Heat Load and Drawings

Uploaded by

harmandeep0407
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views6 pages

Heat Load and Drawings

Uploaded by

harmandeep0407
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

DESIGN DATA SHEET OF HEAT LOAD CALCULATION

Contractor : Mr Anuj Gupta


Project : Central University Rajasthan
Prepared by: Sanjeet Kumar

Site Location : At Bander Sindri Kishangar Rajasthan, India.


Geographic Location : 26.6° N
Altitude : 486 Mtrs ( 1594 Ft)
Note :
1) For unknown Lighting Load , Refer ISHRAE Handbook Table-1-T-38
2) For unknown Equipment Load , Refer ISHRAE Handbook Table-1-T-27,28,29,30,31,32
3) For unknown CFM/Person, CFM/Sqft & Occupancy , Refer ISHRAE Handbook Table-1-T-53
4) For Indicated ADP, Refer ISHRAE Handbook Table-1-T-39,40,41 and We generally assume Selected ADP 54°F ( otherwise its value given by Coil Manufacturer ).

2nd Floor
Inside Design data Data by Heat Load Calculation Units Selection-As per heat load ODU Selection

Summer Dehum. CFM

Selected Tonnage of

Total Tonnage (Tr)


each Machine (Tr)
Max of Summer &

Max of Summer &


Conditioned Area

Monsoon Dehum.

Selected Airflow
(Ground Floor )

Monsoon (CFM)
Fresh Air CFM

Monsoon (TR)
Monsoon TR

Type of Unit
Summer TR
Area (Sqft)

TOTAL HP
Total CFM

CIRCUIT
Sr. No.

(CFM)

ODU
CFM

QTY
1 Second Floor , Room 1 405 2.55 1.92 1317 997 77 2.55 1317
2 Second Floor , Room 2 405 2.36 1.85 1207 955 77 2.36 1207
5 Second Floor , Registrar 438 3.11 2.32 1619 1212 86 3.11 1619
6 Second Floor , DY.Registrar 177 1.20 0.90 624 471 33 1.20 624
16 8000 FM AHU 1 16 8000
7 Second Floor , Q.P Cellars 1 196 1.36 1.02 696 527 42 1.36 696
8 Second Floor , Q.P Cellars 2 159 1.08 0.75 557 383 32 1.08 557
9 Second Floor , Q.P Cellars 3 405 1.97 1.47 990 737 72 1.97 990
10 Second Floor , Q.P Cellars 4 319 2.07 2.07 1064 802 63 2.07 1064
VRV
11 Second Floor , Meeting Room 362 2.30 1.79 1176 922 74 2.30 1176 3.5 1218 1 3.5 1218 28 CKT-1 28
Ductable
13 Second Floor , VIP Visiting 591 3.10 2.45 1564 1253 110 3.10 1564
14 Second Floor , VC Secretariat 663 3.35 2.69 1707 1391 115 3.35 1707
17 Second Floor , Proctor 438 2.77 2.23 1421 1159 86 2.77 1421
Second Floor , Proctor 2 Room
18 423 2.15 1.73 1065 872 85 2.15 1065
Space 22 11000 FM AHU 1 22 11000
19 Second Floor , Pro Office 171 1.56 1.29 689 574 33 1.56 689
20 Second Floor , Hall 398 2.72 2.18 1279 1034 76 2.72 1279
21 Sotre-1 406 2.69 2.00 1462 1135 77 2.69 1462
22 Sotre-2 406 2.69 2.00 1462 1135 77 2.69 1462
TOTAL 6362 39.03 30.67 19902 15558 1216 39.03 19902 42 20218 42 20218

CHECK FIGURES CHECK FIGURES


CFM/Sq. ft. = 3.18 CFM/Sq. ft. =
Sq. Ft./Ton = 153 Sq. Ft./Ton =
CFM/Ton = 487 CFM/Ton =
DESIGN DATA SHEET OF HEAT LOAD CALCULATION
Contractor : Mr. Anuj Gupta
Project : Central University Rajasthan
Prepared by: Sanjeet Kumar

Site Location : At Bander Sindri Kishangar Rajasthan, India.


