0% found this document useful (0 votes)
213 views7 pages

Egd Paper 1 2023 Eng

Engineering Drawing Exams Paper

Uploaded by

innoodira
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
213 views7 pages

Egd Paper 1 2023 Eng

Engineering Drawing Exams Paper

Uploaded by

innoodira
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

lOMoARcPSD|844895

EGD Paper 1 (2023) ENG

Engineering Graphics and Design (Horizon International High School)

Scan to open on Studocu

Studocu is not sponsored or endorsed by any college or university


Downloaded by Inno Odira ([email protected])
lOMoARcPSD|844895

INSTRUCTIONS AND INFORMATION


1. The question paper consists of FOUR questions.
2. Answer ALL the questions.
3. All drawings must be drawn to scale 1 : 1, unless otherwise stated.
4. ALL drawings are in first angle orthographic projection, unless stated
otherwise.
5. ALL drawings must be prepared using pencil and instruments, unless
otherwise stated.
6. ALL answers must be drawn accurately and neatly.
7. ALL the questions must be answered on the question paper, as instructed.
8. All the answer sheets must be re-stapled in numerical sequence and handed
in irrespective of whether the question was attempted or not.
9. Time management is essential in order to complete all the questions.
10. Print your name in the block provided on every ANSWER SHEET.
11. Any details or dimensions not given, must be assumed in good proportion.

FOR OFFICIAL USE ONLY


NATIONAL
MODERATED
MARK

SENIOR CERTIFICATE 1
2
3
4
GRADE 12 TOTAL

2 0 0 2 0 0
FINAL CONVERTED CHECKED BY
MARK

ENGINEERING GRAPHICS AND DESIGN P1


100
SEPTEMBER 2023
COMPLETE THE FOLLOWING:
PREPARATORY EXAMINATION
NAME

NAME
MARKS: 100
EXAMINATION CENTRE
TIME: 3 hours

This question paper consists of 6 pages.


EXAMINATION CENTRE
Copyright reserved
Please turn over 1

Downloaded by Inno Odira ([email protected])


lOMoARcPSD|844895

Engineering graphics and design / P1 NSC EC / September 2023


QUESTION 1: ANALYTICAL (CIVIL)
LAND SURVEYOR'S CERTIFICATE NOTE:
SYMBOL LEGEND Contractors must verify all dimensions Given:
OF THE BORDER LINE LENGTHS
1 BRICK PAVING AND CORNER HEIGHTS OF and levels on the site before The site plan of an existing house with alterations and section of a new dwelling on the adjacent stand, a title block and a
commencing work. Architects to be table of questions. The drawing has not been prepared to the indicated scale.
STAND 1144
2 100 mm HIGH notified immediately of any
2 PALISADE FENCING SURVEYED ON 2023-01-08 discrepancies.
LENGTHS IN CORNER HEIGHTS IN Instructions:
1 800 mm HIGH MILLIMETRES METRES Complete the table below by neatly answering the questions which refer to the accompanying drawing and title block. [29]
3 SECURITY FENCING ARCHITECT'S SIGNATURE ...................................
AB = 36 400 A = 1 550
4
1 800 mm HIGH
BRICK WALL
BC = 36 400 B = 1 552 CLIENT'S SIGNATURE ...................................
QUESTIONS ANSWERS
CD = 5 600 C = 1 552,5
5 INDIGENOUS TREE DE = 32 400 D = 1 552 1 Who was responsible for checking the correctness of the drawing? 1
AE = 40 400 E = 1 550 ANSWER 17
In the space below, draw in neat 2 Who is the owner of the stand 1144? 1
6 SHRUBS
freehand, the front view and top view
of the SANS 10143 graphical symbol
for a BIDET. 3 What is the reference code of this drawing? 1

How far, in meters, are the pillars of the brick wall spaced from one
4 1
another on stand 1144?
PROPOSED NEW DWELLING
W 5 When was the second revision done? 1
STAND 1142
2000 5600
2800
6 How many indigenous trees are on stand 1144? 1
IE
2800 3200
6800

IE 7 Indicate the direction of flow on the sewerage line with an arrow in the circle numbered 1. 1

