0% found this document useful (0 votes)
44 views6 pages

SURAJ INN-GAD-4-37-23-291 - Rev1 Signed

Elevator drawing
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views6 pages

SURAJ INN-GAD-4-37-23-291 - Rev1 Signed

Elevator drawing
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

Power Cable from Mains Switch in the installation 2 Pole (L+N) MCB

Motor Kw
4 Pole (TP+N) MCB (Class-C) with ELCB in
GENERAL CLIENT'S SCOPE site, upto Elevator Machine Room
(Cu_4 core, (TP+N), 415V, 50 Hz Armoured Cable) machine room, for power supply to
elevator controller
(Class-B) with ELCB
in machine room, for
Cross Section Area (mm²) Lighting Circuit
1. Strong scaffolding in elevator shaft at the time of installation as per guide lines by installation engineer.
2. Making of wooden template & all arrangement to fix the same as per installation engineer's guide lines. Length of Length of Length of Length of Length of Length of Earth-Leakage Rated Current Earth-Leakage
Rated Current (A)
cable 30m cable 45m cable 60m cable 90m cable 120m cable 150m Sensitivity (mA) (A) Sensitivity (mA)
3. Supply & fixing of wooden / steel door & door frame on each landing.
14.2 6 10 10 16 16 25 63 300 6 30
4. Cutting, making good holes, grouting / welding for fixing brackets, controller, speed governor, landing fixtures, machine beam , buffer sockle and grouting etc.
NOTE:-1) CONTROLLER SHOULD BE PLACED WITHIN 2 METER RADUIS FROM MACHINE.
5. Storage room of area 40 sq.m per elevator with weather protection and locking arrangement and provision of single phase light & power plug of 2) 2) TWO SEPERATE EARTH WIRES MIN. 8 SWG GI/COPPER WELDED FROM EARTHING PIT TO MACHINE ROOM TERMINATED ON EARTHING BUSBAR
15 Amp. capacity. Storage room must be within the radius of 10m from erection site. It must be kept ready before arrival of material at site OR GI/COPPER STRIP PROPERLY WELDED OR BRAZED AT JOINTS
& will remain in possession of installation engineer till the erection of elevator is completed and handed over to client.
6. Preparatory work - All openings of elevator well must be barricaded to avoid accidents & disturbances during pre & post erection.
7. 3 phase power supply with earthing require at the start of installation.

