﺮ اﻟﺘﻲ ﻳﻘﺪﻣﻬﺎ اﻟﻤﻮرد أو ﻣﻬﻨﺪس اﻟﺘﺼﻤﻴﻢ دﻗﻴﻘﺔ
never be assumed that the quantity take-offs .ﻣﺎﺋﺔ ﺑﺎﻟﻤﺎﺋﺔ
provided by vendors or design engineering is
100 percent accurate.
When using computerized take-off system
capability, the Site Supervision Engineer, in ﻋﻨﺪ اﺳﺘﺨﺪام ﻧﻈﺎم ﺣﺼﺮ اﻟﻜﻤﻴﺎت اﻟﻤﺤﻮﺳﺐ ﻋﻠﻰ
conjunction with Project Controls, should ﻣﻬﻨﺪس اﻹﺷﺮاف ﻋﻠﻰ اﻟﻤﻮﻗﻊ ﺑﺎﻟﺘﻌﺎون ﻣﻊ ﻣﺴﺆول ﺿﺒﻂ
check the preloaded cost codes to ensure that اﻟﻤﺸﺎرﻳﻊ ﻣﺮاﺟﻌﺔ رﻣﻮز اﻟﺘ ﻟﻴﻒ اﻟﻤﺤﻤﻠﺔ ﻣﺴﺒﻘًﺎ ﻟﻀﻤﺎن
they perfectly match those cost codes used by ﻣﻄﺎﺑﻘﺘﻬﺎ ﺗﻤﺎﻣًﺎ ﻣﻊ رﻣﻮز اﻟﻤﺸﺎرﻳﻊ اﻟﺘﻲ ﻳﺴﺘﺨﺪﻣﻬﺎ
the project. .اﻟﻤﺸﺮوع
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
8.7.3 REPORTING
On projects with a computerized piping
quantity tracking system in place, installed اﻟﺘﻘﺎرﻳﺮ8.7.3
piping quantities are often reported by the أﻣﺎ ﻓﻲ اﻟﻤﺸﺎرﻳﻊ اﻟﺘﻲ ﺗﺴﺘﺨﺪم ﻧﻈﺎم ﺗﻌﻘﺐ ﻣﺤﻮﺳﺐ
craft foreman by turning in pipe installation ﻟﻜﻤﻴﺎت اﻷﻧﺎﺑﻴﺐ واﻟﻤﻮاﺳﻴﺮ ﻓﺈن ﺗﻘﺎرﻳﺮ ﻛﻤﻴﺎت اﻷﻧﺎﺑﻴﺐ
cards/reports. Complete installation credit for واﻟﻤﻮاﺳﻴﺮ اﻟﻤﺮّﻛﺒﺔ ﻳﻌﺪﻫﺎ رﺋﻴﺲ ﻋﻤﺎل اﻟﺤﺮﻓﺔ اﻟﻤﻌﻴﻨﺔ
a particular length of pipe cannot be given until ﻻ.ﺑﺎﺳﺘﺨﺪام ﺑﻄﺎﻗﺎت أو ﺗﻘﺎرﻳﺮ ﺗﺮﻛﻴﺐ اﻷﻧﺎﺑﻴﺐ واﻟﻤﻮاﺳﻴﺮ
all items included in the quantity status ﻳﻤﻜﻦ إﻋﻄﺎء زﻳﺎدة اﻟﺘﺮﻛﻴﺒﺎت اﻟ ﻣﻠﺔ ﻟﻄﻮل ﻣﻌﻴﻦ ﻣﻦ
definition are complete. Similarly, complete اﻷﻧﺎﺑﻴﺐ إﻻ ﺑﻌﺪ إﻛﻤﺎل ﺟﻤﻴﻊ اﻟﺒﻨﻮد اﻟﻤﻀﻤﻨﺔ ﻓﻲ ﺗﻌﺮﻳﻒ
installation credit for pipe routed through a وﺑﻨﻔﺲ اﻟﺼﻮرة ﻻ ﻳﻤﻜﻦ اﺳﺘﺨﺮاج ﺗﻘﺮﻳﺮ زﻳﺎدة.ﺣﺎﻟﺔ اﻟﻜﻤﻴﺎت
valve cannot be reported unless the valve is اﻟﺘﺮﻛﻴﺒﺎت اﻟﻤﻜﺘﻤﻠﺔ ﻟﻸﻧﺎﺑﻴﺐ اﻟﻤﻮﺟﻬﺔ ﻣﻦ ﺧﻼل ﺻﻤﺎم إﻻ إذا
correctly installed according to project ن ﺗﺮﻛﻴﺐ اﻟﺼﻤﺎم ﺻﺤﻴﺤﻴًﺎ وﻓﻘًﺎ ﻟﺮﺳﻮﻣﺎت وﻣﻮاﺻﻔﺎت
drawings and specifications. This includes ﻳﺸﻤﻞ ذﻟﻚ ﺗﺸﺬﻳﺐ اﻟﺼﻤﺎﻣﺎت واﻟﻤﺴﺎﻣﻴﺮ.اﻟﻤﺸﺮوع
valve trim, bolting, gasket installation, and .واﻟﺤﺸﻴﺎت وﺗﻮﺟﻴﻪ اﻟﺼﻤﺎم
valve orientation.
Tagged inline instruments and instrument air
header reporting is the responsibility of the
piping group. أﻣﺎ ﺗﻘﺎرﻳﺮ اﻟﻤﻌﺪات اﻟﺪاﺧﻠﻴﺔ اﻟﻤﻮﺳﻮﻣﺔ وﻣﻌﺪات ﺗﻮﺟﻴﻪ
Supervision/craft to inspect all work before .اﻟﻬﻮاء ﻓﻬﻲ ﻣﻦ ﻣﺴﺆوﻟﻴﺔ ﻣﺠﻤﻮﻋﺔ اﻷﻧﺎﺑﻴﺐ واﻟﻤﻮاﺳﻴﺮ
reporting as complete/ready for Site
Supervision Engineer verification. No credit to اﻟﺤﺮﻓﺔ ﻓﺤﺺ ﺟﻤﻴﻊ اﻷﻋﻤﺎل ﻗﺒﻞ/ وﻋﻠﻰ ﻣﺴﺆول اﻹﺷﺮاف
be given for work that has open punch list اﻟﺠﺎﻫﺰﻳﺔ ﻟﻠﺘﺤﻘﻖ ﺑﻮاﺳﻄﺔ ﻣﻬﻨﺪس/إﻋﺪاد ﺗﻘﺮﻳﺮ اﻻﻛﺘﻤﺎل
items tied to a specific milestone. ﻻ ﻳﻀﺎف أي اﻋﺘﻤﺎد ﻟﻸﻋﻤﺎل اﻟﺘﻲ ﻣﺎ.اﻹﺷﺮاف ﻋﻠﻰ اﻟﻤﻮﻗﻊ
The Site Supervision Engineer must determine زاﻟﺖ ﻟﺪﻳﻬﺎ ﻗﺎﺋﻤﺔ أﻋﻤﺎل ﻧﺎﻗﺼﺔ ﻣﻔﺘﻮﺣﺔ ﺑﺨﺼﻮص أﺣﺪ
how the pre-fabricated pipe will be credited, .اﻟﻤﻌﺎﻟﻢ اﻟﺮﺋﻴﺴﻴﺔ
especially if a portion is prefabricated and a
portion is field fabricated. The RFE verifies that وﻋﻠﻰ ﻣﻬﻨﺪس اﻹﺷﺮاف ﻋﻠﻰ اﻟﻤﻮﻗﻊ ﺗﺤﺪﻳﺪ ﻛﻴﻔﻴﺔ اﻋﺘﻤﺎد
reported quantities are correct and that the اﻷﻧﺎﺑﻴﺐ ﻣﺴﺒﻘﺔ اﻟﺼﻨﻊ ﺧﺼﻮﺻًﺎ إذا ن ﺟﺰٌء ﻣﻨﻬﺎ ﻣﺴﺒﻖ