RE What type of fence does the owner want to use on stand 1142, on
2800 BL 8 1
the street sides, to secure his house?
W
A B 9 In what colour should new alterations be indicated on the site plan? 1
2800 BL
MH What is the minimum distance that the braai could be erected in,
SEWERAGE LINE 10 1
LAID AT 1 : 40 BRAAI POSITION FOR from the brick wall?
NEW BRAAI AREA
2800 BL

3 11 How many roding eyes are installed on stand 1144 ? 1


1
Show the position of
2 2023-03-01 the Watt meter 12 What is the height of the wall between the two stands, in meters? 2

IE Indicate the position of The municipality rejected the plans of stand 1142. Give a reason
1 2023-02-24 the new braai area 13 2
STAND 1144 for the decision.
IE REVISION DATE DESCRIPTION
With reference to the north point, on which side is the entrance of
HEIDE ROAD

SPANGENBERG ARCHITECTS 14 2
stand 1142?
BOSKLOOF AVE

EXISTING HOUSE RE
13 MAIN ROAD
Determine, in the space provided below (ANSWER 15) the total length of the brick wall fencing on
GQEBERHA 15 4
stand 1144.
4000 C/C

IE 082 346 6373


3600

RE [email protected] Determine, in the space provided below (ANSWER 16), the total area of the paved ramp on stand
16 4
1142, in square meters.
PRINTED BY: DATE OF PRINT:
2023-02-14
In the space at the title panel (ANSWER 17), draw in neat freehand, the top view and front view of the
FLEMMING PRINTERS 17 SANS 10143 graphical symbol for a bidet. 4
8430

DRAWING TITLE:

SITE PLAN ANSWER 15 ANSWER 16


2800 BL C
Show ALL calculations. Show ALL calculations.
TOTAL 29
PROJECT:
ALTERATIONS ON STAND 1144 FOR
E D MR ROTHERHAM
ALL PILLARS ARE 2000 5600
5220 3600
400 X 400 mm WITH Cnr. BOSKLOOF AVE & KEUR
KEUR STREET 4000 C/C 3 600 mm FENCING IN STREET, HUMANSDORP

2800 3200
BETWEEN PILLARS DRAWING NUMBER:
PROJECT NUMBER:

6800
01-2023 LOUK01-2023
DATE: DRAWN: CHECKED: SCALE:

2023-01-06 GERHARD LEAH 1 : 300 NAME


REFERENCE CODE: DRAWING NO.: 2800

SITE- 1144-23 1 of 6 NAME 2


Copyright reserved Please turn over

Downloaded by Inno Odira ([email protected])


lOMoARcPSD|844895

Engineering graphics and design / P1 NSC EC / September 2023

QUESTION 2: INTERPENETRATION AND DEVELOPMENT:


Given:
· The incomplete front view and top view of a square
pipe penetrating a pentagonal pipe.
· The center of both pipes are in line with each other.
· Starting point X.

Instructions:
Draw to scale 1 : 1, the following views:

2.1 The complete top view.


2.2 The complete front view that clearly shows the curve
of the penetration.
2.3 The development of ONLY the two surfaces (A and B)
of the pentagonal pipe that clearly shows the curve.

· Show ALL centre lines and hidden detail.


· Show ALL necessary construction lines.
[38]

30
60
°

ASSESSMENT CRITERIA
72

1 TOP VIEW 10 21

2 FRONT VIEW 17

3 DEVELOPMENT 10 21
37 40
15

X PENALTIES (-)

B TOTAL 38

A
NAME

NAME 3
Copyright reserved Please turn over

Downloaded by Inno Odira ([email protected])


lOMoARcPSD|844895

Engineering graphics and design / P1 NSC EC / September 2023

QUESTION 3: PERSPECTIVE
Given:
· Three views of a farm house and the information needed to
draw a two-point perspective drawing.

