ZXUN USPP
Universal Subscriber Profile Platform
Test Cases (O&M Volume)
Version: V7.21
ZTE CORPORATION
ZTE Plaza, Keji Road South, Hi-Tech Industrial Park, Nanshan District, Shenzhen,
P.R.China
Postcode: 518057
Tel: +86-755-26771900
URL: http://support.zte.com.cn
E-mail: [email protected]
LEGAL INFORMATION
Copyright 2022 ZTE CORPORATION.
The contents of this document are protected by copyright laws and international treaties. Any reproduction
or distribution of this document or any portion of this document, in any form by any means, without the
prior written consent of ZTE CORPORATION is prohibited. Additionally, the contents of this document
are protected by contractual confidentiality obligations.
All company, brand and product names are trade or service marks, or registered trade or service marks,
of ZTE CORPORATION or of their respective owners.
This document is provided as is, and all express, implied, or statutory warranties, representations or
conditions are disclaimed, including without limitation any implied warranty of merchantability, fitness for
a particular purpose, title or non-infringement. ZTE CORPORATION and its licensors shall not be liable
for damages resulting from the use of or reliance on the information contained herein.
ZTE CORPORATION or its licensors may have current or pending intellectual property rights or applica-
tions covering the subject matter of this document. Except as expressly provided in any written license
between ZTE CORPORATION and its licensee, the user of this document shall not acquire any license
to the subject matter herein.
ZTE CORPORATION reserves the right to upgrade or make technical change to this product without
further notice.
Users may visit the ZTE technical support website http://support.zte.com.cn to inquire for related infor-
mation.
The ultimate right to interpret this product resides in ZTE CORPORATION.
Statement on the Use of Third-Party Embedded Software:
If third-party embedded software such as Oracle, Sybase/SAP, Veritas, Microsoft, VMware, and Redhat
is delivered together with this product of ZTE, the embedded software must be used as only a component
of this product. If this product is discarded, the licenses for the embedded software must be void either
and must not be transferred. ZTE will provide technical support for the embedded software of this product.
Revision History
Revision No. Revision Date Revision Reason
R1.1 2020-02-20 Modify the commands that are changed due to the
NFS simplification function.
Revision No. Revision Date Revision Reason
R1.0 2019-09-17 First Edition
Serial Number: SJ-20210512143710-038
Publishing Date: 2020-02-20 (R1.1)
Contents
CONTENT
Chapter 1 Purpose ............................................................................................... 6
Chapter 2 Test Case List...................................................................................... 7
2.1 Configuration Management ......................................................................................... 7
2.2 Performance Management .......................................................................................... 8
2.3 Fault Management ....................................................................................................... 8
2.4 Security Management .................................................................................................. 9
2.5 Signaling Trace ............................................................................................................ 9
2.7 Log Management ....................................................................................................... 10
2.8 Backup and Restore .................................................................................................. 12
Chapter 3 Additional test case .......................................................................... 12
3.1 Report Function ........................................................................................................ 12
3.2 Time Management.................................................................................................... 13
3.3 Configuration Data Backup and Recovery ............................................................... 13
3.4 Dynamic Management.............................................................................................. 13
3.5 Role Management .................................................................................................... 14
3.6 EPS Subscription Template Management ............................................................... 14
3.7 MML Provisioning Interface ...................................................................................... 14
3.8 Clock Synchronization .............................................................................................. 15
3.9 Batch MML Operation............................................................................................... 15
3.10 Statistic Function of Provisioning ........................................................................... 16
3.11 HLR Service Observation ....................................................................................... 16
3.12 GUI Function ........................................................................................................... 16
3.13 File Management .................................................................................................... 16
Glossary .............................................................................................................. 18
EM ........................................................................................................................ 18
NFS ...................................................................................................................... 18
OMU ..................................................................................................................... 18
- Operation & Management Unit ........................................................................ 18
SC ........................................................................................................................ 18
VM ........................................................................................................................ 18
II
Chapter 1 Purpose
This document is used for testing network management functions.
SJ-20210512143710-038 | 2020-02-20 (R1.1) 1
Chapter 2 Test Case List
Table of Contents
⚫ Configuration Management 2
⚫ Performance Management 3
⚫ Fault Management 3
⚫ Security Management 4
⚫ Signaling Trace 4
⚫ Version Management 5
⚫ Log Management 5
⚫ Backup and Restore 6
2.1 Configuration Management
Test Item EM Function Test
Test SubItem Configuration Management
Test Purpose The purpose of this test is to verify the EM provide configuration management
function.
Pre-requisites ⚫ The EM client can log in to the EM server properly.
