How far, in meters, are the pillars of the brick wall spaced from one
4 1
another on stand 1144?
PROPOSED NEW DWELLING
W 5 When was the second revision done? 1
STAND 1142
2000 5600
2800
6 How many indigenous trees are on stand 1144? 1
IE
2800 3200
6800
IE 7 Indicate the direction of flow on the sewerage line with an arrow in the circle numbered 1. 1
RE What type of fence does the owner want to use on stand 1142, on
2800 BL 8 1
the street sides, to secure his house?
W
A B 9 In what colour should new alterations be indicated on the site plan? 1
2800 BL
MH What is the minimum distance that the braai could be erected in,
SEWERAGE LINE 10 1
LAID AT 1 : 40 BRAAI POSITION FOR from the brick wall?
NEW BRAAI AREA
2800 BL
IE Indicate the position of The municipality rejected the plans of stand 1142. Give a reason
1 2023-02-24 the new braai area 13 2
STAND 1144 for the decision.
IE REVISION DATE DESCRIPTION
With reference to the north point, on which side is the entrance of
HEIDE ROAD
SPANGENBERG ARCHITECTS 14 2
stand 1142?
BOSKLOOF AVE
EXISTING HOUSE RE
13 MAIN ROAD
Determine, in the space provided below (ANSWER 15) the total length of the brick wall fencing on
GQEBERHA 15 4
stand 1144.
4000 C/C
RE [email protected] Determine, in the space provided below (ANSWER 16), the total area of the paved ramp on stand
16 4
1142, in square meters.
PRINTED BY: DATE OF PRINT:
2023-02-14
In the space at the title panel (ANSWER 17), draw in neat freehand, the top view and front view of the
FLEMMING PRINTERS 17 SANS 10143 graphical symbol for a bidet. 4
8430
DRAWING TITLE:
2800 3200
BETWEEN PILLARS DRAWING NUMBER:
PROJECT NUMBER:
6800
01-2023 LOUK01-2023
DATE: DRAWN: CHECKED: SCALE:
Instructions:
Draw to scale 1 : 1, the following views:
30
60
°
ASSESSMENT CRITERIA
72
1 TOP VIEW 10 21
2 FRONT VIEW 17
3 DEVELOPMENT 10 21
37 40
15
X PENALTIES (-)
B TOTAL 38
A
NAME
NAME 3
Copyright reserved Please turn over
QUESTION 3: PERSPECTIVE
Given:
· Three views of a farm house and the information needed to
draw a two-point perspective drawing.
PP − Picture plane
HL − Horizon line ASSESSMENT CRITERIA
GL − Ground line
SP − Station point 1 CONSTRUCTION + VP's 6
TOTAL 39
ENTRANCE
WINDOW
PP PP
HL HL
GL GL
NAME
SP NAME 4
Copyright reserved Please turn over
30°
400 100 240 walls, windows and door openings, the fire pit, the position of
the chimney, the roof and labels.
·
3860
150 The incomplete floor plan showing the walls, steps, fire pit,
DOUBLE position of the doors, windows, fixtures and the electrical
layout.
2100
DOOR
OPENING
· A schematic diagram of the roof trusses, single truss and roof
2100
150
notes.
2760
· The incomplete foundation and external wall with dimensions.
400 FINISHED FLOOR LEVEL GROUND LEVEL 150 · A door and window schedule.
INCOMPLETE NORTH ELEVATION · A fireplace and chimney detail.
· A table of electrical symbols.
DOOR (D1) DOUBLE DOOR (D2) FEATURES · A table of roof components.
500
D1 NC3
D1 + D2 DOORS 2 · Room designations as well as floor finishes.
800 WINDOW NOTES
NC2 + NC3 WINDOWS · A table of sanitary fixtures.
500
600
1200 A = OPENING SIDE
400 B = FIXED PANEL 3 3 5 NC2 · The incomplete floor plan, ground line and roof cap of a new
NC3
FIXTURES S 4
THICKNESS OF ALL BIC SH WC house, drawn to scale 1 : 50, and the incomplete foundation
300
A 700 S SINK
FRAMES: 50 mm (800 mm and a break line for the detailed section, drawn to
475
WT WASH TUB
950
DEPT)
B A WC TOILET 1 scale 1 : 20, on page 6.
950
D1 1
WINDOW SILL: WB WASH BASIN
WT
B
SH SHOWER 5
A 180 x 20 mm D1 WB Instructions:
WINDOW WINDOW FIBRE CEMENT BIC BUILD IN CUPBOARD
Answer this question on page 6.