PP − Picture plane
HL − Horizon line ASSESSMENT CRITERIA
GL − Ground line
SP − Station point 1 CONSTRUCTION + VP's 6

Instructions: 2 WALLS + PORCH 12


Complete the perspective drawing.
3 ROOF 521
· Align the drawing sheet with the ground line (GL).
· Determine and label the vanishing points. 4 WINDOWS + DOOR 11
· Show ALL necessary construction.
· NO hidden detail is required. [39] 5 ARCH + CONSTRUCTION 421
WINDOWS
PENALTIES (-)

TOTAL 39

ENTRANCE

WINDOW
PP PP

HL HL

GL GL
NAME

SP NAME 4
Copyright reserved Please turn over

Downloaded by Inno Odira ([email protected])


lOMoARcPSD|844895

Engineering graphics and design / P1 NSC EC / September 2023


RIDGE COVER ROOF CAP
QUESTION 4: CIVIL DRAWING
VALLEY GUTTER
FIREPLACE AND
DOOR AND WINDOW SCHEDULE CHIMNEY 240 x 20 mm Given:
TO FIT TO FIT
DETAIL FASCIA BOARD · The incomplete north elevation of a new house, showing the

30°
400 100 240 walls, windows and door openings, the fire pit, the position of
the chimney, the roof and labels.
·

3860
150 The incomplete floor plan showing the walls, steps, fire pit,
DOUBLE position of the doors, windows, fixtures and the electrical
layout.

2100
DOOR
OPENING
· A schematic diagram of the roof trusses, single truss and roof
2100

150
notes.

2760
· The incomplete foundation and external wall with dimensions.
400 FINISHED FLOOR LEVEL GROUND LEVEL 150 · A door and window schedule.
INCOMPLETE NORTH ELEVATION · A fireplace and chimney detail.
· A table of electrical symbols.
DOOR (D1) DOUBLE DOOR (D2) FEATURES · A table of roof components.

500
D1 NC3
D1 + D2 DOORS 2 · Room designations as well as floor finishes.
800 WINDOW NOTES
NC2 + NC3 WINDOWS · A table of sanitary fixtures.

500

600
1200 A = OPENING SIDE
400 B = FIXED PANEL 3 3 5 NC2 · The incomplete floor plan, ground line and roof cap of a new

NC3
FIXTURES S 4
THICKNESS OF ALL BIC SH WC house, drawn to scale 1 : 50, and the incomplete foundation
300

A 700 S SINK
FRAMES: 50 mm (800 mm and a break line for the detailed section, drawn to
475

WT WASH TUB
950

DEPT)
B A WC TOILET 1 scale 1 : 20, on page 6.
950

D1 1
WINDOW SILL: WB WASH BASIN
WT
B
SH SHOWER 5
A 180 x 20 mm D1 WB Instructions:
WINDOW WINDOW FIBRE CEMENT BIC BUILD IN CUPBOARD
Answer this question on page 6.
(NC2) (NC3) WINDOW SILL UNDER NC2

A
5 4.1 Use the given incomplete floor plan, to draw, in first-angle
ELECTRICAL FITTINGS
ALL WINDOWS 3
ONE-WAY SWITCH - SINGLE-POLE - 1 orthographic projection to scale 1 : 50, the following views of
TWO-WAY SWITCH - SINGLE-POLE - 2 the new house:

A
2
SWITCHED SOCKET OUTLET - 3 D2
ELECTRICAL SYMBOLS ROOM DESIGNATIONS FLUORESCENT LIGHT 2 x 40 W - 4 FIRE PIT 4.1.1 THE COMPLETE FLOOR PLAN
AND FLOOR FINISHES CEILING LIGHT - 5 Add the following features to the drawing:
· ALL doors and windows.
1. KITCHEN: TILES NOTE: · ALL sanitary fixtures as indicated by the abbreviations.
2. BEDROOM: CARPET THE ARROWS ON THE FLOOR PLAN SHOW
3. BATHROOM: TILES · ALL electrical fittings as indicated by the numbers.
THE LIGHT CONNECTION TO THE SWITCH. FLOOR PLAN
4. LIVING AREA: WOOD · ALL hatching detail.
W SCALE 1 : 50
n x 40 W 5. PORCH / FIREPIT AREA: GRANO 4.1.2 THE COMPLETE NORTH ELEVATION
Show the following features on the drawing:
· The outside walls, double door, steps, fire pit and the
ROOF NOTES:
1 2 250 detailed windows.
ROOF COMPONENTS 30° ROOF PITCH
1 X 250 x 100 mm LINTEL · The roof detail, including the fascia boards, ridge covers,
300 3 ABOVE ALL DOOR AND gutters and chimney of the fireplace.
RIDGE COVER WINDOW OPENINGS 114 x 38 mm ROOF TRUSSES ON
4 114 x 38 mm WALL PLATES · The finished floor level.
VALLEY GUTTER
4.2 Use the given foundation and break line on page 6,
300 300 mm ROOF OVERHANG TO THE END OF THE ROOF TRUSS draw, to scale 1 : 20 a DETAILED SECTION on cutting
240 x 20 mm
5 plane A-A of the area in the ellipse shown on the
FASCIA BOARD ROOF COVER: 20 mm FIBRE CEMENT ROOF SHEETING
incomplete floor plan.
ON 75 x 50 mm PURLINS @ 900 mm c/c
150 x 100 GUTTER FLOOR PLAN Show the following features on the drawing:
240 x 20 mm FASCIA BOARD WITH 150 X 100 mm GUTTERS ON ALL · The complete foundation and external wall detail.
2600

