0% found this document useful (0 votes)
75 views1 page

Quattro Split Phase 120 240VAC 24VDC Setup 600ah Li VE Bus BMS Generator MPPT BMV CCGX

Solar Power user manual, do-it-yourself installation guides, and schematic plans for complete setup, courtesy from a known multinational energy provider.

Uploaded by

Ram Caceres
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views1 page

Quattro Split Phase 120 240VAC 24VDC Setup 600ah Li VE Bus BMS Generator MPPT BMV CCGX

Solar Power user manual, do-it-yourself installation guides, and schematic plans for complete setup, courtesy from a known multinational energy provider.

Uploaded by

Ram Caceres
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PV BREAKERS/ISOLATORS

REMOTE PANEL
VE.Bus MAINS DETECTOR QUATTRO L1 VE.Bus MAINS DETECTOR QUATTRO L1 SMART MPPT SOLAR ARRAY
victron energy

The VE.Bus BMS is enlarged The BatteryProtect must be


SMART BATTERY PROTECT 220 BLUE POWER

BMV-712 SMART COLOR CONTROL GX


VE.Bus BMS visible in this drawing. programmed for Li-Ion mode-C victron energy
BLUE POWER

SmartSolar charge controller


The BMS GND is not connected and 24 Volt either through BMV-712 SMART
BATTERY MONITOR

MPPT 100 | 50
AC Input Inverting AC Loads
victron energy
to prevent ground loops. programming on the device MAIN
BLUE POWER

V
0W
L1: 0W
victron energy
230W
L1: 127W name name
Ground comes through the itself or with a Bluetooth L2: 0W L2: 103W

VE.Bus UTP cable. enabled smartphone or tablet. SETUP SELECT


PV-Charger 0 OFF 0 OFF 0 OFF 0 OFF
Connect the load disconnect -

75%
+
745W
output of the VE.Bus BMS to 340W
DC Power ! i IP43
25.6V 13.2A
Remote H terminal. -155W
Battery 12/24V 50A

Absorbtion
PV 100Vmax 50A
CCGX 1A

Float
Bulk
CCGX POWER +
V+
5x20mm BATTERY PV
FUSE GND

+ - - +
color control

BMS ON/OFF

VE-direct
BMS POWER+ VRM
WORLD
BMS LOAD DISCONNECT MAIN SWITCH-3

VE-direct-2

VE-direct-1

VE.Bus

ETHERNET
BMS CHARGE DISCONNECT
ON
M8 CIRCULAR ALARM LED - D
TE MAIN DC DISTRIBUTION ENGINE

EC T
CONNECTOR

RO
MAIN DC

N P
OF F I G N I T I O
DISTRIBUTION

OFF
FROM QUATTRO L2 MEGA
ALARM LED + HOUSE
100A Starter Battery +

G TO
HIN
FROM MPPT

ve
mo

I TC
POSITIVE

Re

SW
Maximum 5mA R

E
FO
BE
I NE
S T OP EN
G
BUSBAR
GENERATOR 8KW
MEGA
Load 1 +
120-240V / 60Hz AC
xxxA
ALTERNATOR (Lithium Proof)
BTV CABLE

BTV CABLE

MEGA
xxxA Load 2 + AMI
100A
Charge light
ARGOFET
INTERNAL
MEGA
xxxA Load 3 + ALTERNATOR IGNITION
CYRIX Li CHARGE 230 FUSE
victron energy
BLUE POWER B+ D+ B-
MEGA
30 AC
ENGINE SYSTEM
xxxA Load 4 + www.victronenergy.com

NEG. POS.

CYRIX Li MEGA FUSE


CHARGE xxxA Load 5 + xx AMP.
Li-DISTRIBUTION
230 Charger ENERGIZE OUTPUT-2 OUTPUT-1 INPUT GROUND
FROM ENGINE+(30)
Batt. BATTERY 100A 2 Output

100A 3 Output
ARGOFET Battery Isolator
200A 2 Output

200A 3 Output 24V-80A


POSITIVE BUSBAR MEGA
100A Alternator + ISOLATOR

MEGA

THERMAL CIRCUIT BREAKER


200A

60 AMPERE
285060F
A
B
T

D
A
L
MEGA
300A MAIN SWITCH-1 T MPPT +
KEEP POSITIVE BATTERY CABLES RE
SE

ALL AS SHORT AS POSSIBLE AND OFF


ALL AT THE SAME LENGTH !
ANL
Quattro-1 AC IN-2
350A
ON Quattro-1 Batt + Quattro-1 AC IN-1

Battery Pre Main Fuses MEGA QUATTRO-1 / L1 5KW/24V/120V-60Hz AC QUATTRO-2 / L2 5KW/24V/120V-60Hz AC


