Idbms Quiz
Idbms Quiz
• moodle lnm11t ac 1n
Qu estion 1
Which of the following method will ensure the non-serializability of the schedules ?
Correct
View Serializability
2 29 PM Sun 22 Oct ••• -:S:- 19% I i•
moodle lnm11t ac 1n
View Serializability
f" Flag
question
b. Serializability
Question 3
Transaction log files are maintained in the database until _ _ _ _ _?
Correct
Question 3
Transaction log files are maintained in the database until _ _ _ _ _?
Correct
Flag a. Rollback
question
b. Partial commit
c. Commit
• d. Rollback or Commit
Question 4
Any concurrent execution of transactions is correct/consistent if it is ________?
Incorrect
Qu estion 4
Any concurrent execution of transactions is correct/consistent if it is ________?
Incorrect
Flag a. Serializable
question
b. Recoverable
,c
• c. Both Serializable and Recoverable
Question 5
R1(X), R2(Y), R3(Y). W2(Y). W1(X). W3(X), R2(X) , R3(X)
Correct
The given schedule is equivalent to which serial schedule?
Mark 1.00 out
2 29 PM Sun 22 Oct ••• -:;:- 19% 1----i,
moodle lnm11t ac 1n
Qu estion 5
R1(X), R2(Y), R3(Y). W2(Y). W1(X). W3(X), R2(X), R3(X)
Correct
The given schedule is equivalent to which serial schedule?
Mark 1.00 out
of 1.00
f" Flag
question 0
a. T1 -> T3 - > T2
b. T2 -> T1 - > T3
c. T2 -> T3 - > T1
d. T3 -> T1 - > T2
Qu estion 6
The below given schedule is
2 30 PM Sun 22 Oct ••• -:S:- 19% 0 •
• moodle lnm11t ac 1n
Question 6
The below given schedule is
Correct
R1(B), R3(C), R1(A), W2(A), W1(A), W2(B), W3(A), W1(B), W3(B), W3(C)
Mark 1.00 out
of 1.00
Flag
question
a. Recoverable schedule
Qu estion 7
Following two schedules are conflict equal or not?
Incorrect
Schedule 1: R2(A), W2(A), R3(C), W2(B), W3(A), W3(C), R1(A), R1(B), W1(A), W1(B)
Mark -0.25 out
2 30 PM Sun 22 Oct ••• -:S:- 19% r-=l•
moodle lnm11t ac 1n
Qu estion 7
Following two schedules are conflict equal or not?
Incorrect
Schedule 1: R2(A) , W2(A), R3(C), W2(B), W3(A), W3(C), R1(A) , R1(B) , W1(A), W1(B)
Mark -0.25 out
of 1.00
Flag Schedule 2: R2(A), R3(C), W3(A), W2(A), W2(B), W3(C), R1(A), R1(B), W1(A), W1(B)
question
Qu estion 8
Consider the below given schedule
Incorrect
R1(A), W2(A), R2(A), R2(B), R1(B), W1(B), T1-Commit, T2-Commit
2 30 PM Sun 22 Oct ••• -:S:- 19% I i•
moodle lnm11t ac 1n
Question 8
Consider the below given schedule
Incorrect
R1(A), W2(A), R2(A), R2(B), R1(B), W1(B), T1-Commit, T2-Commit
Mark -0.25 out
of 1.00 The given schedule is
f° Flag
question
d. Non-Recoverable
Question 9
Consider the following sequence of instructions in a transaction
Correct
R(A), Debit x from A account, W(A), R(B), Credit x in B account, W(B)
Mark 1.00 out
of 1.00 Which of the following property ensures that sum of A and B account should be same before and after the transaction
f" Flag completion?
2 30 PM Sun 22 Oct ••• -:S:- 19% 0 •
moodle lnm11t ac 1n
Question 9
Consider the following sequence of instructions in a transaction
Correct
R(A) , Debit x from A account, W(A), R(B), Credit x in B account, W(B)
Mark 1.00 out
of 1.00 Which of the following property ensures that sum of A and B account should be same before and after the transaction
Flag completion?
question
a. Isolation
b. Atomicity
C. Deadlock
• d. Consistency
Question 10
Which of the following statement is correct?
Correct
Question 10
Which of the following statement is correct?
Correct
Finish review