MACHINE ROOM NOTE:-


8. Lighting in machine room - permanent electric lighting not less than 100 lumens should be provided in machine room. 1) CONTROLLER SHOULD BE PLACED WITHIN 2 METER RADIUS FROM M/C AND
9. Machine room entrance should be provided with lighting of minimum 100 lumens with control switch at stair case lobby of top floor. SHOULD HAVE MINIMUM 1.5 METER WORKING SPACE IN FRONT OF CONTROLLER.
10. A minimum horizontal clearance of 1.2m should be maintained in front of machine room access door. 2) THE CONTROLLER SHOULD NOT BE IN VICINITY OF WINDOW, TO AVOID WATER SPLASHING”
11. Machine room shall not be used for any purpose other than housing the elevator equipment.
12. Trap doors in machine room shall be hinged, counter balance and should be kept closed & locked, opening inside the machine room and terrace top. Attention : Non authorized people are not allowed to enter and use the elevator machine room.
(applicable for machine room plan and terrace top). Non elevator related components should not be installed either in the machine room or in the elevaror shaft.
13. Ventilation - the machine room shall be provided with natural cross ventional & rain protected windows or louvers with exhaust fans, All measurements are for finished masonry work, unless otherwise specified .
air-condition system so that temperature of machine room does not exceeds 45°C. The measurements refer to the upper edge of the finished floor.
The architectural work must be carried out according to our plan.
14. Suitable unobstructed route & access door preferably with louvers to machine room with RCC steps or M.S. staircase with hand railing.
15. Machine room access door should be of M.S. in two panels hinged type construction opening outward and clear entrance not less If there is any doubt regarding execution of the construction
than 900 mm wide*2000 mm high with locking arrangement. A danger notice board must be displayed permanently on outside. work and supplies, please contact us.
16. The load hooks / girder should be provided as indicated in layout drawing & grouted as per our installation engineer's instruction. MCB to placed near controller with 2m including routing
supporting bars Ø should take 2500 kg capacity load together.
17. Reinforced concrete machine room slab of 200 mm thickness designed to sustain 1000 Kg/sq. m U.D.L. all over its surface in addition to
specific reaction load as shown in layout drawing.
18. Machine room floor slab must not be cast until the slab marking for rope pocket holes is done by installation engineer.
19. Machine room walls, floor and ceiling to be treated as per IS 14665 (Part 2 /Sec 1) : 2000. and painted as per our color code.
FF2
20. Suitable IPS flooring of thickness 50 mm (minimum) after installing all equipment in place.
21. Provision of fire extinguisher in machine room.
22. In case an electric fan is provided minimum protection class is IP 41 and rotating parts must be mechanical protected!
FF2
FF1
POWER, LIGHTING CIRCUITS & SWITCHES
23. Main cable meter room to M/C room through respective elevator shaft / through electrical duct as per local code required. FORCES ON
24. One Light switch (DPIC) of 230V, 50Hz, 1Ø and of capacity 6 Amp. in machine room near the entrance & mounted on suitable M.S. frame. CAR GUIDE SHOE
FF1 = 682 N
CLIENTS APPROVAL
25. One MCB to be connected to 415V main line in machine room before 3Ø power supply (refer builders work sheet for details).
26. One ELCB to be connected to 415V main line in machine room before 3 phase power supply & another ELCB to be connected to FF2 = 364 N
230V main line (for lighting circuit) before 1 phase power supply (refer builders work sheet for details).
SIGNATURE & SEAL
27. Two separate earth wires min. 8 swg GI / Copper welded from earthing pit to machine room terminated on earthing busbar or GI /Copeer strip properly welded or brazed at joints.
28. Convenient outlet 15A/5A in machine room for use of power tools.
TRACTION SHEAVE Ø 485
29. 230V light points along with the bulb of 60W in bulkhead fitting and a 3-pin plug and switch on board in elevator shaft at 1m distance from highest
and lowest point in shaft and intermediate points at 3.5m maximum spacing. Lowest board should have a parallel switch that can be operated WEIGHT ON CWT SIDE 1935 + 250 = 2185KG (APPROX.) DEFLECTOR SHEAVE Ø 406
from the floor with earthing to bulk head /3 pin socket. WEIGHT ON CAR SIDE 2425 + 250 = 2675KG (APPROX.) ARC OF CONTACT 158°
30. Effective double earthing for a separate earth pit exclusively for elevator
DOOR DRIVE TYPE V3F MOTOR
ELEVATOR SHAFT 14.2 / 19
As a continuing policy of product improvement at ThyssenKrupp Elevator,

TYPE OF LANDING DOOR AUTO. C. O. DOOR KW / HP


The design and specifications are subject to change without prior notice.

31. Elevator shaft dimensions mentioned in layout drawings are minimum clear plumb dimensions in mm, and hence the actual wall should not encroach TYPE OF CAR DOOR AUTO. C. O. DOOR RPM 158
on these dimensions.
STOPS / LANDINGS 14 / 14 SUSPENSION ROPES
32. The inside finished face of the hoist way should fall within the limits from clear plumb elevator shaft well dimensions as mentioned below,
CONTROL TRIPLEX COLLECTIVE SELECTIVE SIZE 6 NOS. Ø10
For lift well height upto 30 m = 0 to +25 mm
For lift well height upto 60 m = 0 to +35 mm DRIVE ACVVVF
For lift well height upto 90 m = 0 to +50 mm (As per IS:14665 (Part 2 / Sec 1) : 2000) SPEED 2.00 m/s
33. The Elevator shaft should be without any projection and recesses from machine room slab to the pit floor.
LOAD 1020 Kg.
34. If any projections or recesses are there, than those should be flushed and leveled on underside to an angle not less than 60° from the
PASS. CAPACITY 15
horizontal by means of metal plates or cement.
35. Service pipes, ventilation ducts, electrical conduits etc. for other purpose are not allowed to run in the elevator shaft and machine room. LAYOUT_CLIENT'S SCOPE SHEET _ 1 OF 6
All dimensions are in mm, scale 1:1, otherwise as specified.

