2.pump Line - Poka Yoke - Daily Check Sheet
2.pump Line - Poka Yoke - Daily Check Sheet
A YED
1
B YED
A YED
2
B YED
A YED
3
B YED
A YED
4
B YED
A YED
5
B YED
A YED
6
B YED
A YED
7
B YED
A YED
8
B YED
A YED
9
B YED
A YED
10
B YED
Containment details :
*If the Poka yoke Ok, write On the check sheet "OK"
Reviewed By
(Poka yoke OK- என்றால் .Check Sheet-ல் OK என்று எழுதவும்)
Shift Leader or Process Engineer
“If the Poka yoke NG , write on the check sheet "NG" and Stop the production, Hold the products produced from last ok result immediately, Inform to shift leader/ process engineer for correcting the poka-yoke. After correction, re-check products on hold 100% and decide based on check result”
Poka yoke NG- என்றால் .Check Sheet-ல் NG என்று எழுதவும், production-னை நிறுத்தவும் பிறகுPoka yoke சரிசெய்ய Shift Leader அல்லது Process Engineer- க்கு தெரிவிக்கவும்/ உடனடியாக கடைசியாக Poka yoke OK செய்த எட்டு மணி நேர tank-கை hold செய்யவேண்டும், Poka yoke சரி செய்தபின் Hold செய்த tank-கை 100 % re-check செய்யும் சோதனையின் அடிப்படையில் முடிவை தீர்மானிக்கவும்.
Note : Normally Poka Yoke sample made in positive side. It will not go to negative side. The maximum NG value should not exit above limit. If above the limit value or /below under specification mean stop the line and Follow abnormal procedure
Name
Poka
Characteristic to be controlled by
Poka Yoke Description Time: Time: Time: Time: Time: Time: Time: Time:
poke-yoke
Actual Value- Actual Value- Actual Value- Actual Value- Actual Value- Actual Value- Actual Value- Actual Value-
Actual Value- Actual Value- Actual Value- Actual Value- Actual Value- Actual Value- Actual Value- Actual Value-
Presence of components
PY - 027
Actual Value- Actual Value- Actual Value- Actual Value- Actual Value- Actual Value- Actual Value- Actual Value-
1. 1. 1. 1. 1. 1. 1. 1.
Actual Value- Actual Value- Actual Value- Actual Value- Actual Value- Actual Value- Actual Value- Actual Value-
bly -Cover outlet assy (SOP + CV assy)
PY - 030
assembly
of air pressure tests - Spring struck up /
6 Test Sample 2 -(Check
Double spring Judgement: Judgement: Judgement: Judgement: Judgement: Judgement: Judgement: Judgement:
valve functions (opening,
Spec: As per CPPS
closing, forward
leakage))
Actual Value- Actual Value- Actual Value- Actual Value- Actual Value- Actual Value- Actual Value- Actual Value-
Actual Value- Actual Value- Actual Value- Actual Value- Actual Value- Actual Value- Actual Value- Actual Value-
Act: CV SOP Act: CV SOP Act: CV SOP Act: CV SOP Act: CV SOP Act: CV SOP Act: CV SOP Act: CV SOP
10 tightness by air pressure tester device or serial part with Judgement: Judgement: Judgement: Judgement: Judgement: Judgement: Judgement: Judgement:
test damaged valve
Spec: 0.5ml/min and 50Pa/s
Checked By
Containment details :
*If the Poka yoke Ok, write On the check sheet "OK", (Poka yoke OK- என்றால் .Check Sheet-ல் OK என்று எழுதவும்)
“If the Poka yoke NG , write on the check sheet "NG" and Stop the production, Hold the products produced from last ok result immediately, Inform to shift leader/ process engineer for correcting the poka-yoke. After correction, re-check products on h
Poka yoke NG- என்றால் .Check Sheet-ல் NG என்று எழுதவும், production-னை நிறுத்தவும் பிறகுPoka yoke சரிசெய்ய Shift Leader அல்லது Process Engineer- க்கு தெரிவிக்கவும்/ உடனடியாக கடைசியாக Poka yoke OK
Poka yoke சரி செய்தபின் Hold செய்த tank-கை 100 % re-check செய்யும் சோதனையின் அடிப்படையில் முடிவை தீர்மானிக்கவும்.
Doc Number: YED : DS-OP-F-MFG-173
Rev Date - No 20/06/24 - 02
Month:
2. 2. 2. 2.
3. 3. 3. 3.
4. 4. 4. 4.
to shift leader/ process engineer for correcting the poka-yoke. After correction, re-check products on hold 100% and decide based on check result”
er அல்லது Process Engineer- க்கு தெரிவிக்கவும்/ உடனடியாக கடைசியாக Poka yoke OK செய்த எட்டு மணி நேர tank-கை hold செய்யவேண்டும்,
வும்.