piping is properly installed. Installation credit ﻳﺘﺤﻘﻖ اﻟﻤﻬﻨﺪس.اﻟﺼﻨﻊ وﺟﺰٌء آﺧﺮ ﻣﺼّﻨﻊ ﻓﻲ اﻟﻤﻮﻗﻊ
shall be given as shown in Table 8 7 through اﻟﻤﺴﺆول ﻣﻦ ﺻﺤﺔ اﻟﻜﻤﻴﺎت اﻟﻮاردة ﻓﻲ اﻟﺘﻘﺎرﻳﺮ وأن أﻋﻤﺎل
Table 8 9. ﻳﻤﻜﻦ إﻋﺪاد.اﻟﺼﺤﻴﺢ اﻷﻧﺎﺑﻴﺐ واﻟﻤﻮاﺳﻴﺮ ﺗﻢ ﺗﺮﻛﻴﺒﻬﺎ ﺑﺎﻟﺸ
Applies to projects where commodities such as (7-8) ﺗﻘﺎرﻳﺮ زﻳﺎدة اﻟﺘﺮﻛﻴﺒﺎت وﻓﻘًﺎ ﻟﻤﺎ ﻣﻮﺿﺢ ﻓﻲ اﻟﺠﺪاول
supports, welds, and valves are tracked with the piping .(9-8)و
installation. ﻳﻨﻄﺒﻖ ذﻟﻚ ﻋﻠﻰ اﻟﻤﺸﺎرﻳﻊ اﻟﺘﻲ ﻳﺠﺮي ﻓﻴﻬﺎ ﺗﻌﻘﺐ ﺳﻠﻊ ﻣﺜﻞ
.اﻟﺤﺎﻣﻼت واﻟﻠﺤﺎم واﻟﺼﻤﺎﻣﺎت أﺛﻨﺎء ﺗﺮﻛﻴﺐ اﻷﻧﺎﺑﻴﺐ واﻟﻤﻮاﺳﻴﺮ
Table Error! No text of specified style in
document.-8 General Spooled Piping Quantity
Reporting Milestones -Error! No text of specified style in document. اﻟﺠﺪول
اﻟﻤﻌﺎﻟﻢ اﻟﺮﺋﻴﺴﻴﺔ ﻟﺘﻘﺎرﻳﺮ ﻛﻤﻴﺎت اﻷﻧﺎﺑﻴﺐ واﻟﻤﻮاﺳﻴﺮ ﻓﻲ ﻣﻮاﻗﻊ9
اﻟﺘﺠﻤﻴﻊ
58
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Table Error! No text of specified style in -Error! No text of specified style in document. اﻟﺠﺪول
document.-10 General Field Fabricated Piping ﺗﻘﺎرﻳﺮ ﻛﻤﻴﺎت اﻷﻧﺎﺑﻴﺐ واﻟﻤﻮاﺳﻴﺮ اﻟﻌﺎﻣﺔ اﻟﻤﺼّﻨﻌﺔ ﻓﻲ اﻟﻤﻮﻗﻊ11
Quantity Reporting
Above ground ﻓﻮق ﺳﻄﺢ اﻷرض
Milestone (including rack Below ground ﺗﺤﺖ ﺳﻄﺢ اﻷرض )ﺑﻤﺎ ﻓﻴﻬﺎ اﻷﻧﺎﺑﻴﺐ اﻟﻤﻌﺎﻟﻢ اﻟﺮﺋﻴﺴﻴﺔ
piping) (ذات اﻟﺤﻤﺎﻻت
Staged, sealed, ووﺿﻊ اﻟﺘﺜﺒﻴﺖ
5% 5% %5 %5
and preserved اﻟﺘﺴﺮب ﻣﺎﻧﻌﺎت
59
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
60
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Notes: :ﻣﻼﺣﻈﺎت
Staging includes either moving material from ﻳﺸﻤﻞ اﻟﺘﻨﻈﻴﻢ إﻣﺎ ﻧﻘﻞ اﻟﻤﻮاد ﻣﻦ اﻟﻤﺴﺘﻮدﻋﺎت إﻟﻰ
the Laydown Yard/Warehouse to the area of ﻣﻨﻄﻘﺔ اﻟﺘﺮﻛﻴﺐ أو ﺗﻨﺰﻳﻞ اﻟﻤﻮاد اﻟﻤﺴﻠﻤﺔ ﻓﻲ ﻧﻘﻄﺔ
installation or offloading delivered material at .اﻟﺘﺮﻛﻴﺐ
the point of installation.
The milestone includes permanent plant pre- ﺗﺸﻤﻞ اﻟﻤﻌﺎﻟﻢ اﻟﺮﺋﻴﺴﻴﺔ اﻻﺧﺘﺒﺎر اﻟﺴﺎﺑﻖ واﻟﻼﺣﻖ ﻟﺒﻨﻮد
test and post-test punch list items. Milestone ﻻ ﻳﺸﻤﻞ اﻟﻤﻌﻠﻢ اﻟﺮﺋﻴﺴﻲ أﻋﻤﺎل إﻋﺎدة.ﻗﺎﺋﻤﺔ اﻟﻨﻮاﻗﺺ
does not include pipe test restoration work اﻟﺘﺮﺗﻴﺐ ﺑﻌﺪ اﺧﺘﺒﺎر اﻷﻧﺎﺑﻴﺐ ﻣﺜﻞ إزاﻟﺔ ﻣﻮاد اﻻﺧﺘﺒﺎر اﻟﻤﺆﻗﺘﺔ
such as removal of temporary test materials .ﻣﺜﻞ ﺗﻌﺘﻴﻢ اﻻﺧﺘﺒﺎر وإﻋﺎدة ﺗﺮﺑﻴﻂ اﻟﻔﻠﻨﺸﺎت ﺑﻌﺪ اﻻﺧﺘﺒﺎر
such as test blinds and re-bolting flanges after
testing.
Credit should not be claimed for this reporting ﻳﻤﻜﻦ ﻋﺪم إﺿﺎﻓﺔ اﻋﺘﻤﺎد ﻟﻬﺬه اﻟﻤﻌﺎﻟﻢ اﻟﺮﺋﻴﺴﻴﺔ ﻟﻠﺘﻘﺎرﻳﺮ
milestone until any required drying, sealing, إﻻ ﺑﻌﺪ اﻛﺘﻤﺎل ﻋﻤﻠﻴﺎت اﻟﺘﺠﻔﻴﻒ وﻣﺎﻧﻌﺎت اﻟﺘﺴﺮب وإﻋﺎدة
and preservation activities have been وﻳﺠﺐ ﺗﻨﻔﻴﺬ أﻋﻤﺎل اﻟﺘﺠﻔﻴﻒ.اﻟﺘﺮﺗﻴﺐ ﻟﻠﺤﺪ ﻣﻦ أي ﺗﺄﺧﻴﺮ
completed to minimize the lag. Drying, sealing, وﻣﺎﻧﻌﺎت اﻟﺘﺴﺮب وإﻋﺎدة ﺗﺮﺗﻴﺐ اﻟﻤﻮﻗﻊ ﺣﺴﺐ اﻟﻤﺘﻄﻠﺒﺎت
and preservation activities are to be .اﻟﻬﻨﺪﺳﻴﺔ واﻟﻌﻘﺪ وﻣﺴﺘﻨﺪات اﻟﺒﺎﺋﻊ
implemented as required per Engineering,
Contract, or Vendor documents.
Preservation of spooled piping to be ﻳﺠﺐ أﻳﻀًﺎ إﻛﻤﺎل اﻷﻧﺎﺑﻴﺐ اﻟﻤﺠﻤﻌﺔ ﺣﺴﺐ اﻟﻤﺘﻄﻠﺒﺎت
completed as required by Engineering and/or .أو ﻣﺘﻄﻠﺒﺎت اﻟﺒﺎﺋﻊ/اﻟﻬﻨﺪﺳﻴﺔ و
Vendor requirements.