36. Cutting and making pocket holes in lift well for grouting and fixing of car and C'wt. guide brackets or shaft reduction channels and angles if
elevator shaft walls are of brick.
37. All landing entrances of the elevator should be closed properly and protected by suitable material till elevator installation is completed.
38. Architrave fixing and finishing to be done after fixing of doors and door frames on all floors fill gap between door frame and entrance wall before architectrave work and 01 CHANGES: MACHINE ROOM, KEY PLAN FOR TRIPLEX Anil Yadav 30/03/2024
after installation of door frame.
39. Vent 0.2 SQ. MTR with suitable rain protected cover and wire net of SQ. mesh 25x25 wire Ø3mm, location of smoke window shown in GAD is only a representative
Internally Approved By Revision Details Revised By Date

meta200MR Master GAD Rev. - 0


location can be change if required in consultation with our installation engineer. Suraj Nair Client - SURAJ INN PRIVATE LIMITED, MANTRI HOUSE, NO. 41,
40. Elevator shaft walls to be treated as per IS 14665 (Part 2 /Sec 1) : 2000. and painted as per our color code.
copied in any manner, nor used for manufacturing,

VITTAL MALLYA ROAD, BENGALURU - 560 001.


Without our written consent , it shall neither be

PIT
This presentation is our Intellectual property.

Site - DOUBLE TREE SUITES BY HILTON, IBLUR GATE,


41. Pit floor should be strong enough to bear the load as indicated. ORR - SARJAPUR ROAD JUNCTION, BENGALURU - 560 102.
42. Pit floor should be maintained in dry and clean condition. Drawn by T.P. Humbad 30/12/2023
nor communicated to third party.

Rev.
43. RCC socales for fixing car and C'wt. buffers. Checked by S.G. Bhaganagare 30/12/2023 Job No.- 4-37-23-291 01
44. RCC or Brick partition wall upto 2100 mm height to be provided if two lifts are in the common shaft. Approved by T.P. Humbad 30/12/2023
45. Pit floor and walls to be treated for waterproofing and to minimize accumulation and circulation of dust as per IS 14665 (Part 2 / Sec 1) : 2000.
46. Access to pit - All pits shall have permanent non-combustible vertical ladder installed for easy access to authorized personnel. TK Elevator India Private Limited
TK Elevator India Private Limited
Multi Purpose Facility: Plot No. A-23, MIDC Chakan , Phase II, Village - Khalunmbre, Taluka - Khed, District - Pune Maharashtra - 410 501.
Phone: +91-02135-624500 Fax: +91-02135-662301