Geographic Location : 26.3°N
Altitude : 486 Mtrs ( 1594 Ft)
Note :
1) For unknown Lighting Load , Refer ISHRAE Handbook Table-1-T-38
2) For unknown Equipment Load , Refer ISHRAE Handbook Table-1-T-27,28,29,30,31,32
3) For unknown CFM/Person, CFM/Sqft & Occupancy , Refer ISHRAE Handbook Table-1-T-53
4) For Indicated ADP, Refer ISHRAE Handbook Table-1-T-39,40,41 and We generally assume Selected ADP 54°F ( otherwise its value given by Coil Manufacturer ).

Inside Design data Data by Heat Load Calculation Units Selection-As per heat load ODU Selection

Summer Dehum. CFM

Selected Tonnage of

Total Tonnage (Tr)


each Machine (Tr)
Max of Summer &

Max of Summer &


Conditioned Area

Monsoon Dehum.

Selected Airflow
Monsoon (CFM)
(Ground Floor )

Monsoon (TR)
Fresh Air CFM
Sr. No.

Monsoon TR

Type of Unit
Summer TR

Winter KW
Area (Sqft)

TOTAL HP
Total CFM

CIRCUIT
(CFM)

ODU
CFM

QTY
Ground Floor
ZONE-1
NON VRV NON VRV ODU
1 Ground Floor- Library 365 2.32 1.42 1234 725 67 2.32 1234 4 1222 1 4 1222
Ductable
2 Ground Floor- Room 1 407 2.29 1.55 1211 781 77 2.29 1211
3 Ground floor - Room 2 407 1.99 1.44 1122 773 77 1.99 1122
4 Ground Floor- Staff-1 407 1.99 1.44 1122 773 77 1.99 1122
20 10000 FM AHU 1 20 10000
5 Server Room
6 Ground Floor- Retering & Registrar 445 2.60 1.86 1391 943 87 2.60 1391 Old Area
7 Ground Floor- Hall-1 & Dy Registrar 1706 7.75 5.83 4656 3193 282 7.75 4656
9 Ground Floor- Hall-2& Dy Registrar 2115 9.10 6.94 5309 3704 352 9.10 5309
10 Ground Floor- GAD Section 406 2.69 2.00 1462 1135 77 2.69 1462
12 Ground Floor - ENT Lobby 1484 6.54 5.08 3680 2529 277 6.54 3680 26 13000 FM AHU 1 26 13000

Canteen Area- Left 406 2.69 2.00 1462 1135 77 2.69 1462
New Area
GAD Store 406 2.69 2.00 1462 1135 77 2.69 1462
VRV
11 Ground Floor -Conference Hall 595 2.76 1.94 1586 1036 111 2.76 1586 4.5 1800 1 4.5 1800
Ductable
VRV
CS AHU 28 CKT-1 28
Propose
8 Ground Floor - ENT Lobby 1484 6.54 5.08 3680 2529 277 6.54 3680 10.5 4000 WITH 1 10.5 4000
VRV
1st Floor
NON VRV NON VRV ODU
22 1st Floor Office 160 1.32 0.87 646 411 55 1.32 646 2 600 1 2 600
Cst
17 1st Floor- Establishment 368 1.92 1.22 1084 668 60 1.92 1084 New Area
added
18 1st Floor- Recruitment Cell 407 2.18 1.48 1155 753 69 2.18 1155
19 1st Floor- R&D Office and R&D Director 407 1.97 1.35 1116 749 62 1.97 1116
20 1st Floor Dean Acad- RB Off 407 2.04 1.46 1152 784 77 2.04 1152
24 12000 FM AHU 1 24 12000
21 1st Floor- ITC Cell 407 1.98 1.39 1115 757 69 1.98 1115
23 1st Floor Registrar Office 760 4.11 3.09 2241 1548 158 4.11 2241 Old Area
24 1st Floor J.R & AR 801 3.62 2.84 2105 1509 161 3.62 2105
25 1st Floor Sec Off. UDC-LDC 629 3.01 2.20 1744 1191 113 3.01 1744
VRV
26 1st Floor- Confrence 2 592 2.67 1.91 1530 1015 111 2.67 1530 Old Area 4.5 1800 1 4.5 1800 28 CKT-1 28
Ductable
28 1st Floor- JR Fin. , AR Fin 942 4.34 3.28 2559 1775 169 4.34 2559
30 1st Floor- Int. Ad. Director & Record 407 2.25 1.75 1199 926 62 2.25 1199
31 1st Floor- Executive Engg. & Dwg. Storage 406 2.39 1.90 1274 998 69 2.39 1274 Old Area
25 12500 FM AHU 1 25 12500
33 1st Floor- Finance Office, PS Fin. 1223 6.35 5.18 3544 2707 201 6.35 3544