Installation rates normally exclude scaffolding ﺗﺴﺘﺒﻌﺪ ﻧﺴﺐ اﻟﺘﺮﻛﻴﺒﺎت ﻓﻲ اﻟﻌﺎدة اﻟﺴﻘﺎﻻت وﻣﻨﺎوﻟﺔ
and material handling - this shall be confirmed ﻳﺠﺐ ﺗﺄﻛﻴﺪ ذﻟﻚ اﻋﺘﻤﺎدًا ﻋﻠﻰ إﻋﺪادات ﻫﻴ- اﻟﻤﻮاد
depending on the Code of Accounts set-up. .اﻟﺤﺴﺎﺑﺎت
Milestone to include work associated with ﻳﺸﻤﻞ اﻟﻤﻌﻠﻢ اﻟﺮﺋﻴﺴﻲ اﻷﻋﻤﺎل اﻟﻤﺘﻌﻠﻘﺔ ﺑﺒﻨﻮد إﻋﺎدة
incomplete pipe test restoration items اﻟﺘﺮﺗﻴﺐ ﻏﻴﺮ اﻟﻤﻜﺘﻤﻠﺔ ﺑﻌﺪ اﺧﺘﺒﺎر اﻷﻧﺎﺑﻴﺐ واﻟﺘﻲ ُﺗﺤﺪد أﺛﻨﺎء
identified during RFE post-test walk down (i.e. زﻳﺎرة اﻟﻤﻬﻨﺪس اﻟﻤﺴﺆول ﺑﻌﺪ اﻻﺧﺘﺒﺎر )ﻣﺜﻞ إزاﻟﺔ ﻣﻮاد
removal of temporary test materials such as اﻻﺧﺘﺒﺎر اﻟﻤﺆﻗﺘﺔ ﻣﺜﻞ ﺗﻌﺘﻴﻢ اﻻﺧﺘﺒﺎر وإﻋﺎدة ﺗﺮﺑﻴﻂ
test blinds and re-bolting flanges after testing). ﻻ ﻳﺸﻤﻞ اﻟﻤﻌﻠﻢ اﻟﺮﺋﻴﺴﻲ ﻗﺎﺋﻤﺔ.(اﻟﻔﻠﻨﺸﺎت ﺑﻌﺪ اﻻﺧﺘﺒﺎر
Milestone does not include permanent plant راﺟﻊ،اﻟﺒﻨﻮد اﻟﻨﺎﻗﺼﺔ ﻓﻲ اﻟﻤﻨﺸﺄة اﻟﺪاﺋﻤﺔ ﺑﻌﺪ اﻻﺧﺘﺒﺎر
post-test punch list items, refer to Table Error! Table Error! No text of specified style in
No text of specified style in document.-8 and Error! Reference source not وdocument.-8
Error! Reference source not found.. .found.
8.8 ELECTRICAL
8.8.1 TAKE-OFF ﻛﻬﺮﺑﺎﺋﻴﺔ8.8
Power and control conduits are taken off by اﻟﺤﺼﺮ8.8.1
drawing, size, and type. Individual conduit runs ﺗﺤﺴﺐ اﻟﻄﺎﻗﺔ اﻟﻜﻬﺮﺑﺎﺋﻴﺔ وﻗﻨﻮات اﻟﺘﺤﻜﻢ ﺣﺴﺐ
are listed by electrical devices such as motor, ﺗﺪرج ﻣﺠﺎري اﻟﻘﻨﻮات ﻣﻔﺮدًة.اﻟﺮﺳﻮﻣﺎت واﻟﺤﺠﻢ واﻟﻨﻮع
panel, or control stations. اﻟﻠﻮﺣﺎت أو،ﺣﺴﺐ اﻷﺟﻬﺰة اﻟﻜﻬﺮﺑﺎﺋﻴﺔ ﻣﺜﻞ اﻟﻤﺤﺮ ت
.ﻣﺤﻄﺎت اﻟﺘﺤﻜﻢ
61
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
and larger cable and 3 meters per end on all 3 ﻛﻴﻠﻮﻓﻮﻟﺖ أو أﻛﺒﺮ و5 ﻧﻬﺎﻳﺔ ﻋﻠﻰ اﻟ ﺑﻼت ﻣﺘﺮ ﻟ1.5
other wire and cable. For scheduled wire and ﺑﺎﻟﻨﺴﺒﺔ ﻟﻸﺳﻼك.أﻧﻮاع اﻷﺳﻼك واﻟ ﺑﻼت اﻷﺧﺮى أﻣﺘﺎر ﻟ
cable, the “Engineered” cable length is to be واﻟ ﺑﻼت اﻟﻤﺠﺪوﻟﺔ ﻳﺠﺐ أن ُﺗﺴﺘﺨﺪم اﻷﻃﻮال اﻟﻬﻨﺪﺳﻴﺔ
used as the take-off quantity. This Engineered ﻫﺬه اﻷﻃﻮال اﻟﻬﻨﺪﺳﻴﺔ.ﻟﻠ ﺑﻼت ﻋﻠﻰ أﻧﻬﺎ ﻛﻤﻴﺔ اﻟﺤﺼﺮ
length is effectively the “pulled” linear meters ﻫﻲ ﻓﻲ اﻟﻮاﻗﻊ اﻷﻣﺘﺎر اﻟﺨﻄﻴﺔ "اﻟﻤﺴﺤﻮﺑﺔ" ﺑﻤﺎ ﻓﻴﻬﺎ
including tails, calculated by summing the اﻟﺘﻤﺪﻳﺪات اﻹﺿﺎﻓﻴﺔ اﻟﺘﻲ ُﺗﺤﺴﺐ ﺑﺠﻤﻊ ﻃﻮل ﻗﻨﻮات
length of the raceway in which the cable is اﻷﺳﻼك اﻟﻜﻬﺮﺑﺎﺋﻴﺔ اﻟﺘﻲ ﺗﻤﺮر ﻓﻴﻬﺎ اﻟ ﺑﻼت ﻣﻊ زﻳﺎدة ﺗﻤﺪﻳﺪ
routed and adding on a default tail end length ﺗﻜﻮن أﻃﻮال ﻗﻨﻮات.ﺑﻞ إﺿﺎﻓﻲ اﻓﺘﺮاﺿﻲ ﻓﻲ ﻧﻬﺎﻳﺔ
to each cable end. The raceway lengths used اﻷﻃﻮال ﻟﺤﺴﺎب اﻟﻤﺴﺘﺨﺪﻣﺔ اﻟﻜﻬﺮﺑﺎﺋﻴﺔ اﻷﺳﻼك
to calculate the cable “Engineered” length (e.g. اﻟﻬﻨﺪﺳﻴﺔ ﻟﻠ ﺑﻼت )ﻣﺜﻞ أﻃﻮال اﻟﺤﺼﺮ( إﻣﺎ ﻗﻨﻮات
the take-off length) is either the “Engineered” "ﻫﻨﺪﺳﻴﺔ" )ﺗﻘﺪﻳﺮﻳﺔ( أو أﻃﻮال اﻟﻘﻨﻮات اﻟﻔﻌﻠﻴﺔ اﻟﻤﺮّﻛﺒﺔ
(estimated) raceway length or the actual .ﺣﺴﺐ ﺣﺎﻟﺔ ﺗﺮﻛﻴﺒﺎت ﻗﻨﻮات اﻷﺳﻼك اﻟﻜﻬﺮﺑﺎﺋﻴﺔ
installed raceway length, depending on the
status of the raceway installation.
