Tooling Kick Off Form Overview

TOOLING KICK OFF FORM
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views1 page

Tooling Kick Off Form Overview

TOOLING KICK OFF FORM
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
  • Tooling Kick Off Form

TOOLING KICK OFF FORM

Soft Tool Semi-Tooled Up ✘ Tooled Up

Project Name: Project Code: Supplier Name / Code:

Part Name: Part No: Drawing No.:

Tooling Kickoff For


Tooling Kickoff For (eg
Fixtures & gauges ( TKO Date:
Press Tool,Moulds,):
eg machining clearance):

Supplier APQP Time Line

Date of CAD data Date of Date of tooling End date of Tooling T0 Sample Delivery
Date of Start of Tooling T1 Sample Delivery date Submission of Devp. Plan
release Drg release clearance by Design Completion date

Are all the dates meeting the project time line: YES YES YES

Required Actions
Deliverables Resp. (Name) Status Remarks
What Who When

Interface Sign off Completion Design team G

DFMEA Completion Design Lead- CFT signoff Y

CAE sign off completion Design team

DVP & R sign off completion Validation Team

Design Lead-
<SC>, <CC> List completion
Development team

Design Lead-
GD&T signoff completion
Development team

Design Lead-
Drawing Release completion
Development team

Colour Material Finish completion Product Development

Tool Feasibility Studied Product Development

Are there any ECN in process that put a risk to allowable


Product Development
cost and PPAP timing.

Are there open issues that could result in a new ECN. Product Development

Supplier Tool and part quality will be on time with right


Product Development
quality

APQP Status Report Product Development

Other Project Specific Requirements (RASIC Chart Sign


Product Development
off, Packaging Sign off etc.)

Details of Child Parts & Tooling Types

Tool Type (T0/ T1)


Sl. No. Child Part Name Tooling Description Remarks
T0 Level T1 Level

Concerns/Deviation Tracking

Concerns / Deviation Action Resp Target Date

As per the Tooling Clearance for above part no, we hereby confirm that the tooling and components are manufacturable.

Tooling KICK OFF Accepted Accepted with Concerns / Deviation Rejected

M6, M4 & Variant Approvals

Design Engineer Development Engineer Quality Assurance Engineer Supplier Representative

Name

Signoff

Date

Name Design Head Development Head Purchase head

Signoff / Date