Senior Management Site Safety Walk-Through Checklist
Date: 05-Feb-2024 Project:KAP2B P132-1
Site: All Site
Participants (Names & Job Titles):
Azam Satari
Shady Yaouef Project Director
Wahid bassuony Project Manager
Zaigham Abbas CM
Hse Lead
Note: mark number of compliance observations and negative number of incompliance observations for each subject for overall evaluation. Also, use the Remarks to explain more details regarding any of Safety Subjects
as required
Safety Subjects Compliance Non-compliance N/A Remarks
1 PPE Usage (Behavioral) P
2 Positions of People (Behavioral) P
3 Safety Rules and Procedures Compliance (Behavioral) P
4 Tools and Equipment (including Behavioral) P
5 Housekeeping (including Behavioral) P
Safety Management & Documentation (MS, RA, Signboards, P Risk Assessment was missing for carpet installation. E/I/C must
6 etc) prepair the documentation to avoid stop work notification.
Health & Welfare (Drinking Water, Toilets, Rest Shelters,
7 Food) P Water taps found damaged in site washrooms. Site supervisor
must rectify immediately.
8 Work Permits P
9 Traffic Control & Vehicle Safety P
10 Fire Prevention P
11 Scaffolds/Ladders/Fall Protection/Fall Arrest P
12 Abrasive Blasting & Coating P P
13 Trenching/Excavations/Shoring P
14 Concrete Work P
15 Heavy Equipment P
16 Cutting/Welding/Bracing P
17 Compressed Gasses P
18 Air Compressors P
19 Electrical (Cables, Generators, Inspection, Conditioned) P
Lifting Activity (Cranes, Lifting Accessories, Rigger, Operator, P
20 3rd Party)
21 Chemical Handling (Storage, SDS, PPE, Ventilation, etc) P
22 Waste Management & Housekeeping P Poor housekeeping has been observed at Gran stand building. E/I/C
must rectify the issue.
Confined Space Entry (Permit, Entrant, Log, Emergency Plan
23 & Equip.) P
24 Infra Activities P
Concluding Remarks:
Prepared by: Reviewed by: Reviewed by:
HSE Lead Project Manager Project Director