JHA For Lifting (Ashirvad)
JHA For Lifting (Ashirvad)
APPL/IMS-F-27/
Department: Civil Job activity Description : Activity Start Date & Time:
Vendor/Contractor/Ashirvad team:
Activity End Date & Time:
Lifting by Hydra F-15
Initiated By(M / S)Parag Technobuild Pvt. Ltd. Task Completed By: Supervisor:
Location: New PEB Shed Construction Area Analysis By: Siddhant Gupta Reviewed By: Prasad Kumbhakar
Tools & Equipment/Chemicals used F-15 Hydra, celing belt, chain pully,cable.
Required PPE need to worn Helmet, Shoes, Goggles, Reflective Vest, Hand gloves. Full body harness.
1) Ensure area is free from obstruction and easily accessible for people equipment movement.
Slip, trip and fall 2) Proper housekeeping at workplace must be maintained.
MEDIUM 3) Ensure area is clear from obstruction and easily accessible for equipment/workmen
/ Uneven surface
movement.
4) JHA shall be briefed to all crew involved in the activity.
1) Ensure right tools for right job and all tools & equipment are in good condition and fit for
Damage or Inappropriate tools LOW use.
2) All hand tools & equipment shall be inspected & color coded by competent person.
3)Daily
1) visual
Obtain workinspection
permit asmust be specific
per the done forjob
tools.
before performing the activity and conduct Pre-
job specific TBT at site on site.
2) Keep proper coordination between the team while manually material handling activity start.
3) Provide adequate and appropriate PPEs to all workmen ensure compliance.
lack of co-ordination in group effort/
MEDIUM 4) Trained and experienced people shall be deployed at work.
Wrong body posture
5) Provide adequate workmen for heavy load.
6) Provide Shoulder pad to the workmen during material shifting
7) Ensure workmen should not lift more than 20kg of weight.
8) Do not twist, use your feet to turn your body.
Manual Material Handling 9) Follow the manual handling techniques.
1) Keep away from pinch point and use appropriate type hand gloves.
2) Protect your hand and finger from pinching point.
3) Use adequate PPE.
Sharp edges / Pinch point MEDIUM
4) Training & instructions provided to all involved workmen.
5) Use hand gloves/ packing materials.
6) Remove protruding nails before handling.
1) Ensure area is free from obstruction and easily accessible for people movement.
Slip,trip,falls, MEDIUM 2) Proper housekeeping at workplace must be maintained.
3) Ensure area is clear from obstruction and easily accessible for equipment movement
1) Keep away from pinch point and use Cut resistance hand gloves.
2) Protect your hand and finger from pinching point.
Sharp edges / Pinch point HIGH
3) Use adequate PPE.
Structure assembling with bolting & tightness at ground level and
4) Training & instructions provided to all involved workmen.
height.
) Mandatory PPE and work specific PPE shall be provided.
Slippage of hand tools with hand while
HIGH 2. Area should be barricaded and nobody will be standing nearby during manually assemble
tightness.
work.
1) All rigging Tools & tackles must be certified by TPI, color-coded and in good working
condition.
Lifting gears failure (Wire rope sling, shackles,
HIGH 2) Use adequate SWL of rigging Tools & tackles for materials to be lifted as per lift plan.
Lifting Trunnion)
3) Verify inspection and certification records of all rigging equipment which will be utilized as
per lifting plan.
1) Ensure the area of operation is clear of overhead electrical lines & other obstructions if any
2) Ensure the load and crane hook is clearly visible to the operator.
Collision or striking by crane HIGH
3) Use of signalman with banks man for crane positioning as well as lifting of materials.
4) No one should stay under the load, keep area clear and use tag lines to control the load.
1) Obtain safe work permit prior to lifting activity from authorised person.
2) Crane must have load test & fitness certificate by TPI and in good condition prior to use.
3) Only authorized,trained, experienced with valid license person to operate the equipment.
4) Lifting load should not exceed the SWL of the lifting equipment.
Overload-Crane boom failure, toppling of Crane HIGH 5) Ensure crane safe load indicator(SLI) is in good working condition.
6) Ensure proper communication between all relevant personnel.
7) Crane condition shall be checked & verified before operation by competent person.
8) Only certified, trained & experienced signal man shall be assigned for coordination with
Structure and Equipment erection,BG Sheet installation by crane operator by signaling.
(F-15 crane). ) Ensure cranes in good working condition prior to use.