⚫ Each container of the OMU VM is operating properly, and connects to the EM
server properly.
Test Procedure 1. Log in to the EM client and open the MML Terminal window.
2. Enter the SDM_CMS node under the USPP Name > NF Node, and select Au-
thentication PLMN Template Configuration.
3. Query (SHOW ALLOWEDPLMNTPL) or modify (SET ALLOWEDPLMNTPL)
some attributes related to an authorized PLMN template.
Test Verification ⚫ The command is execute successful.
⚫ There is no error while operating.
Message Flow None
Test Result □Ѵ Pass □ Fail
Remarks
Signature Test Date 25-Sept-2022
2 SJ-20210512143710-038 | 2020-02-20 (R1.1)
2.2 Performance Management
Test Item EM Function Test
Test SubItem Performance Management
Test Purpose The purpose of this test is to verify the EM provide performance management
function.
Pre-requisites ⚫ The EM client can log in to the EM server properly.
⚫ Each container of the OMU VM is operating properly, and connects to the EM
server properly.
Test Procedure 1. Log in to the EM client and open the Performance window.
2. Create and activate a new performance statistics task and waits for a granu-
larity.
3. Execute data query.
Test Verification ⚫ The performance statistics data can be reported properly and the information
is correct.
⚫ There is no error while operating.
Message Flow None
Test Result □Ѵ Pass □ Fail
Remarks
Signature Test Date 25-Sept-2022
2.3 Fault Management
Test Item EM Function Test
Test SubItem Fault Management
Test Purpose The purpose of this test is to verify the EM provide alarm management function.
Pre-requisites ⚫ The EM client can log in to the EM server properly.
⚫ Each container of the OMU VM is operating properly, and connects to the EM
server properly.
Test Procedure 1. Log in to the EM client and open the Alarm window.
2. Trigger an alarm, for example, restarting an SC or NFS.
3. Clear the alarm, for example, the SC or NFS that is waiting to be restarted op-
erates properly.
4. Observe the alarm reporting and recovering.
Test Verification ⚫ The alarm can be properly triggered and cleared.
⚫ There is no error while operating.
Message Flow None
SJ-20210512143710-038 | 2020-02-20 (R1.1) 3
ZXUN USPP Test Cases (O&M Volume)
Test Result □Ѵ Pass □ Fail
Remarks
Signature Test Date 25-Sept-2022
2.4 Security Management
Test Item EM Function Test
Test SubItem Security Management
Test Purpose The purpose of this test is to verify the EM provide security management function.
Pre-requisites ⚫ The EM client can log in to the EM server properly.
⚫ Each container of the OMU VM is operating properly, and connects to the EM
server properly.
⚫ The EM has enabled the centralized security function.
Test Procedure 1. Log in to the EM client and open the System > Security window.
2. Create a role.
3. Create a user and associate the user with the role created in the previous
step.
4. Log in to the EM client useing the new user.
Test Verification ⚫ Log in to the EM client successfully and have proper permissions.
⚫ There is no error while operating.
Message Flow None
Test Result □Ѵ Pass □ Fail
Remarks
Signature Test date 25-Sept-2022
2.5 Signaling Trace
Test Item EM Function Test
Test SubItem Signalling Trace
Test Purpose The purpose of this test is to verify the EM provide trace management function.
Pre-requisites ⚫ The EM client can log in to the EM server properly.
⚫ Each container of the OMU VM is operating properly, and connects to the EM
server properly.
Test Procedure 1. Log in to the EM client and open the Trace window.
2. Create a service signaling tracing task and activate and open the tracing win-
dow.
3. Triggers calls or other services.
4 SJ-20210512143710-038 | 2020-02-20 (R1.1)
2 Test Case List
Test Verification ⚫ Signaling trace information can be reported and decoded properly.
⚫ There is no error while operating.
Message Flow None
Test Result □Ѵ Pass □ Fail
Remarks
Signature Test Date 25-Sept-2022
2.6 Version Management
Test Item EM Function Test
Test SubItem Version Management
Test Purpose The purpose of this test is to verify the EM provide version management function.
Pre-requisites ⚫ The EM client can log in to the EM server properly.
⚫ Each container of the OMU VM is operating properly, and connects to the EM
server properly.
Test Procedure 1. Log in to the EM client and open the MML Terminal window window.
2. Select the CommonS_TMSP node under the USPP Name > NF Node and
execute the following command to query the running version:
SHOW VERSION
3. Waiting the successful response.
Test Verification The running version can be queried properly.
Message Flow None
Test Result □Ѵ Pass □ Fail
Remarks
bSignature Test date 25-Sept-2022
2.7 Log Management
Test Item EM Function Test
Test SubItem Log Management
Test Purpose The purpose of this test is to verify the EM provide log management function.