F.CE.17:REV-01
A

500
GAP

GAP
95
"X"
150 139 GBS = 950 69

M/C ROOM INSIDE HEIGHT = 2800


23 C'WT GUIDE GAUGE
Ø4 TD65_65*75*16

3145

2475
GB = 900
85 C'WT RAIL C'WT FRAME OUTSIDE 150
11 22

2475
2500

RCC
200
1040
SHAFT LIGHT

VDP=1110
10 21

*300 370

1798

2500
ISMC 250

Ø406

365
506

RCC SLAB

5000
ISMB300 20

200

2500
CL C'WT

200
758
Ø406 GUIDE

450
358

8
9 19
T 89 * 62 * 16

2500
203 CAR RAIL

75
.PMOC COMP.
TOP CLERANCE

5000
18 NIAHC CHAIN

2500
1600

SMOKE WINDOW BI-STABLE REED

1150
SW ASSEMBLY BINARY VANE &
FOR DETAILS, INDUCTION ASSEMBLY
17

950

CLEAR SHAFT DEPTH


REF. NOTE NO. 40 8

2500
CAM ASSEMBLY

ST = 2480
KBS = 1570

CAR INSIDE DEPTH


5000
16 CAR GUIDE GAUGE

KT = 1700

345
2500
1100
1000

Ø406
CL CAR

178

178
7 15
GUIDE

O.H.R.H = 5000

2500
153 153

CLEAR ELEVATOR SHAFT HEIGHT = 55750


5000
14

2500

750
KB = 1450

855

885
2200 MIN. CLEAR LINTEL HIGHT

CAR INSIDE WIDTH

965
2400 CAR CLEAR HEIGHT

6 13
2100 CLEAR ENTRANCE

COP-1

COP-2
2500

AXIS
CAR
5000
12

105
2500

215
ELEVATOR ENTRANCE

80
11

BRICK
30
5

200
2500
T° FLOOR TRAVELLING LOP

5000
TOP MOST FLOOR 10 CABLE
550 900W * 2100H 550

2500
CLEAR ENTRANCE
1000 1000
505

4 9

2500
200 SB = 2000 200
RCC CLEAR SHAFT WIDTH RCC

5000
(11) - (T) 5975 8
A
OF CWT GUIDE

2500
(10) - (11) 3250
As a continuing policy of product improvement at ThyssenKrupp Elevator,

(9) - (10) 3250


The design and specifications are subject to change without prior notice.

COMP.
3 7
CHAIN (8) - (9) 3250

2500
(7) - (8) 3250
CAR TRAVEL= 49050

CLIENTS APPROVAL
CL

(6) - (7) 3250


5000
6 ELEVATOR SHAFT & CAR PLAN

2500
(5) - (6) 3250
(4) - (5) 3250
5 STEEL HOOK SIGNATURE & SEAL
(3) - (4) 3250 2
CAPACITY = 2500 KG

2500
(2) - (3) 3250 FOR DETAILS, REF. NOTE NO. 16
5000

(1) - (2) 3250 4 LAYOUT_ELEVATOR SHAFT & CAR PLAN SHEET _ 2 OF 6


2500 REINFORCING BAR Ø25mm
All dimensions are in mm, scale 1:1, otherwise as specified.

(G) - (1) 5000


OF CAR GUIDE

(B) - (G) 5575


150 C'WT BOTTOM RUN BY

1 3
FLOOR HEIGHT IN MM
2500

ELEVATOR ENTRANCE 01 CHANGES: MACHINE ROOM, KEY PLAN FOR TRIPLEX Anil Yadav 30/03/2024

100
Revision Details Revised By Date
5000

B° FLOOR 2
700(min.) 100 700(min.)
CL
C'WT ENCLOSURE

BOTTOM MOST FLOOR


2500

meta200MR Master GAD Rev. - 0


STRETCH
1500

DETAIL OF HOOK "X"


300

1 Client - SURAJ INN PRIVATE LIMITED, MANTRI HOUSE, NO. 41,


copied in any manner, nor used for manufacturing,

Internally Approved By VITTAL MALLYA ROAD, BENGALURU - 560 001.


Without our written consent , it shall neither be

PIT DEPTH = 1700

300
This presentation is our Intellectual property.

CAR BOTTOM RUN BY Site - DOUBLE TREE SUITES BY HILTON, IBLUR GATE,
150

10 mm thick CAR & C'WT CAR & C'WT Suraj Nair ORR - SARJAPUR ROAD JUNCTION, BENGALURU - 560 102.
RAIL SUPPORT PLATE GUIDE RAIL BRACKET Drawn by T.P. Humbad 30/12/2023
nor communicated to third party.

Rev.
STROKE
780

between JOINTS POSITIONS Checked by S.G. Bhaganagare 30/12/2023 Job No.- 4-37-23-291 01
275
780

RAIL & PIT FLOOR


880

Approved by T.P. Humbad 30/12/2023


770

BOTTOM CLEARANCE NOTE:-


*265

1. PULLEY WITH RED COLOUR RIM – DIVERTER PULLEY TK Elevator India Private Limited
2. PULLEY WITH BLUE COLOUR RIM - SUSPENSION PULLEY
*100

* SOCLE HEIGHT OF CAR & CWT BUFFER TK Elevator India Private Limited
SECTION A-A PIT LADDER TO BE DECIDED DURING ERECTION Multi Purpose Facility: Plot No. A-23, MIDC Chakan , Phase II, Village - Khalunmbre, Taluka - Khed, District - Pune Maharashtra - 410 501.
Phone: +91-02135-624500 Fax: +91-02135-662301

F.CE.17:REV-01
365

365
'B'