35 1st Floor JEN(E) & JEN (C) 831 5.04 3.98 2795 2096 140 5.04 2795
36 1st Floor- Purchase 365 2.08 1.39 1083 675 82 2.08 1083 New Area
added
NON VRV NON VRV ODU
29 1st Floor Int. St. Conc. Cell 423 2.72 2.28 1450 1161 100 2.72 1450 4 1200 1 4 1200
Cst

NON VRV NON VRV ODU


32 1st Floor- Confrence 1 592 2.67 1.91 1530 1015 111 2.67 1530 Old Area 4.5 1800 1 4.5 1800
Ductable
TOTAL 20759.0 104.6 78.0 58697.9 41130.9 3780.8 0 104.6 58698 129 59922 11 121 59922

Ground floor Heat Load 46 CHECK FIGURES


First floor Heat Load 49 CFM/Sq. ft. = 2.89
Second floor Heat Load 38 Sq. Ft./Ton = 172
After diversity load @18% 109.06 CFM/Ton = 497
Air cooled type Chiller 110 TR
Primary Pump/ 30Mtr Head 264 USGPM
NORTH POINT
This drawing is a "COPYRIGHT"
N contents of this drawing or part
thereof may not be used or
reproduced without the
permission of the Architect

SER
IFFU CH)
NOTE : -
/ A D
00 S M EA 1. ALL DIMENSIONS ARE IN MM UNLESS MENTIONED
# 6 00x6 (500 CF 0 OTHERWISE..
2 VCD 5
50x3 ER
WITH SIZE - 3 DIFFUS 2. ALL SUPPLY AIR DUCTS SHALL BE INSULATED AS PER
K / A
NEC 0x600 R SPECIFICATIONS.
0
2#6 3. ALL SUPPLY AIR DUCTS UP TO 3 MTR LENGTH FROM THE
OUTLET OF AHU'S SHALL BE ACCOUSTICALLY LINED
AS PER SPEC.
4. ALL SUPPLY AIR GRILLE / DIFFUSER SHALL BE PROVIDED
WITH VCD.
5. OTHERS SERVICES IN THE BUILDING SHALL BE
COORDINATED WITH THE DUCT LAYOUT
6. ALL SUPPLY AND RETURN AIR DUCT SHALL BE PROVIDED
WITH FIRE DAMPERS IN AHU ROOM WALL CROSSING /
FLOOR / SLAB CROSSING.
2 # 600x600 S/A DIFFUSER 7. ALL DOORS OF AHU ROOMS SHOULD BE OPENABLE OUT
WITH VCD (500 CFM EACH) SER
DI FFU CH) SIDE.
0 S/A
NECK SIZE - 450x450
EA
2 # 600x600 R/A DIFFUSER
6 0 0x60 375 CFM 7. DUCT DAMPERS SHALL BE PROVIDED IN ALL THE
2# VCD
( 00
00x3 ER T-JOINTS OF DUCTS.
WITH SIZE - 3 DIFFUS 8. MINOR MODIFICATION IN GRILLE / DIFF. LOCATION TO BE
K /A
NEC 0x600 R ADJUSTED AS PER FINAL RCP LAYOUT AT SITE.
# 6 0
2 9. AIR TRANSFER GRILLE/ UNDER CUT SHALL BE PROVIDE -
AT THE BOTTOM OF THE EACH TOILET BY OTHER AGENCY.
10. THE AHU /FCU IN FALSE CEILING IS REQUIRED
ACCESS DOOR
2#6
0
WITH 0x600 S/
A
NEC VCD (47 DIFFUS
K SIZ 5 CF ER
2#6 E M
00x6 - 325x3 EACH)
HVAC LEGENDS:
00 R 2
/A D 5 VOLUME CONTROL DAMPER
IFFU 1# FLOOR MOUNTED
SER
HORIZONTAL TYPE AHU. 1# FLOOR MOUNTED NEW SUPPLY AIR DUCT
SIZE-2500X2200X1900 H HORIZONTAL TYPE AHU.
13000 CFM / 26.0 TR SIZE-2100X1900X1650 H EXISTING SUPPLY AIR DUCT
10000 CFM / 20.0 TR EXISTING FRESH AIR DUCT
EXISTING RETURN AIR DUCT
ACOUSTIC INSULATION
HVAC ELECTRICAL PANEL
DUCT FLEXIBLE CONNECTOR
3140
DOWN THROW GRILLE
SIDE THROW GRILLE
R1
CHILLED WATER S/R PIPE
DRAIN PIPE
AIR TIGHT PARTITION
SUPPLY AIR DIFFUSER
RETURN AIR DIFFUSER
2#6
0 SER
WITH 0x600 S/ D I FFU CH)
A /A
NEC VCD (30 DIFFUS 00 S M EA
K SIZ 0 CF ER # 6 00x6 (300 CF 0
2#6 E M 2 VCD 5
00x6 - 250x2 EACH) 50x2 ER
1#. 6 00 R 50 WITH SIZE - 2 DIFFUS R
0 /A K / A SE
WITH 0X600 S DIFFUS NEC 0x600 R
0 A D IFFU
/A E /
NEC VCD (12 DIFFUS R 2 # 6 0X600 S CFM)
K SIZ 5 CF ER 0 0
E-17 M 1#. 6 VCD (15 X175
5X17 ) H
WIT SIZE-17
5
5
K
NEC