SANITARY FIXTURES · The fireplace, with the chimney, to the southeast side of
2100

SIDES AND A Ø100 mm RAINWATER DOWN-PIPE


500 600 the cutting plane A-A.
400 10 mm CEILING BOARD ON 38 x 38 mm BRANDERING @ 400 mm c/c · The roof detail, including the fascia board and gutter.
· ALL hatching detail. ONLY the substructure hatching
400

130
2050

200 400 may be drawn in neat freehand.


850

900

/c
750

100 0c
90
400

100 Label the following:


FLOOR LEVEL
/c · The north elevation.
0c
90
400

300

· The floor finishes.


250
400

GROUND LEVEL
500

350
500

200
600

/c
800

(A
) 0c · Ground level, finished floor level and damp proof course (use
90
400

the correct abbreviations and show it on ALL the relevant


200

30°
800 400
1200 600
views).
WASH BASIN TOILET SHOWER WASH TUB SINK 400 c/c 400 c/c 400 c/c
NOTE:
(WB) (WC) (SH) (WT) (S) DIMENSION GUIDE: ALL drawings must comply with the guidelines and graphical
INCOMPLETE FOUNDATION AND SCHEMATIC DIAGRAM OF THE SCHEMATIC DIAGRAM OF symbols as contained in the SANS 10143. [94]
EXTERNAL WALL DETAIL ROOF TRUSSES FOR ROOF ROOF TRUSS (A) FOR ROOF
5
Copyright reserved Please turn over

Downloaded by Inno Odira ([email protected])


lOMoARcPSD|844895

Engineering graphics and design / P1 NSC EC / September 2023

ROOF DETAIL: PENALTIES


MARK ALLOCATION 1 INCORRECT SCALE

A ROOF ANGLE 1 2 NON-ALIGNMENT OF VIEWS

B ROOF SHEET 1 3 INCORRECT LETTERING

C ROOF TRUSS 3 TOTAL PENALTIES (-)


PURLIN +
D 121
SPACING
ASSESSMENT CRITERIA
BRANDERING
E 121
+ SPACING
FLOOR PLAN
CEILING 1
F 2
BOARD
DOORS +
1 WINDOWS
13
G WALL PLATE 1

H FACIA BOARD 121


2 ELECTRICAL 8 21

I GUTTER 1
3 FIXTURES 10 21

4 HATCHING 3
TOTAL 12
5 LABELS 2 21

SUBTOTAL 37 21

NORTH ELEVATION
ROOF + FACIA +
GUTTER +
1 COVERS +
14
CHIMNEY
WALLS + PORCH
BEDROOM
2 + STEPS 7
+ FIRE PIT + FFL
DOOR +
3 WINDOW
6

4 LABELS 1 21

KITCHEN SUBTOTAL 28 21

DETAILED SECTION

1 ROOF DETAIL 12
BATHROOM FOUNDATION +
2 WALLS + FLOOR
5
FIREPLACE +
3 CHIMNEY 6
A

4 HATCHING 4
LIVING ROOM 5 LABELS 1
A

SUBTOTAL 28

TOTAL 94
FIRE PIT

PORCH PENALTIES (-)

GRAND TOTAL

NAME
FLOOR PLAN DETAILED SECTION A-A
SCALE 1 : 50 SCALE 1 : 20 NAME 6
Copyright reserved

Downloaded by Inno Odira ([email protected])