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
marked up as take-offs are done and أﻣﺎ.ُﻳﺤﺼﺮ اﻟﺘﺄرﻳﺾ ﺣﺴﺐ اﻟﺮﺳﻢ واﻟﻤﻮﺻﻼت واﻟﺤﺠﻢ واﻟﻨﻮع
maintained in the Site Supervision Engineer s رﺳﻮﻣﺎت اﻟﺘﺄرﻳﺾ اﻟﻤﻮﺳﻮﻣﺔ ﻟﻠﺤﺼﺮ ﻓُﺘﻌﺪ وﺗﺤﻔﻆ ﻓﻲ
file. Ground rods are taken off in “each” and ُﺗﺤﺼُﺮ اﻷﺳﻼك.ﻣﻠﻒ ﻣﻬﻨﺪس اﻹﺷﺮاف ﻋﻠﻰ اﻟﻤﻮاﻗﻊ
included in the take-off. If they are not shown وإذا ﻟﻢ ﺗﺪرج ﺗﻠﻚ.اﻷرﺿﻴﺔ ﺑﺎﻟﻌﺪد وُﺗﻀّﻤﻦ ﻓﻲ اﻟﺤﺼﺮ
on the drawings, include allowances for pigtails اﻷﺳﻼك ﻓﻲ اﻟﺮﺳﻮﻣﺎت ﻳﺘﻢ ﺗﻀﻤﻴﻦ ﻣﺨﺼﺺ ﻷﺳﻼك
to motors and electrical equipment. All ﺗﻜﻮن ﺟﻤﻴﻊ.اﻟﺘﻤﺎس اﻟﻜﺮﺑﻮﻧﻲ واﻟﻤﻌﺪات اﻟﻜﻬﺮﺑﺎﺋﻴﺔ
raceway (Tray and Conduit) and misc. ﻗﻨﻮات اﻷﺳﻼك اﻟﻜﻬﺮﺑﺎﺋﻴﺔ )اﻟﺤﺎﻣﻼت واﻟﻘﻨﻮات( وﻗﻮاﻋﺪ
equipment grounds are included in the quantity ﻣﻦ اﻟﻤﻌﺪات اﻟﻤﺘﻨﻮﻋﺔ ﻣﺸﻤﻮﻟﺔ ﻓﻲ ﺗﻘﺎرﻳﺮ اﻟﻜﻤﻴﺎت ﻟ
reporting for each of those specific commodity ﺗﺮﻛﻴﺒﺎت ﺗﻠﻚ اﻟﺴﻠﻌﺔ اﻟﻤﺤﺪدة وأﺳﻌﺎر اﻟﻮﺣﺪات وﻣﻦ ﺛﻢ
installations and unit rates, therefore they are ﻟﻴﺴﺖ ﻫﻨﺎﻟﻚ ﺣﺎﺟﺔ ﻟﺘﻌﻘﺒﻬﺎ ﻣﻨﻔﺼﻠًﺔ وإﺻﺪار ﺗﻘﺎرﻳﺮ ﺧﺎﺻﺔ
not required to be tracked and reported .ﻟﻬﺎ
separately.
8.8.2 REPORTING
The electrical craft foreman normally reports اﻟﺘﻘﺎرﻳﺮ8.8.2
installed quantities by completing and ﻳﺮﻓﻊ رﺋﻴﺲ ﻋﻤﺎل اﻟﺤﺮف اﻟﻜﻬﺮﺑﺎﺋﻴﺔ ﺗﻘﺎرﻳﺮ اﻟﻜﻤﻴﺎت اﻟﻤﺮﻛﺒﺔ
submitting an installation card documenting ﻓﻲ اﻟﻌﺎدة ﺑﺈﻛﻤﺎل وﺗﺴﻠﻴﻢ ﺑﻄﺎﻗﺔ اﻟﺘﺮﻛﻴﺐ اﻟﺘﻲ ﺗﻮﺛﻖ
the work performed. The credit linear meters of اﻷﻣﺘﺎر اﻟﺨﻄﻴﺔ اﻹﺿﺎﻓﻴﺔ ﻟﻸﺳﻼك.اﻷﻋﻤﺎل اﻟﻤﻨﺠﺰة
wire and cable installed, terminations واﻟ ﺑﻼت اﻟﻤﺮّﻛﺒﺔ واﻟﻮﺻﻼت اﻟﻄﺮﻓﻴﺔ اﻟﻤﻜﺘﻤﻠﺔ أو اﻷﺟﻬﺰة
completed, or devices set. Installation of the ﻻ ﻳﻜﺘﻤﻞ ﺗﺮﻛﻴﺐ ﻗﻨﻮات اﻷﺳﻼك.اﻟﺘﻲ ﺗﻢ إﻋﺪادﻫﺎ
raceway is not complete unless all trays are اﻟﻜﻬﺮﺑﺎﺋﻴﺔ إﻻ ﺑﻌﺪ ﺗﺜﺒﻴﺖ اﻟﺤﺎﻣﻼت وﺟﻤﻴﻊ اﻟﺪﻋﺎﻣﺎت
.واﻷﻏﻄﻴﺔ واﻟﻤﻘﺎﺑﺲ ﻓﻲ أﻣﺎﻛﻨﻬﺎ
64
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
raceway lengths; therefore, raceway lengths ﺗﺤﺖ اﻷرض اﻟﻮارد ﻓﻲ اﻟﺘﻘﺎرﻳﺮ ﻗﺒﻞ ﺗﻀﻤﻴﻦ ﺗﻠﻚ اﻟﻜﻤﻴﺎت
must be accurate. Discrepancies between the .ﻓﻲ ﺗﻘﺮﻳﺮ اﻟﻜﻤﻴﺎت اﻷﺳﺒﻮﻋﻲ ﻹدارة ﺿﺒﻂ اﻟﻤﺸﺎرﻳﻊ
engineered and actual lengths of cables shall ﻋﻠﻰ اﻟﻬﻨﺪﺳﺔ اﻟﻤﻴﺪاﻧﻴﺔ اﻟﺘﺤﻘﻖ ﻣﻤﺎ ﻻ،وﺑﻨﻔﺲ اﻟﺼﻮرة
be resolved between the Construction ﻣﻦ ﺟﻤﻴﻊ ﻛﻤﻴﺎت اﻟﻘﻨﻮات اﻟﺴﻄﺤﻴﺔ اﻟﻮاردة%10 ﻳﻘﻞ ﻋﻦ
Contractor and Site Supervision Engineer. ﻓﻲ اﻟﺘﻘﺎرﻳﺮ ﻗﺒﻞ ﺗﻘﺪﻳﻢ أي ﻣﻦ ﺗﻠﻚ اﻟﻜﻤﻴﺎت ﻹدارة ﺿﺒﻂ
Field Engineering shall verify 100 percent of .اﻟﻤﺸﺎرﻳﻊ
reported cable tray and underground conduit
quantities, before including those quantities in
the weekly quantity report to Project Controls.
Similarly, Field Engineering shall verify at least
10 percent of all reported above-ground
conduit quantities, before providing any
above-ground conduit quantities to Project
Controls.
If there are discrepancies in any raceway ﻓﻲ ﺣﺎل وﺟﻮد أي اﺧﺘﻼﻓﺎت ﻓﻲ ﻛﻤﻴﺎت ﻗﻨﻮات اﻷﺳﻼك
quantities, these shall be resolved with the ﺑﺎﻟﻨﺴﺒﺔ.اﻟﻜﻬﺮﺑﺎﺋﻴﺔ ﻓﻴﺠﺐ ﺣﻠﻬﺎ ﻣﻊ اﻟﻤﺸﺮف اﻟﻤﻴﺪاﻧﻲ
Field Superintendent. For aboveground ﻟﻜﻤﻴﺎت اﻟﻘﻨﻮات اﻟﺴﻄﺤﻴﺔ إذا ﻧﺖ ﻫﻨﺎﻟﻚ اﺧﺘﻼﻓﺎت ﺗﺰﻳﺪ
conduit quantities, if there are more than 10 ﻓﻲ أي أﺳﺒﻮع ﻓﺘﺠﺐ زﻳﺎدة ﻋﻴﻨﺔ اﻟﻔﺤﺺ إﻟﻰ%10 ﻋﻠﻰ
discrepancies in any week, then the inspection ﻓﻲ ﺣﺎل.( ﻟﻜﻤﻴﺎت ذﻟﻚ اﻷﺳﺒﻮع%100) اﻟﺘﺤﻘﻖ ﺑﺎﻟ ﻣﻞ
sample shall be increased to 100 percent ﻳﺠﺐ أن،اﻟﺤﺎﺟﺔ إﻟﻰ زﻳﺎدة اﻟﻌﻴﻨﺔ ﻓﻲ أﻛﺜﺮ ﻣﻦ ﺛﻼث ﺣﺎﻻت
verification for that week’s quantities. If the ﻟﻜﻤﻴﺎت ﻗﻨﻮات اﻷﺳﻼك%100 ﻳﺘﻢ اﻟﺘﺤﻘﻖ ﺑﻨﺴﺒﺔ
sample is required to be extended on more .اﻟﻜﻬﺮﺑﺎﺋﻴﺔ ﻟﺒﺎﻗﻲ اﻟﻤﺸﺮوع
than three occasions, 100 percent verification
of raceway quantities shall be required for the
remainder of the project.