600
1200

2#6
0
WITH 0x600 S/
A
NEC VCD (25 DIFFUS
K SIZ 0 CF ER

1000
2#6 E M
00x6 - 225x2 )
00 R 2
/A D 5 1200
IFFU
SER

3#6
0
WITH 0x600 S
/A
NEC VCD (15 DIFFUS
K SIZ 0,17 ER
3#6 E 5,
00x6 - 200x2 200 CFM 1# CEILING MOUNTED AHU.
00 R 0
/A D 0 SIZE-1800X1000X650 H
IFFU 4000 CFM / 10.5 TR
SER
REV. DATE DESCRIPTION BY

0 25-5-23 HVAC DRAWING FOR APPROVAL SK

1 11-7-23 REVISED AS PER CLIENT COMMENTS SK

CLIENT
CENTRAL UNIVERSITY RAJASTHAN
PROJECT

CENTRAL UNIVERSITY RAJASTHAN


AT BANDER SINDRI, KISHANGARH.
ARCHITECTS:-

C. P. KUKREJA ASSOCIATES
ASHIRWAD BUILDING,
D-1,GREEN PARK,
NEW DELHI - 110016
PHONE :- 011 26863953 FAX :- 011 26865770
[email protected]

ADMIN BLOCK

DRAWING TITLE

HVAC LAYOUT GROUND FLOOR, ADMIN BLOCK


CENTRAL UNIVERSITY RAJASTHAN
NORTH POINT
This drawing is a "COPYRIGHT"
N contents of this drawing or part
thereof may not be used or
reproduced without the
permission of the Architect