Poka - yoke check sheet
Plant Chennai Department Manufacturing Line Sub Pump Assembly
Yoke No
Carbon Brush height Station
Si. No
Name
Poka
Characteristic to be controlled by
Poka Yoke Description
poke-yoke Time: Time: Time: Time: Time: Time: Time: Time: Time: Time:
OK Master value: OK Master value: OK Master value: OK Master value: OK Master value: OK Master value: OK Master value: OK Master value: OK Master value: OK Master value:
Carbon brush height check with OK requires manual reset and put in RED NG Master Value: NG Master Value: NG Master Value: NG Master Value: NG Master Value: NG Master Value: NG Master Value: NG Master Value: NG Master Value: NG Master Value:
1
master & NG master bin interlock system
Record LH and RH data
Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement
Armature cover assy
Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement
Magnet clip assy
Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement
Magnet clip assy
Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement
&Armature assy
Upper cover
Act Load: Act Load: Act Load: Act Load: Act Load: Act Load: Act Load: Act Load: Act Load: Act Load:
&Armature assy
Upper cover
Final position of upper cap on flux Auto cycle stop and NG box interlink -
PY-046
Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement
&Armature assy
Upper cover
Sensor to detect shape and part No cycle startup until part is detected
7
present with out part loading
(production part)
Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement
&Armature assy
Upper cover
Armature family
Wrong direction of loading armature
PY-048
Checked by
Containment details :
*If the Poka yoke Ok, write On the check sheet "OK"
(Poka yoke OK- என்றால் .Check Sheet-ல் OK என்று எழுதவும்)
“If the Poka yoke NG , write on the check sheet "NG" and Stop the production, Hold the products produced from last ok result immediately, Inform to shift leader/ process engineer for correcting the poka-yoke. After correction, re-check products on hold 100% and decide based on check result”
Poka yoke NG- என்றால் .Check Sheet-ல் NG என்று எழுதவும், production-னை நிறுத்தவும் பிறகுPoka yoke சரிசெய்ய Shift Leader அல்லது Process Engineer- க்கு தெரிவிக்கவும்/ உடனடியாக கடைசியாக Poka yoke OK செய்த எட்டு மணி நேர tank-கை hold செய்யவேண்டு
check செய்யும் சோதனையின் அடிப்படையில் முடிவை தீர்மானிக்கவும்.
Doc Number: YED : DS-OP-F-MFG-173
Rev Date - No 20/06/24 - 02
Month:
r correcting the poka-yoke. After correction, re-check products on hold 100% and decide based on check result”
கு தெரிவிக்கவும்/ உடனடியாக கடைசியாக Poka yoke OK செய்த எட்டு மணி நேர tank-கை hold செய்யவேண்டும், Poka yoke சரி செய்தபின் Hold செய்த tank-கை 100 % re-
Poka - yoke check sheet
Plant Chennai Department Manufacturing Line Sub Pump Assembly
Facility Name TI Automotive Chennai Project YED Area Production
Yoke No Date: Date: Date: Date: Date: Date: Date: Date: Date: Date:
Station
Si. No
Name
Poka
Characteristic to be controlled by
Poka Yoke Description
poke-yoke Time: Time: Time: Time: Time: Time: Time: Time: Time: Time:
Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement
Inlet & Impeller assy
Camera Checking
1 Orientation of impeller cavities
No cycle start, remove part from the
(Use production Part)
nest and try to load it again.
Act Load: Act Load: Act Load: Act Load: Act Load: Act Load: Act Load: Act Load: Act Load: Act Load:
Inlet & Impeller assy
outer shell
2 Based on Force NG
Judgement machine- Inlet
Spec: 3500 to 6000 (as per CPPS)
cover Load NG
Inlet & Impeller assy
Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement
Inlet & Impeller assy
Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement
Inlet & Impeller assy
Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement
Inlet & Impeller assy
Checked by
Containment details :
*If the Poka yoke Ok, write On the check sheet "OK"
(Poka yoke OK- என்றால் .Check Sheet-ல் OK என்று எழுதவும்)
Containment details :
*If the Poka yoke Ok, write On the check sheet "OK"
(Poka yoke OK- என்றால் .Check Sheet-ல் OK என்று எழுதவும்)
“If the Poka yoke NG , write on the check sheet "NG" and Stop the production, Hold the products produced from last ok result immediately, Inform to shift leader/ process engineer for correcting the poka-yoke. After correction, re-check products on hold 100%
Poka yoke NG- என்றால் .Check Sheet-ல் NG என்று எழுதவும், production-னை நிறுத்தவும் பிறகுPoka yoke சரிசெய்ய Shift Leader அல்லது Process Engineer- க்கு தெரிவிக்கவும்/ உடனடியாக கடைசியாக Poka yoke OK செய்த
yoke சரி செய்தபின் Hold செய்த tank-கை 100 % re-check செய்யும் சோதனையின் அடிப்படையில் முடிவை தீர்மானிக்கவும்.