Engine failure MEDIUM 2) Activity shall be stopped till repair performed.
3) Arrange for spare parts as deemed necessary.
1) Crane operators health check up to be ensured prior lifting or erection.
2) Crane operator experienced, licensed & certified by TPI.
Crane operator error MEDIUM 3) Proper coordination/communication to be maintained.
4) Equipment should be lifted slowly under the supervision of erection supervisor/engineer.
5) Follow the lifting plan strictly and keep coordination between both crane operator &
1) Proper coordination between employees.
signalman.
2) Stay clear from equipment. No one should stay under the suspended/hoisted load.
Personnel involved and others in close proximity
MEDIUM 3) Use of tag lines to control and guide the equipment/load.
Striking object due to sudden jerk
4) Erect barriers and warning signs in the effective area and restrict unauthorized personnel
entry.
1) Weather forecast for the day shall be obtained from reliable sources and consulted.
2) The lifting operation should be carried out in the favourable environment which is safe for
Adverse weather conditions LOW whole duration.
3) Check wind speed as deemed necessary and Stop the activity if the wind speed is more than
40 km/h.
4)
1) If expectedhealth
Operator's bad weather condition,
check-up the lifting
to be ensured activity
prior liftingshould be rescheduled.
or erection.
Work at height for equipment ,structure erection and BG sheet 2) Operator must be experienced and certified by third party.
Incompetent / Unauthorised Operator LOW 3) Operator's skills must be assess prior to authorize him to operate cherry picker.
installation using cherry picker
4) Work permit must be obtained prior to start the activity.
5) Proper Supervision must be done for activity.
1) Ensure Emergency stop shall free from damage and its should be on working condition
2) Ensure before operation foot switch and horn should be on working condition.
Pre-operation inspection not done MEDIUM 3) Ensure before operation boom and platform condition,
4) Ensure and test steering function.
5) Ensure and test Drive enable system and braking working condition.
1) Operator must perform pre-operational safety checks and inspection checklist must be
maintained on daily basis.
2) SWL must be mentioned on working platform and it should not be exceed in any condition.
Overload and Mechanical Failure HIGH 2) Visual inspection of hydraulic equipment must be conducted prior to use.
3) Cherry picker must be inspected by third party, and monthly color-code inspection to be
done as per AL procedure.
4) Job supervisor must verify inspection record and certificates.
1) Ground should not be uneven and must be solid to withstand the weight of cherry picker.
2) Ensure proper soil compaction at movement area.
3) Ensure ground assessment must be done prior to movement of cherry picker and groungd
Toppel of cherry picker due to uneven surface MEDIUM must be firm, dry and free from obstructions.
4) Chery picker must be operated form platfform controls and groung controls are only for
inspection and emergency use only.
5) Barricade the work area by hard barrication and warning signs in the effective area and
restrict unauthorized personnel entry
1) Ensure platform access gate must be closed at all time unless entering and exiting from
platfrom at groung level.
2) Extend the boom only after positioned the cherry picker at workplace.
3) Don't move/posiiton cherry picker when workmen are in platform.
4) Do not climb or lean on guardrail of working platform.
5) Warn personnel not to work, stand, or walk under a raised boom or platform.
falling of Man & Material from cherry picker HIGH 6) Don't keep unwated materials in working platform.
7) Only operator should be in platform during positioning the cherry picker.
8) Ensure only trained and experienced workmen shall deploy for height work.
09) Ensure spanner and other hand tools must be tied with hand (use rope) during height work.
10) Working radius must be barricaded and flagman must be appointed to control man and
machinery movement.
11) Work at height permit must be obtained prior to work.
1) Check workarea for clearances overhead, on sides and bottom of platform when lifting or
lowering platform and driving.
2) During operation keep all body parts inside platform railing.
3) Always post a lookout when driving in areas where vision is obstructed.
Crushing & Collision with Structure and
MEDIUM 4) Keep non-operaing personnel at least 2 mts away from machine during all operation.
Powercable
5) Excercise exterme caution at all time to prevent obstacles from striking or interfering with
operating controls and persons in the platform.
6) Cherry picker movement area must be inspected to indentify the associated hazards.
7) Safe distance from structure and fix objects must be maintained during work.
8) Cherry
1) Ensure picker
all power cables
must should not
be operated obstruct the
in favourable access or working
environment which isarea
saferadius.
to do the job.