0% found this document useful (0 votes)
105 views2 pages

As-Built Fire Alarm System

Alarm system

Uploaded by

karim.khalifa232
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
105 views2 pages

As-Built Fire Alarm System

Alarm system

Uploaded by

karim.khalifa232
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Project Title ‫ اسم المشروع‬Refurbishment of STP work in Al Raqai Land port Project No.

‫ رقم المشروع‬22SAC00017
Client ‫المالك‬ ZATCA Contract No. ‫رقم العقد‬ 230839020314
Consultant ‫االستشاري‬ FKEC Prototype ‫النموذج‬
Contractor ‫المقاول‬ Red Water For Project Engineering Company Site No. ‫رقم الموقع‬
To ‫إلى‬ FKEC
Attention ‫عناية‬ Engr.Abu Talib Zain
DRAWING SUBMITTAL FORM From ‫من‬ Red Water For Project Engineering Company
‫نموذج تقديم مخططات‬ Submittal Number ‫رقم التقديم‬ 22SACG00017-001-RWSE-YAA000-1E0-AB-000002
Submission Date ‫تاريخ التقديم‬ 20 /____
____ 24
07 /20_____

Discipline ‫التخصص‬ □ Civil/Str. ‫إنشائي‬/‫مدني‬ □ Architectural ‫معماري‬ □


✔ Electrical ‫كهرباء‬ □ Mechanical ‫ميكانيكا‬
Area ‫ المنطقة‬STP Component Works ‫المكونات‬
Is Approval required for Local Authorities □ No □ Yes
if Yes, specify ( ---------------------------------------------------------- ) ‫ حدد‬،‫إذا كان الجواب نعم‬
‫هل الموافقة مطلوبة للسلطات المحلية‬ ‫ال‬ ‫نعم‬

✔ New Submittal □ Revised Submittal Submitted as: □
✔ Specification □ Alternative
Status ‫الحالة‬
‫تقديم جديد‬ ‫تقديم بعد المراجعة‬ ‫تم تقديم المخطط‬ ‫حسب المواصفات‬ ‫مخطط بديل‬
Drawing No. ‫رقم المخطط‬ Drawing Rev. ‫النسخة‬
Drawing Title As-built Drawing For Fire Alarm System
‫اسم المخطط‬

✔ For Approval □ Shop Drawing □ For construction □ Information □ Working Drawing
Drawing Submission
‫لالعتماد‬ ‫مخطط ورشة‬ ‫للتنفيذ‬ ‫لإلحاطة‬ ‫مخطط للعمل‬
Category
‫غرض تقديم المخطط‬ □ Fabrication □
✔ As-Built □ For Record
□ Other ( --------------------------------------------------------- ) ‫غير ذلك‬
‫للتصنيع‬ ‫حسب المنفذ‬ ‫للحفظ‬
Additional Comments
‫مالحظات إضافية‬
Name/Position ‫اﻟﻤﻨﺼﺐ‬/‫اﻻﺳﻢ‬ Signature with Date ‫التوقيع والتاريخ‬ Stamp ‫الختم‬
Contractor’s Signatory Hesham Rashad
‫توقيع المقاول‬
Electrical Engineer 20 /____
____ 24
07 /20_____

For Consultant’s Use Only ‫الستخدام االستشاري فقط‬


Received By Received on Action on
____ /____ /20_____ ____ /____ /20_____
‫تم استالمه من قبل‬ ‫تاريخ االستالم‬ ‫اإلجراء بتاريخ‬

Consultant’s
Comments
‫مالحظات‬
‫االستشاري‬

□ Approved □ Approved as noted □ Revise and Resubmit □ Rejected □ Received for Information
‫موافقة‬ ‫موافقة مع مالحظات‬ ‫مراجعة وإعادة تقديم‬ ‫مرفوض‬ ‫نسخة منقحة للمعلومية‬
Reviewed by Discipline Engineer ‫ تمت المراجعة من قبل مهندس القسم‬Approved by Project Manager ‫يعتمد من مدير المشروع‬