SJ-20210512143710-038 | 2020-02-20 (R1.1) 5
Pre-requisites ⚫ The EM client can log in to the EM server properly.
⚫ Each container of the OMU VM is operating properly, and connects to the EM
server properly.
Test Procedure 1. Log in to the EM client and open the System > Log window.
2. Select an NF and query all operation logs.
SJ-20210512143710-038 | 2020-02-20 (R1.1) 5
ZXUN USPP Test Cases (O&M Volume)
Test Verification ⚫ The returned operation logs are correct.
⚫ There is no error while operating.
Message Flow None
Test Result □Ѵ Pass □ Fail
Remarks
Signature Test Date 25-Sept-2022
2.8 Backup and Restore
Test Item EM Function Test
Test SubItem Backup and Restore
Test Purpose The purpose of this test is to verify the EM provide backup and restoration func-
tion.
Pre-requisites ⚫ The EM client can log in to the EM server properly.
⚫ Each container of the OMU VM is operating properly, and connects to the EM
server properly.
Test Procedure 1. Log in to the EM client and open the MML Terminal window.
2. Select USPP Name > NF Node and excute the BACKUP or RESTORE com-
mand to backup or retore the data.
Test Verification ⚫ The backup and restoration are successful, and the printed information is cor-
rect.
⚫ There is no error while operating.
Message Flow None
Test Result □Ѵ Pass □ Fail
Modify a data after backup, for example, modify the port of an DIAMETER link to
Remarks
interrupt the link. After data is restored and synchronized, the link is restored.
Signature Test Date 25-Sept-2022
Chapter 3 Additional test case
3.1 Report Function
Test Item O&M Function
Test SubItem Report Function
Test Purpose The purpose of this test is to verify the EM provide Report Function.
Pre-requisites
The EM client can log in to the EM server properly.
Each container of the OMU VM is operating properly, and connects to the EM
server properly.
Test Procedure
Log in to the EM client and open the MML Terminal window.
6 SJ-20210512143710-038 | 2020-02-20 (R1.1)
Enter the SDM_TMSP
Execute the command SHOW VM
Export the result.
Test Verification 1. The query results can be displayed in HTML format.
2. The query results can be exported and saved as a file.
Message Flow
Test Result □Ѵ Pass □ Fail
Remarks
Signature Test date 25-Sept-2022
3.2 Time Management
Test Item O&M Function
Test SubItem Time Management
Test Purpose The purpose of this test is to verify the EM provide Time Management
function.
Pre-requisites
The EM client can log in to the EM server properly.
Each container of the OMU VM is operating properly, and connects to the EM
server properly.
Test Procedure
Log in to the EM client and open the MML Terminal window.
Enter the SDM_TMSP, and select the command: Show Time (SHOW TIME);
Execute the command.
Select the command: SET Time (SET TIME);
Input the parameters needed;
Execute the command.
Test Verification 1. Query time and modify time successful.;
Message Flow
Test Result □Ѵ Pass □ Fail
Remarks
Signature Test date 25-Sept-2022
3.3 Configuration Data Backup and Recovery
Reference to 2.8
3.4 Dynamic Management
Test Item O&M Function
Test Sub Item Dynamic Management
Test Purpose The purpose of this test is to verify the EM provide Dynamic
Management function.
Pre-requisites
The EM client can log in to the EM server properly.
Each container of the OMU VM is operating properly, and connects
to the EM server properly.
Test Procedure 1. Open the EM Terminal window, select SDM_SIG->Device
management->Dynamic Management
2. Select Block signaling link or Unblock signaling link command,
input parameters in needed, and execute the command
Test 1.The operator of Dynamic Management successful.
Verification
6 SJ-20210512143710-038 | 2020-02-20 (R1.1)
Message Flow
Test Result □Ѵ Pass □ N/A
Remarks
Test date 25-Sept-2022
Signature
3.5 Role Management
Test Item O&M Function
Test SubItem Role Management
Test Purpose The purpose of this test is to verify the EM provide Role Management function.
Pre-requisites
The EM client can log in to the EM server properly.
Each container of the OMU VM is operating properly, and connects to the EM
server properly.
Test 1. Open the Terminal window, select the Security management view ;
Procedure 2. Create a role that has all rights;
3. Create a user;
4. Login the EM server using new user;
Test 1. The user created can operate all functions of EM
Verification
Message Flow
Test Result
□Ѵ Pass □ Fail
Remarks
Signature Test date 25-Sept-2022
3.6 EPS Subscription Template Management
Test Item Provisioning Function
Test Sub Item EPS Subscription Template Management
Test Purpose The purpose of this test is to verify EPS Subscription Template
Management Function is normal.