400A
INVERTER/CHARGER INVERTER/CHARGER
120/240VAC Shore power 120/240VAC Generator
Quattro-1 Batt +
ANL

350A MAIN SWITCH-2


Quattro-2 Batt +
OFF
ISOLATION TRANSFORMER OR
Battery Pre Main Fuses MEGA
400A GALVANIC ISOLATOR SHOULD BE
MAIN INCOMING
INSERTED HERE IF NEEDED, AC BREAKERS
INCLUDING NECESSARY
BREAKERS. TOWARDS
ON Quattro-2 Batt + QUATTRO'S
ANL
www.victronenergy.com www.victronenergy.com

350A
victron energy victron energy
BLUE POWER BLUE POWER

charger inverter charger inverter


mains on inverter on mains on inverter on
BMS 2A AC in 1 AC out 1
bulk
I on
overload AC in 1 AC out 1
bulk
I on
overload
AC in 2 AC out 2
absorption
O off
low battery AC in 2 AC out 2
absorption
O off
low battery 50A
BMV 100mA float
charger only
temperature float
charger only
temperature
125/250V
Easy Lock
.battery charger .sinewave inverter .transfer switch .battery charger .sinewave inverter .transfer switch name name
Spare xxA
Quattro Battery
.powerassist .parallel
connectable
.three phase
connectable Quattro Battery
.powerassist .parallel
connectable
.three phase
connectable

3 x Lithium

VOLT

VOLT
24 |5000 |120

AMP
24 |5000 |120

AMP
5x20mm AC transfer capacity: 2x100A | Inverter 120V AC transfer capacity: 2x100A | Inverter 120V

VA

VA
0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF
FUSES CE CE

25.6V-200Ah VE.Bus-1 VE.Bus-2 VE.Bus-1 VE.Bus-2


MCB MCB
SHORE POWER
Smart LiFePO4 BMV POWER + IN IN OUT OUT OUT
BATTERY

BATTERY IN IN IN IN OUT OUT OUT


BATTERY

BATTERY IN IN
CONNECTION
120/240VAC
1 1 1 1-2 2 2 2 1 1 1 1-2 2 2 2
_ _ _ _
L N L N L L N L N L N L L N
BATTERY BATTERY
BTV CABLE BTV CABLE + + + +
Shore Generator

NEUTRAL

NEUTRAL

NEUTRAL

NEUTRAL
LINE

LINE

LINE

LINE

LINE

LINE

LINE

LINE
BATTERY BATTERY
BTV CABLE BTV CABLE

NEUTRAL

NEUTRAL
GROUND AC IN-1 AC OUT-1 AC OUT-2
V-SENSE
+ -
T-SENSE
+ -
AUX1
+ - +
AUX2
- +
GND
RELAY
- S1 S2

ON
TRICKLE
CHARGE
+
K1
NC NO COM
K2
NC NO COM
AC IN-2 GROUND GROUND AC IN-1 AC OUT-1 AC OUT-2
V-SENSE
+ -
T-SENSE
+ - +
AUX1
-
AUX2
+ - +
GND
RELAY
- S1 S2

ON
TRICKLE
CHARGE
+
K1
NC NO COM
K2
NC NO COM
AC IN-2 GROUND
power power
1 2 TRICKLE 1 2 TRICKLE
S1 S2 CHARGE S1 S2 CHARGE

GROUND GROUND

M8 CIRCULAR M8 CIRCULAR M8 CIRCULAR victron energy

CONNECTOR CONNECTOR CONNECTOR


BLUE POWER

Drawing BJE-274A
VE.Bus BMS
Mains detector

Quattro-1 AC IN-2

Quattro-1 AC IN-1

Quattro-1 AC IN-2 Quattro-2 AC IN-2 Quattro-2 AC IN-2


CENTRAL
NEGATIVE BUSBAR Quattro-1 AC IN-1 Quattro-2 AC IN-1 Quattro-2 AC IN-1

Quattro-1 AC OUT-1 Quattro-2 AC OUT-1


VE.Bus BMS mains
detector inside Quattro L1 Quattro-1 AC OUT-2 Quattro-1 AC OUT-1
CYRIX LI-
BP220 GND- VE.Bus mains detector to BMS VE.Bus Master Slave cable Quattro-2 AC OUT-2
CCGX-
ARGO FET- VE.Bus to CCGX VE.Bus to CCGX Quattro-1 AC OUT-2

Load 1 -
KEEP ALL QUATTRO DC POWER NEUTRAL LINK
QUATTRO'S AC OUT-2 SPLIT PHASE NEUTRAL LINK
QUATTRO'S AC OUT-1 SPLIT PHASE
Load 2 -
CABLES AS SHORT AS POSSIBLE SUPPLY 2 X 120VAC AND 1 X 240VAC SUPPLY 2 X 120VAC AND 1 X 240VAC
Load 3 - AND ALL AT THE SAME LENGTH !
25.6V-200Ah