Name: ----------------------------------------------------------------------------- ‫االسم‬ Name: ---------------------------------------------------------------------------- ‫االسم‬


Signature ‫التوقيع‬ Signature ‫التوقيع‬
Date: ____ /____ /20_____ :‫التاريخ‬ Date: ____ /____ /20_____ :‫التاريخ‬

Received By Contractor Signature ‫التوقيع‬


Name ------------------------------------- ‫االسم‬ Date: ___ /___ /20____ ‫التاريخ‬
‫استالم المقاول‬

Note: The approval will not relieve the contractor from the responsibility for conformity to ‫هذا االعتماد ال يعفي المقاول من االلتزام بالمواصفات والمقاييس وال من مسؤولياته التعاقدية بموجب‬ :‫مالحظة‬
specifications, standards and contractual obligations. .‫أحكام و شروط العقد‬

SAC-E01-EQ0-TP-000011_Rev003
MCC
PLANT ROOM

TK-103
CONTROL ROOM
EL +0.150 SYMBOL DESCRIPTION

Fire Alarm Control Panel

SMOKE DETECTOR

SMOKE DETECTOR CEILING VOID

HEAT DETECTOR FIXED TYPE

FIRE ALARM HORN/STROBE

S FIRE ALARM HORN

FIRE ALARM MANUAL CALL POINT

X-RAY

E=#######
N=######

E=#######
N=######

E=#######
N=######
A
1
N=######
E=#######

Ø100mm
DROPS
FREE
RAIN RWP ABOVE
DISCHARGE
FROM
WATER
E=#######
N=######

E=#######
F1

F1
N

W E

Blowers Room MCC Room


Filter Room

3
4
"EMT conduits

1x2C 16AWG unshielded Fire Alarm Cable in


PVC Conduits

3 "EMT conduits 1x2C 16AWG unshielded Fire Alarm Cable in


4 PVC Conduits

1x2C 16AWG unshielded Fire Alarm Cable in


UPVC conduits

Going to Guard Room

AL-RAQI Land Port


1x2C 16AWG unshielded Fire Alarm Cable in
Going to Filter Room
refurbishment of STP Plan and Irrigation System
UPVC conduits

1x2C 16AWG unshielded Fire Alarm Cable in


1x2C 16AWG unshielded Fire Alarm Cable in UPVC conduits
UPVC conduits
Going to Admin & Maitainance Room

End of Loop
Kitchen
Going to MDP Room 1x2C 16AWG unshielded Fire Alarm Cable in MDP ELECTRIC ROOM
UPVC conduits 3/4"EMT conduits
1x2C 16AWG unshielded Fire Alarm Cable in

Kitchen
UPVC conduits
3/4" EMT 1x2C 16AWG unshielded Fire Alarm Cable in
PVC conduits

GUARD ROOM
Start of Loop

REF
1x2C 16AWG unshielded Fire Alarm Cable in
PVC Conduits
3/4" EMT conduits

Zakat, Tax and Customs Authority


1x2C 16AWG unshielded Fire Alarm Cable in

MAINTENANCE
3
4 "EMT conduits

3/4" EMTConduit ADMIN. OFFICE

2,62 2,28
0,48

RED WATER
TOTAL SOLUTION PROVIDER
LIFE SAFETY-SECURITY-CONTROLS

SAUDI ARABIA - P.O.Box 6565 RIYADH, 12314 - PRINCE SULTAN BIN ABDULAZIZ ROAD
MOB.+966 507505464 / 505895051 - TEL. +966 (11) 4304424
www.REDWATER.SA

DUBAI ENGINEERING CONSULTANTS CO.


5110002781 2480170 2488359
WWW.DUBAI.COM.SA

STP Plant buildings

Fire alarm System


STP Plant - AS-built Drawing

SINGLE LINE DIAGRAM

You might also like