Reported quantities should be measured ﻳﺠﺐ ﻗﻴﺎس اﻟﻜﻤﻴﺎت اﻟﻮاردة ﻓﻲ اﻟﺘﻘﺎرﻳﺮ ﻣﻘﺎرﻧًﺔ ﺑﻜﻤﻴﺎت
against take-off quantities only. Quantities ﺑﺎﻟﻨﺴﺒﺔ ﻟﻠﻜﻤﻴﺎت اﻟﻤﺮّﻛﺒﺔ ﺑﺄﻛﺜﺮ ﻣﻦ اﻟﺤﺼﺮ.اﻟﺤﺼﺮ ﻓﻘﻂ
installed more than the take-off could indicate ﻓﺘﺠﺐ اﻹﺷﺎرة إﻟﻰ زﻳﺎدة ﻧﻄﺎق أﻋﻤﺎل اﻟﻤﺸﺮوع وﻳﺠﺐ ﺗﻨﺒﻴﻪ
a project scope increase and should be .ﻣﺴﺆول ﺿﺒﻂ اﻟﻤﺸﺎرﻳﻊ اﻟﻤﻴﺪاﻧﻲ ﻗﺒﻞ إﻳﺮادﻫﺎ ﻓﻲ اﻟﺘﻘﺎرﻳﺮ
reported to Project Field Controls before being
reported.
Table Error! No text of specified style in -Error! No text of specified style in document. اﻟﺠﺪول
document.-14 Electrical Equipment Quantity ﻣﺼﻔﻮﻓﺔ ﺗﻘﺎرﻳﺮ ﻛﻤﻴﺎت اﻟﻤﻌﺪات اﻟﻜﻬﺮﺑﺎﺋﻴﺔ15
Reporting Matrix
66
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
اﻟﻤﻨﻈﻤﺔ
اﻟﺪوﻟﻴﺔ
ﻟﻠﻤﻌﺎﻳﻴﺮ -اﻟﺨﻂ ﺟﻬﺪ ﻛﻬﺮﺑﺎﺋﻲ
اﻟﺘﻴﺎر اﻟﻤﺒﺎﺷﺮ ﻣﻌﺪات اﻟﺠﻬﺪ اﻟﻤﻌﺪات اﻟﻤﻌﺎﻟﻢ
اﻟﺮﺋﻴﺴﻲ ﻣﺘﻮﺳﻂ اﻟﻤﺤﻮﻻت
اﻟﻤﻌﺪات اﻟﻤﻨﺨﻔﺾ اﻟﻌﺎﻣﺔ اﻟﺮﺋﻴﺴﻴﺔ
واﻟﻔﺮﻋﻲ اﻟﻤﻌﺪات
ﺣﺴﺐ ﻗﺴﻢ
اﻟﻨﺎﻗﻞ
اﻻﺳﺘﻼم
%5 %10 %10 %10 %10 %10
واﻟﻤﻨﺎوﻟﺔ
اﻟﺘﻮزﻳﻊ ﻋﻠﻰ
%50 %20 %20 %20 %20 اﻟﻤﻮاﻗﻊ
واﻟﺘﺜﺒﻴﺖ
اﻛﺘﻤﺎل ﻋﻤﻠﻴﺎت
%20
اﻟﻠﺤﺎم
ﺗﻮزﻳﻊ اﻟﺤﻮاﻣﻞ
%20
ﻋﻠﻰ ﻣﻮاﻗﻌﻬﺎ
ﺗﺸﺒﻴﻚ اﻷﺟﺰاء
%15 %50 %50
اﻟﺪاﺧﻠﻴﺔ
%50 اﻛﺘﻤﺎل اﻟﺘﺠﻬﻴﺰ
%50 %50 اﻛﺘﻤﺎل اﻟﺘﺮﻛﻴﺐ
%5 %10 %10 %10 %10 %10 ﻣﻐﺎدرة اﻟﻤﻮﻗﻊ
اﻟﻔﺤﺺ
%5 %10 %10 %10 %10 %10
اﻟﻬﻨﺪﺳﻲ
ISO-Phase
General Medium Low Voltage & Main
DC
Milestone Transformer Voltage Auxiliary per
Equipment Equipment Equipment
Equipment bus section
Receive and
10% 10% 10% 10% 10% 5%
handle
Set in place,
20% 20% 20% 20% 50%
secure
Weld out
20%
complete
Set racks in
20%
place
Hookup
50% 50% 15%
internals
Dress out
50%
complete
67
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ .ﻳﺮﺟﻰ اﻟﺮﺟﻮع
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ .
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
"اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ.
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Complete
50% 50%
installation
Checkout/Fi
10% 10% 10% 10% 10% 5%
eld
Engineering
10% 10% 10% 10% 10% 5%
Inspection
68
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
valves that require bench calibration. For ﺑﺎﻟﻨﺴﺒﺔ ﻟﻠﻤﺸﺎرﻳﻊ اﻟﺘﻲ ﺗﺴﺘﺨﺪم اﻟﺘﻌﻘﺐ اﻟﻴﺪوي.ﻣﻜﺘﺒﻴﺔ
projects using manual quantity tracking, the ﻳﺠﺐ ﺗﺴﺠﻴﻞ ﺗﺎرﻳﺦ.ﻟﻠﻜﻤﻴﺎت ﻳﺠﺐ ﺗﺴﺠﻴﻞ ﻋﻤﻠﻴﺎت اﻟﺤﺼﺮ
take-off should be recorded. The date shall be .ﻣﻌﺎﻳﺮة اﻟﺒﻨﺪ اﻟﻤﻌﻨﻲ
recorded when the item is calibrated.
Loop checks are preferably taken off from loop ﻳﻔﻀﻞ ﺣﺼﺮ اﻻﺧﺘﺒﺎرات اﻟﺪاﺋﺮﻳﺔ ﻣﻦ ﻣﺨﻄﻄﺎت اﻟﺪواﺋﺮ
diagrams and vendor panel drawings. ﻳﺠﺐ إﺟﺮاء ﻣﺮاﺟﻌﺔ، ٍ وﻋﻠﻰ.ورﺳﻮﻣﺎت ﻟﻮﺣﺎت اﻟﺒﺎﺋﻊ
However, a thorough review of P&IDs and the دﻗﻴﻘﺔ ﻟﻤﺨﻄﻂ اﻷﺟﻬﺰة واﻷﻧﺎﺑﻴﺐ وﻓﻬﺎرس اﻷﺟﻬﺰة ﺑﺤﻴﺚ
Instrument Index should also be made so that ﻳﺘﻢ ﺣﺴﺎب اﻟﺪواﺋﺮ اﻟﻬﻮاﺋﻴﺔ وﻏﻴﺮﻫﺎ اﻟﺘﻲ ﻻ ﺗﻈﻬﺮ ﻓﻲ
pneumatic loops and other loops not shown ُﺗﺤﺼﺮ اﻟﺪواﺋﺮ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻣﻦ ﻣﺨﻄﻄﺎت.ﻣﻮاﺿﻊ أﺧﺮى
elsewhere will get counted. The electronic . ﻳﺠﺐ ﺗﺴﺠﻴﻞ ﺣﺼﺮ اﺧﺘﺒﺎر اﻟﺪواﺋﺮ ﺣﺴﺐ أرﻗﺎم اﻟﺪواﺋﺮ.اﻟﺪواﺋﺮ
loops are taken off from loop diagrams. The
loop check take-off should be recorded by the
loop number.
69
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
واﻟﻘﺒﻮل واﻟﺠﺎﻫﺰﻳﺔ
ﻟﻼﺧﺘﺒﺎر
Field Packaged
Panels/Inte
Milestone Mounted Local Racks Instrument
grated
Instruments Systems
Unload and store 10% 10% 10% 10%
Calibration (see
15%
Note below)
Complete
50% 10% 75% 60%
installation
Connections
15% 25%
complete
Checkout/Field
Engineering
Inspection
10% 80% 15% 5%
complete,
Acceptable and
Ready to Test
Note: In cases where instruments do not require ﻓﻲ ﺣﺎل ﻋﺪم ﺣﺎﺟﺔ اﻷﺟﻬﺰة ﻟﻠﻤﻌﺎﻳﺮة ﻳﺘﻢ ﻃﻠﺐ اﻻﻋﺘﻤﺎد:ﻣﻼﺣﻈﺔ
calibration, the credit will be claimed once the .ﺑﻤﺠﺮد اﻛﺘﻤﺎل اﻟﺘﺮﻛﻴﺐ
installation is complete.