NOTE : -
1. ALL DIMENSIONS ARE IN MM UNLESS MENTIONED
OTHERWISE..
2. ALL SUPPLY AIR DUCTS SHALL BE INSULATED AS PER
SPECIFICATIONS.
3. ALL SUPPLY AIR DUCTS UP TO 3 MTR LENGTH FROM THE
OUTLET OF AHU'S SHALL BE ACCOUSTICALLY LINED
AS PER SPEC.
4. ALL SUPPLY AIR GRILLE / DIFFUSER SHALL BE PROVIDED
WITH VCD.
5. OTHERS SERVICES IN THE BUILDING SHALL BE
E COORDINATED WITH THE DUCT LAYOUT
RILL )
5 0 S/A G M EACH 6. ALL SUPPLY AND RETURN AIR DUCT SHALL BE PROVIDED
0 0x 1 0 C F
6 0 E
2# VCD
(3 RILL ER
/A G WITH FIRE DAMPERS IN AHU ROOM WALL CROSSING /
2#6
0
J6
WITH 0x150 R DIFFUS H)
WITH 0x600 S/ 0
2 # 6 0x600 S/ CFM EA
A C FLOOR / SLAB CROSSING.
A
NEC VCD (50 DIFFUS 1 # 6 0 ( 6 00
50
K 0
2 # 6 SIZE - 4 CFM EA R
E J2 VCD 50x4 ER J2
7. ALL DOORS OF AHU ROOMS SHOULD BE OPENABLE OUT
00x6 50x4 CH) WITH SIZE - 4 DIFFUS
00 R 5 K
NEC 0x600 R
/ A SIDE.
/A D 0 J6
0
IFFU 1#6 7. DUCT DAMPERS SHALL BE PROVIDED IN ALL THE
SER
T-JOINTS OF DUCTS.
J3 J3
8. MINOR MODIFICATION IN GRILLE / DIFF. LOCATION TO BE
J6
ADJUSTED AS PER FINAL RCP LAYOUT AT SITE.
9. AIR TRANSFER GRILLE/ UNDER CUT SHALL BE PROVIDE -
2#6 AT THE BOTTOM OF THE EACH TOILET BY OTHER AGENCY.
0
WITH 0x600 S/ J7 J7
A W4 10. THE AHU /FCU IN FALSE CEILING IS REQUIRED
NEC VCD (45 DIFFUS W4 SER
K 0
2 # 6 SIZE - 4 CFM EA R
E IFFU ) ACCESS DOOR
00x6 5 CH) 0 S/A D M EACH
00 R 0x450 GL6 6
0
00x6 (600 CF 0
/A D GL6 2 # 5
IFFU GL6
GL6 VCD 50x4 ER
SER J6a
J6a FD2 WITH SIZE - 4 DIFFUS
FD2 C K R / A
NE 00
00x6
2#6 2#6 USE
R
0 DIFF ACH)
WITH 0x600 S W10 GL6 GL6 W10 00 S / A
ME
/A
NEC VCD (45 DIFFUS
2 # 600x600 S/A DIFFUSER 00x6 0 CF HVAC LEGENDS:
2 # 6 VCD (60 0x450
K 0
2 # 6 SIZE - 4 CFM EA R
E WITH VCD (550 CFM EACH) 5 ER
WITH SIZE - 4 DIFFUS
00x6 5
00 R 0x450
CH) GL6 NECK SIZE - 450x450 GL6
N EC K
0 0 R /A VOLUME CONTROL DAMPER
/A D J5 2 # 600x600 R/A DIFFUSER 00x6
IFFU
SER 2#6 NEW SUPPLY AIR DUCT
GL6 GL6

D4
1# FLOOR MOUNTED D9
D4 EXISTING SUPPLY AIR DUCT
W10 HORIZONTAL TYPE AHU. W10
D4 1# FLOOR MOUNTED SIZE-2500X2200X1900 H J5 EXISTING FRESH AIR DUCT
D4
HORIZONTAL TYPE AHU. 12000 CFM / 24.0 TR EXISTING RETURN AIR DUCT
SIZE-2500X2200X1900 H
12500 CFM / 25.0 TR ACOUSTIC INSULATION
W3 W3
HVAC ELECTRICAL PANEL
J6
DUCT FLEXIBLE CONNECTOR
DOWN THROW GRILLE
W3
W3 SIDE THROW GRILLE
D4
W10
W10
CHILLED WATER S/R PIPE
D3 D3
DRAIN PIPE
W1 J5 AIR TIGHT PARTITION

J6
J9

J9
J5

W9 D8 D8
SUPPLY AIR DIFFUSER
W9
D4 D4
R1 RETURN AIR DIFFUSER
J9

J9
W2 W2

J6a
NON
1#4. VRV UN IT
UNIT0 TR 4 W ETTE8 H
a
J9

J9
J6
W3a A S S 8
PAN SIZE-8 AY CAS W W3a VRV AY C DX2
NON TR 4 W 0WX8400X25H
11 11
1200 EL SIZE 40WX84 SETTE W D4
0 4
CFM -950X 0DX2 UNIT 1#2. SIZE-8 -950X95