CL C'WT CL C'WT

200
GUIDE GUIDE
'B'
'C' 203 203 'C' 250
P9
203

X = 947
835

1150

1150

CLEAR SHAFT DEPTH


CLEAR SHAFT DEPTH
ST = 2480

ST = 2480
240
'D'
P7/2 250 P7/2

225
203
'B'
CL CAR CL CAR

200
GUIDE GUIDE

203
'C' 'C'
P8

965

965
AXIS
CAR

450 450
100

AXIS
CAR
'A' 'C' 'C' 'C'

'A' 75*230 1000 1000 1000 1000


PIT LADDER
SB = 2000 SB = 2000
'B' 100*150 CLEAR SHAFT WIDTH CLEAR SHAFT WIDTH

'C' 100*100

MACHINE ROOM POCKET DETAILS PIT FLOOR DETAILS


'D' 70*100
As a continuing policy of product improvement at ThyssenKrupp Elevator,
The design and specifications are subject to change without prior notice.

Internally Approved By
LAYOUT_ELEVATOR PIT FLOOR & MACHINE ROOM POCKET DETAILS SHEET _ 3 OF 6
Suraj Nair
All dimensions are in mm, scale 1:1, otherwise as specified.

01 CHANGES: MACHINE ROOM, KEY PLAN FOR TRIPLEX Anil Yadav 30/03/2024
Revision Details Revised By Date

CLIENTS APPROVAL meta200MR Master GAD Rev. - 0

Client - SURAJ INN PRIVATE LIMITED, MANTRI HOUSE, NO. 41,


copied in any manner, nor used for manufacturing,

VITTAL MALLYA ROAD, BENGALURU - 560 001.


Without our written consent , it shall neither be

SIGNATURE & SEAL


This presentation is our Intellectual property.

Site - DOUBLE TREE SUITES BY HILTON, IBLUR GATE,


ORR - SARJAPUR ROAD JUNCTION, BENGALURU - 560 102.
Load P7 in case of operation of the safety gear. Drawn by T.P. Humbad 30/12/2023
nor communicated to third party.

Rev.
Loads P8 / P9 in case either car or counterweight lands on the buffers. Checked by S.G. Bhaganagare 30/12/2023 Job No.- 4-37-23-291 01
Approved by T.P. Humbad 30/12/2023

P9 73245 N
P8 93260 N TK Elevator India Private Limited
P7 46630 N
TK Elevator India Private Limited
LOADS (N)_ Multi Purpose Facility: Plot No. A-23, MIDC Chakan , Phase II, Village - Khalunmbre, Taluka - Khed, District - Pune Maharashtra - 410 501.
Phone: +91-02135-624500 Fax: +91-02135-662301

F.CE.17:REV-01
9200

2400 4320 ST = 2480


CLEAR SHAFT DEPTH

2880
W # CONTROLLER
1220 1206 453

593
445 705

CL C'WT
L = 501

GUIDE

190
4-37-54583(01)

4-37-23-291

CLEAR SHAFT WIDTH


ISMB300
SHAFT SIZE : 2000 W X 2400 D

217

SB = 2000
R2
CAR

433
AXIS

R1

216
"X"

1200
ISMB300

CL CAR

387
GUIDE
Ø485 462

ISMB300

190
203 X = 947
SPEED GOVERNOR

207
200 965 1150 365 200
4500

4500
2500
4-37-54584(02)
SHAFT SIZE : 2000 W X 2400 D

E
As a continuing policy of product improvement at ThyssenKrupp Elevator,
The design and specifications are subject to change without prior notice.

M/C ROOM
ENTRANCE

Internally Approved By LAYOUT_ELEVATOR SHAFT & MACHINE ROOM PLAN SHEET _ 4 OF 6

Suraj Nair
All dimensions are in mm, scale 1:1, otherwise as specified.

ELEVATOR SHAFT & MACHINE ROOM PLAN


01 CHANGES: MACHINE ROOM, KEY PLAN FOR TRIPLEX Anil Yadav 30/03/2024
NOTE:- "TRAP DOOR DETAILS NOT SHOWING MACHINE ROOM PLAN AT TIME OF GAD PREPARATION". Revision Details Revised By Date

CLIENTS APPROVAL meta200MR Master GAD Rev. - 0

Client - SURAJ INN PRIVATE LIMITED, MANTRI HOUSE, NO. 41,


copied in any manner, nor used for manufacturing,

VITTAL MALLYA ROAD, BENGALURU - 560 001.