8.10 INSULATION اﻟﻌﺰل8.10
8.10.1 TAKE-OFF اﻟﺤﺼﺮ8.10.1
Insulation is taken off for piping, instruments, ﻳﺤﺼﺮ اﻟﻌﺰل ﻟﻸﻧﺎﺑﻴﺐ واﻷﺟﻬﺰة واﻟﻤﻌﺪات اﻟﻤﻴ ﻧﻴﻜﻴﺔ
and mechanical equipment and is required for وﻳﻜﻮن ﻣﻄﻠﻮﺑًﺎ ﻟﺘﻘﻴﻴﻢ اﻟﻤﻨﺎﻗﺼﺎت وﻣﺮاﻗﺒﺔ ﺳﻴﺮ أﻋﻤﺎل
evaluating bids and monitoring contractor .اﻟﻤﻘﺎول
progress.
Piping insulation take-off uses the same take- ﺗﺴﺘﺨﺪم ﻋﻤﻠﻴﺔ ﺣﺼﺮ ﻋﺰل اﻷﻧﺎﺑﻴﺐ ﻧﻔﺲ ﻗﻴﺎﺳﺎت ﺣﺼﺮ ﻋﺰل
off measurements as the piping requiring ﻳﺠﺐ ﺗﺼﻨﻴﻒ اﻟﺤﺼﺮ ﺣﺴﺐ ﻧﻈﺎم.اﻷﻧﺎﺑﻴﺐ اﻟﺘﻲ ﺗﺘﻄﻠﺐ ﻋﺰًﻻ
insulation. The take-offs should be sorted by .اﻷﻧﺎﺑﻴﺐ ورﻗﻢ اﻟﺨﻂ وﻗﻂ اﻷﻧﺎﺑﻴﺐ وﻧﻮع وﺳﻤﻚ اﻟﻌﺰل
the piping system, line number, piping ُﺗﻘﺎس اﻟﺘﻐﻴﺮات ﻓﻲ اﻻﺗﺠﺎه ﻋﻨﺪ ﺗﺮﻛﻴﺒﺎت اﻷﻧﺎﺑﻴﺐ ﻣﻦ ﺗﻘﺎﻃﻊ
diameter, insulation type, and thickness. اﻟﺨﻄﻮط اﻟﻤﺮﻛﺰﻳﺔ اﻟﺮﺋﻴﺴﻴﺔ وﻟﻴﺲ اﻟﺨﻄﻮط اﻟﻤﺮﻛﺰﻳﺔ
Changes in direction at pipe fittings are ُﻳﻘﺎس ﺣﺼﺮ ﻗﺎﻋﺪة اﻟﻌﺰل ﻣﻦ ﺧﻼل اﻟﺘﺮﻛﻴﺒﺎت.اﻟﻤﻨﺤﻨﻴﺔ
measured from the intersection of straight .واﻟﺼﻤﺎﻣﺎت واﻷﺟﺰاء اﻟﻤﺘﺨﺼﺼﺔ وﻟﻴﺲ ﻣﻦ ﺧﻼل اﻟﻤﻌﺪات
centerlines, not curved centerlines. The take- ﻳﻮﺿﻊ ﻓﻲ اﻟﻌﺎدة اﺣﺘﻴﺎﻃﻲ ﻟﻠﻘﺎﻋﺪة اﻟﻔﻌﺎﻟﺔ ﻟﻠﻌﺰل
off footage of insulation is measured through ﻋﻠﻰ.ﻟﻠﺘﺮﻛﻴﺒﺎت واﻟﺼﻤﺎﻣﺎت وأي أﺟﻬﺰة داﺧﻠﻴﺔ أﺧﺮى
fittings, valves, and specialties, but not through ﻣﻬﻨﺪس اﻹﺷﺮاف ﻋﻠﻰ اﻟﻤﻮاﻗﻊ اﻟﺘﺸﺎور ﻣﻊ اﻹﺷﺮاف
equipment. An allowance is normally made for .اﻟﻤﻴﺪاﻧﻲ أو اﻟﻌﻘﻮد اﻟﻤﻴﺪاﻧﻴﺔ ﻟﺘﺤﺪﻳﺪ اﻻﺣﺘﻴﺎﻃﻲ اﻟﻤﻼﺋﻢ
effective footage of insulation for fittings, ﻓﻲ ﺣﺎل ﻋﺰل رﻗﻢ ﺧﻂ ﻣﻌﻴ ﻦ ﺟﺰﺋﻴًﺎ ﻟﺤﻤﺎﻳﺔ اﻟﻌﺎﻣﻠﻴﻦ ُﻳﺤﺪد
70
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
valves, and other inline devices. The Site ﻣﻬﻨﺪس اﻹﺷﺮاف ﻋﻠﻰ اﻟﻤﻮاﻗﻊ ﺣﺼﺮ اﻟﻘﺎﻋﺪة اﻟﻤﻌﺰوﻟﺔ
Supervision Engineer should consult with Field .ﺑﻨﺎًء ﻋﻠﻰ ﻣﺴﺎر اﻷﻧﺎﺑﻴﺐ وﻣﻌﺎﻳﻴﺮ اﻟﻌﺰل
Supervision or Field Contracts to determine
the appropriate allowance. When a line number
is partially insulated for personnel protection,
the take-off for insulated footage is
determined by the Site Supervision Engineer
based on the pipe routing and the insulation
criteria.
Spooled pipe insulation quantity take-offs ﻋﻠﻰ ﻣﻬﻨﺪس اﻹﺷﺮاف ﻋﻠﻰ اﻟﻤﻮاﻗﻊ اﻟﺘﺤﻘﻖ ﻣﻦ ﺣﺼﺮ
must be verified by the Site Supervision .ﻛﻤﻴﺎت ﺗﺮﻛﻴﺒﺎت اﻷﻧﺎﺑﻴﺐ اﻟﻤﺠّﻤﻌﺔ
Engineer.
Instrument insulation take-offs should be done رﻗﻢ اﻟﺠﻬﺎز،وﻳﺠﺐ أن ﻳﺘﻢ ﺣﺼﺮ ﻋﺰل اﻷﺟﻬﺰة ﺣﺴﺐ اﻟﻨﻈﺎم
by the system, instrument number, insulation وﻛﻤﺎ ﻫﻮ اﻟﺤﺎل ﻓﻲ ﻋﺰل اﻷﻧﺎﺑﻴﺐ.وﻧﻮع اﻟﻌﺰل واﻟُﺴﻤﻚ
type, and thickness. As with piping insulation, ﻳﻘﺎس ﻃﻮل اﻟﺤﺼﺮ ﻋﺒﺮ ﺗﻮﺻﻴﻼت اﻷﻧﺎﺑﻴﺐ وﺻﻤﺎﻣﺎت
the take-off length is measured through tubing .اﻷﺟﻬﺰة واﻟﺒﻨﻮد اﻟﻤﺘﺨﺼﺼﺔ
connections, instrument valves, and specialty
items.
Mechanical equipment insulation is taken off by ُﺗﺤﺼﺮ ﺗﺮﻛﻴﺒﺎت اﻟﻤﻌﺪات اﻟﻤﻴ ﻧﻴﻜﻴﺔ ﺣﺴﺐ رﻗﻢ دﻳﺒﺎﺟﺔ
equipment tag number, insulation type, and ُﺗﺴﺘﺨﺪم ﻗﻴﻤ ﺔ ﺑﻨﺪ.اﻟﻤﻌﺪات وﻧﻮع اﻟﻌﺰل وﺳﻤﻚ اﻟﻌﺰل
insulation thickness. The value of the contract اﻟﺴﺪاد اﻟﺘﻌﺎﻗﺪي ﻟﻌﺰل اﻟﻤﻌﺪات ﺣﺴﺐ رﻗﻢ اﻟﺪﻳﺒﺎﺟﺔ ﻓﻲ
pay item for equipment insulation by tag .اﻟﻌﺎدة ﺳﺎس ﻟﺘﻘﺎرﻳﺮ اﻟﻨﺴﺒﺔ اﻟﻤﺌﻮﻳﺔ ﻟﻼﻛﻤﺎل
number is normally used as the basis for
reporting percent complete.