J9
D1
J9

950X 88 H D1
EAC UNITEL SIZE CH
W11 D6 D6
H FD3 W11
25H D1 D1
FD3
PAN CFM EA
D1
J10
J10 600
D1
D1 D1
W4
Int. S W4
t
7485 . Conc. C
D1 D1 SER
x523 ell
W1
D IFFU )
/ A EACH
GL1
0 0S
LOB
BY
# 6 00x60 (350 CFM
D3 D3 D3 D3 2
D1
VCD x275
FG2 WITH SIZE - 275 IFFUSER
D R
D6
D5 W1 NECK x600 R/A DIFFUSE
0 0 / A
W9
W9 2 # 6 00X600 S FM)
6 0C
ENT.LOBBY D4
1 .
N O
C D (15 X175
V
D9 D10
(BELOW) J5
WITH SIZE-175

600
J5 D10
1200 NECK
W9 D4
W9

W10
W10

W9 W9
J5 J5

W9 W9
REV. DATE DESCRIPTION BY
W9 W9
J5 J5
ENT. LOBBY 0 25-5-23 HVAC DRAWING FOR APPROVAL SK
W6 (BELOW) W6 1 11-7-23 REVISED AS PER CLIENT COMMENTS SK
W5 W6
J5 W8/8 /8a
a W8 J5

W9
W9 J1
J1

CLIENT
CENTRAL UNIVERSITY RAJASTHAN
PROJECT

CENTRAL UNIVERSITY RAJASTHAN


AT BANDER SINDRI, KISHANGARH.
ARCHITECTS:-

C. P. KUKREJA ASSOCIATES
ASHIRWAD BUILDING,
D-1,GREEN PARK,
NEW DELHI - 110016
PHONE :- 011 26863953 FAX :- 011 26865770
[email protected]

ADMIN BLOCK

DRAWING TITLE

J12 HVAC LAYOUT FIRST FLOOR, ADMIN BLOCK


J12 J12 J12
CENTRAL UNIVERSITY RAJASTHAN
NORTH POINT
This drawing is a "COPYRIGHT"
N contents of this drawing or part
thereof may not be used or
reproduced without the
permission of the Architect

NOTE : -
1. ALL DIMENSIONS ARE IN MM UNLESS MENTIONED
OTHERWISE..
2. ALL SUPPLY AIR DUCTS SHALL BE INSULATED AS PER
SPECIFICATIONS.
3. ALL SUPPLY AIR DUCTS UP TO 3 MTR LENGTH FROM THE
OUTLET OF AHU'S SHALL BE ACCOUSTICALLY LINED
AS PER SPEC.
4. ALL SUPPLY AIR GRILLE / DIFFUSER SHALL BE PROVIDED
WITH VCD.
5. OTHERS SERVICES IN THE BUILDING SHALL BE
COORDINATED WITH THE DUCT LAYOUT
6. ALL SUPPLY AND RETURN AIR DUCT SHALL BE PROVIDED
J2 J2 WITH FIRE DAMPERS IN AHU ROOM WALL CROSSING /
FLOOR / SLAB CROSSING.
7. ALL DOORS OF AHU ROOMS SHOULD BE OPENABLE OUT
2#6
0 SIDE.
WITH 0x600 S/ J3 J3
A
NEC VCD (75 DIFFUS 7. DUCT DAMPERS SHALL BE PROVIDED IN ALL THE
K 0 E
2 # 6 SIZE - 4 CFM EA R
00x6 50x4 CH) T-JOINTS OF DUCTS.
00 R 5
/A D 0 8. MINOR MODIFICATION IN GRILLE / DIFF. LOCATION TO BE
IFFU
SER J7 J7
ADJUSTED AS PER FINAL RCP LAYOUT AT SITE.
9. AIR TRANSFER GRILLE/ UNDER CUT SHALL BE PROVIDE -
AT THE BOTTOM OF THE EACH TOILET BY OTHER AGENCY.
W4 W4
2#6 10. THE AHU /FCU IN FALSE CEILING IS REQUIRED
0
WITH 0x600 S
/A ACCESS DOOR
NEC VCD (75 DIFFUS FD2 4.0 TR OUTDOOR UNIT FD2
K 0 E
2 # 6 SIZE - 4 CFM EA R GF- LIBRARY
00x6 5 CH)
00 R 0x450 W10
SIZE- 850H X 1050 X 650
/A D W10
IFFU
SER