(NC2) (NC3) WINDOW SILL UNDER NC2
A
5 4.1 Use the given incomplete floor plan, to draw, in first-angle
ELECTRICAL FITTINGS
ALL WINDOWS 3
ONE-WAY SWITCH - SINGLE-POLE - 1 orthographic projection to scale 1 : 50, the following views of
TWO-WAY SWITCH - SINGLE-POLE - 2 the new house:
A
2
SWITCHED SOCKET OUTLET - 3 D2
ELECTRICAL SYMBOLS ROOM DESIGNATIONS FLUORESCENT LIGHT 2 x 40 W - 4 FIRE PIT 4.1.1 THE COMPLETE FLOOR PLAN
AND FLOOR FINISHES CEILING LIGHT - 5 Add the following features to the drawing:
· ALL doors and windows.
1. KITCHEN: TILES NOTE: · ALL sanitary fixtures as indicated by the abbreviations.
2. BEDROOM: CARPET THE ARROWS ON THE FLOOR PLAN SHOW
3. BATHROOM: TILES · ALL electrical fittings as indicated by the numbers.
THE LIGHT CONNECTION TO THE SWITCH. FLOOR PLAN
4. LIVING AREA: WOOD · ALL hatching detail.
W SCALE 1 : 50
n x 40 W 5. PORCH / FIREPIT AREA: GRANO 4.1.2 THE COMPLETE NORTH ELEVATION
Show the following features on the drawing:
· The outside walls, double door, steps, fire pit and the
ROOF NOTES:
1 2 250 detailed windows.
ROOF COMPONENTS 30° ROOF PITCH
1 X 250 x 100 mm LINTEL · The roof detail, including the fascia boards, ridge covers,
300 3 ABOVE ALL DOOR AND gutters and chimney of the fireplace.
RIDGE COVER WINDOW OPENINGS 114 x 38 mm ROOF TRUSSES ON
4 114 x 38 mm WALL PLATES · The finished floor level.
VALLEY GUTTER
4.2 Use the given foundation and break line on page 6,
300 300 mm ROOF OVERHANG TO THE END OF THE ROOF TRUSS draw, to scale 1 : 20 a DETAILED SECTION on cutting
240 x 20 mm
5 plane A-A of the area in the ellipse shown on the
FASCIA BOARD ROOF COVER: 20 mm FIBRE CEMENT ROOF SHEETING
incomplete floor plan.
ON 75 x 50 mm PURLINS @ 900 mm c/c
150 x 100 GUTTER FLOOR PLAN Show the following features on the drawing:
240 x 20 mm FASCIA BOARD WITH 150 X 100 mm GUTTERS ON ALL · The complete foundation and external wall detail.
2600
SANITARY FIXTURES · The fireplace, with the chimney, to the southeast side of
2100
130
2050
900
/c
750
100 0c
90
400
300
GROUND LEVEL
500
350
500
200
600
/c
800
(A
) 0c · Ground level, finished floor level and damp proof course (use
90
400
30°
800 400
1200 600
views).
WASH BASIN TOILET SHOWER WASH TUB SINK 400 c/c 400 c/c 400 c/c
NOTE:
(WB) (WC) (SH) (WT) (S) DIMENSION GUIDE: ALL drawings must comply with the guidelines and graphical
INCOMPLETE FOUNDATION AND SCHEMATIC DIAGRAM OF THE SCHEMATIC DIAGRAM OF symbols as contained in the SANS 10143. [94]
EXTERNAL WALL DETAIL ROOF TRUSSES FOR ROOF ROOF TRUSS (A) FOR ROOF
5
Copyright reserved Please turn over
I GUTTER 1
3 FIXTURES 10 21
4 HATCHING 3
TOTAL 12
5 LABELS 2 21
SUBTOTAL 37 21
NORTH ELEVATION
ROOF + FACIA +
GUTTER +
1 COVERS +
14
CHIMNEY
WALLS + PORCH
BEDROOM
2 + STEPS 7
+ FIRE PIT + FFL
DOOR +
3 WINDOW
6
4 LABELS 1 21
KITCHEN SUBTOTAL 28 21
DETAILED SECTION
1 ROOF DETAIL 12
BATHROOM FOUNDATION +
2 WALLS + FLOOR
5
FIREPLACE +
3 CHIMNEY 6
A
4 HATCHING 4
LIVING ROOM 5 LABELS 1
A
SUBTOTAL 28
TOTAL 94
FIRE PIT
GRAND TOTAL
NAME
FLOOR PLAN DETAILED SECTION A-A
SCALE 1 : 50 SCALE 1 : 20 NAME 6
Copyright reserved