0% found this document useful (0 votes)
23 views2 pages

TRN Energy Open Access Scheduling Details

Uploaded by

Manish Rajput
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views2 pages

TRN Energy Open Access Scheduling Details

Uploaded by

Manish Rajput
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

OPEN ACCESS (BILATERAL TRANSACTION)-ACCEPTANCE FOR SCHEDULING

Western Regional Load Despatch Centre, Mumbai

Nodal RLDC: WR

Acceptance No: WR/2023/16447/C/R/0 Acceptance Date: 21/06/2023

Registration Code: INDRLDCP93

Application Number: IEX-230621-02089 Application Date: 21/06/2023

INDIAN ENERGY EXCHANGE


1. Name Of Applicant:
LIMITED

2. Applied On Behalf Of: Buyer

TRN ENERGY PRIVATE


3. Injection Entity/State/Region:
LIMITED/Chhattisgarh/WR

Adani Electricity Mumbai


4. Drawee Entity/State/Region:
Limited/Maharashtra/WR

5. Wheeling Regions: Nil

6. Type of Application: C

7. Green Tag: No

8. Open Access Scheduling Requested:

Blocks
Scheduling Requested
From To From To (MW) MWh Route

21/06/2023 21/06/2023 19:00 24:00 70 350 WR-WR

Total MWh(requested) 350

9. Open Access Scheduling Accepted:

Time Period
From To Capacity Approved
(Date) (Date) From Block To Block (MW) MWh Route

21/06/2023 21/06/2023 19:00 24:00 70 350 WR-WR

Total MWh(To be scheduled) 350

10. Remarks: ok

11.Bidding Details: Not Applicable

12.Payment Schedule: Payment Due Date: 26/06/2023


1) Transmission Charges

Trans.Systems Rates(Rs./ MWh) MWh Total (Rs.)

(a)Intra-State

(b)Inter-State(ISTS Charges)

Total Of(1) ₹0

2) Operating Charges

Rates (Rs./Days)/ No Of Days/


RLDC/SLDC Total (Rs.)
(Rs./MWh) Mwh

WRLDC 1000 1 1,000

Maharashtra SLDC 2250 1 2,250

Total Of (2) ₹ 3,250

3) Non-Refundable Application Fee (if not paid earlier) ₹ 5,000

Grand Total (1 + 2 + 3) ₹ 8,250


TDS(if any) may be deducted on amount as follows:

S.No Entity Amount(Rs) PAN

1 GRID-INDIA 6,000 AAFCP2086B

2 Maharashtra SLDC 2,250 AAECM2936N

TOTAL ₹ 8,250

Applicant is requested to deduct TDS in respective PAN A/C of GRID-INDIA/CTUIL/STU/SLDC.The necessary declaration from RLDC in this
regard is available at RLDC website.
Note: This acceptance is subjected to provisions of CERC(Open Access in Inter-State Transmission) Regulations, 2008 and amendments
thereof.
To: INDIAN ENERGY EXCHANGE LIMITED
NLDC, TRN ENERGY PRIVATE LIMITED,Adani Electricity Mumbai Limited,WRLDC ,Maharashtra SLDC

Note: This is a system generated document and does not require any signature

You might also like