Pre-requisites 1. Provision Gateway and PDM modules works normally in HSS;
2. Background works normally in HSS.
Test Procedure 1. Login to Provision Gateway, access to “WCDMA->Profile”
2. Add a profile template for all subscribers in HSS
Test
1. Add a profile correctly
Verification
N/A
Message Flow
Test Result □Ѵ Pass □ Fail □ N/A
Remarks
25-Sept-2022
Signature Test date
3.7 MML Provisioning Interface
Test Item Provisioning Function
Test Sub Item MML Interface Function
6 SJ-20210512143710-038 | 2020-02-20 (R1.1)
Test Purpose The purpose of this test is to verify the MML Interface Function is
normal.
Pre-requisites 1. PGW and PDM modules works normally in HSS;
2. Background works normally in HSS.
3. BOSS system works normally
Test Procedure 1. Configure the TCP link between BOSS and PGW
2. Add an EPS subscription from BOSS system.
Test 1. The connection between PGW and BOSS is success.
Verification 2. Add an IMS subscription successfully
N/A
Message Flow
Test Result □ Pass □ Fail □ N/A
Remarks Pending on boss
Signature Test date
3.8 Clock Synchronization
Test Item Characteristic Services
Test Sub Item Clock Synchronization
Test Purpose To verify the system function of Clock Synchronization
Pre-requisites 1. EM server and clients are working normally;
2. NTP server is available and works normally
Test Procedure 1. Configure the NTP server on EM server
2. Checking the time of system and NTP server
Test 1. System time is same in NTP server and system
Verification
Test Result □Ѵ Pass □ Fail
Remarks
Signature Test date 25-Sept-2022
3.9 Batch MML Operation
Test Item Provisioning Function
Test Sub Item Batch MML Operation
Test Purpose The purpose of this test is to verify the batch MML operation
Function is normal.
Pre-requisites 1. PGW and PDM modules works normally in HSS;
2. Background works normally in HSS.
3. Agent system works normally
Test Procedure 1. On the WCDMA tab of the agent, select Batch
Operation > Number Allocation in Batch on the MML command
tree
2. Set the common parameters of batch operations.
3. Select a profile from the Profile list.
4. Click Batch Execution.
Test
Batch MML excute successfully.
Verification
6 SJ-20210512143710-038 | 2020-02-20 (R1.1)
N/A
Message Flow
Test Result □Ѵ Pass □ Fail □ N/A
Remarks
Test date 25-Sept-2022
Signature
3.10 Statistic Function of Provisioning
Reference to 2.2.
3.11 HLR Service Observation
Reference to 2.5.
3.12 GUI Function
Reference to 2.3~2.5.
3.13 File Management
Test Item O&M Function
Test SubItem File Management
Test Purpose The purpose of this test is to verify the EM provide File Management.
Pre-requisites
The EM client can log in to the EM server properly.
Each container of the OMU VM is operating properly, and connects to the EM
server properly.
Test Procedure
On the Configuration page of an EM client, select USPP Name > NF Node >
Service Nam
Run the LOG COLLECT command to collect logs.
Test Verification The operator can get the log file.
Message Flow
Test Result
□Ѵ Pass □ Fail
Remarks
Signature Test date 25-Sept-2022
3.14 Version Management
Test Item O&M Function
Test SubItem Version Management
Test Purpose The purpose of this test is to verify the EM provide Version Management
function.
Pre-requisites 1. The OMU client has been logged in OMU server.
2. The link between OMU and FE is available.
3. The version file has been copied to the OMU Server directory
Test 1 Open the Terminal window, select the Version Management view
Procedure 2. Execute the load version command:
6 SJ-20210512143710-038 | 2020-02-20 (R1.1)
ADD PKG
ACTIVATE PKG
3. Waiting the successful response
4. Execute the enable package command:
ENABLE VERSION
5. Waiting the successful response
6. When the blade restart successful, execute the query version command:
SHOW VERSION DETAIL
Test 1. The version can be loaded and queried correctly;
Verification
Message Flow
Test Result
□Ѵ Pass □ Fail
Remarks
Signature Test date 25-Sept-2022
3.15 FCAPS management
Reference to 2.1~2.4
6 SJ-20210512143710-038 | 2020-02-20 (R1.1)
Glossary
EM
- Element Management
NFS
- Network Function Service
OMU
- Operation & Management Unit
SC
- Service Component
VM
- Virtual Machine
SJ-20210512143710-038 | 2020-02-20 (R1.1) 7