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
are a key factor in monitoring the progress of ﻳﺠﺐ ﻃﻠﺐ ﺳﺎﻋﺎت ﻋﻤﻞ ﻧﺼﺐ وإزاﻟﺔ.اﻟﻤﻘﺎول أو اﻟﻤﻨﺎﻗﺼﺔ
the insulation work. Weight factors for .اﻟﺴﻘﺎﻻت ﻣﻦ اﻟﻤﻘﺎول ﺳﻮﻳًﺎ ﻣﻊ ﺳﻌﺮ اﻟﻤﻨﺎﻗﺼﺔ
scaffolding erection are normally based on the
contractor’s job hour estimate or bid. Job
hours for scaffolding erection and removal
should be requested from the contractor along
with the bid price.
Credit should not be given for scaffold وﻻ ُﻳﻌﻄﻰ اﻻﻋﺘﻤﺎد ﻟﻨﺼﺐ وإزاﻟﺔ اﻟﺴﻘﺎﻻت ﻟﻸﻧﺎﺑﻴﺐ
installation and removal for piping and .واﻟﻤﻌﺪات اﻟﻤﻴ ﻧﻴﻜﻴﺔ
mechanical equipment.
Mechanical equipment insulation, installation ﻋﺰلError! Reference source not found. ﻳﻮﺿﺢ
credit are shown in Error! Reference source .اﻟﻤﻌﺪات اﻟﻤﻴ ﻧﻴﻜﻴﺔ واﻋﺘﻤﺎد اﻟﺘﺮﻛﻴﺐ
not found..
Table Error! No text of specified style in document.-18 19-Error! No text of specified style in document. اﻟﺠﺪول
Piping Insulation Quantity Reporting Matrix ﻣﺼﻔﻮﻓﺔ ﺗﻘﺎرﻳﺮ ﻛﻤﻴﺎت ﻋﺰل اﻷﻧﺎﺑﻴﺐ
AAC, ETAC, CAC ,AS, ET, H
AC C, CF
PAC )ﻣﻼﺣﻈﺔ HF, PP اﻟﻤﻌﺎﻟﻢ اﻟﺮﺋﻴﺴﻴﺔ
(2 )ﻣﻼﺣﻈﺔ (2 )ﻣﻼﺣﻈﺔ
(2 )ﻣﻼﺣﻈﺔ (2 (2 )ﻣﻼﺣﻈﺔ
%70 80% %75 %75 % 55 ﺗﺮﻛﻴﺐ اﻟﻌﺰل
%15 %5 %10 %10 % 30 ﺗﺮﻛﻴﺐ اﻟﺘﻐﻠﻴﻒ
ﻋﺰل اﻟﺼﻤﺎﻣﺎت
%10 %10 %10 %10 %10 واﻟﻔﻠﻨﺠﺎت )اﻧﻈﺮ
([1] اﻟﻤﻼﺣﻈﺔ
%5 %5 %5 %5 %5 اﻛﺘﻤﺎل اﻟﺘﻮﺻﻴﻼت
AS, ET,
H, C, CF AC CAC AAC, ETAC, PAC
Milestone
HF, PP (Note 2) (Note 2) (Note 2) (Note 2)
(Note 2)
Install
55% 75% 75% 80% 70%
insulation
Install
30% 10% 10% 5% 15%
jacketing
Insulate valves
& flanges (see 10% 10% 10% 10% 10%
note 1)
Connections
5% 5% 5% 5% 5%
complete
AS, ET, C, CF
AC CAC AAC, ETAC, PAC
Milestone H, (Note 2)
(Note 2) (Note 2) (Note 2)
HF, PP
72
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
(Note 2)
Notes: :ﻣﻼﺣﻈﺎت
1. In cases were spools have no valves or flanges ﻓﻲ اﻟﺤﺎﻻت اﻟﺘﻲ ﻻ ﺗﻮﺟﺪ ﻓﻴﻬﺎ ﺻﻤﺎﻣﺎت ﺿﺒﻂ أو ﻓﻠﻨﺠﺎت.1
the credit will be claimed upon completion of .ُﻳﻄﻠﺐ اﻻﻋﺘﻤﺎد ﻋﻨﺪ اﻛﺘﻤﺎل اﻟﻌﺰل واﻟﺘﻐﻠﻴﻒ
the insulation and jacketing.
Table Error! No text of specified style in -Error! No text of specified style in document. اﻟﺠﺪول
document.-20 Mechanical Equipment Insulation ﻣﺼﻔﻮﻓﺔ ﺗﻘﺎرﻳﺮ ﻛﻤﻴﺎت ﻋﺰل اﻟﻤﻌﺪات اﻟﻤﻴ ﻧﻴﻜﻴﺔ21
Quantity Reporting Matrix
اﻟﻤﻌﺪات اﻟﺒﺎردة اﻟﻤﻌﺪات اﻟﺴﺎﺧﻨﺔ اﻟﻤﻌﺎﻟﻢ اﻟﺮﺋﻴﺴﻴﺔ
%50 %50 ﺗﺮﻛﻴﺐ اﻟﻌﺰل
%45 %45 ﺗﺮﻛﻴﺐ اﻟﺘﻐﻠﻴﻒ
%5 %5 اﻟﻔﺤﺺ اﻟﻨﻬﺎﺋﻲ
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Attachment 1 Quantity Tracking Associated Data ERROR! REFERENCE SOURCE NOT FOUND. 9.12
The following associated data is typical for all MMR-CAE-KPC-TP-000038 TYPICAL DESIGN 9.13
Unit
Facility اﻟﺒﻴﺎﻧﺎت اﻟﻤﺘﻌﻠﻘﺔ ﺑﺘﻌﻘﺐ اﻟﻜﻤﻴﺎت2 اﻟﻤﺮﻓﻖ
Engineering System :ﺗﻨﻄﺒﻖ اﻟﺒﻴﺎﻧﺎت اﻟﺘﺎﻟﻴﺔ ﻋﻠﻰ ﺟﻤﻴﻊ اﻟﺴﻠﻊ
Commodity Identifier
Drawing اﻟﻤﻌّﺮف
Material Specification/Purchase Order اﻟﻮﺣﺪة
Account Code اﻟِﻤﺮﻓﻖ
Schedule Code اﻟﻨﻈﺎم اﻟﻬﻨﺪﺳﻲ
Location Code ﻣﻌّﺮف اﻟﺴﻠﻌﺔ
Quantity Status/Quantity اﻟﺮﺳﻢ
Additional associated data is typical for ﻃﻠﺐ اﻟﺸﺮاء/ ﻣﻮاﺻﻔﺎت اﻟﻤﻮاد
individual commodities: رﻣﺰ اﻟﺤﺴﺎب
Concrete رﻣﺰ اﻟﺠﺪول اﻟﺰﻣﻨﻲ
o Concrete Class رﻣﺰ اﻟﻤﻮﻗﻊ
o Vendor Drawing اﻟﻜﻤّﻴﺔ/ ﺣﺎﻟﺔ اﻟﻜﻤﻴﺔ
Equipment :ﺑﻴﺎﻧﺎت إﺿﺎﻓﻴﺔ ذات ﺻﻠﺔ ﺗﺘﻌﻠﻖ ﺑﺴﻠﻊ ﻣﻌﻴﻨﺔ
o Location Drawing
o Description اﻟﺨﺮﺳﺎﻧﺔ
o Weight ﻓﺌﺔ اﻟﺨﺮﺳﺎﻧﺔ o
o Shop Order Number رﺳﻮﻣﺎت اﻟﺒﺎﺋﻊ o
o Storage Requirements اﻟﻤﻌﺪات
o Cleanliness Requirements رﺳﻮﻣﺎت اﻟﻤﻮﻗﻊ o
o Storage Location اﻟﻮﺻﻒ o
o Installation Plan Reference اﻟﻮزن o
74
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
76
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ .ﻳﺮﺟﻰ اﻟﺮﺟﻮع
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ .
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
"اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ.
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
77
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ .ﻳﺮﺟﻰ اﻟﺮﺟﻮع
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ .
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
"اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ.