KH
J5 450 URRA
x45 KHURRA
0 450x450

D4
D4
W10 1# FLOOR MOUNTED W10 J5
HORIZONTAL TYPE AHU.

4.00 TR
D4 D4
SIZE-2100X1900X1650 H
8000 CFM / 16.0 TR
W3 W3

W3
W3
W10
W10
D3 D3

J5
W1 J5
W1

J9
J9

W9 D8 D8 W9
D4
D4
R1

J9
J9

W2 W2

GF- CONFERENCE & LOBBY


FF- CONFERENCE
SF- MEETING ROOM
J9

J9
W3a CIRCUIT-1 / 28 HP W3a
D4 4.0 TR OUTDOOR UNIT VRF OUTDOOR UNIT
FF- CONFERENCE HALL Combi. - ( 14+14 )=28HP D4
KH

J9
D1 450 URR SIZE- 850H X 1050 X 650 2X14HP-1680H X 920 X 760
J9

W11 D6 x45 A D1 D6
FD3 0
W11
D1 D1
J10 RA FD3
UR 0 J10
KH 0x45
SER
D1 D1
45
LOB
BY
D1
W
D1
LOB
BY A D IFFU CH)
W4 /
00 S M EA
4
D1
00x6 (300 CF 5 EACH
D1 W1
# 6

TR
2 VCD 7
75x2

0
ER

4.0
D3 D3 D1 D3 D3 WITH SIZE - 2 DIFFUS R
D1 K A U E
W1 /
NEC 0x600 R S
D9 FG2
6 0 S / A DIFF
2# 00 M)
D9 D5 W4 00X6 0 CF
1#. 6 VCD (15 X150
W1
W9
0
WITH SIZE-15
W9

C K
J5 D4 J5 NE
W4
D4
D9 D4
D9 Q.P.
W9 S W9
LAR
D4 CEL 4105
X
D9 3635
D9 D4
Q.P. S D4
LAR
C L 4105
E
2 5 X
72 D4 D4
Q.P. S
LAR
W10 CEL 3920
D9 D4 2 0 X W10
4 6
W9 D9 D6 W9
J5
J5 Q.P. S
LAR
CEL 3920
X
7225
W9 W9

W9 W9
J5

REV. DATE DESCRIPTION BY


W6 W6

W5 W6 0 25-5-23 HVAC DRAWING FOR APPROVAL SK


J5 W8b J5
W8b 1 11-7-23 REVISED AS PER CLIENT COMMENTS SK

W9
W9 J1
J1
W6
W6 W9
J1

CLIENT
CENTRAL UNIVERSITY RAJASTHAN
PROJECT

CENTRAL UNIVERSITY RAJASTHAN


AT BANDER SINDRI, KISHANGARH.
ARCHITECTS:-

C. P. KUKREJA ASSOCIATES
ASHIRWAD BUILDING,
D-1,GREEN PARK,
NEW DELHI - 110016
PHONE :- 011 26863953 FAX :- 011 26865770
[email protected]

ADMIN BLOCK

DRAWING TITLE

HVAC LAYOUT SECOND FLOOR, ADMIN BLOCK


CENTRAL UNIVERSITY RAJASTHAN
NORTH POINT
This drawing is a "COPYRIGHT"
N contents of this drawing or part
thereof may not be used or
reproduced without the
permission of the Architect