Without our written consent , it shall neither be

SIGNATURE & SEAL


This presentation is our Intellectual property.

Site - DOUBLE TREE SUITES BY HILTON, IBLUR GATE,


ORR - SARJAPUR ROAD JUNCTION, BENGALURU - 560 102.
W WINDOW Drawn by T.P. Humbad 30/12/2023
nor communicated to third party.

Rev.
E EXHAUST Checked by S.G. Bhaganagare 30/12/2023 Job No.- 4-37-23-291 01
Approved by T.P. Humbad 30/12/2023

R2 12103 N TK Elevator India Private Limited


R1 16959 N
TK Elevator India Private Limited
LOADS (N)_ Multi Purpose Facility: Plot No. A-23, MIDC Chakan , Phase II, Village - Khalunmbre, Taluka - Khed, District - Pune Maharashtra - 410 501.
Phone: +91-02135-624500 Fax: +91-02135-662301

F.CE.17:REV-01
'Z' LINTEL (FULL RCC) LINTEL (FULL RCC) LINTEL (FULL RCC)
LINTEL (FULL RCC)
FIREMAN SWITCH 200 GAP FOR FINISHING THE LEVEL,
ONLY ON MAIN FLOOR DW1 DW1 TO BE FILLED UP ONLY AFTER
INSTALLATION OF SHAFT DOORS
DW2 DW2

268

268
316

316
100
FINISHED ENTRANCE
HEIGHT OF OPENING

DH
FFL FFL FFL FFL

Ø80

140-170
185

135
'A' 'B' 'A' 'B'
DH1

Core Core MD
Detail View 'X'

390

ELEVATOR ENTRANCE
DH2

Below fixation scheme detail View ''X'', "Y" & ''Z'' should be as per supplied material by Factory

DH3

DH
140
1875

Detail View `Y' Detail View `Y' Detail View `Z'


170 N DW3
'Y' DW1 DW1
M

140-170
DW2 DW2

DW5 DW6 DW5


DH1

200 200

135

21
1100
DW4 DW4
SDW
SILL FIXING ARRANGEMENT HEADER FIXING ARRANGEMENT

TYPE ENTRANCE (DOOR) WIDTH


TYPE ENTRANCE (DOOR) WIDTH 700 800 900 1000 1100 1200
700 800 900 1000 'DW'
'DW'
1 DW1: DW/2+175 525 575 625 675 725 775
1 DW1: DW/2+175 525 575 625 675 2 DW2: (DW/2+25) 375 425 475 525 575 625
2 DW2: (DW/2+25) 375 425 475 525 3 DW3: 1433 1553 1743 1953 2053 2353
3 SDW: (DW+200) 900 1000 1100 1200
'Y' 4
5
DW4:
M:
310
81.5
350
81.5
400
81.5
-
-
-
-
-
-
6 DW5: - - - 285 310 335

FFL FFL
TYPE ENTRANCE (DOOR) HEIGHT
'DH' 2000 2100 2200 * 7 N: - - - 73 73 73
8 DW6: - - - 310 310 310
1 DH1: 650 683 716
135

9 SDW: (DW+200) 900 1000 1100 1200 1300 1400


2 DH2: (DH+316) 2316 2416 2516
100~150

3 DH3: (DH+80) 2080 2180 2280 TYPE ENTRANCE (DOOR) HEIGHT


4 D: 216 316 416 'DH' 2000 2100 2200 2300 2400

50
1 DH1: 650 683 716 750 783
* Applicable for DW800 & DW900 only 2 DH2: (DH+268) 2268 2368 2468 2568 2668
200 200 3 DH3: (DH+80) 2080 2180 2280 2380 2480
'X' 4 D: 216 316 416 416 416

SDW
1000 1000
200 SW = 2000 200 LANDING SECTION VIEW
RCC CLEAR SHAFT WIDTH RCC
40
80
40
As a continuing policy of product improvement at ThyssenKrupp Elevator,
The design and specifications are subject to change without prior notice.

50 CLIENTS APPROVAL
LOP
900
SIGNATURE & SEAL

LAYOUT_ LANDING DETAILS SHEET _ 5 OF 6


LANDING VIEW
All dimensions are in mm, scale 1:1, otherwise as specified.