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
اﻟﻌﻼﻣﺔ
اﻟﺘﻌﻠﻴﻘﺎت اﻟﻜﻤﻴﺔ وﺣﺪة اﻟﻘﻴﺎس ﺑﻴﺎن رﻣﺰ اﻟﺘ ﻟﻴﻒ
اﻟﺮﺋﻴﺴﻴﺔ
ﺗﺼﻨﻴﻊ اﻷﻧﺎﺑﻴﺐ ذات
اﻟﺒﻜﺮات ﻓﻲ اﻟﻤﻮﻗﻊ
"4,00 - "2,50
1,000 ﻣﺘﺮ ﻃﻮﻟﻲ ☒ A21.160
ﻜْﺮﺑﻦ
أﻧﺒﻮب ﻓﻮﻻذ ُﻣ َ
"4,00 - "2,50
500 ﻣﺘﺮ ﻃﻮﻟﻲ أﻧﺒﻮب ﻓﻮﻻذ ﻣﻘﺎوم ☒ A21.161
ﻟﻠﺼﺪأ
ﺗﻌﺘﺒﺮ اﻟﻜﻤﻴﺎت
اﻟﺮﺋﻴﺴﻴﺔ ﺣﻘﻴﻘﻴﺔ
1,500 ﻣﺘﺮ ﻃﻮﻟﻲ ُ "S/T < 2,50أﻧﺒﻮب ☒ A21.16
وﻟﻬﺬا ُﺗﺮﺣﻞ إﻟﻰ
اﻟﻤﺴﺘﻮى اﻟﺘﺎﻟﻲ.
ﺗﻌﺘﺒﺮ اﻟﻜﻤﻴﺎت
اﻟﺮﺋﻴﺴﻴﺔ ﻏﻴﺮ
ﺗﺼﻨﻴﻊ اﻷﻧﺎﺑﻴﺐ ذات
ﺣﻘﻴﻘﻴﺔ وﻟﻬﺬا ﻻ 1,500 ﻣﺘﺮ ﻃﻮﻟﻲ ☒ A21.1
اﻟﺒﻜﺮات ﻓﻲ اﻟﻤﻮﻗﻊ
ُﺗﺮﺣﻞ إﻟﻰ
اﻟﻤﺴﺘﻮى اﻟﺘﺎﻟﻲ.
ﺗﻮزﻳﻊ وﺗﺮﻛﻴﺐ
اﻷﻧﺎﺑﻴﺐ اﻟﻤﻴﺪاﻧﻴﺔ
ﻓﻲ اﻟﻤﻮﻗﻊ
10,000 ﻣﺘﺮ ﻃﻮﻟﻲ اﻟﻔﻮﻻذ اﻟﻜﺮﺑﻮﻧﻲ ☒ A21.270
2,000 ﻣﺘﺮ ﻃﻮﻟﻲ ﻓﻮﻻذ ﻣﻘﺎوم ﻟﻠﺼﺪأ ☒ A21.271
78
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ .ﻳﺮﺟﻰ اﻟﺮﺟﻮع
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ .
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
"اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ.
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
أﻧﺎﺑﻴﺐ ﻣﻴﺪاﻧﻴﺔ
12,000 ﻣﺘﺮ ﻃﻮﻟﻲ ﺻﻐﻴﺮة > "2.50 ☒ A21.27
ﺣﺎﻣﻞ /ﺟﺴﺮ
79
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ .ﻳﺮﺟﻰ اﻟﺮﺟﻮع
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ .
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
"اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ.
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
On-Site Spooled
Pipe Shop
Fabrication
A21.160 ☒ 2.50" - 4.00" Carbon LM 1,000
Steel Pipe
A21.161 ☒ 2.50" - 4.00" Stainless LM 500
Steel Pipe
A21.16 ☒ S/T < 2.50" Pipe LM 1,500 Key quantities are
true so subtotal is
carried forward to
next level
80
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
ﻣﺨﻄﻂ ﺳﻴﺮ أﻋﻤﺎل ﺗﻌﻘﺐ اﻟﻜﻤﻴﺎت أﺛﻨﺎء اﻟﺘﺸﻴﻴﺪSEQ Attachment \* ARABIC (5)اﻟﻤﺮﻓﻖ
81
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
82
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ .ﻳﺮﺟﻰ اﻟﺮﺟﻮع
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ .
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
"اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ.
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Attachment 7 Quantity Reporting Responsibility Matrix ﻣﺼﻔﻮﻓﺔ ﻣﺴﺆوﻟﻴﺎت ﺗﻘﺎرﻳﺮ اﻟﻜﻤﻴﺎت8 اﻟﻤﺮﻓﻖ
83
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
The Quantity Reporting Matrix identifies the rules of ﺗﺤﺪد ﻣﺼﻔﻮﻓﺔ ﺗﻘﺎرﻳﺮ اﻟﻜﻤﻴﺎت ﻗﻮاﻋﺪ اﻟﻤﺼﺪاﻗﻴﺔ اﻟﺘﻲ ﻳﺠﺐ إﻳﺮادﻫﺎ
credit that are to be reported based on activities and ﺑﻨﺎًء ﻋﻠﻰ ﻇﺮوف اﻷﻧﺸﻄﺔ واﻟﻤﻮاد ﻟﻠﺒﻨﻮد اﻟﺠﺎري ﺗﻌﻘﺒﻬﺎ.
material conditions for items being tracked.
Electronic documents once printed, are uncontrolled and may become outdated. Refer to اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ .ﻳﺮﺟﻰ اﻟﺮﺟﻮع
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ .
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
"اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ.
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
85
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ .ﻳﺮﺟﻰ اﻟﺮﺟﻮع
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ .
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
"اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ.
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Electronic documents once printed, are uncontrolled and may become outdated. Refer to اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ .ﻳﺮﺟﻰ اﻟﺮﺟﻮع
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ .
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
"اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ.
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Electronic documents once printed, are uncontrolled and may become outdated. Refer to اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ .ﻳﺮﺟﻰ اﻟﺮﺟﻮع
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ .
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
"اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ.
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
88
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ .ﻳﺮﺟﻰ اﻟﺮﺟﻮع
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ .
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
"اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ.
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
89
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
91
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
92
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
93
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
Procedure
Procedure
Application Guide.xlsx
Application Guide.xlsx
94
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to ﻳﺮﺟﻰ اﻟﺮﺟﻮع.اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH . إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
."اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ
إﺟﺮاء ﺗﺘﺒﻊ اﻟﻜﻤّﻴﺎت وإﻋﺪاد اﻟﺘﻘﺎرﻳﺮ ﻓﻲ اﻟﻤﺸﺮوع
Project Quantity Tracking and Reporting Procedure
95
MMR-CAE-KPC-PR-000006 Rev.000
Electronic documents once printed, are uncontrolled and may become outdated. Refer to اﻟﻤﺴﺘﻨﺪات اﻹﻟﻜﺘﺮوﻧﻴﺔ اﻟﻤﻄﺒﻮﻋﺔ ﻏﻴﺮ ﺧﺎﺿﻌﺔ ﻟﻠﺮﻗﺎﺑﺔ ﻗﺪ ﺗﺤﺘﻮي ﻋﻠﻰ ﻣﻌﻠﻮﻣﺎت ﻏﻴﺮ ﻣﺤّﺪﺛﺔ .ﻳﺮﺟﻰ اﻟﺮﺟﻮع
MoMRAH’s Portal for current revision. This Document is the exclusive property of MoMRAH إﻟﻰ اﻟﺒّﻮاﺑﺔ اﻹﻟﻜﺘﺮوﻧﻴﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن ﻟﻼﻃﻼع ﻋﻠﻰ اﻟﻨﺴﺨﺔ اﻟﻨﻬﺎﺋﻴﺔ اﻟﻤﺤﺪّﺛﺔ .
and is subject to the restrictions set out in the Important Notice contained in this Document. ﻳﻌﺪ ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻣﻠﻜّﻴﺔ ﺣﺼﺮّﻳﺔ ﻟﻮزارة اﻟﺸﺆون اﻟﺒﻠﺪﻳﺔ واﻟﻘﺮوﻳﺔ واﻹﺳ ن وﺗﺨﻀﻊ ﻟﻠﻘﻴﻮد اﻟﻤﺸﺎر إﻟﻴﻬﺎ ﻓﻲ
"اﻹﺷﻌﺎر اﻟﻬﺎم" اﻟﺬي ﻳﺤﺘﻮﻳﻪ اﻟﻤﺴﺘﻨﺪ.