Doc Number: YED : DS-OP-F-MFG-173
Rev Date - No 20/06/24 - 02
Month:
Date: Date: Date: Date:
Yoke No
Station
Si. No
Name
Poka
Characteristic to be controlled by
Poka Yoke Description
poke-yoke Time: Time: Time: Time: Time: Time: Time: Time: Time: Time:
Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement
Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement
manual reset
Judgement machine- Spring &
PY-066
Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement
part wrong loading Fixture B side LH &
RH Double spring
4 cannot start auto cycle machine requires
manual reset
Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement
Brush spring assy Brush spring assy
Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement
Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement Judgement
Out let cover press Out let cover press
7 and SOP assy presence Machine requires manual reset and auto
(poka-yoke sample) cycle cannot start
Act Load: Act Load: Act Load: Act Load: Act Load: Act Load: Act Load: Act Load: Act Load: Act Load:
Judgement machine- Outlet cover Auto cycle stop and NG box interlink -
PY-070
fit assy
Checked by
Containment details :
*If the Poka yoke Ok, write On the check sheet "OK"
(Poka yoke OK- என்றால் .Check Sheet-ல் OK என்று எழுதவும்)
“If the Poka yoke NG , write on the check sheet "NG" and Stop the production, Hold the products produced from last ok result immediately, Inform to shift leader/ process engineer for correcting the poka-yoke. After correction, re-check products on hold 100% and decide based on check result”
Containment details :
*If the Poka yoke Ok, write On the check sheet "OK"
(Poka yoke OK- என்றால் .Check Sheet-ல் OK என்று எழுதவும்)
“If the Poka yoke NG , write on the check sheet "NG" and Stop the production, Hold the products produced from last ok result immediately, Inform to shift leader/ process engineer for correcting the poka-yoke. After correction, re-check products on hold 100% and decide based on check result”
Poka yoke NG- என்றால் .Check Sheet-ல் NG என்று எழுதவும், production-னை நிறுத்தவும் பிறகுPoka yoke சரிசெய்ய Shift Leader அல்லது Process Engineer- க்கு தெரிவிக்கவும்/ உடனடியாக கடைசியாக Poka yoke OK செய்த எட்டு மணி நேர tank-கை hold செய்யவேண்டும், Pok
செய்யும் சோதனையின் அடிப்படையில் முடிவை தீர்மானிக்கவும்.
Doc Number: YED : DS-OP-F-MFG-173
Rev Date - No 20/06/24 - 02
Month:
Date: Date: Date: Date:
correcting the poka-yoke. After correction, re-check products on hold 100% and decide based on check result”
correcting the poka-yoke. After correction, re-check products on hold 100% and decide based on check result”
கு தெரிவிக்கவும்/ உடனடியாக கடைசியாக Poka yoke OK செய்த எட்டு மணி நேர tank-கை hold செய்யவேண்டும், Poka yoke சரி செய்தபின் Hold செய்த tank-கை 100 % re-check
Poka - yoke check sheet
Plant Chennai Department Manufacturing
Facility Name TI Automotive Chennai Project YED
Date: Date: Date: Date:
Poka Yoke
Station
Si. No
Name
No
Canning Poka Yoke Description Characteristic to be controlled by poke-yoke Time: Time: Time: Time:
PY-075
Judgement machine -2D matrix integrity With out barcode scanning cycle start
1
Poka-yoke Sample Machine requires manual reset
Canning
PY-076
Judgment of Canning Force NG Auto cycle stop and NG box interlink - Based on
2
Poka Yoke sample Force NG
Canning
4
Boundary samples= pumps & without ground RH Judgement RH Judgement RH Judgement RH Judgement
pin contact
Continuity test between ground pin and outer
shell(RH side)
6 Boundary sample = pump with armature reset and cannot restart until NOK part is
where wire is cut detected in the lock red box RH Judgement RH Judgement RH Judgement RH Judgement
PY-082
Aging
Manual process - Machine requires manual
7 Boundary sample = pump with caps but
reset and cannot restart until NOK part is RH Judgement RH Judgement RH Judgement RH Judgement
without springs
detected in the lock red box
PY-083
Aging
8 Boundary sample = pump with armature reset and cannot restart until NOK part is
where wire is cut detected in the lock red box RH Judgement RH Judgement RH Judgement RH Judgement
Line Specification
EOL
6
using of Ok sample
Actual value Actual value Actual value Actual value
current: current: current: current:
Checked by
Containment details :
*If the Poka yoke Ok, write On the check sheet "OK"
(Poka yoke OK- என்றால் .Check Sheet-ல் OK என்று எழுதவும்)
Containment details :
*If the Poka yoke Ok, write On the check sheet "OK"
(Poka yoke OK- என்றால் .Check Sheet-ல் OK என்று எழுதவும்)
“If the Poka yoke NG , write on the check sheet "NG" and Stop the production, Hold the products produced from last ok result immediately, Inform to shift leader/ process engineer for correcting the poka-yoke. A
Poka yoke NG- என்றால் .Check Sheet-ல் NG என்று எழுதவும், production-னை நிறுத்தவும் பிறகுPoka yoke சரிசெய்ய Shift Leader அல்லது Process Engineer- க்கு தெரிவிக்கவும்/ உ
முடிவை தீர்மானிக்கவும்.
Poka - yoke check sheet
Line Pump Assembly
Area Production
Date: Date: Date:
10/06/24 - 01
20/06/24 - 02