NOTE : -
1. ALL DIMENSIONS ARE IN MM UNLESS MENTIONED
OTHERWISE..
2. ALL SUPPLY AIR DUCTS SHALL BE INSULATED AS PER
SPECIFICATIONS.
3. ALL SUPPLY AIR DUCTS UP TO 3 MTR LENGTH FROM THE
OUTLET OF AHU'S SHALL BE ACCOUSTICALLY LINED
AS PER SPEC.
4. ALL SUPPLY AIR GRILLE / DIFFUSER SHALL BE PROVIDED
WITH VCD.
5. OTHERS SERVICES IN THE BUILDING SHALL BE
COORDINATED WITH THE DUCT LAYOUT
6. ALL SUPPLY AND RETURN AIR DUCT SHALL BE PROVIDED
WITH FIRE DAMPERS IN AHU ROOM WALL CROSSING /
FLOOR / SLAB CROSSING.
7. ALL DOORS OF AHU ROOMS SHOULD BE OPENABLE OUT
SIDE.
W7 7. DUCT DAMPERS SHALL BE PROVIDED IN ALL THE
W7
T-JOINTS OF DUCTS.
8. MINOR MODIFICATION IN GRILLE / DIFF. LOCATION TO BE
D11 D11 ADJUSTED AS PER FINAL RCP LAYOUT AT SITE.
9. AIR TRANSFER GRILLE/ UNDER CUT SHALL BE PROVIDE -
AT THE BOTTOM OF THE EACH TOILET BY OTHER AGENCY.
10. THE AHU /FCU IN FALSE CEILING IS REQUIRED
ACCESS DOOR

HVAC LEGENDS:
VOLUME CONTROL DAMPER
SUPPLY AIR DUCT
RETURN AIR DUCT
FRESH AIR DUCT
ACOUSTIC INSULATION
15A PLUG & SOCKET, 1 - PHASE
HVAC ELECTRICAL PANEL
DUCT FLEXIBLE CONNECTOR
DOWN THROW GRILLE
SIDE THROW GRILLE
CHILLED WATER S/R PIPE
DRAIN PIPE
AIR TIGHT PARTITION
CHW RISER-1 CHW RISER-2 S FOR
UNIT
T D OOR SUPPLY AIR DIFFUSER
U
FRESH & EX. AIR DUCT 1# O ICE OOR
FROM GROUND , FIRST & FRESH & EX. AIR DUCT OFF IRST FL RETURN AIR DIFFUSER
SECOND FLOOR FROM GROUND , FIRST & AT F
SECOND FLOOR

EXPANSION TANK
500 LITERS

FOUNDATION-850X850X250H

USE EXISTING UNIT


USE EXISTING UNIT
1# O
Int. S UTDOO
AT F t. Conc. R UNITS 175.
2
IRST C
FLO ell
FOR AIR 73.0 USGPM
OR CHWSEPARA TR
SYS T
TR

TEM OR FOR
4.00

FOU
ND.-
600X
600X
250H
144.
0
60.0 USGPM
319. TR
2 GPM
133. USGPM 223.2 R
0 TR T
93.0

2# A
SIZE IR COOL D11
110 -4100X2 ED CH W7
W7
1# WTR EACH250 X25ILLER
ORK 0
ING ( ACTU 0H
+1# A
STA L ) D11
2# CHW HORIZONTAL TYPE
ND B
Y PRIMARY PUMP
2250

264 USGPM
WOR
K
SIZE-1000X650X630 H
ING ( 1 WORKING +1 STAND BY )
MOTOR-11.0 KW / 30 M. HEAD
1500

STAN
D BY REV. DATE DESCRIPTION BY
4100
1500 0 25-5-23 HVAC DRAWING FOR APPROVAL SK

4100 1 11-7-23 REVISED AS PER CLIENT COMMENTS SK

1500

CLIENT
CENTRAL UNIVERSITY RAJASTHAN
PROJECT

CENTRAL UNIVERSITY RAJASTHAN


AT BANDER SINDRI, KISHANGARH.
ARCHITECTS:-

C. P. KUKREJA ASSOCIATES
ASHIRWAD BUILDING,
D-1,GREEN PARK,
NEW DELHI - 110016
PHONE :- 011 26863953 FAX :- 011 26865770
[email protected]

ADMIN BLOCK

DRAWING TITLE

HVAC LAYOUT TERRACE, ADMIN BLOCK


CENTRAL UNIVERSITY RAJASTHAN