FROM FLOOR NUMBER: MAIN

01 CHANGES: MACHINE ROOM, KEY PLAN FOR TRIPLEX Anil Yadav 30/03/2024

Internally Approved By Revision Details Revised By Date

meta200MR Master GAD Rev. - 0


Suraj Nair Client - SURAJ INN PRIVATE LIMITED, MANTRI HOUSE, NO. 41,
copied in any manner, nor used for manufacturing,

VITTAL MALLYA ROAD, BENGALURU - 560 001.


Without our written consent , it shall neither be
This presentation is our Intellectual property.

Site - DOUBLE TREE SUITES BY HILTON, IBLUR GATE,


ORR - SARJAPUR ROAD JUNCTION, BENGALURU - 560 102.
Note:-
Drawn by T.P. Humbad 30/12/2023
nor communicated to third party.

In the case the control cabinet is located in a fire sector different to other higher floors or Rev.
building areas (very exceptional situation because only in very particular exceptions the
Checked by S.G. Bhaganagare 30/12/2023 Job No.- 4-37-23-291 01
Approved by T.P. Humbad 30/12/2023
lift shaft communicates different fire sectors at different heights), the control cabinet
must be installed on the wall or with full front variant. TK Elevator India Private Limited
TK Elevator India Private Limited
Multi Purpose Facility: Plot No. A-23, MIDC Chakan , Phase II, Village - Khalunmbre, Taluka - Khed, District - Pune Maharashtra - 410 501.
Phone: +91-02135-624500 Fax: +91-02135-662301

F.CE.17:REV-01
#
SCAFFOLDING
500

SB = 2000
CLEAR SHAFT WIDTH
>Ø73.2mm L R

B
100
>Ø43.9-Ø50mm

CLEAR SHAFT DEPTH


ST = 2480
#
OVER LAPPING

975.5

100

F
FIG. 2 #

SHAFT PLAN
900

#
As a continuing policy of product improvement at ThyssenKrupp Elevator,
The design and specifications are subject to change without prior notice.

FIG. 3
500

Internally Approved By Note : Depth wise support is needed on


every landing for steadiness of
>Ø73.2mm Suraj Nair scaffolding shown in. fig 3.
BUILDERS WORK_SCAFFOLDING (CLIENT'S SCOPE) SHEET _ 6 OF 6
VERTICAL MEMBER
FIG. 1
All dimensions are in mm, scale 1:1, otherwise as specified.

FIG. 4
SHAFT ELEVATION B= F= L= R= 01 CHANGES: MACHINE ROOM, KEY PLAN FOR TRIPLEX Anil Yadav 30/03/2024
Revision Details Revised By Date

meta200MR Master GAD Rev. - 0

Client - SURAJ INN PRIVATE LIMITED, MANTRI HOUSE, NO. 41,


copied in any manner, nor used for manufacturing,

Note : 1. Ø Of bamboo not less than 75mm. OR Ø of m.s pipe not less than 50mm (If m.s scaffold is erected.) CLIENTS APPROVAL VITTAL MALLYA ROAD, BENGALURU - 560 001.
Without our written consent , it shall neither be
This presentation is our Intellectual property.

2. Scaffolding should be in plumb. Site - DOUBLE TREE SUITES BY HILTON, IBLUR GATE,
ORR - SARJAPUR ROAD JUNCTION, BENGALURU - 560 102.
3. Earthing connection is required in case of m.s scaffolding. SIGNATURE & SEAL Drawn by T.P. Humbad 30/12/2023
nor communicated to third party.

Rev.
4. Before erecting the scaffolding, Pit should be clean, waterproof. Checked by S.G. Bhaganagare 30/12/2023 Job No.- 4-37-23-291 01
5. If vertical member diameter is reduced to 45-50mm than there should be overlapping in vertical member as shown in fig. 4. Approved by T.P. Humbad 30/12/2023

TK Elevator India Private Limited


TK Elevator India Private Limited
Multi Purpose Facility: Plot No. A-23, MIDC Chakan , Phase II, Village - Khalunmbre, Taluka - Khed, District - Pune Maharashtra - 410 501.
Phone: +91-02135-624500 Fax: +91-02135-662301

F.CE.17:REV-01

You might also like