25.6V-200Ah

25.6V-200Ah
Smart LiFePO4

Smart LiFePO4

Smart LiFePO4
Lithium

Lithium

Lithium

NEUTRAL LINK NEUTRAL LINK


Load 4 -
Q1 Conn-G Batt+
victron energy

victron energy

victron energy

Load 5 -
BLUE POWER

BLUE POWER

BLUE POWER

Engine- Q1 Conn-G Batt+


name name name name name name name name name name name name name name name name name name

MPPT- Q2 Conn-G Batt+


0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF 0 OFF

Alternator- Q2 Conn-G Batt+


Q1 Conn-F Batt- Q1 Conn-F Batt- MCB MCB MCB MCB MCB MCB

Q1 Conn-F Batt- Q1 Conn-F Batt-

Q1 Conn-L Case ground Q1 Conn-L Case ground Quattro-1 Quattro-2 Quattro's Quattro-1 Quattro-2 Quattro's
AC out-2 AC out-2 240V out AC out-1 AC out-1 240V out
Q2 Conn-F Batt- Q2 Conn-F Batt-

Q2 Conn-F Batt- Q2 Conn-F Batt-

Q2 Conn-L Case ground Q2 Conn-L Case ground


120V L1 Switched load-1 120V L1 No Break load-1
120V L1 Switched load-2 120V L1 No Break load-2
120V L2 Switched load-1 120V L2 No Break load-1
120V L2 Switched load-2 120V L2 No Break load-2
240V L1-L2 Switched load-1 240V L1-L2 No Break load-1
SUPPLIED UTP CABLE
+B2 Starter Battery + 240V L1-L2 Switched load-2 240V L1-L2 No Break load-2
+B1

IMPORTANT INFORMATION ! IMPORTANT INFORMATION ! IMPORTANT INFORMATION ! IMPORTANT INFORMATION ! IMPORTANT INFORMATION ! IMPORTANT INFORMATION !
THE BMV SHUNT CAN BE UPGRADED When operating in inverter mode, the Neutral output of Quattro split phase setup programming Recommended AC Out-1 cable/breaker size Quattro's Recommended AC Out-2 cable/breaker size Quattro's Recommended DC cable/fuse size Quattro's Recommended AC IN-1 & AC IN-2 WARNING
a inverter/charger must be connected to ground to cable/breaker size Quattro's
FROM STANDARD 500A TO 1000A. The split phase programming has to be With Power assist each Quattro can add AC Out-2 only is available when power is 0-5 m cable length: 4 x 50SQmm 120/240 VOLT AC IS EXTREMELY
guarantee proper functioning of a GFCI or RCD device. completed with Victron's VE.Bus Quick 5KW to the output load per phase when present on AC IN-1 or AC IN-2. 5-10 m cable length: 4 x 95SQmm AC IN-1 & AC IN-2 both must be protected HAZARDOUS !!!
THE BMV SHUNT IS MOUNTED
In case of a split phase supply the Neutral also must Configure before the VE.Bus BMS assistant needed. Together with the adjustable 100A During battery operation it will be Cable length stands for the distance between the by a circuit breaker rated at 100A max per DO NOT TOUCH ANY LIVE WIRED
DIRECT ON BOTH BUSBARS. be grounded. is loaded into each Quattro ! input this all adds up to the max sum of disconnected. AC Out-2 supports up to 50A battery connections and the Quattro connections !!! phase or less. This depends heavily on the PARTS OF THE INSTALLATION !!!
Drawing BJE-274B The primary Case ground connection from a inverter Quattro programming with VEConfigure
input and output current of 100+42=142A per phase and is adjustable. Recommendations are without other loads in the size of the connected power source.The WHEN IN DOUBT, ALWAYS CONSULT
per phase. An Earth leakage device with An Earth leakage device with breaker or a system and these also should be taken into input currents must be adjusted to fit the YOUR VICTRON DEALER !!!
charger like a Multi or a Quattro, must be connected to The VE.Bus BMS assistant has to be added breaker or a combination MCB/RCD must combination MCB/RCD must be installed account for proper main battery, main fuse & main size of the connected power sources. The
the Central Negative Busbar of the DC system. Size of to each Quattro with Victron's VEConfigure be installed on the output. Cable size must on the output. Cable size must be adjusted switch cables !!! breaker and cable size for both AC IN-1 &
this cable must be identical to connected DC negative. after completion of the split phase setup. be adjusted accordingly. accordingly. Fuse size should be 1x400A or 2x200A per Quattro. AC IN-2 should be adjusted accordingly.

KEEP NEGATIVE BATTERY CABLES


ALL AS SHORT AS POSSIBLE AND
ALL AT THE SAME LENGTH !

You might also like